Time Schedule

2
TIME SCHEDULE PEKERJAAN RENOVASI RUANG KERJA BSM FRD GEDUNG GRAHA MANDIRI LANTAI 10 JL. IMAM BONJOL NO. 61 JAKARTA NO JENIS PEKERJAAN DURASI M3 (22/0 A PEKERJAAN PERSIAPAN B PEKERJAAN BONGKARAN C PEKERJAAN DINDING D PEKERJAAN LANTAI E PEKERJAAN INSTALASI LISTRIK, LAN DAN TELEPON F PEKERJAAN LAIN-LAIN

description

Time Schedule

Transcript of Time Schedule

Page 1: Time Schedule

TIME SCHEDULE PEKERJAANRENOVASI RUANG KERJA BSM FRD

GEDUNG GRAHA MANDIRI LANTAI 10JL. IMAM BONJOL NO. 61JAKARTA

NO JENIS PEKERJAAN DURASI AGUSTUS

M3 (22/08/14-24/08/14)

A PEKERJAAN PERSIAPANB PEKERJAAN BONGKARAN C PEKERJAAN DINDINGD PEKERJAAN LANTAIE PEKERJAAN INSTALASI LISTRIK, LAN DAN TELEPON

F PEKERJAAN LAIN-LAIN

Page 2: Time Schedule

AGUSTUS SEPTEMBER

M3 (22/08/14-24/08/14) M4 (29/08/14-31/08/14) M1 (05/09/14-07/09/14) M2 (12/09/14-14/09/14)