DAFTAR DAFTAR HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN KABUPATEN RAJA AMPAT TAHUN ANGGARAN 2013 ( Harga Tidak Termasuk PPN) No. URAIAN / NAMA / JENIS BARANG SATUAN KET. 1 2 3 5 6 A. UPAH 1 Mandor oh Rp 175,000.00 2 Mekanik oh Rp 150,000.00 3 Mekanik pembantu oh Rp 119,000.00 4 Kepala tukang oh Rp 165,000.00 5 Tukang batu oh Rp 150,000.00 6 Tukang kayu oh Rp 150,000.00 7 Tukang besi / tukang las oh Rp 150,000.00 8 Tukang cat oh Rp 150,000.00 9 Tukang listrik oh Rp 150,000.00 10 Tukang ledeng / pipa oh Rp 150,000.00 11 Tukang gali sumur oh Rp 105,000.00 12 Operator terlatih oh Rp 147,000.00 13 Operator kurang terlatih oh Rp 96,580.76 14 Pembantu operator oh Rp 119,000.00 15 Supir material / truck oh Rp 133,000.00 16 Supir personil / mobil ringan oh Rp 133,000.00 17 Pembantu supir / kenek oh Rp 119,000.00 18 Pekerja terlatih oh Rp 112,000.00 19 Pekerja agak terlatih oh Rp 105,000.00 20 Pekerja tak terlatih oh Rp 98,000.00 21 Penjaga oh Rp 84,350.00 22 Pemasak aspal oh Rp 68,323.54 23 Pengangkut air oh Rp 68,323.54 B. MATERIAL/BAHAN 1 Alang-alang ikat 2 Alat-alat bantu** set Rp 188,860.00 3 unit Rp 105,000.00 4 unit Rp 70,000.00 5 Aluminium foil Rp 128,800.00 6 Amplas lembar Rp 15,000.00 7 Aspal bitumen kg Rp 17,262.50 8 Rp 372,120.00 9 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 51,540.58 10 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm lembar Rp 100,100.00 11 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm lembar Rp 150,080.00 12 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm lembar Rp 57,400.00 13 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 109,900.00 14 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm lembar Rp 77,700.00 15 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm lembar Rp 160,160.00 16 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 128,240.00 17 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm lembar Rp 191,940.00 18 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm lembar Rp 180,180.00 HARGA SATUAN (Rp) All socket reducer PVC ø 100 x 80 (mm) All socket reducer PVC ø 80 x 50 (mm) Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwar

description

Rab Sarana Pendukung Pariwisata

Transcript of Rab Sarana Pendukung Pariwisata

Page 1: Rab Sarana Pendukung Pariwisata

DAFTAR DAFTAR HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN

KABUPATEN RAJA AMPATTAHUN ANGGARAN 2013

( Harga Tidak Termasuk PPN)

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

A. UPAH

1 Mandor oh Rp 175,000.00

2 Mekanik oh Rp 150,000.00

3 Mekanik pembantu oh Rp 119,000.00

4 Kepala tukang oh Rp 165,000.00

5 Tukang batu oh Rp 150,000.00

6 Tukang kayu oh Rp 150,000.00

7 Tukang besi / tukang las oh Rp 150,000.00

8 Tukang cat oh Rp 150,000.00

9 Tukang listrik oh Rp 150,000.00

10 Tukang ledeng / pipa oh Rp 150,000.00

11 Tukang gali sumur oh Rp 105,000.00

12 Operator terlatih oh Rp 147,000.00

13 Operator kurang terlatih oh Rp 96,580.76

14 Pembantu operator oh Rp 119,000.00

15 Supir material / truck oh Rp 133,000.00

16 Supir personil / mobil ringan oh Rp 133,000.00

17 Pembantu supir / kenek oh Rp 119,000.00

18 Pekerja terlatih oh Rp 112,000.00

19 Pekerja agak terlatih oh Rp 105,000.00

20 Pekerja tak terlatih oh Rp 98,000.00

21 Penjaga oh Rp 84,350.00

22 Pemasak aspal oh Rp 68,323.54

23 Pengangkut air oh Rp 68,323.54

B. MATERIAL/BAHAN

1 Alang-alang ikat

2 Alat-alat bantu** set Rp 188,860.00

3 unit Rp 105,000.00

4 unit Rp 70,000.00

5 Aluminium foil m² Rp 128,800.00

6 Amplas lembar Rp 15,000.00

7 Aspal bitumen kg Rp 17,262.50

8 m² Rp 372,120.00

9 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 51,540.58

10 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm lembar Rp 100,100.00

11 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm lembar Rp 150,080.00

12 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm lembar Rp 57,400.00

13 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 109,900.00

14 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm lembar Rp 77,700.00

15 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm lembar Rp 160,160.00

16 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 128,240.00

17 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm lembar Rp 191,940.00

18 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm lembar Rp 180,180.00

HARGA SATUAN (Rp)

All socket reducer PVC ø 100 x 80 (mm)

All socket reducer PVC ø 80 x 50 (mm)

Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna)

