  • RAB STAGE/TRIBUN ST TELKOM

    NO JENIS PEKERJAAN VOLUME SAT

    A PERSIAPAN 1 Pembersihan Lahan 1.000 Ls2 Pembuatan Gudang 1.000 Ls3 Pekerjaan Bouwplang 1.000 Ls

    B PEKERJAAN TANAH1 Galian 39.0002 Urugan Pasir Pile Cup T = 5 cm 3.9003 Lantai Pondasi T = 5 cm 3.900

    C PEKERJAAN PONDASI1 Pasangan Pondasi 99.8002 Urugan Tanah 19.5003 123.7404 Kolom 10/20 10-4 8-250 10.0005 Pasangan Bata Merah 134.0556 Rabat Beton 82.390

    Jumlah Total

    MMM

    MM

    Sloof 10/20 10-4 8-250 MMMM

  • RAB STAGE/TRIBUN ST TELKOM

    HARGA SATUAN JUMLAH BOBOTBAHAN & UPAH PEKERJAAN

    Rp 4,500,000 Rp 4,500,000 2.88% Rp 3,750,000 Rp 3,750,000 2.40% Rp 4,500,000 Rp 4,500,000 2.88%

    Rp 27,610 Rp 1,076,790 0.69% Rp 111,550 Rp 435,045 0.28% Rp 470,750 Rp 1,835,925 1.17%

    Rp 517,825 Rp 51,678,935 33.03% Rp 20,000 Rp 390,000 0.25% Rp 98,010 Rp 12,127,757 7.75% Rp 98,010 Rp 980,100 0.63% Rp 87,379 Rp 11,713,592 7.49% Rp 770,257 Rp 63,461,474 40.56%

    Rp 156,449,618 100%