Rencana kerja (1) (1)

26
Material Unit Jumlah Pekerjaan Air Conditioner AC Indoor unit 120 AC Outdoor Unit 13 Rerfnet bh 125 4 Way Cassete Panel bh 84 Pipa Dia m 1546.2 Pipa PVC btg 99 Fresh Air bh 6 Kabel NYM 3 x 2,5 mm m 1740 Kabel NYY 4 x 16 mm m 439.7 Instalasi Ducting 600 x 300 m 8.4 Instalasi Ducting 500 x 300 m 8.9 Instalasi Ducting 400 x 200 m 8.5 Instalasi Ducting 200 x 200 m 25.8 Instalasi Ducting 200 x 150 m 28 Instalasi Ducting 200 x 100 m 52 RAG 200 x 200 bh 47 Pekerjaan Plumbing Pekerjaan Utama Transfer Pump unit 2 Control Panel Automatic unit 1 Package Pump Booster unit 4 Gate Valve bh 6 Check Valve bh 1 Flexible Joint bh 3 Pipa PPR 80 set 1 Pipa PPR 50 m 62 Panel Pompa Transfer unit 1 Water Level Control set 1 Instalasi Air Bersih Pipa air bersih PPR ¢ 50 m 28 ¢ 40 m 40 ¢ 20 m 47.5 ¢ 15 m 60 Gate Valve dia 50 mm bh 8 Fiting - fiting Matrial Bantu ls 6 Tangki Air Fibreglass + Separator bh 1 Instalasi Air Kotor dan Bekas STP Biotechnology, Capasity 55 m3/day, Biofiltration System bh 1 Pipa Air Kotor & Bekas( PVC ) "AW" ¢ 100 m 470 ¢ 65 m 53 ¢ 50 m 30 Fitting & Material Bantu ls 5 - Accessories

description

rencana kerjaaa elktrikall engginering alm bobot

Transcript of Rencana kerja (1) (1)

Page 1: Rencana kerja (1) (1)

Material Unit Jumlah Total %

Pekerjaan Air Conditioner 7.689%AC Indoor unit 120AC Outdoor Unit 13Rerfnet bh 1254 Way Cassete Panel bh 84Pipa Dia m 1546.2Pipa PVC btg 99Fresh Air bh 6Kabel NYM 3 x 2,5 mm m 1740Kabel NYY 4 x 16 mm m 439.7Instalasi Ducting 600 x 300 m 8.4Instalasi Ducting 500 x 300 m 8.9Instalasi Ducting 400 x 200 m 8.5Instalasi Ducting 200 x 200 m 25.8Instalasi Ducting 200 x 150 m 28Instalasi Ducting 200 x 100 m 52RAG 200 x 200 bh 47

Pekerjaan Plumbing 1.114%Pekerjaan Utama Transfer Pump unit 2Control Panel Automatic unit 1Package Pump Booster unit 4Gate Valve bh 6Check Valve bh 1Flexible Joint bh 3Pipa PPR 80 set 1Pipa PPR 50 m 62Panel Pompa Transfer unit 1Water Level Control set 1

Instalasi Air Bersih 1.114%Pipa air bersih PPR¢ 50 m 28¢ 40 m 40¢ 20 m 47.5¢ 15 m 60Gate Valve dia 50 mm bh 8Fiting - fiting Matrial Bantu ls 6Tangki Air Fibreglass + Separator bh 1

Instalasi Air Kotor dan Bekas 1.114%STP Biotechnology, Capasity 55 m3/day, Biofiltration System bh 1Pipa Air Kotor & Bekas( PVC ) "AW"¢ 100 m 470¢ 65 m 53¢ 50 m 30Fitting & Material Bantu ls 5- Accessories

Page 2: Rencana kerja (1) (1)

Clean Out ¢ 100 bh 12Floor drain ¢ 100 bh 20Pipa vent ( PVC ) "D"¢ 50 m 31Fitting & Material Bantu ls 6Roof Drain ¢ 100 bh 24

Pekerjaan Hydran 3.968%DIESEL HYDRANT PUMP set 1ELECTRIC HYDRANT PUMP set 1JOCKEY HYDRANT PUMP set 1Panel Kontrol Unit 1Pressure Tank kap. 200 liter - 12 bar Unit 1Accessories- Pipa Black steel Sch 40 dia 100 mm m 12- Pipa Header dia 150 mm L = 4 m m 4- Gate Valve dia 100 mm bh 12- Gate Valve dia 65 mm bh 1- Check Valve dia 100 mm bh 1- Check Valve dia 65 mm bh 3- Stainer dia 100 mm bh 1- Flexible Connextion dia 100 mm bh 3- Flow meter dia 100mm bh 1- Foot Valve dia 100mm bh 1- Redukser 150 x 100 mm bh 1- Pressure Switch bh 3- Pressure Gauge bh 3- Strainer dia 40mm bh 1- Fleksibel conection dia 40mm bh 1- Fiting - fiting dan Matrial bantu ls 1- Testing Commusioning ls 1Rumah Genset dan Pompa lot 1 GWT Biotec kapasitas 60 m3 lot 1 Septiktank Biopro, 10 m3 lot 2

INSTALASI PIPA RISER- Pipa Black steel Sch 40 dia 100 mm m 28- Fiting - fiting Matrial Bantu lot 1Assesories 0- Gate Valve dia 100 mm bh 3- Automatic air vent dia 25 mm bh 3

INSTALASI PIPA HYDRAN Lantai Site plan- Pipa Black steel Sch 40 dia 100 mm m 178.6- Pipa Black steel Sch 40 dia 80 mm m 187.15- Pipa Black steel Sch 40 dia 65 mm m 264.8- Hydrant Pillar (HP), Two way type two ways set 5- Hose Rell Cabinet (HRC) type C set 5 Lengkap dgn 1 rol selang 1,5" 30 m' nozzle, accessories,dll 0- Siamesse Conection bh 1- Fiting - fiting Matrial Bantu ls 7- Indoor Hydrant Box Unit ( IHB ) Type A2 set 11

Page 3: Rencana kerja (1) (1)

Lengkap dgn 1 rol selang nozzle, hose, valve, accessories,dll

Pekerjaan Fire SprinklerPengadaan dan pemasangan pipa gip medium lengkapperalatan fitting, penggantung dll.¢ 100 m 167.5¢ 80 m 27.5¢ 65 m 45¢ 50 m 47.5¢ 40 m 50¢ 32 m 210¢ 25 m 935BCV lengkap unit 5¢ 80Sprinkler HeadType : upright bh 275

Pekerjaan Lift 2.142%PERALATAN UTAMAPassanger Lift 1000 Kg ex Mitshubishi leng Acc dan Instalasi unit 2Passenger Elefator Barang ex Mitshubishi leng Acc dan Instalasi set 1Biaya Pemasangan set 3Testing Commissioning ls 1