Page 2: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

19 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm lembar Rp 134,960.00

20 Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm lembar Rp 202,440.00

21 Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm lembar Rp 200,200.00

22 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm lembar Rp 163,380.00

23 Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm lembar Rp 245,000.00

24 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm lembar Rp 177,520.00

25 Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm lembar Rp 265,580.00

26 Foldimg Gate ( tebal 2 mm ) m2 Rp 1,026,859.68

27 Folding Gate ( tebal 3 mm ) m2 Rp 1,260,236.88

28 Atap genteng (standar KIA) lembar Rp 20,020.00

29 buah Rp 7,000.00

30 Atap genteng kodok buah Rp 2,000.00

31 Atap genteng soka buah Rp 3,704.40

32 Atap metal (biasa / polos) lembar Rp 123,620.00

33 Atap metal batuan /tekstur lembar Rp 135,940.00

34 lembar Rp 221,200.00

35 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) lembar Rp 72,100.00

36 Air Release Valve dia 25 mm Unit Rp 3,070,776.49

37 Air Release Valve dia 50 mm Unit Rp 3,838,587.48

38 Gorong-gorong/Buis beton dia "100 m' Rp 1,587,600.00

39 Gorong-gorong/Buis beton dia "80 m' Rp 1,278,900.00

40 Gorong-gorong/Buis beton dia "60 m' Rp 970,200.00

41 buah Rp 449,680.00

42 buah Rp 901,880.00

43 buah Rp 444,780.00

44 buah Rp 494,200.00

45 buah Rp 691,880.00

46 buah Rp 2,450,000.00

47 Bataco buah Rp 2,961.00

48 Batacote m² Rp 86,520.00

49 Batu alam tempel m² Rp 617,820.00

50 Batu apung kg Rp 3,640.00

51 Batu bata berongga uk. 5 x 11 x 24 (cm) buah Rp 3,640.00

52 Batu bata merah (lokal) bh Rp 7,500.00

53 Batu bata besar ( 8x8x20 ) cm bh Rp 2,469.60

54 Batu bata kecil ( 5x8x20 ) cm bh Rp 2,116.80

55 Batu belah 10 - 15 (cm) m³ Rp 1,500,000.00

56 Batu belah 15 - 20 (cm) m³ Rp 1,500,000.00

57 m³ Rp 750,000.00

58 Batu kali bulat m³ Rp 420,840.00

59 Batu kapur m³ Rp 205,940.00

60 Batu kerikil ayak / batu saring / kerai m³ Rp 290,360.00

61 Batu kerikil dari galian bukit m³ Rp 938,000.00

62 Batu kerikil sungai (dengan pasir) m³ Rp 588,000.00

63 Batu paras m² Rp 617,820.00

64 Batu kacang m3 Rp 583,443.00

65 Batu pecah 0,5 - 1 (cm) m³ Rp 1,190,000.00

66 Batu pecah 1 - 2 (cm) m³ Rp 1,050,000.00

67 Batu pecah 2 - 3 (cm) m³ Rp 1,050,000.00

68 Batu pecah 3 - 5 (cm) m³ Rp 1,050,000.00

69 Batu pecah 5 - 7 (cm) m³ Rp 1,050,000.00

70 Batu pecah 7 - 10 (cm) m³ Rp 407,680.00

71 Batu teraso m³ Rp 259,420.00

Atap genteng beton ( jenis press)

Atap seng fibreglass tebal

Bak cuci piring (sink) stainless steel 1 lobang

Bak cuci piring (sink) stainless steel 2 lobang

Bak mandi fibreglass volume 0,15 m³

Bak mandi fibreglass volume 0,30 m³

Bak mandi fibreglass volume 1,00 m³

Bak mandi jenis bathtub

Batu gunung (quarry)

