RENCANA ANGGARAN BIAYA PENGADAAN JASA KONSULTAN STUDI...
Transcript of RENCANA ANGGARAN BIAYA PENGADAAN JASA KONSULTAN STUDI...
No Rincian Harga Total
1 Biaya Project Management -Rp
2 Biaya Operasional dan Laporan -Rp
-Rp
-Rp
-Rp
Diusulkan Oleh:
< >
<Jabatan>
Sub-Total (Sebelum Pajak)
Total
Total + Pajak 10%
PENGADAAN JASA KONSULTAN STUDI KELAYAKAN DAN BASIC ENGINEERING DESIGN
RENCANA ANGGARAN BIAYA
PosisiJumlah
TenagaBulan Bobot Satuan Harga Satuan (Rp) Harga Total
1 Project Manager (Team Leader) 1 10 Orang - Bulan -Rp -Rp 2 Interface Manager 1 10 Orang - Bulan -Rp - 3 Railways Systems Engineer 1 10 Orang - Bulan -Rp -Rp 4 Light Rail Rolling Stock Expert 1 10 Orang - Bulan -Rp -Rp 5 Rolling Stock Engineer 1 10 Orang - Bulan -Rp -Rp 6 Financial Analyst 1 10 Orang - Bulan -Rp -Rp 7 SCADA/OCC Expert 1 10 Orang - Bulan -Rp -Rp 8 Signalling Engineer 1 10 Orang - Bulan -Rp -Rp 9 Track Facility Expert 1 10 Orang - Bulan -Rp -Rp
10 Risk Assessment Expert 1 10 Orang - Bulan -Rp -Rp 11 AFC Expert 1 10 Orang - Bulan -Rp -Rp 12 PSD Expert 1 10 Orang - Bulan -Rp -Rp 13 Power Traction Specialist 1 10 Orang - Bulan -Rp -Rp
14 Transportation Specialist 1 10 Orang - Bulan -Rp 15 Telecom Engineer 1 10 Orang - Bulan -Rp 16 Power Engineer 1 10 Orang - Bulan -Rp 17 Alignment Engineer 1 10 Orang - Bulan -Rp 18 Environtment Management Engineer 1 10 Orang - Bulan -Rp 19 Station Structure Engineer 1 10 Orang - Bulan -Rp 20 Viaduct Structure Engineer 1 10 Orang - Bulan -Rp 21 Soil Investigation Engineer 1 10 Orang - Bulan -Rp 22 Topographic/GIS Engineer 1 10 Orang - Bulan -Rp 23 Geotechnical Engineer 1 10 Orang - Bulan -Rp 24 Architectural Engineer 1 10 Orang - Bulan -Rp 25 MEP Engineer 1 10 Orang - Bulan -Rp 26 Cost Estimate Analyst 1 1 10 Orang - Bulan -Rp 27 Cost Estimate Analyst 2 1 10 Orang - Bulan -Rp 28 Legal Analyst 1 10 Orang - Bulan -Rp
-Rp
1 Sekretaris 10 Orang - Bulan -Rp 2 Surveyor 10 Orang - Bulan -Rp 3 Asisten Surveyor 10 Orang - Bulan -Rp 4 Autocad Operator 10 Orang - Bulan -Rp 5 Supporting Staff 10 Orang - Bulan -Rp 6 Office Boy 10 Orang - Bulan -Rp 7 Office Guard/Security Officer 10 Orang - Bulan -Rp 8 Driver 10 Orang - Bulan -Rp
-Rp
-Rp
2
PROJECT MANAGEMENT
TOTAL BIAYA (diluar Pajak)
No
1
Kualifikasi Tenaga Ahli
PENGADAAN JASA KONSULTAN STUDI KELAYAKAN DAN BASIC ENGINEERING DESIGN
Jumlah
Jumlah
Tenaga Penunjang
International
National
Uraian Unit Kuantitas Satuan Harga Satuan Harga Total
-Rp
-Rp
-Rp
-Rp
-Rp
-Rp
-Rp
-Rp
1 Paparan Laporan Pendahuluan Studi Kelayakan 5 Buku -Rp
2 Laporan Pendahuluan Studi Kelayakan 5 Buku -Rp
3 Paparan Interim Akhir Studi Kelayakan 50 Buku -Rp
4 Laporan Interim Studi Kelayakan 50 Buku -Rp
5 Paparan Laporan Akhir Studi Kelayakan 5 Buku -Rp
6 Laporan Teknis Studi Kelayakan dan BED 10 Buku -Rp
7 Laporan Akhir Studi Kelayakan 5 Buku -Rp
-Rp
-Rp
2
Total Biaya Langsung Personil
Biaya Operasional dan Laporan
PENGADAAN JASA KONSULTAN STUDI KELAYAKAN DAN BASIC ENGINEERING DESIGN
No
Operasional
Pengadaan Pelaporan Studi Kelayakan
Jumlah
1