RAB_Terbaru Ruko Cilegon
date post
29-Jun-2015Category
Documents
view
1.051download
26
Embed Size (px)
Transcript of RAB_Terbaru Ruko Cilegon
RENCANA ANGGARAN BIAYA PEKERJAAN PERSIAPANNO PS URAIAN : PEKERJAAN PERSIAPAN 1 m2 - Pembersihan Lokasi Pekerja Mandor SAT. HARGA SATUAN VOLUME HARGA PEKERJAAN
OH OH JUMLAH DIBULATKAN OH OH OH OH JUMLAH DIBULATKAN OH OH OH OH OH JUMLAH DIBULATKAN OH OH OH OH OH JUMLAH DIBULATKAN OH OH OH OH JUMLAH DIBULATKAN OH OH OH OH JUMLAH DIBULATKAN
5,000 500 5,500 5,500 5,000 7,500 750 500 13,750 13,800 136,000 9,000 75,000 75,000 2,000 297,000 297,000 100,000 75,000 150,000 22,500 5,000 352,500 352,500 50,000 150,000 15,000 5,000 220,000 220,000 20,000 15,000 1,500 2,000 38,500 38,500 TOTAL
1220
6,710,000
1 m1 - Pengukuran & pemasangan bouwplank Pekerja Tukang kayu Kepala tukang Mandor
341.79
4,716,647
1 unit - Papan Nama Proyek (ukuran 0.9 x 2.2 m) Pekerja Tukang batu Tukang kayu Tukang cat Mandor
1
297,000
1 m2 - Kantor Direksi Pekerja Tukang batu Tukang kayu Kepala Tukang Mandor
18
6,345,000
1 m2 - Los Kerja / Gudang Pekerja Tukang kayu Kepala tukang Mandor
9
1,980,000
1 m' - Pagar Pengaman Proyek Tinggi 2m Pekerja Tukang kayu Kepala tukang Mandor
212.47
8,179,710 28,228,356.80
RENCANA ANGGARAN BIAYA PEKERJAAN TANAHNO TN : PEKERJAAN TANAH 1 m3 - Perataan Tanah Pekerja Mandor Alat bantu URAIAN SAT.
OH OH set JUMLAH DIBULATKAN OH OH JUMLAH DIBULATKAN OH OH set JUMLAH DIBULATKAN
1 m3 - Galian Tanah Biasa Kedalamn 1 m - 2 m Pekerja Mandor
1 m3 - Urugan tanah bekas galian pondasi ( manual ) Pekerja Mandor Alat bantu
AHHARGA SATUAN VOLUME HARGA PEKERJAAN
2,500 500 270 3,270 3,300 26,300 5,200 31,500 31,500 25,000 2,000 2,430 29,430 29,400 TOTAL
1220
402,600.00
117.25
3,693,375
43.97
1,292,681.25 5,388,656.25
RENCANA ANGGARAN BIAYA PEKERJAAN PONDASI & BETONNO URAIAN SAT.
PDS : PEKERJAAN PONDASI 1 m3 - Pondasi Setempat/Pondasi Cakar Ayam Pekerja Tukang batu Mandor Kepala tukang
OH OH OH OH JUMLAH DIBULATKAN
BTN : PEKERJAAN BETON 1 m3 - Cor beton K. 225 ( manual ) Pekerja Tukang batu mandor Alat bantu
OH OH OH set JUMLAH DIBULATKAN OH OH OH jam set JUMLAH DIBULATKAN OH OH OH set JUMLAH DIBULATKAN OH OH OH set JUMLAH DIBULATKAN OH OH OH set
1 m3 - Cor beton K. 225 dengan readymix Pekerja Tukang batu mandor Concrete vibrator Alat bantu
1 kg - Pembesian ( besi ulir ) Pekerja Tukang besi Mandor Alat bantu
1 m2 - Bekisting dengan triplex 9 mm + bongkaran dan penyiraman Pekerja Tukang kayu Mandor Alat bantu
1 m2 - Perancah kayu / stoot werk - tinggi s/d 4 m Pekerja Tukang kayu Mandor Alat bantu
JUMLAH DIBULATKAN
& BETONHARGA SATUAN VOLUME HARGA PEKERJAAN
75,000 112,500 60,000 4,500 252,000 252,000
20.57
5,183,640.00
90,000 19,560 58,580 21,018 189,158 189,200 34,425 10,328 6,880 14,457 8,261 74,351 74,400 750 375 500 81 1,706 1,700 8,250 29,550 2,700 5,063 45,563 45,600 54,000 56,700 5,400 26,123
263.2
49,797,440.00
87,480
320
23,808,000.00
87,480
148,716,000.00
300
13,680,000.00
142,223 142,200 TOTAL
120
17,064,000.00 258,249,080.00