Page 3: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

72 Baut / mur baja buah Rp 23,100.00

73 Baut klem buah Rp 11,060.00

74 Bensin premium liter Rp 18,193.00

75 Besi baja profil IWF kg Rp 45,000.00

76 Besi baut kuda-kuda kg Rp 27,720.00

77 Besi beton kg Rp 17,500.00

78 Besi jaring kawat baja kg Rp 30,000.00

79 kg Rp 32,060.00

80 Besi siku 6 m' Rp 315,000.00

81 Besi strip kg Rp 74,970.00

82 Kawat kg Rp 49,000.00

83 Plat kembang 3 mm m2 Rp 280,052.64

84 Besi strip 2 x 3 m' Rp 40,740.00

85 Bend C1 dia 200 mm x 45 ff m' Rp 912,272.00

86 Bend C1 dia 200 mm x 90 ff m' Rp 2,303,200.12

87 Bend PVC 100 x 90 Unit Rp 877,265.42

88 Bend PVC 150 x 90 Unit Rp 1,151,482.75

89 Bend PVC 50 x 90 Unit Rp 255,781.76

90 Bend PVC 80 x 90 Unit Rp 383,671.76

91 Besi teralis ø 6 mm - 10 mm m' Rp 40,740.00

92 Bilik bambu kering, uk. 1,5 x 4 (m) buah Rp 86,520.00

93 Bliksem spit penangkal petir buah Rp 142,100.00

94 buah Rp 90,160.00

95 Box sekering, 1 goup / phase buah Rp 83,720.00

96 Box sekering, 2 goup / phase buah Rp 101,220.00

97 Box sekering, 3 goup / phase buah Rp 115,220.00

98 Box sekering set Rp 79,380.00

99 Box Water Meter bh Rp 61,740.00

100 Bola lam pijar bh Rp 8,820.00

101 Bola lampu TL.20 W bh Rp 88,550.00

102 Bubungan atap (nok) alumunium standar 40 cm, swg. 22 m² Rp 119,840.00

103 Bubungan atap (nok) asbes sepasang lembar Rp 86,520.00

104 Bubungan atap (nok) genteng (standar KIA) buah Rp 60,480.00

105 Bubungan atap (nok) genteng beton buah Rp 7,607.25

106 Bubungan atap (nok) genteng kodok buah Rp 10,080.00

107 Bubungan atap (nok) genteng soka buah Rp 6,552.00

108 Bubungan atap (nok) metal (biasa / polos) buah Rp 49,000.00

109 m' Rp 49,000.00

110 Buis beton bertulang ø 45 cm - 75 cm buah Rp 691,880.00

111 Buis beton bertulang ø 75 cm - 120 cm buah Rp 1,606,220.00

112 Buis beton tak bertulang ø 100 cm buah Rp 644,980.00

113 Buis beton tak bertulang ø 60 cm buah Rp 147,000.00

114 Buis beton tak bertulang ø 80 cm buah Rp 644,980.00

115 Cat besi merk "GENDANG" kg Rp 31,046.40

116 Cat besi merk "PLATONE" kg Rp 71,111.25

117 Cat dasar kg Rp 31,600.00

118 Cat genteng kg Rp 33,250.00

119 Cat jalan kg Rp 89,320.00

120 Cat jembatan kg Rp 90,160.00

121 Cat menie kg Rp 50,000.00

122 Cat kayu kg Rp 65,000.00

123 Cat minyak kg Rp 50,000.00

124 Cat tembok kg Rp 34,552.00

Besi prestressed polos

Bondbeam uk. 40 x 20 x 20 (cm)

Bubungan atap (nok) metal (standar Rainbow)

Page 4: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

125 Cat tembok merk kg Rp 31,600.00

126 Cat tembok merk "KENLUX" kg Rp 23,020.20

127 Cat tembok merk "PLATON" kg Rp 21,241.50

128 Cat tembok merk "SUPERKEN" kg Rp 17,934.00

129 Cat vernis kg Rp 27,300.00

130 Closed duduk (lokal) buah Rp 2,250,000.00

131 Closed jongkok keramik buah Rp 400,000.00

132 buah Rp 200,000.00

133 buah Rp 333,620.00

134 Closed jongkok keramik leher lurus bh Rp 617,400.00

135 Closed jongkok keramik leher bengkok bh Rp 201,390.00

136 Closed duduk keramik uk. Besar bh Rp 2,175,600.00

137 Closed duduk keramik uk. Kecil bh Rp 536,550.00

138 Clamp saddle C1 dia 50 x 13 mm unit Rp 127,657.15

139 Clamp saddle C1 dia 80 x 13 mm unit Rp 146,327.33

140 Clamp saddle PVC dia 50 x 13 mm unit Rp 242,712.29

141 Clamp saddle PVC dia 80 x 13 mm unit Rp 290,555.50

142 Conblock (C.B. 10) buah Rp 97,580.00

143 Conblock (C.B. 15) buah Rp 80,360.00

144 m² Rp 2,822.40

145 m² Rp 3,175.20

146 Dempul kg Rp 45,500.00

147 Kapur tembok kg Rp 9,114.00

148 Minyak cat Ltr Rp 45,500.00

149 Plamur tembok kg Rp 98,000.00

150 Dempul Gypsum kg Rp 7,056.00

151 Dempul jadi kg Rp 205,100.00

152 Dina bolt / ramset buah Rp 3,080.00

153 Door stop buah Rp 123,620.00

154 unit Rp 58,344.30

155 Dop Gip dia 13 mm unit Rp 7,001.32

156 Dop PVC dia 100 mm unit Rp 179,000.14

157 Dop PVC dia 80 mm unit Rp 104,086.58

158 Double Nipple Gip dia 13 mm bh Rp 35,280.00

159 Daun pintu fiber wc polos bh Rp 617,400.00

160 Daun pintu fiber wc corak bh Rp 882,000.00

161 Elastromer bearing pad - Rp 1,989,120.00

162 Elektroda penghantar bumi untuk penangkal petir buah Rp 455,700.00

163 Engsel pintu / jendela 3" buah Rp 21,000.00

164 Engsel pintu / jendela 4" buah Rp 28,420.00

165 Engsel pintu / jendela 5" buah Rp 39,480.00

166 Engsel pintu kaca 10 mm set Rp 14,840.00

167 Engsel putar jendela / ventilasi buah Rp 126,000.00

168 Engsel kuningan untuk pintu 2 bh Rp 28,518.00

169 Engsel kuningan untuk jendela 2 bh Rp 20,374.20

170 Eternit asbes uk. 1 x 1 (m), tebal 4 mm m² Rp 45,780.00

171 Eternit asbes uk. 1 x 1 (m), tebal 5 mm m² Rp 48,160.00

172 Eternit asbes uk. 1 x 1 (m), tebal 6 mm m² Rp 51,940.00

173 Enternit jaber Ment m2 Rp 31,752.00

174 Exspanoglet lembar Rp 105,000.00

175 m² Rp 118,300.00

176 m² Rp 212,940.00

177 m² Rp 281,260.00

Closed jongkok porcelaint (lokal)

