RAB

70
01+049Dokumen Tender 05/06/2022HARGA BAHAN DAFTAR HARGA BAHAN PROYEK : BUSINESS PARK GORONTALO LOKASI : JL. BOTUTIHE NO. 08 GORONTALO PEKERJAAN : ARSITEKTUR NO URAIAN VOL SAT HARGA SATUAN 1 Granit Tile 60x60 1.00 m2 125,000.00 2 Semen PC 1.00 zak 55,000.00 3 Pasir pasang 1.00 m3 250,000.00 4 Semen Warna / AM Grout 1.00 zak 25,000.00 5 Keramik 25 x 45 1.00 m2 - 6 Keramik 30x30 1.00 m2 - 7 Stepnozing granit 1.00 m2 - 8 Granit Tile 60x60 Kolam Renang 1.00 m2 - 9 Granit Tile 60x60, type Rock 1.00 m2 - 10 Cat Traffic 1.00 m' - 11 Paving Stone 1.00 m2 - 12 Pattern Concrete 1.00 m2 - 13 Bata merah 1.00 bh - 14 Bata ringan, 60x20x10 1.00 bh - 15 Mortar Utama ( MU-380 ) 1.00 zak - 16 Keramik Dinding 30x30 1.00 m2 - 17 Keramik Dinding 25x45 1.00 m2 - 18 Siku L.40 pelindung kolom 1.00 kg - 19 Besi d.12 angker 1.00 kg - 20 Penutup plafond gypsum 1.00 m2 - 21 Rangka plafond metal furing 1.00 m2 - 22 Rangka plafond metal furing 1.00 m2 - 23 List Gypsum minimalis 1.00 m' - 24 Cat Dulux Weathershild ex-ICI 1.00 kg - 25 Alkali resistant 1.00 kg - 26 Plamir 1.00 kg - 27 Kertas gosok 1.00 lbr - 28 Cat Catylac 1.00 kg - 29 Alkali resistant 1.00 kg - 30 Plamir 1.00 kg - 31 Cat zincromate 1.00 kg - 32 Thineer 1.00 kg - 33 Cat besi 1.00 kg - 34 Thineer 1.00 kg - 35 Closed monoblok type CW 421 J ex Toto 1.00 unit - 36 Wastafel type LW 523 J ex Toto 1.00 unit - 37 Wastafel type LW 642 CJ ex Toto 1.00 unit - 38 Urinoir type U 57 M ex Toto 1.00 unit - 39 Mirror 110x135 cm bevel ex Asahimas 1.00 m2 - 40 Floor drain type TX 1 B ex Toto 1.00 unit - 41 Shower spray type 19 CSNCR 1.00 unit - 42 Jet Shower type TX 432 SH 1.00 unit - 43 Skat urinoir A 100 ex Toto 1.00 unit - 44 Dinding partisi pro Cubix 1.00 m2 - 45 Pintu partisi pro Cubix 1.00 m2 - 46 Meja wastafel granite 1.00 m2 - 47 Door handle with towel bar type TX 10 B ex Toto 1.00 unit -

