PERBANDINGAN ESTIMASI BIAYA ANTARA PONDASI TIANG
PANCANG DENGAN PONDASI TELAPAK KOMBINASI
SUMURAN PADA PEMBANGUNAN GEDUNG 5 (LIMA) LANTAI
SKRIPSI
MAMAN SUDARMAN
1203010016
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH PURWOKERTO
2016
iii
PERBANDINGAN ESTIMASI BIAYA ANTARA PONDASI TIANG
PANCANG DENGAN PONDASI TELAPAK KOMBINASI
SUMURAN PADA PEMBANGUNAN GEDUNG 5 (LIMA) LANTAI
SKRIPSI
Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar Sarjana Teknik
MAMAN SUDARMAN
1203010016
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH PURWOKERTO
AGUSTUS 2016
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
iv
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
v
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
vi
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
vii
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
viii
MOTTO
“Yen keuyeung tangtu pareung”
Artinya :
“Selama kita masih mau dan terus berusaha, pasti usaha itu akan membuahkan hasil
cepat atau lambat”
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
ix
PERSEMBAHAN
Puji syukur kehadirat Allah SWT yang telah melimpahkan rahmat dan hidayah-
Nya sehingga skripsi yang berjudul “Perbandingan Estimasi Biaya Antara Pondasi
Tiang Pancang Dengan Pondasi Telapak Kombinasi Sumuran Pada Pembangunan
Gedung 5 (lima) Lantai“ dapat terselesaikan.
Penulis menyadari terselesaikannya skripsi ini tidak lepas dari bantuan banyak
pihak, maka rasa terima kasih penulis persembahkan kepada :
1. Bapak, ibu dan adik tercinta.
2. Nani Sri Mulyani dan seluruh keluarga tercinta.
3. Dosen pembimbing Bapak Amris Azizi, S.T.,M.Si. dan M. Agus Salim. A,
S.T.,M.T.
4. Teman-teman teknik sipil khususnya teman-teman seperjuangan yaitu Teknik Sipil
angkatan 2012.
5. Teman-teman yang tergabung dalam “sahabat Clan Indo Alcander”.
6. Keluarga besar KKN Tunas Alamanda XVII 2015.
7. Dan semua pihak yang ikut membantu dalam penulisan skripsi ini yang tidak dapat
penulis sebutkan satu-persatu.
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
x
KATA PENGANTAR
السالم عليكم ورحمة هللا وبركاته
Puji syukur alhamdulillah penulis panjatkan kehadirat Allah SWT atas berkat,
rahmat, taufik dan hidayah-Nya, penyusunan skripsi yang berjudul “Perbandingan
Estimasi Biaya Antara Pondasi Tiang Pancang Dengan Pondasi Telapak Kombinasi
Sumuran Pada Pembangunan Gedung 5 (lima) Lantai” dapat diselesaikan dengan
baik.
Penulis menyadari bahwa dalam proses penulisan skripsi ini banyak mengalami
kendala, namun berkat bantuan, bimbingan, kerjasama dari berbagai pihak dan berkah
dari Allah SWT sehingga kendala-kendala yang dihadapi tersebut dapat diatasi. Untuk itu
penulis menyampaikan ucapan terima kasih dan penghargaan kepada Bapak Amris Azizi,
S.T.,M.Si. selaku dosen pembimbing I dan Bapak M.Agus Salim. A, S.T.,M.T. selaku
dosen pembimbing II yang telah dengan sabar, tekun, tulus dan ikhlas meluangkan
waktu, tenaga dan pikiran memberikan bimbingan, motivasi, arahan, dan saran-saran
yang sangat berharga kepada penulis selama menyusun skripsi.
Selanjutnya ucapan terima kasih penulis sampaikan pula kepada:
1. Bapak Dr. H. Syamsudi Irsyad, S.H., M.H selaku Rektor Universitas
Muhammadiyah Purwokerto atas segala kebijaksanaan dan perhatian sehingga
peneliti dapat menyusun skripsi ini dengan baik.
