LEARNING OUTCOMES

Pada akhir pertemuan ini, diharapkan mahasiswa akan dapat menggunakan rumus dan menghitung rancangan konstruksi sambungan keling

Page 3: sambungan keling.ppt

3

OUTLINE MATERI

• Pengertian

• Metoda Pengelingan

• Tipe Sambungan Keling

• Desain Sambungan Keling

Page 4: sambungan keling.ppt

4

PENGERTIAN

Definition: Rivet is a short cylindrical bar with a head integral with it. The

cylindrical portion of the rivets is called shank or body and lower portion of shank is known as tail.

Rivets are usually made from steel, brass, alluminum, copper

Function:

The function of rivets in a joint is to make a connection that has strength and tightness.

Page 5: sambungan keling.ppt

5

CARA PENGELINGAN

Page 6: sambungan keling.ppt

6

TIPE SAMBUNGAN KELING

• Dua tipe sambungan– Lap Joint

• A lap joint is that in which one plate overlaps the other and the two plates are then riveted together.

– Butt Joint• A butt joint is that in which the main plates are

kept in allignment butting (touching) each other and a cover plate (strap) is placed either on one side or in both sides of the main plates.

– Single strap butt joint.– Double strap butt joint.

Page 7: sambungan keling.ppt

7

TIPE SAMBUNGAN KELING

• Jumlah Baris Pengelingan :– Single riveted joint.– Double riveted joint.

Page 8: sambungan keling.ppt

8

TIPE SAMBUNGAN KELING

Page 9: sambungan keling.ppt

9

MACAM PAKU KELING

Page 10: sambungan keling.ppt

10

• Pitch Jarak dari pusat satu keling ke pusat keling lainnya

yang sejajar, dinotasikan dengan p.• Diagonal Pitch

Jarak antara pusat keling pada baris berikutnya dari sambungan keling zig-zag

• Back PitchJarak tegak lurus diantara garis pusat dari baris

berikutnya, donotasikan dengan ps.

• Margin Merupakan jarak antara pusat dari lubang keling

dengan tepi dari pelat, notasi m.

DISAIN TEKNIS KELING

Page 11: sambungan keling.ppt

11

• Sambungan keling dapat rusak dengan beberapa cara:– Pinggiran pelat sobek. (m = 1.5 d)

PERHITUNGAN KEKUATAN

Page 12: sambungan keling.ppt

12

• Sobek melalui suatu baris keling

PERHITUNGAN KEKUATAN

Page 13: sambungan keling.ppt

13

Area sobekan per panjang pitch At = (p – d).t

• Ketahanan sobek per panjang pitch

Pt = ft. At

p = pitch dari kelingd = diameter kelingt = ketebalan plat

ft = tegangan tarik yg diijinkan dari bahan plat

PERHITUNGAN KEKUATAN

Page 14: sambungan keling.ppt

14

PERGESERAN PADA KELING

2

4dAs

nfdP ss2

4

Ketahanan geser keling per panjang pitch

Area geser per keling

Page 15: sambungan keling.ppt

15

PATAH (CRUSH) PADA KELING.

• Area patah per rivet

Ac = d.t

• Total area patah

Ac = n.d.t

• Ketahanan patah keling per panjang pitch

Pc = n d t fc

• n = jumlah keling per panjang pitch

• fc = tegangan patah yg diijinkan bahan keling

Page 16: sambungan keling.ppt

16

EFISIENSI SAMBUNGAN KELING

• Strength of The Riveted Joint Pt, Ps, Pc

• Strength of Plate, P = p x t x ft

• Efisiensi sambungan;

t

cst

ftP

PPP

..

,, ofLeast

Page 17: sambungan keling.ppt

17

EFISIENSI SAMBUNGAN

Lap Joint Effisiensi But joint (D strap)

Effisiensi

Single 45 – 60 Single 55 – 60

Double 63 – 70 Double 70 – 83

Triple 72 - 80 Triple 80 – 90

Quadruple 85 – 94

Page 18: sambungan keling.ppt

18

SAMBUNGAN KELING TANGKI

1. Penentuan tebal shell (silinder):

t = (P D) / ( 2 ft l) + 0,1 cm

t = tebal silinder,

P = tekanan dalam silinder

ft = tegangan tarik ijin

l = efisiensi sambungan las longitudinal (lihat tabel)

D = internal diameter silinder

Desain Longitudinal butt joint ( standard India)

Page 19: sambungan keling.ppt

19

2. Diameter lubang dan paku keling

d = 6 t 0,5 berlaku untuk d > 8 mm d = diameter lubang paku keling

t = tebal silinder• Untuk d< 8 mm, perhitungan dari beban geser• Diameter paku ditentukan dari diameter lubang (lihat tabel)

3. Perhitungan pitch (p)

p max = C t + 4,128 cm, C konstanta, tergantung jenis sambungan, lihat tabel

4. Perhitungan efisiensi sama dengan perhitungan efisiensi sambungan keling plat

SAMBUNGAN KELING TANGKI

Page 20: sambungan keling.ppt

20

Perhitungan lap joint circumferensial :

1. Perhitungan tebal silinder sama dengan untuk butt joint

longitudinal

2. Jumlah paku keling (n) :

n = (D/d)2 (P/fs)

3. Perhitungan Pitch , ditentukan dari pers h = (p-d)/ p

4. Jumlah baris

n/ {p (D +t)/ p}

SAMBUNGAN KELING TANGKI

Page 21: sambungan keling.ppt

21

PENUTUP