Transcript of RAB

Page 1: RAB

01+049Dokumen Tender 04/12/2023HARGA BAHAN

DAFTAR HARGA BAHAN

PROYEK : BUSINESS PARK GORONTALO

LOKASI : JL. BOTUTIHE NO. 08 GORONTALO

PEKERJAAN : ARSITEKTUR

NO URAIAN VOL SAT

1 Granit Tile 60x60 1.00 m2 125,000.00 -

2 Semen PC 1.00 zak 55,000.00 -

3 Pasir pasang 1.00 m3 250,000.00 -

4 Semen Warna / AM Grout 1.00 zak 25,000.00 -

5 Keramik 25 x 45 1.00 m2 - -

6 Keramik 30x30 1.00 m2 - -

7 Stepnozing granit 1.00 m2 - -

8 Granit Tile 60x60 Kolam Renang 1.00 m2 - -

9 Granit Tile 60x60, type Rock 1.00 m2 - -

10 Cat Traffic 1.00 m' - -

11 Paving Stone 1.00 m2 - -

12 Pattern Concrete 1.00 m2 - -

13 Bata merah 1.00 bh - -

14 Bata ringan, 60x20x10 1.00 bh - -

15 Mortar Utama ( MU-380 ) 1.00 zak - -

16 Keramik Dinding 30x30 1.00 m2 - -

17 Keramik Dinding 25x45 1.00 m2 - -

18 Siku L.40 pelindung kolom 1.00 kg - -

19 Besi d.12 angker 1.00 kg - -

20 Penutup plafond gypsum 1.00 m2 - -

21 Rangka plafond metal furing 1.00 m2 - -

22 Rangka plafond metal furing 1.00 m2 - -

23 List Gypsum minimalis 1.00 m' - -

24 Cat Dulux Weathershild ex-ICI 1.00 kg - -

25 Alkali resistant 1.00 kg - -

26 Plamir 1.00 kg - -

27 Kertas gosok 1.00 lbr - -

28 Cat Catylac 1.00 kg - -

29 Alkali resistant 1.00 kg - -

30 Plamir 1.00 kg - -

31 Cat zincromate 1.00 kg - -

32 Thineer 1.00 kg - -

33 Cat besi 1.00 kg - -

34 Thineer 1.00 kg - -

35 Closed monoblok type CW 421 J ex Toto 1.00 unit - -

36 Wastafel type LW 523 J ex Toto 1.00 unit - -

37 Wastafel type LW 642 CJ ex Toto 1.00 unit - -

38 Urinoir type U 57 M ex Toto 1.00 unit - -

39 Mirror 110x135 cm bevel ex Asahimas 1.00 m2 - -

40 Floor drain type TX 1 B ex Toto 1.00 unit - -

41 Shower spray type 19 CSNCR 1.00 unit - -

42 Jet Shower type TX 432 SH 1.00 unit - -

43 Skat urinoir A 100 ex Toto 1.00 unit - -

44 Dinding partisi pro Cubix 1.00 m2 - -

45 Pintu partisi pro Cubix 1.00 m2 - -

46 Meja wastafel granite 1.00 m2 - -

47 Door handle with towel bar type TX 10 B ex Toto 1.00 unit - -

HARGA SATUAN

JUMLAH HARGA

Page 2: RAB

01+049Dokumen Tender 04/12/2023HARGA BAHAN

NO URAIAN VOL SAT HARGA SATUAN

JUMLAH HARGA

48 Paper holder type TX 703 AC ex Toto 1.00 unit - -

49 Hand Dryer Toto 1.00 unit - -

50 Pipa Stainless 2,5" 1.00 m' - -

51 Kusen UNP 10 1.00 m' - -

52 Kusen Aluminium 1.00 m' - -

53 Sealant 1.00 m' - -

54 Kaca Clear 5mm 1.00 m2 - -

55 Kaca Clear 10mm 1.00 m2 - -

56 Kaca Clear 12mm 1.00 m2 - -

57 Kaca Stopsol 1.00 m2 - -

58 Kaca Stopsol Blue Green 8mm 1.00 m2 - -

59 Pintu Frameless, 12mm tempered 1.00 m2 - -

60 Floor hinge 1.00 bh - -

61 Handle 1.00 bh - -

62 Kunci 1.00 bh - -

63 Fire Door 1.00 dn - -

Page 3: RAB

01+049Dokumen Tender 04/12/2023 UPAH KERJA

DAFTAR HARGA UPAH

PROYEK : BUSINESS PARK GORONTALO

LOKASI : JL. BOTUTIHE NO. 08 GORONTALO

PEKERJAAN : ARSITEKTUR

NO URAIAN SATUPAH KERJA

Rp

1 Pekerja 1 hari 40,000.00

2 Tukang Batu 1 hari 50,000.00

3 Tukang Besi 1 hari 50,000.00

4 Tukang Kayu 1 hari 55,000.00

5 Tukang Listrik 1 hari 50,000.00

6 M a n d o r 1 hari 60,000.00

7 Operator Terampil 1 hari 60,000.00

8 Operator Semi Terampil 1 hari 50,000.00

9 S o p i r 1 hari 60,000.00

10 Pembantu Sopir 1 hari 40,000.00

11 Mekanik terampil 1 hari 60,000.00

12 Pembantu Mekanik 1 hari 50,000.00

Page 4: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

ANALISA HARGA SATUAN

PROYEK : BUSINESS PARK GORONTALO

LOKASI : JL. BOTUTIHE NO. 08 GORONTALO

PEKERJAAN : ARSITEKTUR

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

A PEKERJAAN LANTAI

1 Lantai granit tile Coridor 60/60

Granit Tile 60x60 m2 1.050 125,000.00 - 131,250.00

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

131,250.00

2 Lantai granit tile Lift Lobby 60/60

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

-

3 Lantai granit tile kamar 60 x 60

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

-

4 Lantai keramik kamar mandi 25 x 45

Keramik 25 x 45 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

-

5 Lantai granit tile tangga 60/60

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

Page 5: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

6 Lantai keramik 30/30

Keramik 30x30 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

7 Step nosing tangga-granite tile

Stepnozing granit m2 0.200 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

8 Lantai Kayu area Kolam Renang

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

9 Bak kolam renang

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

10 Granit Tile Type Rock

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

11 Car stopper beton

Beton + Pembesian m3 0.020 - - -

Plaster m2 0.330 - - -

Upah dan alat m' 1.000 - - -

Page 6: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

12 Traffic Painting (marka)

Cat Traffic m' 1.000 - - -

Upah dan alat m' 1.000 - - -

13 Paving Stone

Paving Stone m2 1.015 - - -

Pasir + Pemadatan m3 0.100 - - -

Upah dan alat m2 1.000 - - -

14 Lantai screed stand

P.C zak 0.135 - - -

Pasir pasang m3 0.017 - - -

Upah Plaster m2 1.000 - - -

Upah dan alat m2 1.000 - - -

15 Lantai pattern concrete

Pattern Concrete m2 1.000 - - -

PC zak 0.017 - - -

Pasir pasang m3 0.100 - - -

Upah dan alat m2 1.000 - - -

B PEKERJAAN DINDING

1 Pasangan bata

Bata merah bh 50.000 - - -

Mortar Utama ( MU-380 ) zak 0.460 - - -

Practical concrete m3 0.005 - - -

Upah dan alat m3 1.000 - - -

2 Pasangan bata ringan

Bata ringan, 60x20x10 bh 8.500 - - -

Mortar Utama ( MU-380 ) zak 0.200 - - -

Practical concrete m3 0.005 - - -

Upah dan alat m2 1.000 - - -

-

3 Plesteran + acian dinding

P.C zak 0.135 - - -

Pasir pasang m3 0.017 - - -

Upah Plaster m2 1.000 - - -

Upah Acian m2 1.000 - - -

Page 7: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

4 Benangan kolom+dinding

P.C zak 0.020 - - -

Pasir pasang m3 0.005 - - -

Upah dan alat m' 1.000 - - -

5 Dinding KM unit keramik 30x30

Keramik 30x30 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

Jumlah -

6 Dinding KM unit keramik 25x45

Keramik 25x45 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

7 Dinding granit tile lift lobby 60/60

Granit Tile 60x60 m2 1.050 - - -