Pekerjaan Elektrikal 0.820%BIAYA PENYAMBUNGAN DAYA PLN ls 1

PEKERJAAN PERATAN UTAMA 3.865%PEKERJAAN TEGANGAN MENENGAHKabel dari gardu PLN ke MV - MDP -EN2XSEBY 3 X 120 mm² m 12Kabel dari MV-MDP-E kesisi primer trafo : N2xSY 3(1x95mm2) m 12Icoming Load Break switch cubicle, Type IM 630 A set 1Metering Cubicle set 1Instalasi Pembumian ls 1Testing dan commisioning ls 1Material bantu ls 1

Pekerjaan TransformatorTransformator 20 KV/380V-220V/50 Hz Kav. 800 KVA unit 1Instalasi pembumian ls 1Testing commisioning ls 1Material bantu ls 1

PEKERJAAN TEGANGAN RENDAHPANEL TEGANGAN RENDAH( LVMDP ) PHB UTR - 4 + ATS unit 1Panel Capasitor Bank 440 Kvar unit 1Panel kontrol Genset (PKG) + AMF unit 1PHB (PANEL HUBUNG BAGI ) unit 1Panel Penerangan Lantai Satu unit 1Panel Penerangan Lantai Dua unit 1

Page 4: Rencana kerja (1) (1)

Panel Penerangan Lantai Tiga unit 1Panel Penerangan Lantai Empat unit 1Panel Penerangan Lantai Lima unit 1Panel Penerangan Lantai Atap unit 1Panel Distribusi Out Door AC Lantai Tiga unit 1Panel Distribusi Out Door AC Lantai Atap unit 1Panel Distribusi AC Lantai Satu unit 1Panel Distribusi AC Lantai Dua unit 1Panel Distribusi AC Lantai Tiga unit 1Panel Distribusi AC Lantai Empat unit 1Panel Distribusi AC Lantai Lima unit 1Panel Distribusi AC Lantai Atap unit 1Panel Penerangan Jalan & Luar unit 1Panel Distribusi Pompa unit 1Panel Distribusi Elevator (Lift) unit 1

KABEL DISTRIBUSI TEGANGAN RENDAHKabel dari Trafo ke LVMDP m 8Kabel dari Genset ke LVMDP m 8Kabel dari LVMDP ke PHB m 45Kabel dari LVMDP ke PD.Pompa m 19Kabel dari LVMDP ke PP.Jalan m 12Kabel dari PHB 1 ke :Panel penerangan Lt. Satu m 6Panel penerangan Lt. Dua m 24Panel penerangan Lt. Tiga m 27.6Panel penerangan Lt. Empat m 31.2Panel penerangan Lt. Lima m 34.8Panel penerangan Lt. Atap m 46panel distribusi Aut Door AC Lt.3 m 27.6panel distribusi Aut Door AC Lt.A m 46panel distribusi AC lt. Satu m 6panel distribusi AC lt.Dua m 24panel distribusi AC lt. Tiga m 27.6panel distribusi AC lt. Emapt m 31.2panel distribusi AC lt. Lima m 34.8panel distribusi AC lt. Atap m 46

INSTALASI PEMBUMIAN TEGANGAN RENDAHBC 6 mm² m 120BC 150 mm² m 47Batang Pentanahan (Ground Rod) bh 12Matrial Bantu/ Tes Comisioning ls 1

PEK. INSTALASI PENERANGAN, FIXTURES & STOP KONTAK 1.425%- Lampu TBS 299 TL5 - 2 x 28 w M2 bh 353- Lampu TMS 012 TKI - TLD 2 x 36 W bh 40- Lampu TKO - TLD 1 x 36 W bh 73- Lampu Cover Acrylic TL 5 Ecsesial - 1 x 14 w bh 28- Down Liht FBH - PLC 145 -2 x 18 W bh 334- Down Light E 27 1 x 15 w bh 116- Down Liht FBH - PLC 145 -2 x 26 W bh 2- Sklar Tunggal 10 A bh 62

Page 5: Rencana kerja (1) (1)

- Sklar Ganda 10 A bh 46- Grid Switch 12 Gang bh 8- Stop Kontak 16 A bh 119- Instalasi Penerangan kabel 3 x 2,5mm² + pvc 20 mm titik 1053- Instalasi Stop Kontak kabel 3 x 2,5 mm² + pvc 20 mm titik 119- Matrial Bantu ls 6- Down Liht CDM-T -1 x 35 W bh 127

Lampu Penerangan Jalan- Lampu Taman BUlat PL 25 W bh 27- Tiang Lampu panjang Pipa galfanis 2,5" tinggi 2,5m bh 27- Instalasi Penerangan Jalan kabel NYY 4 x 4 mm² m 360.8- Instalasi Penerangan kabel 3 x 2,5mm² + pvc 20 mm titik 27

PEKERJAAN PENANGKAL PETIR 0.219%- E.F * Lightning Protection unit 1- E.F * HV Lightning Carrier (Coaxial Cable) m 91.2- Connecting Sleeve bh 1- E.F* Lightning Counter Stroke bh 1- Earth Steel Copper Rod 5/8" m 16- Earth Rod Coupling bh 12- Earth Clamp bh 1- Driving Tip bh 1- Driving Stud bh 1

PEKERJAAN FIRE ALARM 0.421%- Master Control Fire Alarm( MCFA ) unit 1

INSTALASI FIRE ALARM- Fixed Detector bh 6- ROR Detector bh 62- Smoke Detector bh 99- Break Glass Switch bh 12- Alarm Bell bh 12- Lampu Tanda bh 12- Instalasi Detector titik 203- Fire Extingusher Carbon Dioxide Berat isi 3,2 kg bh 12- Box Fire Extingusher Carbon Dioxide Berat isi 3,2 kg bh 1- Matial Bantu ls 6

PEKERJAAN SYSTEM TELEPON / PABX 0.473%PABX SYSTEM set 1 Instalasi dari Rumah Kabel s/d MDF ; ( Jelly Armoured Cable 20 x 2 x 0,8 mm ) + Sparing PVC 4" + Galian m 38Kabel dari MDF - PABX ke : 0- SDF - 3 : ITC 200 X 2 pair x 0,6 mm² m 48

0Instalasi Telepon 0- TB 1 20 Extention unit 6- Instalasi Telepon titik 42- Outlet telepon bh 42- Kabel dai MDF ke TB 1- 10(4 x 0,6 mm) m' 185.2- Matrial Bantu ls 6

Page 6: Rencana kerja (1) (1)

- Cable Tray 200 x 100 mm m' 323- Elbow (Radius) for Tray bh 6- Matrial Bantu ls 6

PEK. SYSTEM TATA SUARA 0.233%Peralatan UtamaCabinet Rack set 1DVD/CD/MP3 Player set 2Pre Equalizer set 1Grafik Equalizer set 1Power Amplifire ZA-2240 B set 2Paging Microphone Type PM-660 D/1 set 1Emergency Microphone PM-660 D set 1Speaker Selector SS-021B set 1MDF - SS set 1TB - SS set 1- Celling Speker, KAP 3 w LHM 0606 bh 143- Volume Control bh 26- Instalasi Tata suara titik 169

Page 7: Rencana kerja (1) (1)