Closed jongkok terasso

Conblock tebal 6 cm

Conblock tebal 8 cm

Dop PVC ø 50 mm

Fibre Plat 1,20 x 2,40 (m), tebal 4 mm

Fibre Plat 1,20 x 2,40 (m), tebal 6 mm

Fibre Plat 1,20 x 2,40 (m), tebal 8 mm

Page 5: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

178 Floor drain buah Rp 67,760.00

179 Formica 4" x 8" lbr Rp 111,160.00

180 Flange C1 dia 200 mm bh Rp 190,436.15

181 Flange Socket PVC dia 200 mm unit Rp 767,810.99

182 Filler kg Rp 2,116.80

183 buah Rp 70,000.00

184 buah Rp 70,000.00

185 buah Rp 5,885,540.14

186 buah Rp 23,520.00

187 Gate Valve dia 150 + Flange socket unit Rp 8,316,862.90

188 Gate Valve dia 200 mm m' Rp 5,171,405.90

189 Gate Valve dia 50 + Flange socket unit Rp 96,490.80

190 Gate Valve dia 80 + Flange socket unit Rp 2,466,248.40

191 Gibult Joint dia 200 mm unit Rp 4,654,941.98

192 Glass block uk. 20 x 20 (cm) buah Rp 35,840.00

193 Grease (minyak gemuk) kg Rp 60,480.00

194 Grendel (biasa) buah Rp 28,420.00

195 Grendel (istimewa) buah Rp 221,200.00

196 lembar Rp 175,000.00

197 lembar Rp 175,000.00

198 Grendel kuning bh Rp 11,466.00

199 buah Rp 53,060.00

200 buah Rp 53,060.00

201 buah Rp 90,160.00

202 buah Rp 3,088,820.00

203 Hollow block (H.B. 10) buah Rp 80,360.00

204 Hollow block (H.B. 15) buah Rp 87,780.00

205 Hollow block (H.B. 20) buah Rp 105,000.00

206 Hook buah Rp 28,420.00

207 Huruf Galvanized-Stainless steel m² Rp 563,360.00

208 Jendela besi m² Rp 563,360.00

209 Jendela nako (kerangka + kaca 5 mm) m² Rp 333,620.00

210 Daun jendela alumunium lengkap ( 80 x 120 ) cm bh Rp 704,993.63

211 Daun pintu alumunium lengkap ( 90 x 120 ) bh Rp 980,000.00

212 Daun pintu alumunium untuk WC ( 80 x 200 ) bh Rp 1,234,800.00

213 Kabel biasa m' Rp 4,760.00

214 Kabel bulat m' Rp 6,720.00

215 Kabel listrik NYY 4 x 2,5 mm² m' Rp 8,120.00

216 Kabel listrik NYY 4 x 4 mm² m' Rp 17,080.00

217 m' Rp 43,120.00

218 Kaca bening tebal 10 mm m² Rp 503,160.00

219 Kaca bening tebal 3 mm m² Rp 350,000.00

220 Kaca bening tebal 5 mm m² Rp 350,000.00

221 Kaca bening tebal 8 mm m² Rp 350,000.00

222 Kaca buram tebal 12 mm m² Rp 605,360.00

223 Kaca cermin tebal 5 mm m² Rp 109,200.00

224 Kaca cermin tebal 6 mm m² Rp 109,200.00

225 Kaca cermin tebal 8 mm m² Rp 109,200.00

226 m² Rp 617,820.00

227 m² Rp 741,300.00

228 m² Rp 399,000.00

229 Kaca naco ryben 5 mm (lengkap) uk. 15 x 17 cm Daun Rp 48,686.40

230 Kaca ryben 3 m m2 Rp 189,035.53

Gate valve / stop kran ø 1 (inch) kuningan

Gate valve / stop kran ø 1/2 (inch) kuningan

Gate valve / stop kran ø 100 (mm)