Semen PC zak 0.100 - - -

Pasir pasang m3 0.030 - - -

Semen warna/ AM Grout zak 0.020 - - -

Upah dan alat m2 1.000 - - -

8 Siku pelindung kolom parkir L 40mm

Siku L.40 kg 2.512 - - -

Besi d.12 angker kg 0.444 - - -

Cat besi m2 0.100 - - -

Upah dan alat m' 1.000 - - -

C PEKERJAAN PLAFOND

1 Acian langit-langit beton

P.C zak 0.136 - - -

Upah dan alat m2 1.000 - - -

2 Plafond gypsum

Penutup plafond gypsum m2 1.000 - - -

Rangka plafond metal furing m2 1.000 - - -

Page 8: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

Page 9: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

3 Plafond gypsum lengkung / m2

Penutup plafond gypsum m2 1.000 - - -

Rangka plafond metal furing m2 1.000 - - -

4 List Gypsum minimalis

List Gypsum minimalis m' 1.000 - - -

Upah dan alat m' 1.000 - - -

5 Benangan Balok

P.C zak 0.020 - - -

Pasir pasang m3 0.005 - - -

Upah dan alat m' 1.000 - - -

D PEKERJAAN CAT

1 Cat dinding

Cat Dulux Weathershild ex-ICI kg 0.167 - - -

Alkali resistant kg 0.120 - - -

Plamir kg 0.015 - - -

Kertas gosok lbr 0.010 - - -

Upah dan alat m2 1.000 - - -

2 Cat Plafond

Cat Catylac kg 0.167 - - -

Alkali resistant kg 0.120 - - -

Plamir kg 0.015 - - -

Kertas gosok lbr 0.010 - - -

Upah dan alat m2 1.000 - - -

3 CAT ZINCROMATE / M2

Cat zincromate kg 0.220 - - -

Thineer kg 0.200 - - -

Kertas gosok lbr 0.200 - - -

Upah dan Alat m2 1.000 - - -

4 CAT BESI / M2

Cat besi kg 0.350 - - -

Thineer kg 0.200 - - -

Kertas gosok lbr 0.100 - - -

Upah dan Alat m2 1.000 - - -

Page 10: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

5 Cat Tekstur Kolom

Cat Dulux Weathershild ex-ICI kg 0.333 - - -

Alkali resistant kg 0.200 - - -

Plamir kg 0.015 - - -

Kertas gosok lbr 0.010 - - -

Upah dan alat m2 1.000 - - -

E PEKERJAAN KAMAR MANDI WC

1 Closed monoblok type CW 421 J ex Toto

CW 421 J unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

2 Wastafel type LW 523 J ex Toto

LW 523 J unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

3 Wastafel type LW 642 CJ ex Toto

LW 642 CJ unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

4 Urinoir type U 57 M ex Toto

U 57 M unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

5 Mirror 110x135 cm bevel ex Asahimas

Mirror m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

6 Floor drain type TX 1 B ex Toto

TX 1 B unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

7 Shower spray type 19 CSNCR

19 CSNCR unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

Page 11: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

8 Jet Shower type TX 432 SH

TX 432 SH unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

9 Skat urinoir A 100 ex Toto

A 100 unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

10 Dinding partisi pro Cubix

Partisi Cubical m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

11 Pintu partisi pro Cubix

Pintu Partisi Cubical m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

12 Meja wastafel granite

Meja wastafel granite m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

13 Door handle with towel bar type TX 10 B ex Toto

TX 10 B unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

14 Paper holder type TX 703 AC ex Toto

TX 703 AC unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

15 Hand Dryer Toto

Hand Dryer unit 1.000 - - -

Upah dan Alat unit 1.000 - - -

16 Bak Kontrol

Bak kontrol bh 1.000 - - -

Upah dan Alat bh 1.000 - - -

Page 12: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

F PEKERJAAN RAILLING

1 Railling Tangga B stainless stell Ø 2.5”

Pipa Stainless 2,5" m' 1.000 - - -

Accsesories m' 1.000 - - -

Upah dan alat m' 1.000 - - -

2 Railling Tangga C stainless stell Ø 2.5”

Pipa Stainless 2,5" m' 1.000 - - -

Accsesories m' 1.000 - - -

Upah dan alat m' 1.000 - - -

-

G PEKERJAAN PINTU & JENDELA

1 Kusen Besi (Pintu SD2)

Kusen UNP 10 m' 1.000 - - -

Cat besi m' 1.000 - - -

Upah dan Alat m' 1.000 - - -

2 Kusen Aluminium

Kusen Aluminium m' 1.000 - - -

Upah dan Alat m' 1.000 - - -

3 Sealant

Sealant m' 1.000 - - -

Upah dan Alat m' 1.000 - - -

4 Kaca Clear 5mm

Kaca Clear 5mm m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

-

5 Kaca Clear 10mm

Kaca Clear 10mm m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

-

6 Kaca Clear 12mm

Kaca Clear 12mm m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

Page 13: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

7 Kaca Stopsol Blue Green 5mm

Kaca Stopsol m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

8 Kaca Stopsol Blue Green 8mm

Kaca Stopsol m2 1.000 - - -

Upah dan Alat m2 1.000 - - -

9 Daun Pintu SD1

Daun Pintu (PLAT), uk 91,5x210 dn 1.000 - - -

Engsel bh 3.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

-

10 Daun Pintu SD2

Daun Pintu (PLAT), uk 79x210 dn 1.000 - - -

Engsel bh 3.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

11 Daun Pintu DW1

Pintu Frameless, 12mm tempered m2 2.772 - - -

Floor hinge bh 1.000 - - -

Handle bh 2.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

12 Daun Pintu DW2

Pintu Frameless, 12mm tempered m2 5.100 - - -

Floor hinge bh 2.000 - - -

Kunci bh 2.000 - - -

Handle bh 2.000 - - -

Upah dan Alat dn 1.000 - - -

13 Daun Pintu DW3

Pintu Frameless, 12mm tempered dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

Page 14: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

14 Daun Pintu DWT

Pintu Frameless, 12mm tempered m2 1.365 - - -

Engsel bh 2.000 - - -

Kunci bh 1.000 - - -

Handle bh 2.000 - - -

Upah dan Alat dn 1.000 - - -

15 Daun Pintu D1

Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

-

16 Daun Pintu D2

Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

17 Daun Pintu D3

Daun Pintu (Panel),kaca + Accessories dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

18 Daun Pintu D4

Daun Pintu (Panel),kaca + Accessories dn 2.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

19 Daun Pintu D6

Daun Pintu dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

19 FD1(FIRE DOOR)

Fire Door dn 1.000 - - -

Jumlah -

Page 15: RAB

01+045 01+048Dokumen Tender 04/12/2023 ANALISA HARGA

NO URAIAN SAT KOEF.