SEPTEMBER 2015 OKTOBER 201518 19 20 21 22 23 24 25 26

31-6 7-13 14-20 21-27 28-4 5-11 12-18 19-25 26-10.384% 0.384% 0.384% 0.384% 0.865% 0.865% 0.865% 0.865% 0.538%

6 6 6 6 13.5 13.5 13.5 13.5 8.40.65 0.65 0.65 0.65 1.46 1.46 1.46 1.46 0.916.25 6.25 6.25 6.25 14.06 14.06 14.06 14.06 8.754.2 4.2 4.2 4.2 9.45 9.45 9.45 9.45 5.88

77.31 77.31 77.31 77.31 173.95 173.95 173.95 173.95 108.234.95 4.95 4.95 4.95 11.14 11.14 11.14 11.14 6.930.3 0.3 0.3 0.3 0.675 0.675 0.675 0.675 0.4287 87 87 87 195.75 195.75 195.75 195.75 121.8

21.99 21.99 21.99 21.99 49.47 49.47 49.47 49.47 30.780.42 0.42 0.42 0.42 0.945 0.945 0.945 0.945 0.5880.45 0.45 0.45 0.45 1.00 1.00 1.00 1.00 0.620.43 0.43 0.43 0.43 0.96 0.96 0.96 0.96 0.601.29 1.29 1.29 1.29 2.90 2.90 2.90 2.90 1.811.4 1.4 1.4 1.4 3.15 3.15 3.15 3.15 1.962.6 2.6 2.6 2.6 5.85 5.85 5.85 5.85 3.64

2.35 2.35 2.35 2.35 5.2875 5.2875 5.2875 5.2875 3.29

0.056% 0.056% 0.056% 0.056% 0.100% 0.100% 0.100% 0.100% 0.100%

0.10 0.10 0.10 0.10 0.18 0.18 0.18 0.18 0.180.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.20 0.20 0.20 0.20 0.36 0.36 0.36 0.36 0.360.30 0.30 0.30 0.30 0.54 0.54 0.54 0.54 0.540.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.093.10 3.10 3.10 3.10 5.58 5.58 5.58 5.58 5.580.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.056% 0.056% 0.056% 0.056% 0.100% 0.100% 0.100% 0.100% 0.100%

1.40 1.40 1.40 1.40 2.52 2.52 2.52 2.52 2.522.00 2.00 2.00 2.00 3.60 3.60 3.60 3.60 3.602.38 2.38 2.38 2.38 4.28 4.28 4.28 4.28 4.283.00 3.00 3.00 3.00 5.40 5.40 5.40 5.40 5.400.40 0.40 0.40 0.40 0.72 0.72 0.72 0.72 0.720.30 0.30 0.30 0.30 0.54 0.54 0.54 0.54 0.540.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.056% 0.056% 0.056% 0.056% 0.100% 0.100% 0.100% 0.100% 0.100%

0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

23.5 23.5 23.5 23.5 42.3 42.3 42.3 42.3 42.32.65 2.65 2.65 2.65 4.77 4.77 4.77 4.77 4.771.5 1.5 1.5 1.5 2.7 2.7 2.7 2.7 2.7

0.250 0.250 0.250 0.250 0.450 0.450 0.450 0.450 0.450

Page 8: Rencana kerja (1) (1)

0.6 0.6 0.6 0.6 1.08 1.08 1.08 1.08 1.081 1 1 1 1.8 1.8 1.8 1.8 1.8

1.55 1.55 1.55 1.55 2.79 2.79 2.79 2.79 2.790.3 0.3 0.3 0.3 0.54 0.54 0.54 0.54 0.541.2 1.2 1.2 1.2 2.16 2.16 2.16 2.16 2.16

0.198% 0.198% 0.198% 0.198% 0.357% 0.357% 0.357% 0.357% 0.357%

0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.080.20 0.20 0.20 0.20 0.36 0.36 0.36 0.36 0.360.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.080.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.10 0.10 0.10 0.10 0.18 0.18 0.18 0.18 0.18

1.40 1.40 1.40 1.40 2.52 2.52 2.52 2.52 2.520.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.270.15 0.15 0.15 0.15 0.27 0.27 0.27 0.27 0.27

8.93 8.93 8.93 8.93 16.07 16.07 16.07 16.07 16.079.36 9.36 9.36 9.36 16.84 16.84 16.84 16.84 16.84

13.24 13.24 13.24 13.24 23.83 23.83 23.83 23.83 23.830.25 0.25 0.25 0.25 0.45 0.45 0.45 0.45 0.450.25 0.25 0.25 0.25 0.45 0.45 0.45 0.45 0.450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.35 0.35 0.35 0.35 0.63 0.63 0.63 0.63 0.630.55 0.55 0.55 0.55 0.99 0.99 0.99 0.99 0.99

Page 9: Rencana kerja (1) (1)

8.38 8.38 8.38 8.38 15.08 15.08 15.08 15.08 15.081.38 1.38 1.38 1.38 2.48 2.48 2.48 2.48 2.482.25 2.25 2.25 2.25 4.05 4.05 4.05 4.05 4.052.38 2.38 2.38 2.38 4.28 4.28 4.28 4.28 4.282.50 2.50 2.50 2.50 4.50 4.50 4.50 4.50 4.50

10.50 10.50 10.50 10.50 18.90 18.90 18.90 18.90 18.9046.75 46.75 46.75 46.75 84.15 84.15 84.15 84.15 84.150.25 0.25 0.25 0.25 0.45 0.45 0.45 0.45 0.450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13.75 13.75 13.75 13.75 24.75 24.75 24.75 24.75 24.75

0.143%

0.130.070.200.07

0.055% 0.055% 0.055% 0.123% 0.123%

0.07 0.07 0.07 0.15 0.15

0.193% 0.193% 0.193% 0.193% 0.348% 0.348% 0.348% 0.348% 0.348%

0.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.080.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.080.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

Page 10: Rencana kerja (1) (1)

0.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.090.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.40 0.40 0.40 0.40 0.72 0.72 0.72 0.72 0.720.40 0.40 0.40 0.40 0.72 0.72 0.72 0.72 0.722.25 2.25 2.25 2.25 4.05 4.05 4.05 4.05 4.050.95 0.95 0.95 0.95 1.71 1.71 1.71 1.71 1.710.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.08

0.30 0.30 0.30 0.30 0.54 0.54 0.54 0.54 0.541.20 1.20 1.20 1.20 2.16 2.16 2.16 2.16 2.161.38 1.38 1.38 1.38 2.48 2.48 2.48 2.48 2.481.56 1.56 1.56 1.56 2.81 2.81 2.81 2.81 2.811.74 1.74 1.74 1.74 3.13 3.13 3.13 3.13 3.132.30 2.30 2.30 2.30 4.14 4.14 4.14 4.14 4.141.38 1.38 1.38 1.38 2.48 2.48 2.48 2.48 2.482.30 2.30 2.30 2.30 4.14 4.14 4.14 4.14 4.140.30 0.30 0.30 0.30 0.54 0.54 0.54 0.54 0.541.20 1.20 1.20 1.20 2.16 2.16 2.16 2.16 2.161.38 1.38 1.38 1.38 2.48 2.48 2.48 2.48 2.481.56 1.56 1.56 1.56 2.81 2.81 2.81 2.81 2.811.74 1.74 1.74 1.74 3.13 3.13 3.13 3.13 3.132.30 2.30 2.30 2.30 4.14 4.14 4.14 4.14 4.14

