Sistem Perencanaan dan Pengendalian Proyek

9
TUGAS SI-5152 SISTEM PERENCANAAN DAN PENGENDALIAN PROYEK DOSEN PENGASUH : PROF.DR.IR. RIZAL Z TAMIN DISUSUN OLEH: NAMA : ANNA ELVARIA NIM : 25014017 FAKULTAS TEKNIK SIPIL DAN LINGKUNGAN PROGRAM MAGISTER TEKNIK SIPIL INSTITUT TEKNOLOGI BANDUNG 2014

description

Tugas Kuliah

Transcript of Sistem Perencanaan dan Pengendalian Proyek

  • TUGAS SI-5152SISTEM PERENCANAAN DAN PENGENDALIAN

    PROYEK

    DOSEN PENGASUH :PROF.DR.IR. RIZAL Z TAMIN

    DISUSUN OLEH:NAMA : ANNA ELVARIANIM : 25014017

    FAKULTAS TEKNIK SIPIL DAN LINGKUNGANPROGRAM MAGISTER TEKNIK SIPILINSTITUT TEKNOLOGI BANDUNG

    2014

  • WORK BREAKDOWN STRUCKTURE AND ORGANZATION BREAKDOWN

    WORK BREAKDOWN STRUCKTURE (WBS)

    1. PROYEK PEMBANGUNAN GEDUNG

    2. PROYEK PEMBANGUNAN PLTU

    PROYEK PEMBANGUNAN GEDUNG

    SITE PREPARATION STRUKTUR

    1. GROUND ANCHORDAN PRESTRESS

    2. BAJA3. BEKISTING4. BETON

    SITEPREPARATION

    CIVILWORKS

    TURBINGENERATOR

    BOILERHOUSE

    PRESSUREPARTS

    1. STEAM DRUM2. ECONOMISER3. EVAPORATORS4. DOWNOOMERS5. SUPERHEATORS6. REHEATERS

    WORK BREAKDOWN STRUCKTURE AND ORGANZATION BREAKDOWN

    WORK BREAKDOWN STRUCKTURE (WBS)

    1. PROYEK PEMBANGUNAN GEDUNG

    2. PROYEK PEMBANGUNAN PLTU

    PROYEK PEMBANGUNAN GEDUNG

    STRUKTUR

    1. GROUND ANCHORDAN PRESTRESS

    2. BAJA3. BEKISTING4. BETON

    ARSITEKTUR

    1. PINTU DANJENDELA

    2. PASANGANDINDING

    3. KERAMIK, DLL

    MEKANIKAL DAN ELEKTRIKAL

    1. PLUMBING2. LIFT, DLL

    PROYEK PEMBANGUNAN PLTU

    TURBINGENERATOR

    STEAMGENERATOR(BOILER)

    PRESSUREPARTS

    1. STEAM DRUM2. ECONOMISER3. EVAPORATORS4. DOWNOOMERS5. SUPERHEATORS6. REHEATERS

    COALSYSTEM

    AIRSYSTEM

    BOILERCLEANINGSYSTEM

    COAL AND ASHHANDLINGSYSTEM

    WORK BREAKDOWN STRUCKTURE AND ORGANZATION BREAKDOWN

    WORK BREAKDOWN STRUCKTURE (WBS)

    1. PROYEK PEMBANGUNAN GEDUNG

    2. PROYEK PEMBANGUNAN PLTU

    MEKANIKAL DAN ELEKTRIKAL

    1. PLUMBING2. LIFT, DLL

    BOILERCLEANINGSYSTEM

    BALANCESYSTEM

    ELECTICALAND

    CONTROL

  • 3. PROYEK PEMBANGUNAN JEMBATAN

    4. PROYEK PEMBANGUNAN PLTA

    SITEPREPARATION

    POWERHOUSE

    WATERRESERVOIR

    PROYEK PEMBANGUNAN JEMBATAN

    ARSITEKTUR

    DESAINFISIK

    WARN

    A KAB

    EL

    TAMA

    N MED

    IAN JA

    LAN

    DESAINUTAMA

    RANG

    KA JE

    MBAT

    AN

    PONDASI

    3. PROYEK PEMBANGUNAN JEMBATAN

    4. PROYEK PEMBANGUNAN PLTA

    PROYEK PEMBANGUNAN PLTA

    WATERRESERVOIR WATERTURBIN

    1. SPIRAL CASE2. HEAD COVER3. GUIDE VANE4. STAY VANE5. RUNNER6. BEARING

    GENERATOR

    1. STATOR2. ROTOR3. EXCITER4. POROS5. KOPLING

    PROYEK PEMBANGUNAN JEMBATAN

    STRUKTUR

    PONDASI BETON

    UTILITAS

    LAMPUJALAN

    MEDIANJALAN

    3. PROYEK PEMBANGUNAN JEMBATAN

    4. PROYEK PEMBANGUNAN PLTA

    GENERATOR TRANSFORMATOR

    UTILITAS

    MEDIANJALAN TROTOAR

  • 5. PROYEK PEMBANGUNAN JALAN

    PROYEK PEMBANGUNAN JALAN

    LAPIS PERKERASAN

    LAPISANPONDASI

    LAPISANTENGAH

    ASPA

    L CON

    CRETE

    WEAR

    ING CO

    URE

    5. PROYEK PEMBANGUNAN JALAN

    PROYEK PEMBANGUNAN JALAN

    LAPIS PERKERASAN

    LAPISANASPAL

    DRAINASE

    LAMPUJALAN

    MEDIANJALAN

    5. PROYEK PEMBANGUNAN JALAN

    UTILITAS

    MEDIANJALAN TROTOAR

  • ORGANIZATION BREAKDOWN STRUCKTURE (OBS)