HARGAJUMLAH HARGA

MATERIAL UPAH

Rp. Rp. Rp.

20 Kusen type SHD1(SHAFT DOOR)

Daun Pintu dn 1.000 - - -

Hinge bh 2.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

Jumlah -

21 Kusen type SHD2(SHAFT DOOR)

Daun Pintu dn 1.000 - - -

Floor hinge bh 2.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

22 Daun Pintu DF1

Pintu Frameless, 12mm tempered dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

23 Daun Pintu DJ

Daun Pintu (PANEL),Jalusi dn 1.000 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

-

24 Jendela WDS

Frame Pintu Aluminium m' 6.200 - - -

Floor hinge bh 1.000 - - -

Kunci bh 1.000 - - -

Upah dan Alat dn 1.000 - - -

-

Page 16: RAB

01+048Dokumen Tender 04/12/2023BILL REKAP

MULTI CONSTRUCT INDONESIAPROYEK BUSINESS PARK GORONTALO

REKAPITULASI PAKET PEKERJAAN V DAN VIPEKERJAAN STRUKTUR DAN ARSITEKTUR

NOTOTAL

MATERIAL UPAHRp. Rp.

A BILL NO. 01 PRELIMINARIES - -B BILL NO. 02 STRUKTUR BETON LT. 01 S/D ATAP - -C BILL NO. 03 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( FAS. HOTEL ) - -D BILL NO. 04 PEKERJAAN FINISHING DASAR LANTAI DASAR ( FAS. HOTEL ) - -E BILL NO. 05 PEKERJAAN FINISHING DASAR LANTAI 03 ( FAS. HOTEL ) - -F BILL NO. 06 PEKERJAAN FINISHING DASAR LANTAI 04 ( FAS. HOTEL ) - -G BILL NO. 07 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( MALL ) - -H BILL NO. 08 PEKERJAAN FINISHING DASAR LANTAI DASAR ( MALL ) - -I BILL NO. 09 PEKERJAAN FINISHING DASAR LANTAI 01 ( MALL ) - -J BILL NO. 10 PEKERJAAN FINISHING DASAR LANTAI 02 ( MALL ) - -K BILL NO. 11 PEKERJAAN FINISHING DASAR LANTAI 03 ( MALL ) - -L BILL NO. 12 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 01 & 03 ( HOTEL ) - -M BILL NO. 13 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 02 & 04 ( HOTEL ) - -N BILL NO. 14 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 05 ( HOTEL ) - -O BILL NO. 15 PEKERJAAN FINISHING ATAP DAN GONDOLA - -P BILL NO. 16 PEKERJAAN LANDSEKAP - -

TOTAL ( exclude ppn ) - -Ppn 10% - -

TOTAL ( include ppn ) - --

DIBULATKAN --

Page 17: RAB

01+048Dokumen Tender 04/12/2023BILL 01 PREMLIMINARIES

BQ PAKET V DAN VI

A BILL. NO. 01 PRELIMINARIES

No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

I. PEKERJAAN PERSIAPAN & PENUNJANG

1 PERALATAN

1 Bar Bender -

2 Bar Cutter -

3 Electric Concrete Vibrator -

4 Compressor -

5 Theodolite -

6 Waterpass -

7 Concrete Pump -

8 Concrete Tremie -

9 Drum -

10 Lifting Hoist -

11 Scafolding for Facade -

12 Concrete Mixer -

13 Summersible pump -

14 Cable & Lamp dll asesories elektrikal -

15 Mob. & Demob Of Equipments (except TC) -

16 Lain-lain -

2 Overhead, Site Facilities & Personnel Cost

1 Kontractor memelihara & melindungi fasilitas umum proyek -

2 Restricted used of site -

3 Akses sementara di lokasi -

4 Peninjauan lokasi sebelum pelelangan -

5 Drainase sementara & Pompa selama pelaksanaan -

7 Site Meeting selama pelaksanaan -

8 Test & Sample -

9 Site Management Costs -

10 Membuat laporan -

11 Faktor K3 termasuk barikade dalam pekerjaan -

12 Semua perijinan sehubungan pelaksanaan pekerjaan -

14 Pengukuran -

15 Kantor lapangan, gudang, barak pekerja dll -

16 Air kerja -

17 Jaring sementara sisi luar -

18 Pembersihan & pembuangan sampah selama pelaksanaan pekerjaan. -

19 Pembersihan lahan saat selesainya pekerjaan -

21 Shop drawings -

22 As Built drawings -

24 Photographs -

25 PLN + PDAM + Telp. for Site office (Connection + Monthly) -

27 Security -

28 Fire Extingueshers -

29 Sign Board -

30 Lain-lain segala sesuatu yang diperlukan untuk menunjang kelancaran -

pelaksanaan pekerjaan

Page 18: RAB

01+048Dokumen Tender 04/12/2023BILL 01 PREMLIMINARIES

No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

Page 19: RAB

01+048Dokumen Tender 04/12/2023BILL 01 PREMLIMINARIES

No JENIS PEKERJAAN SAT. KUANTITAS HARGA KETERANGAN

Catatan :

1 Manajemen & cara kerja setiap kontraktor berbeda, karena itu kontraktor

harus memperkirakan sendiri segala hal yang diperlukan untuk menun-

jang kelancaran pelaksanaan & penyelesaian proyek sesuai dengan

rencana kerja masing-masing.

2 Daftar yang ada adalah untuk menolong mempercepat proses pembuatan

penawaran.

