RENCANA ANGGARAN BIAYA PEKERJAAN PERSIAPAN
NO URAIAN SAT. HARGA VOLUME HARGA PEKERJAAN SATUAN
PS : PEKERJAAN PERSIAPAN
Pekerja OH 5,000 Mandor OH 500
JUMLAH 5,500 DIBULATKAN 5,500 1220 6,710,000
Pekerja OH 5,000 Tukang kayu OH 7,500 Kepala tukang OH 750 Mandor OH 500
JUMLAH 13,750 DIBULATKAN 13,800 341.786 4,716,647
1 unit - Papan Nama Proyek (ukuran 0.9 x 2.2 m)Pekerja OH 136,000 Tukang batu OH 9,000 Tukang kayu OH 75,000 Tukang cat OH 75,000 Mandor OH 2,000
JUMLAH 297,000 DIBULATKAN 297,000 1 297,000
Pekerja OH 100,000 Tukang batu OH 75,000 Tukang kayu OH 150,000 Kepala Tukang OH 22,500 Mandor OH 5,000
JUMLAH 352,500 DIBULATKAN 352,500 18 6,345,000
Pekerja OH 50,000 Tukang kayu OH 150,000 Kepala tukang OH 15,000 Mandor OH 5,000
JUMLAH 220,000 DIBULATKAN 220,000 9 1,980,000
1 m' - Pagar Pengaman Proyek Tinggi 2mPekerja OH 20,000 Tukang kayu OH 15,000 Kepala tukang OH 1,500 Mandor OH 2,000
JUMLAH 38,500 DIBULATKAN 38,500 212.47 8,179,710
TOTAL 28,228,356.80
1 m2 - Pembersihan Lokasi
1 m1 - Pengukuran & pemasangan bouwplank
1 m2 - Kantor Direksi
1 m2 - Los Kerja / Gudang

RENCANA ANGGARAN BIAYA PEKERJAAN TANAH
NO URAIAN SAT.
TN : PEKERJAAN TANAH
Pekerja OHMandor OHAlat bantu set
JUMLAHDIBULATKAN
Pekerja OHMandor OH
JUMLAHDIBULATKAN
Pekerja OHMandor OHAlat bantu set
JUMLAHDIBULATKAN
1 m3 - Perataan Tanah
1 m3 - Galian Tanah Biasa Kedalamn 1 m - 2 m
1 m3 - Urugan tanah bekas galian pondasi ( manual )

RENCANA ANGGARAN BIAYA PEKERJAAN TANAH
HARGA VOLUME HARGA PEKERJAAN SATUAN
2,500 500 270 3,270 3,300 1220 402,600.00
26,300 5,200 31,500 31,500 117.25 3,693,375
25,000 2,000 2,430 29,430 29,400 43.96875 1,292,681.25
TOTAL 5,388,656.25

RENCANA ANGGARAN BIAYA PEKERJAAN PONDASI & BETON
NO URAIAN SAT.
PDS : PEKERJAAN PONDASI
Pekerja OHTukang batu OHMandor OHKepala tukang OH
JUMLAHDIBULATKAN
BTN : PEKERJAAN BETON
Pekerja OHTukang batu OHmandor OHAlat bantu set
JUMLAHDIBULATKAN
Pekerja OHTukang batu OHmandor OHConcrete vibrator jamAlat bantu set
JUMLAHDIBULATKAN
1 kg - Pembesian ( besi ulir )Pekerja OHTukang besi OHMandor OHAlat bantu set
JUMLAHDIBULATKAN
Pekerja OHTukang kayu OHMandor OHAlat bantu set
JUMLAHDIBULATKAN
Pekerja OHTukang kayu OHMandor OHAlat bantu set
JUMLAHDIBULATKAN
1 m3 - Pondasi Setempat/Pondasi Cakar Ayam
1 m3 - Cor beton K. 225 ( manual )
1 m3 - Cor beton K. 225 dengan readymix
1 m2 - Bekisting dengan triplex 9 mm + bongkaran dan penyiraman
1 m2 - Perancah kayu / stoot werk - tinggi s/d 4 m

RENCANA ANGGARAN BIAYA PEKERJAAN PONDASI & BETON
HARGA VOLUME HARGA PEKERJAAN SATUAN
75,000 112,500 60,000 4,500 252,000 252,000 20.57 5,183,640.00
90,000 19,560 58,580 21,018 189,158 189,200 263.2 49,797,440.00 87,480
34,425 10,328 6,880 14,457 8,261 74,351 74,400 320 23,808,000.00
750 375 500 81 1,706 1,700 87,480 148,716,000.00
8,250 29,550 2,700 5,063 45,563 45,600 300 13,680,000.00
54,000 56,700 5,400 26,123 142,223 142,200 120 17,064,000.00
TOTAL 258,249,080.00