2. Bapak M. Taufik Tamam, S.T.,M.T. selaku Dekan Fakultas Teknik Universitas
Muhammadiyah Purwokerto
3. Bapak M. Agus Salim. A, S.T.,M.T. selaku ketua Program Studi Teknik Sipil
Universitas Muhammadiyah Purwokerto yang telah memberikan dorongan dan
semangat untuk segera menyelesaikan penyusunan tugas akhir ini.
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xi
4. Seluruh staf pengajar, Bapak dan Ibu Dosen Program Studi Teknik Sipil khususnya
yang telah memberi bekal ilmu pengetahuan sehingga penulis dapat menyelesaikan
studi dan menyelesaikan penulisan tugas akhir ini.
5. Seluruh staf Tata Usaha Universitas Muhammadiyah Purwokerto yang telah
membantu dalam kelancaran administrasi.
6. Kedua orang tua, Nani Sri Mulyani dan Saudara terdekat yang selalu mendo’akan
dan memberikan dukung baik moral maupun materil, nasehat dan motivasinya yang
tidak terbatas sehingga peneliti selalu bersemangat dan optimis dalam menghadapi
setiap masalah.
7. Rekan-rekan Mahasiswa Program Studi Teknik Sipil yang telah banyak
memberikan masukan kepada penulis baik selama dalam mengikuti perkuliahan
maupun dalam penulisan skripsi ini.
8. Semua pihak yang tidak dapat penulis sebut satu persatu yang telah membantu
dalam penyelesaian penulisan tugas akhir ini.
Akhirnya, dengan segala kerendahan hati penulis menyadari masih banyak terdapat
kekurangan-kekurangan, sehingga penulis mengharapkan adanya saran dan kritik yang
bersifat membangun demi kesempurnaan skripsi ini.
و السالم عليكم ورحمة هللا وبركاته
Purwokerto, 11 Agustus 2016
Penulis,
Maman Sudarman
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xii
PERBANDINGAN ESTIMASI BIAYA ANTARA PONDASI TIANG PANCANG
DENGAN PONDASI TELAPAK KOMBINASI SUMURAN PADA
PEMBANGUNAN GEDUNG 5 (LIMA) LANTAI
Maman Sudarman1, Amris Azizi2 , M. Agus Salim. A3
ABSTRAK
Biaya dan waktu pekerjaan menjadi salah satu faktor penting dalam
mempertimbangkan pemilihan jenis pondasi selain dari pertimbangan daya dukung tanah
dan kedalaman muka air tanah (MAT). Pekerjaan konstruksi bangunan membutuhkan
suatu struktur yang kuat dan juga effisien dalam hal kebutuhan biaya serta effektif dalam
hal waktu pekerjaan. Penelitian ini bertujuan untuk menganalisis perbandingan biaya dan
waktu pekerjaan antara pondasi tiang pancang dan pondasi telapak kombinasi sumuran
pada pembangunan Gedung 5 (lima) lantai. Biaya dan waktu pekerjaan dianalisis dengan
menggunakan metode dan koeffisien pekerja dari Standar Nasional Indonesia (SNI 7394-
2008). Jumlah pekerja disamakan untuk semua pekerjaan pondasi yang diambil dari
jumlah pekerja minimal yang dibutuhkan untuk pekerjaan pondasi tiang pancang. Dari
hasil analisis didapatkan biaya untuk pekerjaan pondasi tiang pancang sebesar Rp
1.033.335.049,62 dengan waktu pekerjaan selama 167 hari. Untuk pekerjaan pondasi
telapak kombinasi sumuran dibutuhkan biaya sebesar Rp 860.476.416 dengan waktu
pelaksanaan 268 hari. Sehingga diperoleh perbedaan biaya antara pondasi tiang pancang
dan pondasi telapak kombinasi sumuran sebesar Rp 172.858.633,19 dan perbedaan waktu
antara pondasi tiang pancang dan pondasi telapak kombinasi sumuran adalah sebesar 101
hari.