Gate valve / stop kran ø 3/4 (inch) kuningan

Gypsum board motif uk. 1.22 x 2.44 (m), tebal 9 mm

Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm

Handle jendela

Handle pintu

Handle untuk meubelair (furniture) + kunci

Handle untuk pintu kaca lebar

Kabel slink

Kaca gelap (ray band) tebal 10 mm

Kaca gelap (ray band) tebal 12 mm

Kaca gelap (ray band) tebal 5 mm

Page 6: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

231 Kaca ryben 5 m m2 Rp 211,680.00

232 Kaca patri tebal 5 mm m² Rp 2,992,920.00

233 Kaca wireglass tebal 5 mm m² Rp 1,224,440.00

234 Kain kassa kg Rp 23,100.00

235 Kait angin (biasa) buah Rp 15,258.60

236 Kait angin (istimewa) buah Rp 23,520.00

237 Kapur bakar m³ Rp 148,260.00

238 Kapur sirih kg Rp 51,940.00

239 Karpet talang, lebar 0,60 m' m' Rp 19,139.40

240 Kawat nyamuk logam m² Rp 42,095.20

241 Kawat nyamuk plastik m² Rp 21,107.80

242 Kawat berduri kg Rp 26,460.00

243 Kawat beton kg Rp 30,870.00

244 Kawat bronjong kg Rp 176,680.00

245 Kawat burung m² Rp 32,060.00

246 Kawat harmonika m² Rp 38,500.00

247 Kawat kassa / kawat loket m² Rp 27,160.00

248 Kawat seng polos kg Rp 28,420.00

249 Kayu bakar m³ Rp 441,000.00

250 Kayu bulat "4 cm m3 Rp 1,493,614.08

251 Kayu bulat dia 8 -10/4 m m3 Rp 891,098.38

252 batang Rp 26,735.63

253 Kayu gergajian kelas I, balok m³ Rp 3,850,000.00

254 Kayu gergajian kelas I, papan m³ Rp 3,850,000.00

255 Kayu gergajian kelas I, profil m' Rp 27,160.00

256 Kayu gergajian kelas III, balok m³ Rp 3,713,149.33

257 Kayu gergajian kelas III, papan m³ Rp 3,447,080.00

258 Kayu gergajian kelas III, profil m' Rp 14,140.00

259 Kayu gergajian kelas IV, balok m³ Rp 2,687,046.19

260 Kayu gergajian kelas IV, papan m³ Rp 2,347,520.00

261 Kayu untuk konstruksi jembatan m³ Rp 5,930,400.00

262 Kayu untuk perancah m³ Rp 1,692,600.00

263 Keramik 10 x 20 (cm) gelap m² Rp 103,740.00

264 Keramik 10 x 20 (cm) polos m² Rp 111,160.00

265 Keramik 10 x 20 (cm) terang m² Rp 103,740.00

266 Keramik 15 x 15 cm m²

267 Keramik 15 x 20 cm m² Rp 106,260.00

268 Keramik 20 x 20 (cm) polos m² Rp 91,000.00

269 Keramik 20 x 25 (cm) m² Rp 91,000.00

270 Keramik 25 x 25 cm m² Rp 113,680.00

271 Keramik 30 x 30 (cm) gelap m² Rp 130,900.00

272 Keramik 30 x 30 (cm) polos m² Rp 98,000.00

273 Keramik 30 x 30 (cm) putih / berwarna m² Rp 111,160.00

274 Keramik 30 x 30 (cm) terang m² Rp 118,580.00

275 Keramik 40 x 40 (cm) putih / berwarna m² Rp 105,000.00

276 Keramik KM/WC anti slip 20 x 20 (cm) m² Rp 105,000.00

277 Keramik 30x30 cm merk "Hercules" ( corak ) m2 Rp 85,015.98

278 Keramik 30x30 cm merk "Ikad" ( polos ) m2 Rp 94,017.67

279 Keramik 30x30 cm merk "Ikad" ( corak ) m2 Rp 101,519.96

280 Keramik 30x30 cm merk "KIA" ( polos ) m2 Rp 84,142.80

281 Keramik 30x30 cm merk "KIA" ( corak ) m2 Rp 77,014.48

282 Keramik 20x25 cm merk "Mulia" ( corak ) m2 Rp 95,256.00

283 buah Rp 8,680.00

Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau

Knee / elbow PVC 1(inch)

Page 7: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

284 buah Rp 4,340.00

285 buah Rp 5,180.00

286 Knee Gip dia 13 mm bh Rp 5,362.56

287 Knee PVC dia 3" bh Rp 12,836.63

288 Kompon gypsum lembar Rp 66,780.00

289 Koral beton m3 Rp 635,040.00

290 Kopling dia 13 mm bh Rp 10,584.00

291 Kran air dia 13 mm bh Rp 70,560.00

292 Kran air ø 0,75 (inch) buah Rp 55,580.00

293 Kran air ø 1,50 (inch) buah Rp 67,900.00

294 Kuas roll buah Rp 35,000.00

295 Kuas uk. 1" buah Rp 8,400.00

296 Kuas uk. 1,5" buah Rp 16,100.00

297 Kuas uk. 3" buah Rp 23,800.00

298 Kunci jendela (lokal) set Rp 37,100.00

299 Kunci lemari buah Rp 56,840.00

300 Kunci pintu (biasa) set Rp 175,000.00

301 Kunci pintu (istimewa) set Rp 333,620.00

302 set Rp 56,840.00

303 Kunci silinder buah Rp 258,160.00

304 Kunci tanam buah Rp 175,000.00

Knee / elbow PVC 1/2 (inch)

Knee / elbow PVC 3/4 (inch)

Kunci pintu untuk meubelair (furniture)