RENCANA ANGGARAN BIAYA PEKERJAANPASANGAN BATA & PLESTERAN
No Item PekerjaanVOLUME
(Rp) (Rp)1 Pekerjaan Pasangan Bata Merah (1:5) : (per m2)
Ongkos Pasang : unit- Tukang Batu OH 7,500- Knek / Pekerja OH 16,000- Kepala Tukang OH 750- Mandor Sipil (Supervisi) OH 1,500
25,750 3005.1252 Pekerjaan Plesteran & Aci ( 1 : 5)
Ongkos Pasang : unit- Tukang Batu OH 11,250- Knek / Pekerja OH 10,000- Kepala Tukang OH 1,125- Mandor Sipil (Supervisi) OH 1,000
23,375 6010.25
TOTAL
Harga /m2 Harga Satuan /m2

HARGA PEKERJAAN
3005.125 77,381,969
140,489,594
217,871,563

RENCANA ANGGARAN BIAYA PEKERJAAN SANITARI
NO URAIAN SAT.
SNT : PEKERJAAN SANITER1 unit - Closet jongkok standar ex. TOTO
Pasir pasangSemen PC 50 kg kgcloset jongkok standar bhPekerja OHTukang batu OHKepala tukang OHMandor OH
JUMLAHDIBULATKAN
1 m2- Daun Pintu untuk KM/WCPasir pasang m³Semen PC 50 kg kgUrinoar toto bhPerlengkapan 30% harga urinoar -Pekerja OHTukang kayu OHKepala tukang kayu OHMandor OH
JUMLAH
DIBULATKAN1 Unit - Bak air fiber glass kap. 200 ltr
Pasir pasang m³Semen PC 50 kg ZakBak air fiber glass kap. 200 ltr bhPekerja OHTukang batu OHMandor OH
JUMLAHDIBULATKAN
1 unit - Pemasangan Kaca cermin ( t=6 mm )Cermin 6 mm Lengkap bhPekerja OHMandor OH
JUMLAHDIBULATKAN
m³

RENCANA ANGGARAN BIAYA PEKERJAAN SANITARI
HARGA VOLUME HARGA PEKERJAAN SATUAN
- - - 50,000 112,500 22,500 16,000 201,000 201,000 42 8,442,000
- - - - 50,000 75,000 7,500 10,000 142,500
142,500 84 11,970,000
- - - 60,000 75,000 70,000 205,000 205,000 42 8,610,000
- 49,125 41,420 90,545 90,500 42 3,801,000
TOTAL 32,823,000

RENCANA ANGGARAN BIAYA PEKERJAAN M & E
NO URAIAN SAT.
IL : PEK. INSTALASI PENERANGAN dan STOP KONTAK1 Ttk - Instalasi Penerangan & Stop Kontak
Fiting keramik 125 watt bhNYM 3 x 2.5 mm2Klem bhSaklar bhPipa Conduit PVC klas DPekerja OHTukang listrik OHPembantu instalator OH
JUMLAHDIBULATKAN
1Bh - Lampu Baret 40 wattLampu baret 40 watt bhPekerja OHTukang listrik OHPembantu instalatir OH
JUMLAHDIBULATKAN
1Bh - Stop kontak 3 (phase)Stop kontak 25A, 3 phase Brocco bhPekerja OHTukang listrik OHPembantu instalatir OH
JUMLAHDIBULATKAN
1Bh - Saklar tunggal BroccoSaklar tunggal bhPekerja OHTukang listrik OHPembantu instalatir OH
JUMLAHDIBULATKAN
1Bh - Saklar double BroccoSaklar double bhPekerja OHTukang listrik OHPembantu instalatir OH
JUMLAHDIBULATKAN
1 unit - Pasang Box Panel pembagiPHB induk uk. 80 x 60 x 40 bhNFB 100 A bhKabel scunt (sepatu kabel) Cu 25, 35 mm bhKabel scunt (sepatu kabel) Cu 50 mm bhMCB 32 A bhNH Fuse 50 A bbHolder fuse bh
m¹
m¹

Fiting keramik 250 watt bhSaklar bhKabel 10 m m¹Lampu indikator setPlat tembaga 0.5 m setPas. Ground bhPekerja OHMandor OHInstalatur/ Tukang listrik OH
JUMLAHDIBULATKAN
IA PEK. INSTALSI AIR BERSIH & PEMBUANGAN1 M' - Instalasi Pipa PVC type AW dia. 1 1/2 "
Pipa PVC m¹Perlengkapan 35 % harga pipa -Pekerja OHmandor OHTukang pasang pipa OHKepala tukang pipa OH
JUMLAHDIBULATKAN