RENCANA ANGGARAN BIAYA PEKERJAAN PASANGAN BATA & PLESTERANNo 1 2 Harga /m2 Harga Satuan /m2 (Rp) (Rp) Pekerjaan Pasangan Bata Merah (1:5) : (per m2) Ongkos Pasang : unit Tukang Batu OH 7,500 Knek / Pekerja OH 16,000 Kepala Tukang OH 750 Mandor Sipil (Supervisi) OH 1,500 25,750 Pekerjaan Plesteran & Aci ( 1 : 5) Ongkos Pasang : unit Tukang Batu OH 11,250 Knek / Pekerja OH 10,000 Kepala Tukang OH 1,125 Mandor Sipil (Supervisi) OH 1,000 23,375 Item Pekerjaan TOTAL VOLUME
3005.13
6010.25
HARGA PEKERJAAN
3005.13 77,381,969
140,489,594 217,871,563
RENCANA ANGGARAN BIAYA PEKERJAAN SANITARINO SNT URAIAN : PEKERJAAN SANITER 1 unit - Closet jongkok standar ex. TOTO Pasir pasang Semen PC 50 kg closet jongkok standar Pekerja Tukang batu Kepala tukang Mandor SAT.
m kg bh OH OH OH OH JUMLAH DIBULATKAN m kg bh OH OH OH OH JUMLAH DIBULATKAN
1 m2- Daun Pintu untuk KM/WC Pasir pasang Semen PC 50 kg Urinoar toto Perlengkapan 30% harga urinoar Pekerja Tukang kayu Kepala tukang kayu Mandor
1 Unit - Bak air fiber glass kap. 200 ltr Pasir pasang Semen PC 50 kg Bak air fiber glass kap. 200 ltr Pekerja Tukang batu Mandor
m Zak bh OH OH OH JUMLAH DIBULATKAN bh OH OH JUMLAH DIBULATKAN
1 unit - Pemasangan Kaca cermin ( t=6 mm ) Cermin 6 mm Lengkap Pekerja Mandor
TARIHARGA SATUAN VOLUME HARGA PEKERJAAN
50,000 112,500 22,500 16,000 201,000 201,000 50,000 75,000 7,500 10,000 142,500 142,500 60,000 75,000 70,000 205,000 205,000 49,125 41,420 90,545 90,500 TOTAL
42
8,442,000
84
11,970,000
42
8,610,000
42
3,801,000 32,823,000
RENCANA ANGGARAN BIAYA PEKERJAAN M & ENO IL URAIAN : PEK. INSTALASI PENERANGAN dan STOP KONTAK 1 Ttk - Instalasi Penerangan & Stop Kontak Fiting keramik 125 watt NYM 3 x 2.5 mm2 Klem Saklar Pipa Conduit PVC klas D Pekerja Tukang listrik Pembantu instalator SAT.
bh m bh bh m OH OH OH JUMLAH DIBULATKAN bh OH OH OH JUMLAH DIBULATKAN bh OH OH OH JUMLAH DIBULATKAN bh OH OH OH JUMLAH DIBULATKAN bh OH OH OH JUMLAH DIBULATKAN bh bh bh
1Bh - Lampu Baret 40 watt Lampu baret 40 watt Pekerja Tukang listrik Pembantu instalatir
1Bh - Stop kontak 3 (phase) Stop kontak 25A, 3 phase Brocco Pekerja Tukang listrik Pembantu instalatir
1Bh - Saklar tunggal Brocco Saklar tunggal Pekerja Tukang listrik Pembantu instalatir
1Bh - Saklar double Brocco Saklar double Pekerja Tukang listrik Pembantu instalatir
1 unit - Pasang Box Panel pembagi PHB induk uk. 80 x 60 x 40 NFB 100 A Kabel scunt (sepatu kabel) Cu 25, 35 mm
Kabel scunt (sepatu kabel) Cu 50 mm MCB 32 A NH Fuse 50 A Holder fuse Fiting keramik 250 watt Saklar Kabel 10 m Lampu indikator Plat tembaga 0.5 m Pas. Ground Pekerja Mandor Instalatur/ Tukang listrik
bh bh bb bh bh bh m set set bh OH OH OH JUMLAH DIBULATKAN
IA
PEK. INSTALSI AIR BERSIH & PEMBUANGAN 1 M' - Instalasi Pipa PVC type AW dia. 1 1/2 " Pipa PVC Perlengkapan 35 % harga pipa Pekerja mandor Tukang pasang pipa Kepala tukang pipa
m OH OH OH OH JUMLAH DIBULATKAN
&EJUMLAH VOLUME HARGA PEKERJAAN
18,570 7,988 11,530 38,088 38,100 5,225 7,875 11,370 24,470 24,500 5,260 7,913 11,680 24,853 24,900 5,260 7,913 11,680 24,853 24,900 5,260 7,913 11,680 24,853 24,900 -
28
1,066,800
168
4,116,000
28
697,200
56
1,394,400
56
1,394,400
25,000 5,000 37,500 67,500 67,500
28
1,890,000
1,800 180 4,500 450 6,930 6,900 TOTAL
3000
20,700,000 31,258,800
RENCANA ANGGARAN BIAYA PEKERJAAN ATAPNO PA : PEKERJAAN ATAP 1 m2 - Pekerjaan Atap Pekerja Tukang kayu Mandor Kepala tukang URAIAN SAT.