Page 8: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

305 Kunci tanam antik buah Rp 210,000.00

306 Kunci tanam kamar mandi buah Rp 88,900.00

307 Kunci gembok bh Rp 63,000.00

308 Kunci tanam besar merk "693LD" set Rp 96,873.00

309 Kunci tanam kecil merk "693LD" set Rp 74,970.00

310 Kunci tanam besar merk "ROYAL" set Rp 147,294.00

311 Kunci tanam kecil merk "ROYAL" set Rp 105,840.00

312 Kusen alumunium m' Rp 186,701.76

313

314 Kusen pintu / jendela alumunium 3" m² Rp 856,940.00

315 Kusen pintu / jendela alumunium 4" m² Rp 1,063,580.00

316 Lampu downlight SL 20 Watt buah Rp 88,550.00

317 Lampu taman + tiang + merkuri buah Rp 328,720.00

318 Lampu taman bulat komplit set Rp 370,300.00

319 Lampu TL 20 W + aksesoris titik Rp 111,152.89

320 Lampu TL 40 W + aksesoris titik Rp 158,620.00

321 Lampu TL bulat 10 W + aksesoris titik Rp 122,920.00

322 Lampu TL bulat 20 W + aksesoris titik Rp 166,040.00

323 m² Rp 96,320.00

324 m² Rp 98,840.00

325 m² Rp 121,100.00

326 m² Rp 138,320.00

327 Lis kayu profil uk. 3 x 3 cm m' Rp 32,634.00

328 Lis kayu biasa uk. 0,75 x 2 cm m' Rp 15,876.00

329 kg Rp 40,600.00

330 kg Rp 44,100.00

331 Lem PVC ultra kecil klg Rp 8,820.00

332 Mata lampu + instalasi titik Rp 73,220.00

333 titik Rp 545,160.00

334 Minyak bekisting liter Rp 13,580.00

335 liter Rp 40,460.00

336 Minyak pelumas (oli) liter Rp 64,400.00

337 Minyak solar liter Rp 19,320.00

338 Minyak tanah (industri) liter Rp 18,837.00

339 Multiplek tebal 12 mm 4 x 8 (inch) lembar Rp 211,400.00

340 Multiplek tebal 15 mm 4 x 8 (inch) lembar Rp 505,540.00

341 Multiplek tebal 18 mm 4 x 8 (inch) lembar Rp 570,080.00

342 Multiplek tebal 6 mm uk. 1.22 x 2.44 (m) lembar Rp 198,940.00

343 Multiplek tebal 9 mm 4 x 8 (inch) lembar Rp 298,480.00

344 Melamin uk. ( 4' x 8' ) m2 Rp 1,394,848.00

345 Paku kg Rp 38,500.00

346 Paku anti Karat kg Rp 53,060.00

347 Paku asbes kg Rp 43,260.00

348 Paku ulir asbes kg Rp 43,779.27

349 Paku berbagai ukuran (1/2" - 1") kg Rp 29,400.00

350 Paku berbagai ukuran (2" - 5") kg Rp 35,000.00

351 Paku jembatan kg Rp 86,520.00

352 Paku kait bh Rp 2,380.00

353 Paku sekrup bh Rp 2,520.00

354 Paku seng kg Rp 36,400.00

355 Paku tembok kg Rp 35,000.00

356 Paku Gypsum kg Rp 55,419.00

357 Panel listrik / MCB, 1 group / fase buah Rp 142,380.00

Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m)

Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m)

Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m)

Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,15 (m)

Lem (standar Aica Aibond)

Lem (standar Fox)

Meter box (terpasang)

Minyak pelarut cat (solvent)

