TIME SCHEDULE PEKERJAAN RENOVASI RUANG KERJA BSM FRD GEDUNG GRAHA MANDIRI LANTAI 10 JL. IMAM BONJOL NO. 61 JAKARTA NO JENIS PEKERJAAN DURASI M3 (22/0 A PEKERJAAN PERSIAPAN B PEKERJAAN BONGKARAN C PEKERJAAN DINDING D PEKERJAAN LANTAI E PEKERJAAN INSTALASI LISTRIK, LAN DAN TELEPON F PEKERJAAN LAIN-LAIN
-
Upload
areef-rahman-s -
Category
Documents
-
view
8 -
download
0
description
Time Schedule
Transcript of Time Schedule
TIME SCHEDULE PEKERJAANRENOVASI RUANG KERJA BSM FRD
GEDUNG GRAHA MANDIRI LANTAI 10JL. IMAM BONJOL NO. 61JAKARTA
NO JENIS PEKERJAAN DURASI AGUSTUS
M3 (22/08/14-24/08/14)
A PEKERJAAN PERSIAPANB PEKERJAAN BONGKARAN C PEKERJAAN DINDINGD PEKERJAAN LANTAIE PEKERJAAN INSTALASI LISTRIK, LAN DAN TELEPON
F PEKERJAAN LAIN-LAIN
AGUSTUS SEPTEMBER
M3 (22/08/14-24/08/14) M4 (29/08/14-31/08/14) M1 (05/09/14-07/09/14) M2 (12/09/14-14/09/14)