REKAPITULASI RENCANA ANGGARAN BIAYA
II PEKEKERJAAN BANGUNAN AA PEK. KONSTRUKSI LANTAI I
B PEK. KONSTRUKSI LANTAI II
JUMLAH REAL COST 355.571.300,21
PPN 10 % 35.557.130,02
JUMLAH REAL COST + PPN 391.128.430,23
JUMLAH TOTAL FISIK 426.685.560,25
BIAYA PERENCANAAN 28.445.704,02
BIAYA PENGAWASAN 17.778.565,01
BIAYA UMUM 14.222.852,01
JUMLAH TOTAL 1.269.389.541,75
DIBULATKAN 1.269.389.541,00
Banjar. 02 pebruari 2015
Menyetujuikepala kemenag kota banjar
Drs. H. Dadang Romansyah, M.SiNip. 19590125 198601 1 001
NO. URAIAN PEKERJAANJUMLAH HARGA
Rp.
TERBILANG : SATU MILYAR DUA RATUS ENAM PULUH SEMBILAN JUTA TIGA RATUS DELAPAN PULUH SEMBILAN RIBU LIMA RATUS EMPAT PULUH SATU RUPIAH
KEGIATAN : PEMBANGUNAN GEDUNG
PEKERJAAN : USULAN PEMBANGUNAN GEDUNG AULA DEPAG BANJAR
LOKASI : KOTA BANJAR
TAHUN ANGGARAN 2015
I PEK. TANAH DAN PONDASI BATU BELAH 592.130,00
III PEK. BETON 147.218.660,80
I PEK. DINDING DAN PLESTERAN 40.838.237,71
II PEK. BETON 25.911.233,42
III PEK. KUSEN,PINTU DAN JENDELA 27.731.364,74
IV PEK. KUDA-KUDA, ATAP DAN PLAFOND 59.095.692,97
V PEK. ALAT PENGGANTUNG 4.484.453,60
VI PEK. LANTAI 34.681.847,20
VII PEK. PENGECATAN 7.488.961,78
VIII PEK. LISTRIK 3.819.368,00
IX PEK. PENANGKAL PETIR DAN PENTANAHAN 3.709.350,00
X PEK. SANITASI -
-
RINCIAN RENCANA ANGGARAN BIAYA
HARGA JUMLAH
NO. KODE SAT. VOLUME SATUAN HARGA SATUAN
ANALIS Rp. Rp.
1 3 4 5 6 7
II PEKEKERJAAN BANGUNAN A
A PEK. KONSTRUKSI LANTAI II PEK. TANAH DAN PONDASI BATU BELAH
JUMLAH 592.130,00
III PEK. BETON
JUMLAH 147.218.660,80
URAIAN PEKERJAAN
2
KEGIATAN : PEMBANGUNAN GEDUNG
PEKERJAAN : USULAN PEMBANGUNAN GEDUNG AULA DEPAG BANJAR
LOKASI : KOTA BANJAR
TAHUN ANGGARAN 2015
1 Galian Tanah Pondasi kedalaman 1 m 02.2.1 m3 1,20 51.700,00 62.040,00
3 Urugan Tanah Kembali 02.8.1 m3 11,52 37.400,00 430.848,00
4 Urugan pasir alas pondasi 02.08.2 m3 0,65 152.680,00 99.242,00
1 Pondasi plat Tebal 25 cm ( 12 mm - 150 mm 2 lapis ) 07.15.1.A m3 3,25 3.039.983,08 9.879.945,00
2 Sloof 15/20 (4 10 mm, 6 mm - 150 mm ) 07.15.1.B m3 0,84 3.879.977,46 3.259.181,07
3 Sloof 20/30 (6 12 mm, 8 mm - 150 mm ) 07.15.1.C m3 1,26 3.794.897,39 4.781.570,71
6 Kolom 20/30 (4 12 mm, 8 mm - 150 mm ) 07.15.1.F m3 0,90 5.520.913,04 4.968.821,73
7 Kolom 25/35 (8 D 13 mm, 10 mm - 150 mm ) 07.15.1.G m3 4,38 4.800.454,65 21.001.989,09
9 Balok Bordes 15/25 (6 12 mm, 8 mm - 150 mm ) 07.15.1.J m3 0,14 5.515.006,65 744.525,90
10 Kolom 20/25 (4 12 mm, 8 mm - 150 mm ) 07.15.1.F m3 0,10 5.520.913,04 552.091,30