Page 20: RAB

01+049Dokumen Tender 04/12/2023BILL 02

BQ PAKET V PEKERJAAN STRUKTUR

B BILL. NO. 02 STRUKTUR BETON LT. 01 S/D ATAP

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I STRUKTUR BETON KOLOM KOMPOSIT

Referensi Gambar : No. FTD.1012 A S/D B Lt. Dasar 1 Beton Kolom K = 250 KG/M2 S/D LT. 05 m3 457.95 - - - -

Termasuk pembesian dan begesting

II STRUKTUR BETON TANGGA BETON

Referensi Gambar : No. ARS. Lt. Basement 1 Beton tebal Tangga K = 250 KG/M2 S/D LT. 05 m3 - - - -

Termasuk pembesian dan begesting

III STRUKTUR BETON SHEAR WALL

Referensi Gambar : No. FTD.1002D Lt. Basement 1 Beton Shear Wall K = 250 KG/M2 S/D LT. 05 m3 551.59 - - - -

Termasuk pembesian dan begesting

IV STRUKTUR BETON CORE WALL

Referensi Gambar : No. FTD.1506 D Lt. Basement 1 Beton Core Wall K = 250 KG/M2 S/D LT. 05 m3 372.06 - - - -

Termasuk pembesian dan begesting

V STRUKTUR BETON RAMP

Referensi Gambar : No. STR.1601 Lt. Basement 1 Plat Beton Ramp K = 250 KG/M2 S/D LT. DASAR m3 62.28 - - - -

Termasuk pembesian dan begesting 2 Balok Ramp 300/500 m3 6.72 - - - -

3 Balok Ramp 300/650 m3 40.44 - - - -

VI STRUKTUR BETON ATAP HOTEL

Referensi Gambar : No. ARS. Area Hotel 1 Plat Atap Beton Hotel K = 250 KG/M2 LT. 05 m3 192.00 - - - -

Termasuk pembesian dan begesting 2 Balok Beton Hotel K = 250 KG/M2 m3 246.24 - - - -

Termasuk pembesian dan begesting

VIII BETON SUMPIT

Referensi Gambar : No. FTD.8001 S/D 9014 Lt. Basement 1 Plat Beton Sumpit Grace trap & Pit Lift K = 250 KG/M2 m3 17.34 - - - -

Termasuk pembesian dan begesting

Page 21: RAB

01+049Dokumen Tender 04/12/2023BILL 02

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

IX PLAT LANTAI R. KM HOTEL

Referensi Gambar : No. FTD. Area Hotel 1 Plat Beton KM Hotel Lantai 01 S/D Lantai 05 LT. 01 S/D LT. 05 m3 129.46 - - - -

Termasuk pembesian dan begesting

Page 22: RAB

01+048Dokumen Tender 04/12/2023 BILL 03

BQ PAKET VI PEKERJAAN FINISHING

C BILL. NO. 03 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( FASILITAS HOTEL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel

Referensi Gambar : No. ARS. 1101-B Lt. Basement 1 Kolom Praktis m3 14.26 - - - -

2 Balok Praktis m3 5.63 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel

Referensi Gambar : No. ARS. Lt. Basement 1 Beton tebal 4 cm tanpa wire mesh m2 653.58 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel

Referensi Gambar : No. ARS. 1101-B Lt. Basement 1 Pasangan Dinding Dalam Bata Ringan m2 2,081.25 - - - -

Spesi menggunakan MU 2 Plesteran & Acian m2 4,162.50 - - - -

3 Benangan kolom dan dinding m' 616.00 - - - -

4 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 582.42 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel

Referensi Gambar : No. ARS. 1101-B Lt. Basement 1 Waterprofing lantai KM m2 83.78 - - - -

2 Dinding Toilet Homogenous 60x60 m2 101.44 - - - -

3 Lantai Toilet Homogenus 60x60 m2 83.78 - - - -

4 Lantai Granite 60x60 m2 125.27 - - - -

5 Plint Lantai Granite 10x60 m' 72.15 - - - -

6 Lantai Keramik 40 x 40 m2 444.54 - - - -

7 Plint Lantai keramik 10x40 m' 385.13 - - - -

Untuk Lantai R. karaoke masuk pada Pekerjaan Interior

Page 23: RAB

01+049Dokumen Tender 04/12/2023 BILL 04

BQ PAKET VI PEKERJAAN FINISHING

D BILL. NO. 04 PEKERJAAN FINISHING DASAR LANTAI DASAR ( FASILITAS HOTEL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel

Referensi Gambar : No. ARS. 1102-B Lt. Dasar 1 Kolom Praktis m3 3.03 - - - -

2 Balok Praktis m3 1.71 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel

Referensi Gambar : No. ARS. 1102-B Lt. Dasar 1 Beton tebal 4 cm tanpa wire mesh m2 217.21 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel

Referensi Gambar : No. ARS. 1102-B Lt. Dasar 1 Pasangan Dinding Dalam Bata Ringan m2 431.10 - - - -

Spesi menggunakan MU 2 Plesteran & Acian m2 627.05 - - - -

3 Benangan kolom dan dinding m' 180.18 - - - -

4 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 118.88 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel

Referensi Gambar : No. ARS. 1102-B

1 Lantai Granite 60x60 Lt. Dasar m2 182.09 - - - -

2 Plint Lantai Granite 60x60 m' 73.05 - - - -

3 Lantai Homogenous 60x60 coridor luar m2 35.12 - - - -

Page 24: RAB

01+049Dokumen Tender 04/12/2023BILL 05

BQ PAKET VI PEKERJAAN FINISHING

E BILL NO. 05 PEKERJAAN FINISHING DASAR LANTAI 03 ( FASILITAS HOTEL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel Lt. 03

Referensi Gambar : No. ARS. 1105-B

1 Kolom Praktis m3 17.08 - - - -

2 Balok Praktis m3 7.28 - - - -

3 Meja beton dudukan washthafel m3 0.19 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel Lt. 03

Referensi Gambar : No. ARS. 1105-B

1 Beton tebal 4 cm tanpa wire mesh m2 656.64 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Fasilitas Hotel Lt. 03

Referensi Gambar : No. ARS. 1105-B

1 Pasangan Dinding Luar Bata merah m2 888.53 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 1,147.41 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 2,961.36 - - - -

