Vol satuan harga
1 3 4 5 6 8
2.1.1
2.1.1.1 1 keg 1,290,000 1,290,000 1290000
2.1.1.2 46 HOK 90,000 4,140,000 4,140,000
2.1.1.3 35 HOK 80,000 2,800,000 2,800,000
2.1.1.4 44 HOK 80,000 3,520,000 3,520,000
2.1.1.5 72 HOK 85,000 6,120,000 6,120,000
2.1.1.6 111 HOK 80,000 8,880,000 8,880,000
2.1.1.7 70 HOK 70,000 4,900,000 4,900,000
2.1.1.8 25 hari 50,000 1,250,000 1,250,000
2.1.1.9 1 buah 85,000 85,000 85,000
2.1.1.10 1 bendel 52,810 52,810 52,810
33,037,810 33,037,810
ATK 0
Jumlah total belanja barang dan jasa
Pekerja 0
Sewa Molen 0
Papan informasi 0
Tukang kayu 0
Tukang gali 0
Tukang besi 0
Tukang batu 0
Honor Tim pelaksana kegiatan
HOK Kepala Tukang 0
Jumlah belanja di
tambah pajak
2 7 8
Belanja barang dan jasa
Kode Rek URAIANRINCIAN PERHITUNGAN
jumlah PPnharga satuan di tambah
pajak
Lokasi kegiatan Rt 4 - 6
SUMBER ANGGARAN ( DANA DESA) Keterangan
Bidang : Pembangunan Desa Rencana belanja atau pengeluaran
Jenis Keg : Pembangunan SPAL ( RT 04 - Rt 06 )
Volume : T 0,90 m x 0.90 m x P.195 m
RENCANA KERJA DAN ANGGARAN ( RKA) DESA
PEJAMBON KECAMATAN SUMBERREJO KABUPATEN BOJONEGORO
RKA - Pembangunan Desa
Anggaran : Rp. 129.075.900,-
2.1.1 vol satuan harga Jumlah Semester II
2.1.1.11 470 zak 45,000 21,150,000 23,545,000
2.1.1.12 450 btg 55,000 24,750,000 27,225,000
2.1.1.13 10 btg 25,000 250,000 273,000
2.1.1.14 60 m3 280,000 16,800,000 16,800,000
2.1.1.15 50 m3 300,000 15,000,000 1,500,000 16,500,000
2.1.1.16 240 btg 8,000 1,920,000 192,000 2,112,000
2.1.1.17 140 btg 21,500 3,010,000 301,000 3,311,000
2.1.1.18 18 lb 125,000 2,250,000 225,000 2,475,000
2.1.1.19 30 kg 19,000 570,000 627,000
2.1.1.20 47 kg 19,000 893,000 89,300 982,300
2.1.1.21 24 kg 23,000 552,000 55,200 607,200
2.1.1.22 5 rol 3,300 16,500 1,650 18,150
2.1.1.23 1 bh 600,000 600,000 60,000 660,000
2.1.1.24 13 bh 8,500 110,500 11,050 121,550
2.1.1.26 15 btg 22,300 334,500 33,450 367,950
2.1.1.27 4 rol 93,850 375,400 37,540 412,940
88,581,900 7,456,190 96,038,090
0 129,075,900
Pejambon, 5 januari 2017
No Nip
BENDAHARA DESA
NURUL ARIFIN
EVALUASI DAN VERIFIKASITanda Tangan
Nama Jabatan
Sufyan Plt. Sekreataris Desa
Plastik selasar 103,235
Jumlah total belanja Modal 0
Jumlah total belanja Modal dan jasa ( SPA L ) 874,350
Arco dorong 660,000
Timba Cor 9,350
Pipa pvc 2/3 24,530
Paku 7 cm dan 5 cm 20,900
Kawat ikat Galvanis 25,300
Benang 3,630
kayu usuk 3x5x1m 23,650
Triplek 1 cm 137,500
Bendrat 57,000 20,900
Pasir Cor 280,000
batu koral 330,000
kayu usuk 3x5x1 m 8,800
besi 10 mm 2,475,000 60,500
besi 6 mm 23,000 27,300
Belanja Modal ppn
Semen 2,395,000 50,096