6.00 6.00 6.00 6.00 10.80 10.80 10.80 10.80 10.802.35 2.35 2.35 2.35 4.23 4.23 4.23 4.23 4.230.60 0.60 0.60 0.60 1.08 1.08 1.08 1.08 1.080.05 0.05 0.05 0.05 0.09 0.09 0.09 0.09 0.09

0.095% 0.095% 0.095% 0.160% 0.160% 0.160% 0.160% 0.166%23.53 23.53 23.53 39.71 39.71 39.71 39.71 41.18

2.67 2.67 2.67 4.50 4.50 4.50 4.50 4.674.87 4.87 4.87 8.21 8.21 8.21 8.21 8.521.87 1.87 1.87 3.15 3.15 3.15 3.15 3.27

22.27 22.27 22.27 37.57 37.57 37.57 37.57 38.977.73 7.73 7.73 13.05 13.05 13.05 13.05 13.530.13 0.13 0.13 0.22 0.22 0.22 0.22 0.234.13 4.13 4.13 6.98 6.98 6.98 6.98 7.23

Page 11: Rencana kerja (1) (1)

3.07 3.07 3.07 5.18 5.18 5.18 5.18 5.370.53 0.53 0.53 0.90 0.90 0.90 0.90 0.937.93 7.93 7.93 13.39 13.39 13.39 13.39 13.88

70.20 70.20 70.20 118.46 118.46 118.46 118.46 122.857.93 7.93 7.93 13.39 13.39 13.39 13.39 13.880.40 0.40 0.40 0.67 0.67 0.67 0.67 0.708.47 8.47 8.47 14.29 14.29 14.29 14.29 14.82

1.80 1.80 1.80 3.04 3.04 3.04 3.04 3.151.80 1.80 1.80 3.04 3.04 3.04 3.04 3.15

24.05 24.05 24.05 40.59 40.59 40.59 40.59 42.091.80 1.80 1.80 3.04 3.04 3.04 3.04 3.15

0.015% 0.015% 0.015% 0.016% 0.016%0.07 0.07 0.07 0.08 0.086.08 6.08 6.08 6.84 6.840.07 0.07 0.07 0.08 0.080.07 0.07 0.07 0.08 0.081.07 1.07 1.07 1.20 1.200.80 0.80 0.80 0.90 0.900.07 0.07 0.07 0.08 0.080.07 0.07 0.07 0.08 0.080.07 0.07 0.07 0.08 0.08

0.042% 0.042% 0.042% 0.021% 0.021% 0.021% 0.021% 0.035% 0.035%0.10 0.10 0.10 0.05 0.05 0.05 0.05 0.08 0.080.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.60 0.60 0.60 0.30 0.30 0.30 0.30 0.50 0.506.20 6.20 6.20 3.10 3.10 3.10 3.10 5.17 5.179.90 9.90 9.90 4.95 4.95 4.95 4.95 8.25 8.251.20 1.20 1.20 0.60 0.60 0.60 0.60 1.00 1.001.20 1.20 1.20 0.60 0.60 0.60 0.60 1.00 1.001.20 1.20 1.20 0.60 0.60 0.60 0.60 1.00 1.00

20.30 20.30 20.30 10.15 10.15 10.15 10.15 16.92 16.921.20 1.20 1.20 0.60 0.60 0.60 0.60 1.00 1.000.10 0.10 0.10 0.05 0.05 0.05 0.05 0.08 0.080.60 0.60 0.60 0.30 0.30 0.30 0.30 0.50 0.50

0.041% 0.041% 0.041% 0.041% 0.053% 0.053%0.09 0.09 0.09 0.09 0.11 0.11

3.32 3.32 3.32 3.32 4.28 4.28

4.20 4.20 4.20 4.20 5.40 5.40

0.52 0.52 0.52 0.52 0.68 0.683.68 3.68 3.68 3.68 4.73 4.733.68 3.68 3.68 3.68 4.73 4.73

16.21 16.21 16.21 16.21 20.84 20.840.52 0.52 0.52 0.52 0.68 0.68

Page 12: Rencana kerja (1) (1)

28.26 28.26 28.26 28.26 36.34 36.340.52 0.52 0.52 0.52 0.68 0.680.52 0.52 0.52 0.52 0.68 0.68

0.020% 0.020% 0.020% 0.020% 0.026% 0.026%

0.09 0.09 0.09 0.09 0.11 0.110.18 0.18 0.18 0.18 0.22 0.220.09 0.09 0.09 0.09 0.11 0.110.09 0.09 0.09 0.09 0.11 0.110.18 0.18 0.18 0.18 0.22 0.220.09 0.09 0.09 0.09 0.11 0.110.09 0.09 0.09 0.09 0.11 0.110.09 0.09 0.09 0.09 0.11 0.110.09 0.09 0.09 0.09 0.11 0.110.09 0.09 0.09 0.09 0.11 0.11

12.51 12.51 12.51 12.51 16.09 16.092.28 2.28 2.28 2.28 2.93 2.93

14.79 14.79 14.79 14.79 19.01 19.01

Page 13: Rencana kerja (1) (1)

KETERANGAN

3.268% 0.865% 0.865% 0.538%51 14 14 8

6 1 1 153 14 14 936 9 9 6

657 174 174 10842 11 11 7

3 1 1 0740 196 196 122187 49 49 31

4 1 1 14 1 1 14 1 1 1

11 3 3 212 3 3 222 6 6 420 5 5 3

0.423% 0.100% 0.100% 0.100%

0.8 0.2 0.2 0.20.4 0.1 0.1 0.11.5 0.4 0.4 0.42.3 0.5 0.5 0.50.4 0.1 0.1 0.11.1 0.3 0.3 0.30.4 0.1 0.1 0.1

23.6 5.6 5.6 5.60.4 0.1 0.1 0.10.4 0.1 0.1 0.1

0.423% 0.100% 0.100% 0.100%

11 3 3 3 Minggu Ke 2615 4 4 4 Minggu Ke 2618 4 4 4 Minggu Ke 2623 5 5 5 Minggu Ke 26

3 1 1 1 Minggu Ke 262 1 1 1 Minggu Ke 260 0 0 0 Minggu Ke 26

0.423% 0.100% 0.100% 0.100%0.4 0.1 0.1 0.1 Minggu Ke 26

178.6 42.3 42.3 42.3 Minggu Ke 2620.1 4.8 4.8 4.8 Minggu Ke 2611.4 2.7 2.7 2.7 Minggu Ke 26

1.9 0.5 0.5 0.5 Minggu Ke 26

Jumlah Bobot (%) Minggu 23

Jumlah Bobot (%) Minggu

24

Jumlah Bobot (%) Minggu 25

Jumlah Bobot (%) Minggu 26

Page 14: Rencana kerja (1) (1)