OH OH OH OH JUMLAH DIBULATKAN
2430
APJUMLAH VOLUME HARGA PEKERJAAN
1,000 4,725 250 473 6,448 6,400
2430 TOTAL
15,552,000 49,743,360
RENCANA ANGGARAN BIAYA PEKERJAAN PLAFON & CATNO PC URAIAN : PEKERJAAN CAT 1 m2 - Cat dinding luar ( ICI Weathershield ) Cat setara dasar ICI - interior Cat setara penutup 2x ICI - interior Plamur/ dempul tembok Pekerja Tukang cat Mandor Kepala tukang SAT.
kg kg kg OH OH OH OH JUMLAH DIBULATKAN kg kg kg OH OH OH OH JUMLAH DIBULATKAN
1 m2 - Cat dinding dalam ( Jotun ) Cat setara dasar Jotun - interior Cat setara penutup 2x Jotun - interior Plamur/ dempul tembok Pekerja Tukang cat Mandor Kepala tukang
& CATJUMLAH VOLUME HARGA PEKERJAAN
1,000 4,725 250 473 6,448 6,400 1,000 4,725 250 473 6,448 6,400
1220
7,808,000
5342.4 TOTAL
34,191,360 41,999,360
RENCANA ANGGARAN BIAYA PEKERJAAN LANTAINO LT URAIAN : PEKERJAAN LANTAI 1 m2 - Lantai keramik 20 x 20 ad. 1 : 3 Pasir pasang Semen PC 50 kg Semen warna ( cor nat ) Keramik 20 x 20 standar Pekerja Tukang batu Mandor Kepala Tukang SAT.
m3 kg kg m2 hr hr hr hr JUMLAH DIBULATKAN m3 kg kg m2 hr hr hr hr JUMLAH DIBULATKAN m3 kg kg m2 hr hr hr hr JUMLAH DIBULATKAN
1 m2 - Lantai keramik 40 x 40 ad. 1 : 3 Pasir pasang Semen PC 50 kg Semen warna ( cor nat ) Keramik 40 x 40 standar Pekerja Tukang batu Mandor Kepala Tukang
1 m2 - Keramik dinding 20 x 20 Pasir pasang Semen PC 50 kg Semen warna ( cor nat ) Keramik 20 x 20 standar Pekerja Tukang batu Mandor Kepala Tukang
AN LANTAIHARGA SAT. HARGA SATUAN VOLUME HARGA PEKERJAAN
50,000 75,000 100,000 75,000
13,500 975 1,350 975 16,800 16,800 12,500 9,000 1,250 900 23,650 23,700 14,500 11,250 1,370 1,125 28,245 28,200 TOTAL
150
2,520,000
50,000 75,000 100,000 75,000
3700
87,690,000
50,000 75,000 100,000 75,000
294
8,290,800 98,500,800
NO
ITEM PEKERJAAN 1 Pekerjaan Persiapan 2 Pekerjaan Tanah 3 Pekerjaan Pondasi & Cor 4 Pekerjaan Bata & Plesteran 5 Pekerjaan Atap 6 Pekerjaan Sanitari 7 Pekerjaan M/E 8 Pekerjaan Pengecatan 9 Pekerjaan Keramik TOTAL NILAI PEKERJAAN LUAS BANGUNAN Harga/m2
NILAI RAB 28,228,357 7,672,471 258,249,080 217,871,563 49,743,360 32,823,000 31,258,800 34,191,360 98,500,800 758,538,790 2,440 310,877