Page 9: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

358 Panel listrik / MCB, 2 group / fase buah Rp 182,280.00

359 Panel listrik / MCB, 3 group / fase buah Rp 187,180.00

360 Panel listrik / MCB, 4 group / fase buah Rp 252,280.00

361 m² Rp 210,000.00

362 Pasir ayak untuk beton m³ Rp 588,000.00

363 Pasir pasang m³ Rp 588,000.00

364 Pasir urug / timbun m³ Rp 448,000.00

365 Pasir kasar m3 Rp 111,132.00

366 Pegangan pintu/door holder buah Rp 123,620.00

367 kg Rp 1,260.00

368 Pintu alumunium - swing + door closer unit Rp 3,298,820.00

369 Pintu alumunium - swing + floorhinge unit Rp 4,969,160.00

370 Pintu besi m² Rp 741,300.00

371 Pintu besi lipat m² Rp 1,235,500.00

372 Pipa besi hitam Medium dia "1 x 6 m m' Rp 32,283.85

373 Pipa besi hitam Medium dia "2 x 6 m m' Rp 39,207.25

374 Piap besi hitam Medium dia "3 x 6 m m' Rp 96,929.45

375 Pipa besi hitam S 11 dia 4" x 6 m m' Rp 96,929.45

376 Pipa Gip dia 100 mm m' Rp 61,593.00

377 Pipa Gip dia 150 mm m' Rp 75,793.20

378 Pipa Gip dia 200 mm m' Rp 108,838.80

379 Pipa Gip Dia 50 mm m' Rp 9,490.61

380 Pipa besi galvanis ø 0,5 (inch) m' Rp 45,780.00

381 Pipa besi galvanis ø 0,75 (inch) m' Rp 59,360.00

382 Pipa besi galvanis ø 1 (inch) m' Rp 91,980.00

383 Pipa besi galvanis ø 1,25 (inch) m' Rp 118,580.00

384 Pipa besi galvanis ø 1,5 (inch) m' Rp 137,200.00

385 Pipa besi galvanis ø 2 (inch) m' Rp 188,440.00

386 Pipa besi galvanis ø 4 (inch) m' Rp 579,460.00

387 Pipa beton ø 20 cm, panjang 1 m' buah Rp 197,680.00

388 Pipa beton ø 60 cm, panjang 1 m' buah Rp 324,940.00

389 Pipa PVC RR dia 100 mm m' Rp 53,910.05

390 Pipa PVC RR dia 150 mm m' Rp 87,049.87

391 Pipa PVC RR dia 200 mm m' Rp 254,030.99

392 Pipa PVC RR dia 50 mm m' Rp 14,235.93

393 Pipa PVC RR dia 75 mm m' Rp 34,248.06

394 Pipa PVC Wavin dia 1" x 4 m m' Rp 11,157.30

395 Pipa PVC Wavin dia 2" x 4 m m' Rp 23,152.50

396 Pipa PVC Wavin dia 3" x 4 m m' Rp 42,997.50

397 Pipa PVC Wavin Lucky LG dia 4" x 4 m m' Rp 64,496.25

398 Pipa PVC ø 1(inch) AW, panjang 4 m m' Rp 17,780.00

399 Pipa PVC ø 1,5 (inch) AW, panjang 4 m m' Rp 30,940.00

400 Pipa PVC ø 1/2 (inch) AW, panjang 4 m m' Rp 10,080.00

401 Pipa PVC ø 3 (inch) AW, panjang 4 m m' Rp 79,100.00

402 Pipa PVC ø 3/4 (inch) AW, panjang 4 m m' Rp 13,300.00

403 Pipa PVC ø 4 - 6 (inch) AW, panjang 4 m m' Rp 129,780.00

404 Pipa Gip dia 13 mm m' Rp 3,967.42

405 Pipa Gip dia 3/4 mm m; Rp 56,321.69

406 Plamuer kg Rp 50,000.00

407 Plint keramik 10 x 15 cm buah Rp 2,520.00

408 Plint keramik 10 x 20 cm buah Rp 3,640.00

409 Plint keramik 10 x 40 cm buah Rp 4,900.00

410 Plint ubin abu-abu 15 x 20 (cm) buah Rp 11,620.00

Parquette lantai

Pembersih / cleaner untuk keramik / porcelaint

Page 10: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

411 Plint ubin granito 10 x 30 cm buah Rp 12,320.00

412 Plint ubin granito 10 x 40 cm buah Rp 14,840.00

413 lembar Rp 102,480.00

414 lembar Rp 111,160.00

415 lembar Rp 108,780.00

416 lembar Rp 160,580.00

417 lembar Rp 170,520.00

418 lembar Rp 182,840.00

419 Politur liter Rp 83,580.00

420 Politur jadi liter Rp 137,620.00

421 buah Rp 2,240.00

422 Profil aluminium T m' Rp 64,260.00

423 Pengadaan Water meter dia 13 mm unit Rp 617,400.00

424 m' Rp 1,613,500.00

425 m' Rp 64,260.00

426 m' Rp 77,840.00

427 m' Rp 37,100.00

428 m' Rp 86,520.00

429 Rangka atap baja ringan type limas m² Rp 489,300.00

430 Rangka atap baja ringan type pelana m² Rp 455,840.00

431 Rapidrant kg Rp 4,760.00

432 buah Rp 14,140.00

433 buah Rp 19,600.00

434 buah Rp 16,940.00

435 Reducer C1 dia 200 mm x80 mm unit Rp 1,150,432.91

436 Reducer PVC 150 x 100 unit Rp 1,862,119.01

437 Reducer Pvc 200 x 150 unit Rp 2,031,319.82

438 Rel pintu dorong buah Rp 308,840.00

439 Residu liter Rp 25,900.00

440 Rolling door m2 Rp 648,391.87

441 m² Rp 704,200.00

442 m² Rp 580,720.00

443 lembar Rp 173,040.00

444 buah Rp 14,280.00

445 buah Rp 8,085.00

446 Sabun kg Rp 13,020.00

447 Saklar tunggal buah Rp 25,000.00

448 Saklar ganda buah Rp 50,000.00

449 Sealent kg Rp 86,520.00

450 Semen PC @ 50 kg kg Rp 3,000.00

458 Semen warna kg Rp 25,000.00

459 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) lembar Rp 79,100.00

460 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) lembar Rp 98,840.00

461 Seng gelombang Bjls 20 m2 Rp 72,100.00

462 Seng plat uk. 1,00 x 2,00 cm Bjls 30 Kp Rp 42,000.00

463 Sherra block buah Rp 3,640.00

464 Sirtu m³ Rp 350,000.00

465 Slot jendela buah Rp 19,740.00

466 Slot pintu buah Rp 22,260.00

467 buah Rp 21,000.00

468 buah Rp 14,840.00

469 buah Rp 16,940.00

470 buah Rp 12,320.00

Plywood uk. 0,30 x 0,60 (m), tebal 4mm

Plywood uk. 0,30 x 0,60 (m), tebal 6mm

Plywood uk. 0,60 x 1,20 (m), tebal 4mm

Plywood uk. 0,60 x 1,20 (m), tebal 6mm

Plywood uk. 1,22 x 2,44 (m), tebal 4 mm

Plywood uk. 1,22 x 2,44 (m), tebal 9 mm

Porcelaint uk. 11 cm x 11 cm

Railing tangga stainless steel pipa dia. 2" dan 1"