4.6 1.1 1.1 1.1 Minggu Ke 267.6 1.8 1.8 1.8 Minggu Ke 26

11.8 2.8 2.8 2.8 Minggu Ke 262.3 0.5 0.5 0.5 Minggu Ke 269.1 2.2 2.2 2.2 Minggu Ke 26

1.508% 0.357% 0.357% 0.357%0.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.0 0.0 0.0 0.04.6 1.1 1.1 1.11.5 0.4 0.4 0.44.6 1.1 1.1 1.10.4 0.1 0.1 0.10.4 0.1 0.1 0.11.1 0.3 0.3 0.30.4 0.1 0.1 0.11.1 0.3 0.3 0.30.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.11.1 0.3 0.3 0.31.1 0.3 0.3 0.30.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.4 0.1 0.1 0.10.8 0.2 0.2 0.2

10.64 2.52 2.52 2.520.38 0.09 0.09 0.09

0 0 0 0.001.14 0.27 0.27 0.271.14 0.27 0.27 0.27

67.9 16.1 16.1 16.171.1 16.8 16.8 16.8

100.6 23.8 23.8 23.81.9 0.5 0.5 0.51.9 0.5 0.5 0.50.0 0.0 0.0 0.00.4 0.1 0.1 0.12.7 0.6 0.6 0.64.2 1.0 1.0 1.0

Page 15: Rencana kerja (1) (1)

64 15 15 1510 2 2 217 4 4 418 4 4 419 5 5 580 19 19 19

355 84 84 842 0 0 00 0 0 00 0 0 0

105 25 25 25

0.000% 0.000% 0.000% 0.143%

0.130.070.200.07

0.109% 0.055% 0.123% 0.123%0.13 0.07 0.15 0.15

1.469% 0.348% 0.348% 0.348%

4.56 1.08 1.08 1.080 0 0 0.00

4.56 1.08 1.08 1.080.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.09

0.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.09

0.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.09

Page 16: Rencana kerja (1) (1)

0.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.090.38 0.09 0.09 0.09

3.0 0.7 0.7 0.73.0 0.7 0.7 0.7

17.1 4.1 4.1 4.17.2 1.7 1.7 1.74.6 1.1 1.1 1.10.0 0.0 0.0 0.02.3 0.5 0.5 0.59.1 2.2 2.2 2.2

10.5 2.5 2.5 2.511.9 2.8 2.8 2.813.2 3.1 3.1 3.117.5 4.1 4.1 4.110.5 2.5 2.5 2.517.5 4.1 4.1 4.1

2.3 0.5 0.5 0.59.1 2.2 2.2 2.2

10.5 2.5 2.5 2.511.9 2.8 2.8 2.813.2 3.1 3.1 3.117.5 4.1 4.1 4.1

45.6 10.8 10.8 10.817.9 4.2 4.2 4.2

4.6 1.1 1.1 1.10.4 0.1 0.1 0.1

0.606% 0.160% 0.160% 0.166%150 40 40 41

17 5 5 531 8 8 912 3 3 3

142 38 38 3949 13 13 14

1 0 0 026 7 7 7

Page 17: Rencana kerja (1) (1)

20 5 5 53 1 1 1

51 13 13 14448 118 118 123

51 13 13 143 1 1 1

54 14 14 15

11 3 3 311 3 3 3

153 41 41 4211 3 3 3

0.029% 0.015% 0.016% 0.016%0.1 0.1 0.1 0.1

12.2 6.1 6.8 6.80.1 0.1 0.1 0.10.1 0.1 0.1 0.12.1 1.1 1.2 1.21.6 0.8 0.9 0.90.1 0.1 0.1 0.10.1 0.1 0.1 0.10.1 0.1 0.1 0.1

0.190% 0.021% 0.035% 0.035%0.4 0.1 0.1 0.1

2.7 0.3 0.5 0.527.9 3.1 5.2 5.244.6 5.0 8.3 8.3

5.4 0.6 1.0 1.05.4 0.6 1.0 1.05.4 0.6 1.0 1.0

91.4 10.2 16.9 16.95.4 0.6 1.0 1.00.4 0.1 0.1 0.12.7 0.3 0.5 0.5

0.124% 0.041% 0.053% 0.053%0.3 0.1 0.1 0.1

10 3 4 40 0 0 0

13 4 5 5

2 1 1 111 4 5 511 4 5 549 16 21 21

2 1 1 1

Page 18: Rencana kerja (1) (1)

85 28 36 362 1 1 12 1 1 1

0.061% 0.020% 0.026% 0.026%

0.3 0.1 0.1 0.10.5 0.2 0.2 0.20.3 0.1 0.1 0.10.3 0.1 0.1 0.10.5 0.2 0.2 0.20.3 0.1 0.1 0.10.3 0.1 0.1 0.10.3 0.1 0.1 0.10.3 0.1 0.1 0.10.3 0.1 0.1 0.1

37.5 12.5 16.1 16.16.8 2.3 2.9 2.9

44.4 14.8 19.0 19.0

Page 19: Rencana kerja (1) (1)

No Material Satuan Jumlah Total %31-6 7-13 14-20 21-27

1 Biaya Penyambungan Listrik Unit 1.00 0.156%

2 Pekerjaan instalasi utama Unit 3.306% 0.275% 0.275%

Meteran Unit 1.00 0.08 0.08Panel Utama / Capasitor Bank Unit 1.00 0.08 0.08Panel LVMDP Unit 1.00 0.08 0.08Panel Penerangan Unit 1.00 0.08 0.08Panel AC Unit 1.00 0.08 0.08Panel Distribusi Lift Unit 1.00 0.08 0.08Panel Outdoor / taman Unit 1.00 0.08 0.08Panel Penerangan Lt 1 - 4 Unit 4.00 0.33 0.33Panel AC Lt 1 - 4 Unit 4.00 0.33 0.33Panel Pompa Unit 1.00 0.08 0.08Kabel Fider dari Transformer ke LVMDP NYY 4x50 mm m' 230.00 19.17 19.17Kabel Fider dari Genset ke ATS NYY 4x50 mm m' 7.00 0.58 0.58Kabel Fider dari ATS ke LVMDP NYY 4x50 mm m' 20.00 1.67 1.67Kabel Fider dari LVMDP NYY 4x6 mm KE Panel Lift m' 7.00 0.58 0.58Kabel Fider dari LVMDP NYY 4x6 mm KE Panel Lift 1 -4 m' 59.00 4.92 4.92Kabel Fider dari LVMDP NYY 4x6 mm KE PP1 - L1 m' 7.00 0.58 0.58Kabel Fider dari LVMDP NYY 4x6 mm KE PP1 - L2 m' 12.00 1.00 1.00Kabel Fider dari LVMDP NYY 4x6 mm KE PP1 - L3 m' 17.00 1.42 1.42Kabel Fider dari LVMDP NYY 4x6 mm KE PP1 - L4 m' 23.00 1.92 1.92Kabel Fider dari LVMDP NYY 4x25 mm KE PPAC - L1 m' 7.00 0.58 0.58Kabel Fider dari LVMDP NYY 4x25 mm KE PPAC - L2 m' 12.00 1.00 1.00Kabel Fider dari LVMDP NYY 425 mm KE PPAC - L3 m' 17.00 1.42 1.42Kabel Fider dari LVMDP NYY 4x25 mm KE PPAC - L4 m' 23.00 1.92 1.92Passanger Lift 1000 Kg ex Otis leng Acc dan Instalasi set 2.00 0.17 0.17Biaya Pemasangan lift set 2.00 0.17 0.17Testing Commissioning lift ls 1.00 0.08 0.08