4 Benangan kolom dan dinding m' 408.75 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 572.57 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel Lt. 03

Referensi Gambar : No. ARS. 1105-B

1 Waterprofing lantai KM m2 98.71 - - - -

2 Dinding Toilet Homogenous 60x60 m2 85.96 - - - -

3 Lantai Toilet Homogenus 60x60 m2 31.20 - - - -

4 Lantai Granite 60x60 m2 213.84 - - - -

5 Plint Lantai Granite 10x60 m' 140.00 - - - -

6 Lantai Keramik 40 x 40 m2 321.80 - - - -

7 Plint Lantai keramik 10x40 m' 137.00 - - - -

8 Lantai Coridor Service Homogenous 40 x 40 m2 89.80 - - - -

9 Plint Lantai Homogenous 10x40 m' 87.00 - - - -

Page 25: RAB

01+049Dokumen Tender 04/12/2023BILL 06

BQ PAKET VI PEKERJAAN FINISHING

F BILL NO. 06 PEKERJAAN FINISHING DASAR LANTAI 04 ( FASILITAS HOTEL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Fasilitas Hotel Lt. 04

Referensi Gambar : No. ARS. 1106-B

1 Kolom Praktis m3 23.80 - - - -

2 Balok Praktis m3 10.14 - - - -

3 Meja beton dudukan washthafel m3 0.67 - - - -

II PEKERJAAN COR TOPPING HCS Fasilitas Hotel Lt. 04

Referensi Gambar : No. ARS. 1106-B

1 Beton tebal 4 cm tanpa wire mesh m2 2,837.85 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERA Fasilitas Hotel Lt. 04

Referensi Gambar : No. ARS. 1106-B

1 Pasangan Dinding Dalam Bata merah m2 2,065.64 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Luar bata ringan m2 777.15 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 4,134.96 - - - -

4 Benangan kolom dan dinding m' 556.00 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 1,245.16 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Fasilitas Hotel Lt. 04

Referensi Gambar : No. ARS. 1106-B

1 Waterprofing lantai KM m2 147.16 - - - -

2 Dinding Toilet Homogenous 60x60 m2 166.32 - - - -

3 Dinding Swimming Pool Mozaik Keramik m2 51.25 - - - -

4 Lantai Swimming Pool Mozaik Keramik m2 140.27 - - - -

5 Lantai Toilet Homogenus 60x60 m2 71.24 - - - -

6 Lantai Pool Deck Homogeneus Rock 60x60 m2 192.22 - - - -

7 Plint Lantai Pool Deck Homogeneus 10x60 m' 45.48 - - - -

8 Lantai Keramik 40x40 m2 141.40 - - - -

9 Plint Lantai Keramik 10X40 m' 126.50 - - - -

10 Lantai Homogenius 60x60 m2 171.36 - - - -

11 Plint LantaiHomogenius 10x60 m' 163.50 - - - -

12 Lantai Granite 60x60 m2 2,121.36 - - - -

13 Plint Lantai Granite 10x60 m' 491.53 - - - -

Page 26: RAB

BQ PAKET VI PEKERJAAN FINISHING

G BILL NO. 7 PEKERJAAN FINISHING DASAR LANTAI BASEMENT ( MALL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. Basement

Referensi Gambar : No. ARS. 1101

1 Kolom Praktis m3 10.64 - - - -

2 Balok Praktis m3 9.35 - - - -

3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. Basement

Referensi Gambar : No. ARS. 1101

1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. Basement

Referensi Gambar : No. ARS. 1101

1 Pasangan Dinding Luar Bata merah m2 854.95 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 439.70 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 2,071.44 - - - -

4 Benangan kolom dan dinding m' 341.94 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 765.77 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. Basement

Referensi Gambar : No. ARS. 1101

1 Waterprofing lantai KM m2 57.41 - - - -

2 Dinding Toilet Homogenous 60x60 m2 101.66 - - - -

3 Lantai Toilet Homogenus 60x60 m2 35.26 - - - -

V PEKERJAAN CAR STOPER

Referensi Gambar : No. ARS. 3611

1 Car Stoper beton uk. 200x150 Basement Un 146.00 - - - -

Besi stek D.22 Epoxy Zone 1 Dan Zone 2

2 Garis Pembatas Finish Cat Basement m' 483.00 - - - -

Zone 1 Dan Zone 2

VI PEKERJAAN CONNER GUARD

Referensi Gambar : No. ARS. 3611

1 Conner guard kolom ( Besi Siku L 50x50 ) Basement m' 177.00 - - - -

Finis Cat Zone 1 Dan Zone 2

2 Tali air m' 377.60 - - - -

VII PEKERJAAN PULAU PULAU

Referensi Gambar : No. ARS. 3611

1 Canstein cor 150/100 Basement m' 169.58 - - - -

Zone 1 Dan Zone 2

2 Urugan pasir padat m2 226.28 - - - -

3 Screed Finis trowel m2 226.28 - - - -

4 Tali air m' 508.73 - - - -

Page 27: RAB

01+049Dokumen Tender 04/12/2023BILL 08

BQ PAKET VI PEKERJAAN FINISHING

H BILL NO. 08 PEKERJAAN FINISHING DASAR LANTAI DASAR ( MALL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. Dasar

Referensi Gambar : No. ARS. 1103

1 Kolom Praktis m3 10.38 - - - -

2 Balok Praktis m3 9.12 - - - -

3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. Dasar

Referensi Gambar : No. ARS. 1103

1 Beton tebal 4 cm tanpa wire mesh m2 4,099.00 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. Dasar

Referensi Gambar : No. ARS. 1103

1 Pasangan Dinding Luar Bata merah m2 834.10 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 2,677.70 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 5,618.89 - - - -