RENCANA ANGGARAN BIAYA PEKERJAAN M & E
JUMLAH VOLUME HARGA PEKERJAAN
- - - - - 18,570 7,988 11,530 38,088 38,100 28 1,066,800
- 5,225 7,875 11,370 24,470 24,500 168 4,116,000
- 5,260 7,913 11,680 24,853 24,900 28 697,200
- 5,260 7,913 11,680 24,853 24,900 56 1,394,400
- 5,260 7,913 11,680 24,853 24,900 56 1,394,400
- - - - - - -

- - - - - - 25,000 5,000 37,500 67,500 67,500 28 1,890,000
- - 1,800 180 4,500 450 6,930 6,900 3000 20,700,000
TOTAL 31,258,800

RENCANA ANGGARAN BIAYA PEKERJAAN ATAP
NO URAIAN SAT.
PA : PEKERJAAN ATAP1 m2 - Pekerjaan Atap
Pekerja OHTukang kayu OHMandor OHKepala tukang OH
JUMLAHDIBULATKAN
2430

RENCANA ANGGARAN BIAYA PEKERJAAN ATAP
JUMLAH VOLUME HARGA PEKERJAAN
1,000 4,725 250 473 6,448 6,400 2430 15,552,000
TOTAL 49,743,360

RENCANA ANGGARAN BIAYA PEKERJAAN PLAFON & CAT
NO URAIAN SAT.
PC : PEKERJAAN CAT1 m2 - Cat dinding luar ( ICI Weathershield )
Cat setara dasar ICI - interior kgCat setara penutup 2x ICI - interior kgPlamur/ dempul tembok kgPekerja OHTukang cat OHMandor OHKepala tukang OH
JUMLAHDIBULATKAN
1 m2 - Cat dinding dalam ( Jotun )Cat setara dasar Jotun - interior kgCat setara penutup 2x Jotun - interior kgPlamur/ dempul tembok kgPekerja OHTukang cat OHMandor OHKepala tukang OH
JUMLAHDIBULATKAN

RENCANA ANGGARAN BIAYA PEKERJAAN PLAFON & CAT
JUMLAH VOLUME HARGA PEKERJAAN
- - - 1,000 4,725 250 473 6,448 6,400 1220 7,808,000
- - - 1,000 4,725 250 473 6,448 6,400 5342.4 34,191,360
TOTAL 41,999,360

RENCANA ANGGARAN BIAYA PEKERJAAN LANTAI
NO URAIAN SAT.
LT : PEKERJAAN LANTAI1 m2 - Lantai keramik 20 x 20 ad. 1 : 3
Pasir pasang m3Semen PC 50 kg kgSemen warna ( cor nat ) kgKeramik 20 x 20 standar m2Pekerja hrTukang batu hrMandor hrKepala Tukang hr
JUMLAHDIBULATKAN
1 m2 - Lantai keramik 40 x 40 ad. 1 : 3Pasir pasang m3Semen PC 50 kg kgSemen warna ( cor nat ) kgKeramik 40 x 40 standar m2Pekerja hrTukang batu hrMandor hrKepala Tukang hr
JUMLAHDIBULATKAN
1 m2 - Keramik dinding 20 x 20Pasir pasang m3Semen PC 50 kg kgSemen warna ( cor nat ) kgKeramik 20 x 20 standar m2Pekerja hrTukang batu hrMandor hrKepala Tukang hr
JUMLAHDIBULATKAN

RENCANA ANGGARAN BIAYA PEKERJAAN LANTAI
HARGA SAT. HARGA VOLUME HARGA PEKERJAAN SATUAN
- - - -
50,000 13,500 75,000 975 100,000 1,350 75,000 975
16,800 16,800 150 2,520,000
- - - -
50,000 12,500 75,000 9,000 100,000 1,250 75,000 900
23,650 23,700 3700 87,690,000
- - - -
50,000 14,500 75,000 11,250 100,000 1,370 75,000 1,125
28,245 28,200 294 8,290,800
TOTAL 98,500,800

NO ITEM PEKERJAAN NILAI RAB1 Pekerjaan Persiapan 28,228,357 2 Pekerjaan Tanah 7,672,471 3 Pekerjaan Pondasi & Cor 258,249,080 4 Pekerjaan Bata & Plesteran 217,871,563 5 Pekerjaan Atap 49,743,360 6 Pekerjaan Sanitari 32,823,000 7 Pekerjaan M/E 31,258,800 8 Pekerjaan Pengecatan 34,191,360 9 Pekerjaan Keramik 98,500,800
TOTAL NILAI PEKERJAAN 758,538,790 LUAS BANGUNAN 2,440 Harga/m2 310,877