Kata kunci : Estimasi Biaya, Pondasi tiang pancang, pondasi telapak, pondasi sumuran
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xiii
A COMPARISO OF COST ESTIMATION BETWEEN PILE FOUNDATION AND
PALM FOUNDATION WITH CAISSON COMBINATION ON FIVE-STORY
BUILDING
Maman Sudarman1, Amris Azizi2 , M. Agus Salim. A3
ABSTRACT
Cost and time work become an important factor in considering the choice of
foundation apart from considerations soil bearing capacity and depth of the groundwater
table (MAT). Building construction work requires a strong structure and also efficient in
terms of the need for cost effective in time and work. This study aimed to analyze the cost
and time comparison between the work of the pile foundation and footplate with caisson
combination on the construction of five-story building. Cost and time of work analyzed
using the methods and coefficients of workers from the Indonesian National Standard
(SNI 739-2008). The number of workers equated to all the foundation work which were
drawn from a minimum number of workers required for the job pile foundation. From the
analysis, the cost for pile foundation was Rp 1,033,335,049.62 in 167 days of work. For
footplate foundation with caisson combination required a cost of Rp 860,476,416.43 in
268 days of work. Thus, the diffrence costs between the pile foundation and footplate
foundation with caisson combinations was Rp 172,858,633.19 and the time difference
was 101 days.
Keyword : Cost estimation, Pile foundation, Footplate foundation, Caisson
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xiv
DAFTAR ISI
HALAMAN JUDUL .................................................................................................... III HALAMAN PERSETUJAN ......................... ERROR! BOOKMARK NOT DEFINED.
HALAMAN PENGESAHAN ........................................................................................ V HALAMAN PERNYATAAN ORISINALITSAS ....................................................... V HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI................................. VI MOTTO ..................................................................................................................... VIII
PERSEMBAHAN ......................................................................................................... IX KATA PENGANTAR .................................................................................................... X ABSTRAK ................................................................................................................... XII ABSTRACT ............................................................................................................... XIII DAFTAR ISI ............................................................................................................... XIV DAFTAR TABEL .................................................................................................... XVII DAFTAR GAMBAR .................................................................................................. XIX DAFTAR LAMPIRAN ............................................................................................... XX BAB I PENDAHULUAN ................................................................................................ 1 A. LATAR BELAKANG ............................................................................................. 1 B. RUMUSAN MASALAH ......................................................................................... 3
C. TUJUAN PENELITIAN ......................................................................................... 3 D. MANFAAT PENELITIAN .................................................................................... 3 E. BATASAN PENELITIAN ...................................................................................... 4 BAB II LANDASAN TEORI DAN TINJAUAN PUSTAKA ...................................... 5 A. LANDASAN TEORI ............................................................................................... 5
1. Daya Dukung Tanah ......................................................................................... 5 a. Daya Dukung Tanah Pada Tanah Granuler .......................................... 10 b. Daya Dukung Tanah Pada Tanah Kohesif ............................................ 14
2. Pembebanan Pondasi ...................................................................................... 17 a. Pembebanan Pondasi Tiang .................................................................. 18 b. Pembebanan Pondasi Telapak ............................................................... 20
c. Pembebanan Pondasi Sumuran ............................................................. 22
3. Perancangan Pondasi ...................................................................................... 23 a. Perancangan Pondasi Tiang .................................................................. 24 b. Perancangan Pondasi Telapak ............................................................... 40
c. Perancangan Pondasi Sumuran ............................................................. 51 4. Perhitungan Waktu Pekerjaan ........................................................................ 56 5. Material Pondasi ............................................................................................. 57
a. Bahan..................................................................................................... 57 b. Mutu Bahan ........................................................................................... 58
6. Perhitungan Anggaran Biaya Pekerjaan ......................................................... 58 a. Rencana Anggaran Biaya Pekerjaan Pondasi Tiang ............................. 59
b. Rencana Anggaran Biaya Pekerjaan Pondasi Telapak.......................... 60 c. Rencana Anggaran Biaya Pekerjaan Pondasi Sumuran ........................ 60