3 Armature 2.698%

Instalasi penerangan ttk 482.00Instalasi Stop Kontak ttk 792.00Armature Lampu Down Light 25 watt bh 258.00Armature Lampu Down Light 10 watt bh 285.00Armature Lampu Barret 18 Watt bh 15.00Armature Lampu RM 2X36 watt bh 34.00Armature Exhaus Fan 25 watt ex Panaconic (plafond) bh 136.00AC Split Wall Mounted 1 K bh 105.00AC Split Wall Mounted 2 K bh 16.00AC Split Cassette 5 K bh 17.00Armature Sakelar tunggal ex.Clipsal e siries bh 194.00Armature Sakelar Seri ex.Clipsal e siries bh 138.00Armature Saklar Hotel bh 13.00Armature Stop kontak AC bh 100.00Armature Stop kontak Double bh 346.00

4 Pekerjaan Fire Alarm 0.418% 0.035% 0.035%

Main Control Panel - Fire Alarm ( MCFA ) unit 1.00 0.08 0.08Main Distribution Frame - Fire ( MDF - FA ) bh 1.00 0.08 0.08Terminal Box - Fire Alarm ( TB - FA - 1 s/d 4 ) bh 5.00 0.42 0.42Material Bantu lot 1.00 0.08 0.08Testing dan Kommisioning lot 1.00 0.08 0.08Smoke Detector bh 113.00 9.42 9.42Rate of Rise Heat Detector bh 21.00 1.75 1.75Manual Break Glass Switch bh 8.00 0.67 0.67Alarm bell bh 8.00 0.67 0.67Lampu Indikator bh 8.00 0.67 0.67Instalasi fire alarm ttk 158.00 13.17 158.00Material Bantu lot 4.00 0.33 0.33Testing dan Kommisioning lot 4.00 0.33 0.33

5 Pekerjaan Telephone System 0.424%

Peralatan Utama

PABX Main Unit for 160 ports (2 cabinet) unit 1.00Trunk Card Unit 4 Port bh 1.00

Page 20: Rencana kerja (1) (1)

Caller ID 4 Port bh 1.00Digital Card Units 8 Ports bh 1.00Single Line Card Unit 8 Port bh 5.00Key Phone 36 K/ 2x16 LCD Display, DK6-36D bh 6.00DSS Console For DK 6 bh 1.00Pesawat SLT with Display & Massage Lamp bh 1.00Testing dan Commisioning lot 1.00Pesawat SLT with Display & Massage Lamp bh 80.00Outlet Telephone bh 80.00JB Telephone bh 4.00Instalasi Telephone ttk 80.00Material bantu lot 4.00

6 Pek.Instalasi Data 0.110%Antena bh 1.00Router bh 1.00Server bh 1.00Switch Hub 24 port bh 4.00Instalasi data ttk 70.00Outlet data bh 70.00Material bantu lot 4.00Commisioning test lot 4.00

7 Instalasi MATV 0.128%Antena UHF 22 Elemen Irco bh 4.55Antena VHF 10 Elemen Irco bh 4.55Master Head Amplifier Irco bh 4.55Coaxial 7C/2V, dari Antena ke Mixer mtr 100.10Coaxial 7C/2V, dari mixer ke TB-Spliter-TV/lt.2 mtr 54.60Termination & supporting material lot 4.55Testing dan Commisioning lot 4.55 Outlet TV bh 81.00 Splitter 1 x 6 Port bh 20.00TB-Splitter-TV/lt.1 bh 4.00 Coaxial Cable 7C-2V Dari TB-Spliter-TV/lt.1 ke TB-Spliter-TV/lt. mtr 127.40 Instalasi Outlet TV bh 81.00 Material Bantu lot 4.00 Testing dan Commisioning lot 4.00

8 Pekerjaan Tata Suara 0.196%Cabinet Rack set 1.00DVD/CD/MP3 Player set 1.00Pre Equalizer set 1.00Grafik Equalizer set 1.00Power Amplifire ZA-2240 B set 2.00Paging Microphone Type PM-660 D/1 set 1.00Emergency Microphone PM-660 D set 1.00Speaker Selector SS-021B set 1.00MDF - SS set 1.00TB - SS set 1.00Celling Speker, KAP 3 w LHM 0606 bh 132.00Volume control bh 4.00Instalasi Sound System ttk 132.00

9 Pekerjaan CCTV 0.359%

DVR 16 CH Invinity bh 2.00UPS 1200 VA bh 2.00HD 2 TB Survaillace bh 2.00Kamera Invinity DS 873 Infrared bh 32.00LCD Monitor 18 Inchi bh 4.00Instalasi CCTV bh 32.00Setting Commisioning lot 1.00

10 Penangkal Petir 0.083%Air Terminal elektro statik H=3000 mm bh 1.00BC 50 mm2 menuju ke Bak Kontrol dalam Pipa PVC dia 2" mtr 50.00Peralatan penunjang pendukung Air terminal lot 1.00Klem-klem , Wire Rope 3/8", Trekskur, Isolator, 0.00Bracket, Seal , Test Box , dls 0.00Bak Kontrol 400 x 400 x 400 mm, dari Beton Bertulang, lengkap d unit 1.00terminal dari plat tembaga electrode pentanahan sesuai dgn gamb unit 1.00perencana. 0.00Biaya Instalasi lot 1.00Testing & Comissioning included perijinan dari DEPNAKER lot 1.00 Material Bantu lot 1.00

Page 21: Rencana kerja (1) (1)

11 Pekerjaan Grounding 0.020%Arde lot 1.00Kabel BC dari panel ls 1.00

12 Pekerjaan MekanikalPekerjaan Plumbing and Sanitary 0.968% 0.058% 0.058%Biaya Penyambungan PDAM + Meteran Unit 1.00 0.06 0.06Pembuatan sumur lot 1.00 0.06 0.06Pompa Transfer Unit 1.00 0.06 0.06Kapasitas 150 Liter/Menit 0.00 0.00Head 27 Meter 0.00 0.00Putaran 2900 RPM 0.00 0.00c/w Panel Control Automatic Lift Pump 0.00 0.00Pompa Distribusi Unit 1.00 0.06 0.06Roof Tank Stainless Cap.1m3 unit 6.00 0.36 0.36Header dia 80 mm M 27.30 1.64 1.64Gate Valve dia. 50 mm2 bh 5.00 0.30 0.30Gate Valve dia. 50 mm2 ( untuk by pass Sand Filter carbon filter ) bh 5.00 0.30 0.30Check Valve dia 50 mm2 bh 3.00 0.18 0.18Floating Valve dia 50 mm2 bh 3.00 0.18 0.18Fleksible Joint dia 50 mm2 bh 5.00 0.30 0.30Strainer dia 50 mm2 bh 9.10 0.55 0.55Pressure gauge bh 9.10 0.55 0.55Pipa dia 50 mm mtr 85.00 5.10 5.10Fitting - fitting Lot 1.00 0.06 0.06Material Bantu Lot 1.00 0.06 0.06Testing dan Kommisioning ls 1.00 0.06 0.06Septiktank Biopro, 10 m3 unit 3.00 0.18 0.18