13 Balok anak 20/40 (8 D 13 mm, 10 mm - 150 mm ) 07.15.1.K m3 1,12 4.281.924,13 4.795.755,03
14 Balok induk 25/50 (10 D 16 mm, 2 12 mm, 10 mm - 150 mm ) 07.15.1.M m3 4,81 5.439.942,12 26.166.121,61
15 07.15.1.N m3 1,38 5.832.496,48 8.048.845,15
16 Plat Lantai T. = 12 cm ( 8 mm - 150 mm 2 lapis ) 07.15.1.O m3 12,53 4.468.902,67 55.981.049,95
17 Plat Lantai Bordes T. = 12 cm ( 8 mm - 150 mm 2 lapis ) 07.15.1.O m3 0,12 4.468.902,67 536.268,32
18 Plat Tangga T. = 12 cm ( 8 mm - 150 mm 2 lapis ) 07.15.1.P m3 1,44 4.446.177,74 6.402.495,94
24 Pek. Neut kusen dihitung bh 4,00 25.000,00 100.000,00
25 Pas. Raling tangga dihitung ls 14,00 700.000,00 9.800.000,00
Balok Kantilever 25/50/35 (10 D 16 mm, 2 12 mm, 10 mm - 150 mm )
-
1 3 4 5 6 72
-
1 3 4 5 6 72
-
1 3 4 5 6 72
B PEK. KONSTRUKSI LANTAI III PEK. DINDING DAN PLESTERAN
JUMLAH 40.838.237,71
II PEK. BETON
JUMLAH 25.911.233,42
III PEK. KUSEN,PINTU DAN JENDELA
JUMLAH 27.731.364,74
IV PEK. KUDA-KUDA, ATAP DAN PLAFOND
JUMLAH 59.095.692,97
V PEK. ALAT PENGGANTUNG
JUMLAH 4.484.453,60
1 Pas. Dinding bata 1pc:5ps 04.1.5 m2 160,37 106.619,70 17.098.132,16
3 Pas. Plesteran 1pc : 5ps 05.1.2 m2 324,26 45.548,36 14.769.474,77
4 Pas. Acian 05.7.1 m2 324,26 27.665,00 8.970.630,77
1 Kolom 12/12 (4 10 mm, 6 mm - 200 mm ) 07.15.1.D m3 0,25 5.664.895,21 1.403.081,25
2 Kolom 20/20 (4 12 mm, 8 mm - 150 mm ) 07.15.1.E m3 0,48 4.895.226,97 2.349.708,95
3 Kolom 25/25 (6 12 mm, 8 mm - 150 mm ) 07.15.1.H m3 2,50 4.915.187,90 12.287.969,76
4 Balok Latai 12/15 (4 10 mm, 6 mm - 150 mm ) 07.15.1.I.Rob m3 0,50 5.137.046,31 2.589.071,34
5 Ring Balok 15/20 (4 12 mm, 6 mm - 200 mm ) 07.15.1.I m3 1,27 4.329.859,81 5.516.999,12
6 Balok pagar selasar 12/15 (4 10 mm, 6 mm - 150 mm ) 07.15.1.I.Rob m3 0,32 5.137.046,31 1.664.403,00
11 Pek. Neut kusen dihitung bh 4,00 25.000,00 100.000,00
1 Pas. Kusen Pintu , Jendela Dan Buvenlig Allumunium 4 " warna 06.1.5 m' 108,00 115.885,00 12.515.580,00
3 Pas. Kaca polos 5 mm BV 12.5.2 m2 25,10 119.860,40 3.007.896,74
5 Pas. Daun Pintu alumunium 06.2.1 m2 3,36 980.100,00 3.293.136,00
6 Pas. Daun Jendela alumunium 06.3.1 m2 11,20 795.960,00 8.914.752,00
1 Pas. Rangka Atap Baja Ringan T.0.75mm Jarak maks.120cm Terpasang Upah-Bahan m2 152,14 150.000,00 22.821.000,00
2 Pas. Genteng Metal tebal 0.35 mm Corak /Warna Terpasang 08.1.6 m2 152,29 109.978,00 16.748.549,62