7. Faktor Aman ................................................................................................... 61
B. TINJAUAN PUSTAKA ........................................................................................ 61 BAB III METODE PENELITIAN .............................................................................. 65
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xv
A. OBJEK PENELITIAN ......................................................................................... 65 B. JENIS PENELITIAN ........................................................................................... 65 C. TAHAP PENELITIAN ......................................................................................... 66
1. Survey Pendahuluan ....................................................................................... 66 2. Metode Perolehan Data .................................................................................. 66 3. Perancangan Pondasi ...................................................................................... 67 4. Analisis Data .................................................................................................. 67 5. Penyajian Laporan .......................................................................................... 68
D. DIAGRAM ALUR PENELITIAN ...................................................................... 68 BAB IV HASIL DAN PEMBAHASAN ....................................................................... 69 A. DATA TANAH ...................................................................................................... 69 B. DATA STRUKTUR .............................................................................................. 69
1. Data Dimensi Kolom dan Reaksi Tumpuan ................................................... 70 2. Data Dimensi Pondasi Tiang Pancang............................................................ 71
C. PERANCANGAN ................................................................................................. 72 1. Daya Dukung Tanah dan Daya Dukung Bahan Pondasi ................................ 72
a. Daya Dukung Pondasi Tiang Pancang (Qa) .......................................... 74 b. Daya Dukung Pondasi Kombinasi (Qa) ................................................ 75
2. Pondasi Tiang Pancang ................................................................................... 77
a. Tahanan Aksial Tiang Pancang (Pn) ..................................................... 77 b. Tahanan Lateral Tiang Pancang (Hn) .................................................... 77 c. Jumlah Tiang Pancang (n) ..................................................................... 79 d. Susunan Tiang Pancang ........................................................................ 79 e. Gaya Aksial Tiang Pancang .................................................................. 81 f. Gaya Lateral Tiang Pancang ................................................................. 82 g. Tinjauan Geser ...................................................................................... 83 h. Penulangan pilecap................................................................................ 85
3. Pondasi Telapak .............................................................................................. 88 a. Kedalaman pondasi telapak (Df) ........................................................... 88 b. Dimensi Pondasi Telapak ...................................................................... 88
c. Kontrol tegangan tanah (q).................................................................... 90 d. Tinjauan Geser ...................................................................................... 91 e. Penulangan Telapak .............................................................................. 92
4. Pondasi Sumuran ............................................................................................ 96
a. Dimensi Rencana Pondasi Sumuran ..................................................... 96 b. Penyaluran beban (PN) .......................................................................... 97 c. Kontrol pondasi sumuran ...................................................................... 97 d. Daya dukung akibat pembebanan ......................................................... 98 e. Penulangan pondasi sumuran ................................................................ 99
D. ANALISIS RENCANA ANGGARAN BIAYA ................................................ 100 1. Pondasi Tiang Pancang ................................................................................. 100
a. Biaya Mobilisasi dan Demobilisasi ..................................................... 100 b. Biaya Pilecap ....................................................................................... 101 c. Biaya Tiang Pancang........................................................................... 101
2. Pondasi Kombinasi ....................................................................................... 102
a. Biaya Telapak...................................................................................... 102
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xvi
b. Biaya Sumuran .................................................................................... 102
E. ANALISIS RENCANA WAKTU PEKERJAAN ............................................. 103 1. Pondasi Tiang Pancang ................................................................................. 103
a. Waktu Pekerjaan Mobilisasi dan Demobilisasi................................... 103 b. Waktu Pekerjaan Pilecap..................................................................... 104 c. Waktu Pekerjaan Tiang Pancang ........................................................ 104