13 Pekerjaan Instalasi Air 1.783% 0.134% 0.134%Pemipaan Pipa Distribusi GIV dia 40 mm mtr 527.80 39.58 39.58 Pipa Distribusi GIV dia 32 mm mtr 832.65 62.45 62.45 Pipa Distribusi GIV 10 dia 20 mm mtr 259.35 19.45 19.45 Pipa Distribusi GIV 10 dia 15 mm mtr 536.90 40.27 40.27 Gate Valve dia. 40 mm bh 5.00 0.38 0.38 Fitting - fitting lot 4.00 0.30 0.30 Material Bantu lot 4.00 0.30 0.30 Testing dan Kommisioning lot 4.00 0.30 0.30

13.1 Sanitary dan FixtureClosed duduk bh 81.00 6.08 6.08Washtafel bh 83.00 6.23 6.23Urinal type muslim bh 3.00 0.22 0.22sekat urinal bh 2.00 0.15 0.15Floor drain 2" bh 103.00 7.73 7.73Jett spray + kran bh 81.00 6.08 6.08Kran air bh 113.00 8.48 8.48Shower + Kran bh 74.00 5.55 5.55Material bantu lot 4.00 0.30 0.30Testing dan Kommisioning lot 4.00 0.30 0.30

13.2 Air Bekas 0.00 0.00Pipa PVC AW 4" mtr 1606.15 120.46 120.46Pipa PVC AW 3" mtr 564.20 42.31 42.31Pipa PVC AW 2" mtr 691.60 51.87 51.87Pipa PVC AW 11/4" mtr 436.80 32.76 32.76fitting PVC lot 4.00 0.30 0.30Material bantu lot 4.00 0.30 0.30Testing & Commisioning lot 4.00 0.30 0.30Septiktank Biopro 4 m3 unit 1.00 0.08 0.08

13.3 Air Kotor 0.00 0.00Pipa PVC AW 4" mtr 2115.75 158.68 158.68Pipa PVC AW 3" mtr 709.80 53.23 53.23Pipa PVC AW 2" mtr 300.30 22.52 22.52fitting PVC lot 4.00 0.30 0.30Material bantu lot 4.00 0.30 0.30Testing & Commisioning lot 4.00 0.30 0.30

14 INSTALASI PIPA HYDRAT 0.780% 0.049% 0.049%

INSTALASI PIPA RISER - Pipa Black steel Sch 40 dia 100 mm m' 58.00 3.627 3.627 - Fiting - fiting Matrial Bantu lot 1.00 0.063 0.063 Assesories - - - Gate Valve dia 100 mm bh 3.00 0.188 0.188 - Automatic air vent dia 25 mm bh 3.00 0.188 0.188 Lantai Site plan - Pipa Black steel Sch 40 dia 100 mm m' 250.00 15.634 15.634 - Pipa Black steel Sch 40 dia 80 mm m' 100.00 6.254 6.254

Page 22: Rencana kerja (1) (1)

- Pipa Black steel Sch 40 dia 65 mm m' 75.00 4.690 4.690 - Hydrant Pillar (HP), Two way type two ways set 5.00 0.313 0.313 - Hose Rell Cabinet (HRC) type C set 5.00 0.313 0.313 Lengkap dgn 1 rol selang 1,5" 30 m' nozzle, accessories,dll - - - Siamesse Conection buah 1.00 0.063 0.063 - Fiting - fiting Matrial Bantu ls 1.00 0.063 0.063 - Pipa Black steel Sch 40 dia 100 mm m' 24.00 1.501 1.501 - Pipa Black steel Sch 40 dia 80 mm m' 75.00 4.690 4.690 - Pipa Black steel Sch 40 dia 65 mm m' 108.00 6.754 6.754 - Indoor Hydrant Box Unit ( IHB ) Type A2 set 6.00 0.375 0.375 Lengkap dgn 1 rol selang nozzle, hose, valve, accessories,dll - - - Fiting - fiting Matrial Bantu ls 3.00 0.188 0.188 Pekerjaan Fire Sprinkler - - Pengadaan dan pemasangan pipa gip medium lengkap - - peralatan fitting, penggantung dll. - -

¢ 100 m 180.00 11.257 11.257 ¢ 80 m 16.50 1.032 1.032 ¢ 65 m 27.00 1.689 1.689 ¢ 50 m 28.50 1.782 1.782 ¢ 40 m 30.00 1.876 1.876 ¢ 32 m 60.00 3.752 3.752 ¢ 25 m 467.00 29.205 29.205

BCV lengkap unit 3.00 0.188 0.188 ¢ 80 0.00 - -

Sprinkler Head 0.00 - - Type : upright bh 125.00 7.817 7.817

15 Sistem Drainase 0.243% - - - - Saluran keliling bangunan m 210.33Bak kontrol 60X60 cm, tinggi 65 cm unit 12.00

16 Pekerjaan Pipa Air Hujan (PAH) 0.111% Pipa PVC AW dia 4"di roof

Page 23: Rencana kerja (1) (1)

28-4 5-11 12-18 19-25 26-1 30-60.013% 0.013% 0.013% 0.023% 0.023%

0.083 0.083 0.083 0.150 0.150

0.275% 0.298% 0.298% 0.298% 0.298% ###

0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.08 0.09 0.09 0.09 0.09###0.33 0.36 0.36 0.36 0.36###0.33 0.36 0.36 0.36 0.36###0.08 0.09 0.09 0.09 0.09###

19.17 20.70 20.70 20.70 20.70###0.58 0.63 0.63 0.63 0.63###1.67 1.80 1.80 1.80 1.80###0.58 0.63 0.63 0.63 0.63###4.92 5.31 5.31 5.31 5.31###0.58 0.63 0.63 0.63 0.63###1.00 1.08 1.08 1.08 1.08###1.42 1.53 1.53 1.53 1.53###1.92 2.07 2.07 2.07 2.07###0.58 0.63 0.63 0.63 0.63###1.00 1.08 1.08 1.08 1.08###1.42 1.53 1.53 1.53 1.53###1.92 2.07 2.07 2.07 2.07###0.17 0.18 0.18 0.18 0.18###0.17 0.18 0.18 0.18 0.18###0.08 0.09 0.09 0.09 0.09###

0.225% 0.225% ###

40.17 40.17###66.00 66.00###21.50 21.50###23.75 23.75###1.25 1.25###2.83 2.83###

11.33 11.33###8.75 8.75###1.33 1.33###1.17 1.17###

16.17 16.17###11.50 11.50###1.08 1.08###8.33 8.33###

28.83 28.83###

0.035% 0.063% 0.063% 0.063% 0.063%

0.08 0.15 0.15 0.15 0.150.08 0.15 0.15 0.15 0.150.42 0.75 0.75 0.75 0.750.08 0.15 0.15 0.15 0.150.08 0.15 0.15 0.15 0.159.42 16.95 16.95 16.95 16.951.75 3.15 3.15 3.15 3.150.67 1.20 1.20 1.20 1.200.67 1.20 1.20 1.20 1.200.67 1.20 1.20 1.20 1.20