3 Pas. Bubungan Genteng Metal Type Bulat Terpasang 08.5.4 m' 17,00 98.054,00 1.666.918,00
4 Pas. Listplank GRC 2.25/25 cm 06.18.4 rob. m' 44,00 43.780,00 1.926.320,00
5 Pas. Rangka Plafond Kayu Lokal Kls II 06.15.4 m2 98,00 93.632,00 9.175.936,00
6 Pas. Plafond Gypsum 120x240cm Tebal 9mm (dalam bangunan) 09.7.1 m2 98,00 45.171,30 4.426.787,40
7 Pas. Plafond GRC 120x240cm Tebal 4 mm ( luar bangunan) 09.7.2 m2 32,33 36.866,50 1.191.893,95
9 Pas. Lyst Plafond gypsum 15 cm (bagian dalam bangunan) Upah-Bahan m' 42,00 15.000,00 630.000,00
10 Pas. Lyst Plafond kayu profil 5 cm (bagian luar bangunan) 06.27.1 m' 32,00 15.884,00 508.288,00
1 Pas. Door Closer 12.3.3 bh 2,00 400.664,00 801.328,00
2 Pas. Kunci pintu 2 slagh type silinder 12.1.4 bh 2,00 252.494,00 504.988,00
3 Pas. Pegangan pintu uk. Besar 12.3.4 psg 2,00 205.964,00 411.928,00
4 Pas. Slot pintu type espagnolet 12.1.5.A psg 2,00 126.368,00 252.736,00
5 Pas. Slot Jendela 12.1.5 bh 8,00 36.718,00 293.744,00
6 Pas. Engsel daun pintu 12.2.1 bh 9,00 44.510,40 400.593,60
7 Pas. Engsel daun jendela 12.2.2 bh 32,00 25.784,00 825.088,00
8 Pas. Hak angin kait 12.3.2 bh 32,00 31.064,00 994.048,00
-
1 3 4 5 6 72
VI PEK. LANTAI
JUMLAH 34.681.847,20
VII PEK. PENGECATAN
JUMLAH 7.488.961,78
VIII PEK. LISTRIK
JUMLAH 3.819.368,00
IX PEK. PENANGKAL PETIR DAN PENTANAHAN
JUMLAH 3.709.350,00
1 Pas. Urugan pasir bawah lantai 02.08.2 m3 4,90 152.680,00 748.132,00
2 Pas. Lantai Granit polis 60/60 cm bagian dalam 13.10.9 rob.2 m2 98,00 269.315,20 26.392.889,60
3 Pas. Lantai Granit polis 60/60 cm bagian selasar 13.10.9 rob.2 m2 28,00 269.315,20 7.540.825,60
1 Cat Dinding sekw. Sanlex 14.3.7 m2 324,26 16.319,60 5.291.780,44
3 Cat Plafond sekw. Sanlex 14.4.2 m2 130,33 16.858,60 2.197.181,34
1 Pas.Instalasi Titik Cahaya kabel 2x2,5 mm2 L6 titik 12,00 155.914,00 1.870.968,00
2 Pas.Instalasi Titik Stop Kontak kabel 3x2,5 mm2 L7 titik 5,00 172.480,00 862.400,00
3 Pas.Lampu Downlight + SL 14 watt Upah-Bahan set 8,00 95.000,00 760.000,00
4 Pas.Lampu SL 14 watt flapond fitting Upah-Bahan set 4,00 48.000,00 192.000,00
5 Pas.Stop Kontak Upah-Bahan bh 5,00 13.800,00 69.000,00
7 Pas.Saklar Tunggal Upah-Bahan bh 2,00 15.000,00 30.000,00
8 Pas.Saklar Ganda Upah-Bahan bh 2,00 17.500,00 35.000,00
1 Pek Pemasangan Spitzen L9 set 1,00 251.350,00 251.350,00
2 Pek Pemasangan Grounding Penangkal Petir dihitung ls 3,00 500.000,00 1.500.000,00
3 Pek Pemasangan Kawat BC 25mm2 L10 m' 25,00 78.320,00 1.958.000,00