2. Pondasi Kombinasi ....................................................................................... 105 a. Waktu Pekerjaan Telapak ................................................................... 105
b. Waktu Sumuran ................................................................................... 105
BAB V PENUTUP ....................................................................................................... 106 A. KESIMPULAN .................................................................................................... 106 B. SARAN ................................................................................................................. 107 DAFTAR PUSTAKA .................................................................................................. 108
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xvii
DAFTAR TABEL
Tabel 2.1 Konsistensi tanah berdasarkan hasil sondir ................................................. 5
Tabel 2.2 Nilai fs menurut Terzaghi ............................................................................. 6
Tabel 2.3 Nilai untuk tanah keadaan asli dilapangan. .................................................. 7
Tabel 2.4 Berat jenis tanah (gravity spesific) .............................................................. 8
Tabel 2.5 Penentuan faktor aman ............................................................................... 61
Tabel 4.1 Data hasil sondir......................................................................................... 69
Tabel 4.2 Pengelompokan rekasi tumpuan ................................................................ 70
Tabel 4.3 Dimensi kolom ........................................................................................... 70
Tabel 4.4 Spesifikasi pondasi tiang pancang ............................................................. 71
Tabel 4.5 Daya dukung tanah pondasi tiang pancang ................................................ 74
Tabel 4.6 Daya dukung bahan tiang pancang ............................................................ 75
Tabel 4.7 Daya dukung pondasi tiang pancang dari hasil sondir ............................... 75
Tabel 4.8 Daya dukung tanah pondasi sumuran ........................................................ 76
Tabel 4.9 Daya dukung bahan pondasi sumuran ....................................................... 77
Tabel 4.10 Tahanan lateral berdasarkan defleksi tiang maksimum ........................... 78
Tabel 4.11 Tahanan lateral berdasarkan momen maksimum ..................................... 78
Tabel 4.12 Jumlah dan kapasitas dukung tiang pancang ........................................... 79
Tabel 4.13 Dimensi pilecap dan susunan pondasi tiang pancang tipe A ................... 80
Tabel 4.14 Dimensi pilecap dan susunan pondasi tiang pancang tipe B ................... 81
Tabel 4.15 Dimensi pilecap dan susunan pondasi tiang pancang tipe C ................... 81
Tabel 4.16 Berat tanah dan berat pilecap ................................................................... 82
Tabel 4.17 Gaya aksial pada tiang pancang ............................................................... 82
Tabel 4.18 Gaya lateral pada tiang pancang arah x dan arah y .................................. 83
Tabel 4.19 Gaya lateral pada tiang pancang .............................................................. 83
Tabel 4.20 Tinjauan geser arah x pondasi tiang pancang .......................................... 84
Tabel 4.21 Tinjauan geser arah y pondasi tiang pancang .......................................... 84
Tabel 4.22 Tinjauan geser pons pondasi tiang pancang ............................................. 85
Tabel 4.23 Tulangan lentur arah x pondasi tiang pancang ......................................... 85
Tabel 4.24 Tulangan lentur arah y pondasi tiang pancang ......................................... 86
Tabel 4.25 Tulangan susut arah x pondasi tiang pancang .......................................... 86
Tabel 4.26 Tulangan susut arah y pondasi tiang pancang .......................................... 87
Tabel 4.27 Dimensi pondasi telapak .......................................................................... 89
Tabel 4.28 Tegangan tanah pondasi telapak .............................................................. 90
Tabel 4.29 Tinjauan geser arah x pondasi telapak ..................................................... 91
Tabel 4.30 Tinjauan geser arah y pondasi telapak ..................................................... 92
Tabel 4.31 Tinjauan geser pons pondasi telapak ....................................................... 92
Tabel 4.32 Tulangan lentur arah x pondasi telapak ................................................... 93
Tabel 4.33 Tulangan lentur arah y pondasi telapak ................................................... 93
Tabel 4.34 Tulangan susut arah x pondasi telapak .................................................... 94
Tabel 4.35 Tulangan susut arah y pondasi telapak .................................................... 94
Tabel 4.36 Dimensi pondasi sumuran ........................................................................ 96
Tabel 4.37 Penyaluran beban pondasi sumuran ......................................................... 97
Tabel 4.38 Kesetabilan terhadap guling ..................................................................... 98
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xviii
Tabel 4.39 Kesetabilan terhadap geser....................................................................... 98
Tabel 4.40 Tegangan pondasi sumuran ...................................................................... 99
Tabel 4.41 Kebutuhan tulangan pondasi sumuran ..................................................... 99
Tabel 4.42 Biaya sewa pekerjaan tiang pancang .................................................... 100