    1. PROYEK PEMBANGUNAN GEDUNG

    SITE MANAGERMEP

    SUPE

    RVISO

    R MEP

    HSEOFFICER

    HSE S

    UPER

    VISOR

    SITEMANAGER

    Q.SU

    PERV

    ISOR S

    TRUK

    TUR

    Q.SU

    PERV

    ISOR A

    RSITE

    KTUR

    Q.SU

    PERV

    ISOR M

    EP

    SURV

    EYOR

    ENGINEERING MANAGER

    SITE E

    NGINE

    ER AR

    SITEK

    TUR

    SITE E

    NGINE

    ER M

    EP

    BAR

    BEND

    ING SC

    HEDU

    LE

    SITE E

    NGINE

    ER ST

    RUKT

    UR

    DRAF

    TERA

    RSITE

    KTUR

    DRAF

    TERM

    EP

    DRAF

    TERS

    TRUK

    TUR

    PROJECT DIRECTOR

    PROJECT MANAGER

    QUALITY ASSURANCE MANAGER

    HEAD OFFICESITE OFFICE

    COMMERCIALMANAGER

    QUAN

    TITY S

    URVE

    YOR

    BUYER

    GAM-KASIR

    ADMI

    NISTR

    ATION

    STOCK

    KEEP

    ER

    ENGINEERINGMANAGER

    TUKA

    NG

    TUKA

    NG

    TUKA

    NG

  • 2. PROYEK PEMBANGUNAN PLTU

    PROJECT MANAGER

    HSE MANAGER

    HSE OFFICER

    QUALITY ASSURANCEMANAGER

    ADMINISTRATIONMANAGER

    GENE

    RAL A

    FFAIR

    ACCO

    UNTIN

    G

    SECUR

    ITY

    ENGINEERINGMANAGER

    CIVIL E

    NGINE

    ER

    MECH

    ANIC

    ENGIN

    EER

    ELECT

    RIC EN

    GINEER

    EQUIPMENTMANAGER

    EQUIP

    MENT

    ENGIN

    EER

    CIVIL E

    QUIPM

    ENT S

    UPER

    VISOR

    QUALITYCONTROL

    PLANN

    ING &

    SCHE

    DULIN

    G

    COST

    CONT

    ROL

    OPERATIONMANAGER

    CONT

    ROLR

    OOM

    OPER

    ATOR

    STEAM

    GEN

    ERAT

    EOPE

    RATO

    R

  • 3. PROYEK PEMBANGUNAN JEMBATAN

    ENGINEERINGMANAGER

    PROJECT MANAGER

    COST ANDQUANTITYENGINEER

    MATERIALENGINEER

    BRIDGEENGINEER

    GEODETICENGINEER

    HYDROLOGIENGINEER

    GEOTECHNICENGINEER

    ASS.BRIDGE

    ENGINEER

    ASS.GEODETICENGINEER

    ASS.HYDROLOGIENGINEER

    ASS.GEOTECHNICENGINEER

    ASS. COST ANDQUANTITYENGINEER

    ASS.MATERIALIENGINEER

    JURU UKURBURUH LAPANGAN

    SEKRETARISOPERATOR KOMP/CAD

    OFFICE BOY

    HSE MANAGER

    HSE OFFICER

    SITEMANAGER

  • 4. PROYEK PEMBANGUNAN PLTA

    PROJECT MANAGER

    HSE MANAGER

    HSE OFFICER

    QUALITY ASSURANCEMANAGER

    ADMINISTRATIONMANAGER

    GENE

    RAL A

    FFAIR

    ACCO

    UNTIN

    G

    SECUR

    ITY

    ENGINEERINGMANAGER

    CIVIL E

    NGINE

    ER

    MECH

    ANIC

    ENGIN

    EER

    ELECT

    RIC EN

    GINEER

    EQUIPMENTMANAGER

    EQUIP

    MENT

    ENGIN

    EER

    CIVIL E

    QUIPM

    ENT S

    UPER

    VISOR

    QUALITYCONTROL

    PLANN

    ING &

    SCHE

    DULIN

    G

    COST

    CONT

    ROL

    OPERATIONMANAGER

    CONT

    ROL R

    OOM

    OPER

    ATOR

    WATER T

    URBIN

    OPER

    ATOR

  • 5. PROYEK PEMBANGUNAN JALAN

    PROJECT MANAGER

    HSE MANAGER

    HSE OFFICER

    QUALITY ASSURANCEMANAGER

    ADMINISTRATIONMANAGER

    GENE

    RAL A

    FFAIR

    ACCO

    UNTIN

    G

    SECUR

    ITY

    HSEMANAGER

    HSE O

    FFICE

    R

    ENGINEERINGMANAGER

    SITE E

    NGINE

    ER AR

    SITEK

    TUR

    SITE E

    NGINE

    ER M

    E

    BAR

    BEND

    ING SC

    HEDU

    LE

    SITE E

    NGINE

    ER ST

    RUKT

    UR

    DRAF

    TERA

    RSITE

    KTUR

    DRAF

    TERM

    E

    DRAF

    TER S

    TRUK

    TUR

    TUKA

    NG

    TUKA

    NG

    TUKA

    NG

    SITEMANAGER

    Q. SU

    PERV

    ISOR S

    TRUK

    TUR

    Q. SU

    PERV

    ISOR A

    RSITE

    KTUR

    Q. SU

    PERV

    ISORM

    E

    SURV

    EYOR