Rencana Profil Gording Bangunan Kantor

5
RENCANA PROFIL GORDING BANGUNAN KANTOR (K1) Jarak antar gording : 1,18 m Jarak antar kuda – kuda : 6,25 m Sudut kemiringan atap : 22º Penutup atap Asbes gelombang : 11 kg/m 2 Tekanan tiup angin : 40 kg/m 2 PROFIL GORDING Light Lip Channels 125 x 50 x 20 x 4,5 Ix = 238.10 4 mm 4 Zx = 38.10 3 mm 3 Iy = 33,5.10 4 mm 4 Zy = 10,1.10 3 mm 3 ANALISA BEBAN Beban mati : Berat gording = 8,32 kg/m Berat atap = 1,18 m x 11 kg/m 2 = 12,98 kg/m Q = 21,3 kg/m Beban hidup : Di tengah-tengah gording P = 100 kg Beban angin : Tekanan angin = 40 kg/m 2 Koefisien angin tekan = 0,02α – 0,4 = 0,02(22) – 0,4 = 0,04

Transcript of Rencana Profil Gording Bangunan Kantor

Page 1: Rencana Profil Gording Bangunan Kantor

RENCANA PROFIL GORDING BANGUNAN KANTOR (K1)

Jarak antar gording : 1,18 m

Jarak antar kuda – kuda : 6,25 m

Sudut kemiringan atap : 22º

Penutup atap Asbes gelombang : 11 kg/m2

Tekanan tiup angin : 40 kg/m2

PROFIL GORDING

Light Lip Channels 125 x 50 x 20 x 4,5

Ix = 238.104 mm4 Zx = 38.103 mm3

Iy = 33,5.104 mm4 Zy = 10,1.103 mm3

ANALISA BEBAN

Beban mati :

Berat gording = 8,32 kg/m

Berat atap = 1,18 m x 11 kg/m2

= 12,98 kg/m

Q = 21,3 kg/m

Beban hidup :

Di tengah-tengah gording P = 100 kg

Beban angin :

Tekanan angin = 40 kg/m2

Koefisien angin tekan = 0,02α – 0,4

= 0,02(22) – 0,4 = 0,04

Koefisien angin hisap = - 0,4

tekan = 0,04.(40 kg/m2).(1,18 m) = 1,888 kg/m

hisap = -0,4.(40 kg/m2).(1,18 m) = -18,88 kg/m

Page 2: Rencana Profil Gording Bangunan Kantor

Mencari momen-momen pada gording :

Pada arah sumbu lemah dipasang trekstang pada tengah bentang sehingga Ly = (0,5 x jarak kuda-kuda) = 3,125 m

Akibat beban mati :

q = 21,3 kg/m

qx = q.cos(22º) = 21,3 kg/m.cos(22º) = 19,749 kg/m

qy = q.sin(22º) = 21,3 kg/m.sin(22º) = 7,979 kg/m

Mx = 18

.(19,749).(6,25)2 = 96,431 kg.m

My = 18

.(7,979).(3,125)2 = 9,74 kg.m

Akibat beban hidup :

P = 100 kg

Mx = 14

.(P.cosα).Lx

= 14

.(100 kg.cos(22º)).6,25 m = 144,872 kg.m

My = 14

.(P.sinα).Ly

= 14

.(100 kg.sin(22º)).3,125 m = 29,266 kg.m

Page 3: Rencana Profil Gording Bangunan Kantor

Akibat angin :

Karena beban bekerja tegak lurus sumbu x sehingga hanya ada Mx

Angin tekan : Mx = 18

. ( t).(Lx)2

= 18

. (1,888 kg/m).(6,25 m)2 = 9,219 kg.m

Angin hisap : Mx = 18

. ( h).(Lx)2

= 18

. (-18,88 kg/m).(6,25 m)2 = -92,188 kg.m

Kombinasi Beban :

Kombinasi Beban arah x (kg.m) arah y (kg.m)1. U = 1,4 D 135,003 13,6362. U = 1,2 D + 0,5 La 188,153 26,3213. U = 1,2 D + 1,6 La 347,513 58,514 U = 1,2 D + 1,6 La + 0,8 W 354,888 58,5144. U = 1,2 D + 1,3 W + 0,5 La 200,138 26,3215. U = 0,9 D ± 1,3 W 98,772 8,766 74,803 8,766

Jadi Mux = 354,888 kg.m = 354,888.104 N.mm

Muy = 58,514 kg.m = 58,514.104 N.mm

Asumsikan penampang kompak

Mnx = Zx . fy = 38.103 mm3 . (240 MPa)

= 9,12.106 N.mm (OK)

Mny = Zy . fy = 10,1.103 mm3 . (240 MPa)

= 2,424.106 N.mm (OK)

Untuk mengantisipasi masalah puntir maka Mny dapat dibagi 2 sehingga :

M uxb .M nx

+ M uyb . M ny /2

≤1

Page 4: Rencana Profil Gording Bangunan Kantor

3 54 ,888 . 104 N . mm(0,9 ) .9,12.106 N . mm

+ 58 ,514 .104 N .mm(0,5 ) . (0,9 ) . 2,424.106 N . mm

≤ 1

0,969 ≤ 1 (OK)

`