4 Benangan kolom dan dinding m' 500.40 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 1,120.64 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. Dasar

Referensi Gambar : No. ARS. 1103

1 Waterprofing lantai KM m2 65.72 - - - -

2 Dinding Toilet Homogenous 60x60 m2 127.01 - - - -

3 Lantai Toilet Homogenus 60x60 m2 48.80 - - - -

Page 28: RAB

01+049Dokumen Tender 04/12/2023BILL 09

BQ PAKET VI PEKERJAAN FINISHING

I BILL NO. 09 PEKERJAAN FINISHING DASAR LANTAI 01 ( MALL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 01

Referensi Gambar : No. ARS. 1105-A

1 Kolom Praktis m3 8.52 - - - -

2 Balok Praktis m3 4.99 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 01

Referensi Gambar : No. ARS. 1106-B

1 Beton tebal 4 cm tanpa wire mesh m2 4,099.00 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 01

Referensi Gambar : No. ARS. 1106-B

1 Pasangan Dinding Luar Bata merah m2 784.75 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 351.76 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 1,818.42 - - - -

4 Benangan kolom dan dinding m' 417.00 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 933.87 - - - -

Page 29: RAB

01+049Dokumen Tender 04/12/2023 BILL 10

BQ PAKET VI PEKERJAAN FINISHING

J BILL NO. 10 PEKERJAAN FINISHING DASAR LANTAI 02 ( MALL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 02

Referensi Gambar : No. ARS. 1105-A

1 Kolom Praktis m3 13.85 - - - -

2 Balok Praktis m3 11.11 - - - -

3 Meja beton dudukan washthafel m3 0.29 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 02

Referensi Gambar : No. ARS. 1106-B

1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 02

Referensi Gambar : No. ARS. 1106-B

1 Pasangan Dinding Luar Bata merah m2 734.50 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 2,692.60 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 5,483.36 - - - -

4 Benangan kolom dan dinding m' 556.00 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 1,120.64 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. 02

Referensi Gambar : No. ARS. 1106-B

1 Waterprofing lantai KM m2 65.54 - - - -

2 Dinding Toilet Homogenous 60x60 m2 104.00 - - - -

3 Lantai Toilet Homogenus 60x60 m2 48.56 - - - -

4 Lantai Keramik 40x40 m2 442.46 - - - -

5 Plint Lantai Keramik 10X40 m' 78.70 - - - -

Page 30: RAB

01+049Dokumen Tender 04/12/2023BILL 11

BQ PAKET VI PEKERJAAN FINISHING

K BILL NO. 11 PEKERJAAN FINISHING DASAR LANTAI 03 ( MALL )

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Mall Lt. 03

Referensi Gambar : No. ARS. 1105-A

1 Kolom Praktis m3 10.38 - - - -

2 Balok Praktis m3 9.12 - - - -

3 Meja beton dudukan washthafel m3 0.35 - - - -

II PEKERJAAN COR TOPPING HCS Mall Lt. 03

Referensi Gambar : No. ARS. 1106-B

1 Beton tebal 4 cm tanpa wire mesh m2 347.79 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Mall Lt. 03

Referensi Gambar : No. ARS. 1106-B

1 Pasangan Dinding Luar Bata merah m2 834.10 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Dalam bata ringan m2 439.70 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 2,038.08 - - - -

4 Benangan kolom dan dinding m' 333.60 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 747.10 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Mall Lt. 03

Referensi Gambar : No. ARS. 1106-B

1 Waterprofing lantai KM m2 53.80 - - - -

2 Dinding Toilet Homogenous 60x60 m2 127.01 - - - -

3 Lantai Toilet Homogenus 60x60 m2 52.81 - - - -

4 Lantai Keramik 40x40 m2 294.98 - - - -

5 Plint Lantai Keramik 10X40 m' 78.70 - - - -

Page 31: RAB

01+049Dokumen Tender 04/12/2023BILL 12

BQ PAKET VI PEKERJAAN FINISHING

L BILL NO. 12 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 01 & 03 HOTEL

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Typikal Lt. 01 & 03

Referensi Gambar : No. ARS.1108 ( Hotel ) 1 Kolom Praktis m3 7.17 - - - -

2 Balok Praktis m3 10.13 - - - -

3 Meja beton dudukan washthafel dan khitchen m3 3.37 - - - -

II PEKERJAAN COR TOPPING HCS Typikal Lt. 01 & 03

Referensi Gambar : No. ARS.1108 ( Hotel ) 1 Beton tebal 5 cm menggunakan wire mesh m2 1,256.53 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Typikal Lt. 01 & 03

Referensi Gambar : No. ARS.1108 ( Hotel ) 1 Pasangan Dinding Dalam Bata merah m2 1,588.99 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Luar bata ringan m2 352.32 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 3,358.15 - - - -

4 Benangan kolom dan dinding m' 384.42 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 2,800.42 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Typikal Lt. 01 & 03

Referensi Gambar : No. ARS.1108 ( Hotel ) 1 Waterprofing lantai KM m2 346.89 - - - -

2 Dinding Toilet Marmer Travertine 60x60 m2 848.56 - - - -

3 Lantai Toilet Marmer Travertine 60x60 m2 165.57 - - - -

4 Lantai Ruang Tidur Homogenous 60x60 m2 908.63 - - - -

5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 794.65 - - - -

6 Lantai Coridor Homogenous Tile 60x60 m2 142.06 - - - -

7 Plint Lantai Coridor Homogenous Tile 10x60 m' 220.40 - - - -

8 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -

9 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -

10 Lantai R linen Keramik 40x40 m2 3.80 - - - -

11 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -

12 Lantai R ME Keramik 40x40 m2 4.90 - - - -

Page 32: RAB

01+049Dokumen Tender 04/12/2023BILL 13

BQ PAKET VI PEKERJAAN FINISHING

M BILL NO. 13 PEKERJAAN FINISHING DASAR TYPICAL LANTAI 02 & 04 HOTEL

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Typikal Lt. 02 & 04

Referensi Gambar : No. ARS.1111 ( Hotel ) 1 Kolom Praktis m3 8.17 - - - -

2 Balok Praktis m3 11.43 - - - -

3 Meja beton dudukan washthafel dan khitchen m3 3.25 - - - -

II PEKERJAAN COR TOPPING HCS Typikal Lt. 02 & 04

Referensi Gambar : No. ARS.1111 ( Hotel ) 1 Beton tebal 5 cm menggunakan wire mesh m2 1,217.41 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Typikal Lt. 02 & 04