Tabel 4.43 Biaya pekerjaan pilecap ........................................................................ 101
Tabel 4.44 Biaya tiang pancang .............................................................................. 101
Tabel 4.45 Biaya pekerjaan pondasi telapak ........................................................... 102
Tabel 4.46 Biaya pekerjaan pondasi sumuran......................................................... 102
Tabel 4.47 Waktu pekerjaan mobilisasi dan demobilisasi ...................................... 103
Tabel 4.48 Waktu pekerjaan pilecap ....................................................................... 104
Tabel 4.49 Waktu pekerjaan tiang pancang ............................................................ 104
Tabel 4.50 Waktu pekerjaan pondasi telapak ......................................................... 105
Tabel 4.51 Waktu pekerjaan pondasi sumuran ....................................................... 105
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xix
DAFTAR GAMBAR
Gambar 2.1 Klasifikasi tanah berdasarkan uji sondir .................................................. 7
Gambar 2.2 Hubungan sudut gesek dalam puncak (φ) dan qc ..................................... 8
Gambar 2.3 Faktor nilai Nq Nc Nγ ............................................................................... 12
Gambar 2.4 Faktor kapasitas dukung Nc .................................................................... 15
Gambar 2.5 Pengaruh eksentrisitas dengan beban vertikal ........................................ 21
Gambar 2.6 Model susunan tiang............................................................................... 29
Gambar 2.7 Tinjauan geser arah x ............................................................................. 31
Gambar 2.8 Tinjauan geser arah y ............................................................................. 33
Gambar 2.9 Tinjauan geser dua arah.......................................................................... 34
Gambar 2.10 Tulangan lentur arah x.......................................................................... 36
Gambar 2.11 Tulangan lentur arah y.......................................................................... 38
Gambar 2.12 Desain penulangan pilecap ................................................................... 39
Gambar 2.13 Perbedaan elevasi antara dua pondasi yang berdekatan ....................... 41
Gambar 2.14 Kontrol tegangan tanah ........................................................................ 41
Gambar 2.15 Tinjauan geser arah x ........................................................................... 43
Gambar 2.16 Tinjauan geser arah y ........................................................................... 45
Gambar 2.17 Tinjauan geser dua arah (pons) ............................................................ 46
Gambar 2.18 Tulangan lentur arah x.......................................................................... 48
Gambar 2.19 Tulangan lentur arah y.......................................................................... 50
Gambar 2.20 Desain penulangan pondasi telapak ..................................................... 51
Gambar 2.21 Perletakan posisi pondasi sumuran ...................................................... 54
Gambar 2.22 Penulangan pondasi sumuran ............................................................... 56
Gambar 3.1 Diagram alur penelitian .......................................................................... 68
Gambar 4.1 Kolom tipe A, tipe B dan tipe C ............................................................. 71
Gambar 4.2 Susunan tiang pancang Tipe A ............................................................... 80
Gambar 4.3 Susunan tiang pancang Tipe B ............................................................... 80
Gambar 4.4 Susunan tiang pancang Tipe C ............................................................... 81
Gambar 4.5 Desain penulangan pondasi tiang Tipe A ............................................... 87
Gambar 4.6 Desain penulangan pondasi tiang Tipe B ............................................... 88
Gambar 4.7 Desain penulangan pondasi tiang Tipe C ............................................... 88
Gambar 4.8 Desain pondasi telapak tipe A ................................................................ 89
Gambar 4.9 Desain pondasi telapak tipe B ................................................................ 89
Gambar 4.10 Desain pondasi telapak tipe C .............................................................. 90
Gambar 4.11 Desain penulangan pondasi telapak Tipe A ......................................... 95
Gambar 4.12 Desain penulangan pondasi telapak Tipe B ......................................... 95
Gambar 4.13 Desain penulangan pondasi telapak Tipe C ......................................... 95
Gambar 4.14 Desain pondasi sumuran ...................................................................... 96
Gambar 4.15 Desain penulangan pondasi sumuran ................................................ 100
Perbandingan Estimasi Biaya..., Maman Sudarman, Fakultas Teknik UMP, 2016
xx
DAFTAR LAMPIRAN
Lampiran 1 ................................................................................................................. 110
Lampiran 2 ................................................................................................................. 111
Lampiran 3 ................................................................................................................. 112
Lampiran 4 ................................................................................................................. 113
Lampiran 5 ................................................................................................................. 114
Lampiran 6 ................................................................................................................. 115