158.00 284.40 158.00 158.00 158.000.33 0.60 0.60 0.60 0.600.33 0.60 0.60 0.60 0.60

0.011% 0.011% 0.011% 0.011% 0.011% ###

0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###

Page 24: Rencana kerja (1) (1)

0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###0.13 0.13 0.13 0.13 0.13###0.15 0.15 0.15 0.15 0.15###0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###2.00 2.00 2.00 2.00 2.00###2.00 2.00 2.00 2.00 2.00###0.10 0.10 0.10 0.10 0.10###2.00 2.00 2.00 2.00 2.00###0.10 0.10 0.10 0.10 0.10###

0.003% 0.003% 0.003% 0.003% 0.003% ###

0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###0.03 0.03 0.03 0.03 0.03###0.10 0.10 0.10 0.10 0.10###1.75 1.75 1.75 1.75 1.75###1.75 1.75 1.75 1.75 1.75###0.10 0.10 0.10 0.10 0.10###0.10 0.10 0.10 0.10 0.10###

0.003% 0.003% 0.003% 0.003% 0.003% ###

0.11 0.11 0.11 0.11 0.11###0.11 0.11 0.11 0.11 0.11###0.11 0.11 0.11 0.11 0.11###2.50 2.50 2.50 2.50 2.50###1.37 1.37 1.37 1.37 1.37###0.11 0.11 0.11 0.11 0.11###0.11 0.11 0.11 0.11 0.11###2.03 2.03 2.03 2.03 2.03###0.50 0.50 0.50 0.50 0.50###0.10 0.10 0.10 0.10 0.10###3.19 3.19 3.19 3.19 3.19###2.03 2.03 2.03 2.03 2.03###0.10 0.10 0.10 0.10 0.10###0.10 0.10 0.10 0.10 0.10###

0.005% 0.005% 0.005% 0.005% 0.005% ###

0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.050 0.050 0.050 0.050 0.050###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###0.025 0.025 0.025 0.025 0.025###3.300 3.300 3.300 3.300 3.300###0.100 0.100 0.100 0.100 0.100###3.300 3.300 3.300 3.300 3.300###

0.014% 0.014%

0.08 0.080.08 0.080.08 0.081.28 1.280.16 0.161.28 1.280.04 0.04

0.006% 0.006% 0.006%

0.07 0.07 0.073.33 3.33 3.330.07 0.07 0.070.00 0.00 0.000.00 0.00 0.000.07 0.07 0.070.07 0.07 0.070.00 0.00 0.000.07 0.07 0.070.07 0.07 0.070.07 0.07 0.07

Page 25: Rencana kerja (1) (1)

0.001% 0.001% 0.001%

0.033 0.033 0.0330.033 0.033 0.033

0.058% 0.058% 0.058% 0.073% 0.073%###0.06 0.06 0.06 0.08 0.08###0.06 0.06 0.06 0.08 0.08###0.06 0.06 0.06 0.08 0.08###0.00 0.00 0.00 0.00 0.00###0.00 0.00 0.00 0.00 0.00###0.00 0.00 0.00 0.00 0.00###0.00 0.00 0.00 0.00 0.00###0.06 0.06 0.06 0.08 0.08###0.36 0.36 0.36 0.45 0.45###1.64 1.64 1.64 2.05 2.05###0.30 0.30 0.30 0.38 0.38###0.30 0.30 0.30 0.38 0.38###0.18 0.18 0.18 0.23 0.23###0.18 0.18 0.18 0.23 0.23###0.30 0.30 0.30 0.38 0.38###0.55 0.55 0.55 0.68 0.68###0.55 0.55 0.55 0.68 0.68###5.10 5.10 5.10 6.38 6.38###0.06 0.06 0.06 0.08 0.08###0.06 0.06 0.06 0.08 0.08###0.06 0.06 0.06 0.08 0.08###0.18 0.18 0.18 0.23 0.23###

0.134% 0.134% 0.201% 0.201% 0.201%

39.58 39.58 59.38 59.38 59.3862.45 62.45 93.67 93.67 93.6719.45 19.45 29.18 29.18 29.1840.27 40.27 60.40 60.40 60.400.38 0.38 0.56 0.56 0.560.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.45

6.08 6.08 9.11 9.11 9.116.23 6.23 9.34 9.34 9.340.22 0.22 0.34 0.34 0.340.15 0.15 0.23 0.23 0.237.73 7.73 11.59 11.59 11.596.08 6.08 9.11 9.11 9.118.48 8.48 12.71 12.71 12.715.55 5.55 8.33 8.33 8.330.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.450.00 0.00 0.00 0.00 0.00

120.46 120.46 180.69 180.69 180.6942.31 42.31 63.47 63.47 63.4751.87 51.87 77.81 77.81 77.8132.76 32.76 49.14 49.14 49.140.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.450.08 0.08 0.11 0.11 0.110.00 0.00 0.00 0.00 0.00

158.68 158.68 238.02 238.02 238.0253.23 53.23 79.85 79.85 79.8522.52 22.52 33.78 33.78 33.780.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.450.30 0.30 0.45 0.45 0.45

0.049% 0.049% 0.117% 0.117% 0.117%

3.627 3.627 8.705 8.705 8.705 0.063 0.063 0.150 0.150 0.150 - - - - - 0.188 0.188 0.450 0.450 0.450 0.188 0.188 0.450 0.450 0.450

15.634 15.634 37.523 37.523 37.523 6.254 6.254 15.009 15.009 15.009

Page 26: Rencana kerja (1) (1)

4.690 4.690 11.257 11.257 11.257 0.313 0.313 0.750 0.750 0.750 0.313 0.313 0.750 0.750 0.750 - - - - - 0.063 0.063 0.150 0.150 0.150 0.063 0.063 0.150 0.150 0.150 1.501 1.501 3.602 3.602 3.602 4.690 4.690 11.257 11.257 11.257 6.754 6.754 16.210 16.210 16.210 0.375 0.375 0.901 0.901 0.901 - - - - - 0.188 0.188 0.450 0.450 0.450 - - - - - - - - - - - - - - - 11.257 11.257 27.016 27.016 27.016 1.032 1.032 2.476 2.476 2.476 1.689 1.689 4.052 4.052 4.052 1.782 1.782 4.278 4.278 4.278 1.876 1.876 4.503 4.503 4.503 3.752 3.752 9.005 9.005 9.005 29.205 29.205 70.092 70.092 70.092 0.188 0.188 0.450 0.450 0.450 - - - - - - - - - - 7.817 7.817 18.761 18.761 18.761

- - 0.020% 0.020% 0.020% ###

17.528 17.528 17.528 ### 1.000 1.000 1.000 ###

0.007% 0.007% 0.007% ###