Referensi Gambar : No. ARS.1111 ( Hotel ) 1 Pasangan Dinding Dalam Bata merah m2 1,811.53 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Luar bata ringan m2 248.03 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 3,530.68 - - - -

4 Benangan kolom dan dinding m' 437.60 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 3,097.06 - - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Typikal Lt. 02 & 04

Referensi Gambar : No. ARS.1111 ( Hotel ) 1 Waterprofing lantai KM m2 346.89 - - - -

2 Dinding Toilet Marmer Travertine 60x60 m2 848.56 - - - -

3 Lantai Toilet Marmer Travertine 60x60 m2 165.57 - - - -

4 Lantai Ruang Tidur Homogenous 60x60 m2 821.51 - - - -

5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 751.09 - - - -

6 Lantai teras R. Tidur Homogenous 60x60 m2 48.00 - - - -

7 Plint Lantai teras R. Tidur Homogenous 60x60 m' 105.60 - - - -

8 Lantai Coridor Homogenous Tile 60x60 m2 142.06 - - - -

9 Plint Lantai Coridor Homogenous Tile 10x60 m' 220.40 - - - -

10 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -

11 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -

12 Lantai R linen Keramik 40x40 m2 3.80 - - - -

13 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -

14 Lantai R ME Keramik 40x40 m2 4.90 - - - -

Page 33: RAB

01+049Dokumen Tender 04/12/2023BILL 14

BQ PAKET VI PEKERJAAN FINISHING

N BILL NO. 14 PEKERJAAN FINISHING DASAR LANTAI 05 HOTEL

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN BETON NON STRUKTURAL Lantai 05 ( Hotel )

Referensi Gambar : No. ARS.1111A

1 Kolom Praktis m3 8.90 - - - -

2 Balok Praktis m3 8.83 - - - -

3 Meja beton dudukan washthafel dan khitchen m3 4.52 - - - -

II PEKERJAAN COR TOPPING HCS Lantai 05 ( Hotel )

Referensi Gambar : No. ARS.1111A

1 Beton tebal 5 cm menggunakan wire mesh m2 2,162.52 - - - -

III PEKERJAAN PASANGAN DINDING DAN PLESTERAN Lantai 05 ( Hotel )

Referensi Gambar : No. ARS.1111A

1 Pasangan Dinding Dalam Bata merah m2 1,611.16 - - - -

Spesi menggunakan MU 2 Pasangan Dinding Luar bata ringan m2 487.32 - - - -

Spesi menggunakan MU 3 Plesteran & Acian m2 3,777.26 - - - -

4 Benangan kolom dan dinding m' 416.60 - - - -

5 Tali Air Dindingkusen pintu , jendela dan plint Lantai m' 2,352.53 - - - -

- - - -

IV PEKERJAAN PELAPIS DINDING DAN LANTAI Lantai 05 ( Hotel )

Referensi Gambar : No. ARS.1111A

1 Waterprofing lantai KM m2 373.59 - - - -

2 Dinding Toilet Marmer Travertine 60x60 m2 811.09 - - - -

3 Lantai Toilet Marmer Travertine 60x60 m2 200.76 - - - -

4 Lantai Ruang Tidur Homogenous 60x60 m2 984.76 - - - -

5 Plint Lantai Ruang Tidur Homogenous 10x60 m' 717.53 - - - -

6 Lantai Coridor Homogenous Tile 60x60 m2 125.65 - - - -

7 Plint Lantai Coridor Homogenous Tile 10x60 m' 193.34 - - - -

8 Lantai area lobby lift Granite 60x60 m2 31.58 - - - -

9 Plint Lantai area lobby lift Granite 10x60 m' 23.17 - - - -

10 Lantai R linen Keramik 40x40 m2 3.80 - - - -

11 Plint Lantai R linen Keramik 10x40 m' 7.00 - - - -

12 Lantai R ME Keramik 40x40 m2 4.90 - - - -

Page 34: RAB

01+049Dokumen Tender 04/12/2023BILL 15

BQ PAKET VI PEKERJAAN EKSTERIOR ( FINISHING )

O BILL NO. 15 PEKERJAAN FINISHING ATAP DAN GONDOLA

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAH

Rp. Rp. Rp. Rp.

I PEKERJAAN DINDING PARAPET

Referensi Gambar : No. ARS.1111A LT. ATAP 1 Kolom 20/20 m3 8.32 - - - - 2 Balok Praktis 10/15 m3 4.16 - - - - 3 Dinding Parapet

Pasangan bata merah spesi menggunakan m2 332.64 - - - -MU

4 Plesteran & Acian m2 665.28 - - - - 5 Benangan kolom dan dinding m' 362.80 - - - -

Page 35: RAB

01+049Dokumen Tender 04/12/2023BILL 16

BQ PAKET VI PEKERJAAN LANDSEKAP

P BILL NO.16 PEKERJAAN LANDSEKAP

NO URAIAN KUANTITASHARGA JUMLAH

Area / Lantai SAT MATERIAL UPAH MATERIAL UPAHRp. Rp. Rp. Rp.

I PEKERJAAN GARDU JAGA 6 M2 Dasar Ls 1.000 - - - - Referensi Gambar No. ARS / 3612

II PEKERJAAN PAGAR & TAMAN ( TIANG BENDERA ) Dasar Ls 1.000 - - - - Referensi Gambar No. ARS / 3613 S/D 3613B