SCHEDULE PENGADAAN DAN PEMASANGAN PLTS SHS 80 Wp
NO URAIAN Kuantitas Satuan Jangka Waktu Pelaksanaan (Minggu)1 2 3 4
A PENGADAAN MATERIAL UTAMA1 Module Surya 80Wp Monocristaline / Policristaline 199 bh2 Controller (BRC) 10A / 12 Volt 199 set3 Battery VRLA - GEL 80 AH 12 V 199 bh4 Kotak Battery / Peralatan 199 set5 Kabel Modul dan Kabel Battery 1393 mtr6 Kabel Kotak Peralatan / Controler ke Lampu 4975 mtr7 Kabel Kotak Peralatan / Controler ke Battery 398 mtr8 Lampu LED 5 Watt 12 Vdc dan Fitting E27 597 pcs9 Modul Support 199 set
10 Accessories 199 set
B JASA PENGIRIMAN DAN INSTALASI1 PENGIRIMAN SAMPAI LOKASI 199 set
2 PEMASANGAN DAN INSTALASI 199 set
C SERAH TERIMA
Jangka Waktu Pelaksanaan (Minggu)5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22