Rangka / frame accoustic board - cross tee

Rangka / frame accoustic board - main tee

Rangka / frame accoustic board - rod / adjustable dia. 4 mm

Rangka / frame accoustic board - wall angle

Reducer PVC dari 1/2 (inch) ke 1 (inch)

Reducer PVC dari 1/2 (inch) ke 3/4 (inch)

Reducer PVC dari 3/4 (inch) ke 1 (inch)

Rolling dor - alumunium tebal

Rolling dor - alumunium tipis

Rooflight fibreglass uk. 1,8 x 0,9 (m)

Rooster block uk. 12 x 11 x 24 (cm)

Rooster block uk. 20 x 20 (cm)

Slot ventilasi / bouwvenlight

Socket PVC ø 1 (inch)

Socket PVC ø 1/2 (inch)

Socket PVC ø 3/4 (inch)

Page 11: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

471 Soda api kg Rp 54,320.00

472 lembar Rp 86,520.00

473 Stone Coating kg Rp 57,820.00

Stop Kontak titik Rp 28,175.00

474 Stop kontak + instalasi titik Rp 65,268.00

475 Stop kran dia 13 mm bh Rp 36,124.45

476 kg Rp 7,420.00

477 Sunscreen alumunium m² Rp 111,160.00

478 buah Rp 4,492,320.00

479 buah Rp 3,701,082.34

480 buah Rp 13,597,920.00

481 buah Rp 41,390,440.00

482 buah Rp 3,916,500.00

483 buah Rp 8,895,600.00

484 buah Rp 11,836,160.00

485 buah Rp 15,122,520.00

486 buah Rp 17,680,040.00

487 buah Rp 1,680,280.00

488 buah Rp 3,706,500.00

489 buah Rp 7,413,000.00

490 buah Rp 13,597,920.00

491 buah Rp 1,359,120.00

492 lembar Rp 158,760.00

493 lembar Rp 202,580.00

494 lembar Rp 308,840.00

495 m2 Rp 94,500.00

496 Tee C1 dia 200 x 200 mm ff unit Rp 3,676,689.76

497 Tee Gip dia 13 mm bh Rp 5,292.00

498 unit Rp 1,160,622.16

499 Tee PVC 150 x 100 mm unit Rp 1,862,119.01

500 Tee PVC 150 x 150 mm unit Rp 2,030,085.25

501 Tee PVC 150 x 40 mm unit Rp 1,692,612.49

502 Tee PVC 200 x 200 mm unit Rp 2,708,426.42

503 unit Rp 877,240.00

504 unit Rp 444,780.00

505 unit Rp 846,305.08

506 Tee Pvc 80 x 80 mm unit Rp 1,160,622.16

507 Tutup Manhole uk. 60 x 60 cm unit Rp 511,796.38

508 Tempat sabun keramik buah Rp 90,160.00

509 Ter kg Rp 12,568.50

510 Timbunan biasa m³ Rp 300,000.00

511 Timbunan pilihan / tanah puru m³ Rp 300,000.00

512 Triplek tebal 2.5 mm uk. 1.22 x 2.44 (m) lembar Rp 104,720.00

513 Triplek tebal 4 mm uk. 1.22 x 2.44 (m) lembar Rp 119,000.00

514 Triplek 2,2 mm uk. ( 4' x 8' ) m2 Rp 69,090.00

515 Triplek 3,0 mm uk. ( 4' x 8' ) m2 Rp 93,800.00

516 Triplek 4,0 mm uk. ( 4' x 8' ) m2 Rp 119,000.00

517 Triplek 6,0 mm uk. ( 4' x 8' ) m2 Rp 143,325.00

518 Ubin abu-abu 20 x 20 (cm) buah Rp 7,420.00

519 Ubin berwarna 20 x 20 (cm) buah Rp 8,680.00

520 Ubin granito 30 x 30 cm m²

521 Ubin granito 40 x 40 cm m²

522 Ubin motif (mozaik) m² Rp 259,420.00

Softboard uk. 1,20 x 2,40 (m), tebal 4 mm

Streorox - 100

Tangki air / hydrant umum fiberglass 1.000 liter

Tangki air / hydrant umum fiberglass 2.000 liter

Tangki air / hydrant umum fiberglass 3.000 liter

Tangki air / hydrant umum fiberglass 6.000 liter (horizontal)

Tangki air / hydrant umum polyethylene 1.000 liter

Tangki air / hydrant umum polyethylene 2.000 liter

Tangki air / hydrant umum polyethylene 3.000 liter

Tangki air / hydrant umum polyethylene 4.000 liter

Tangki air / hydrant umum polyethylene 5.000 liter

Tangki air / hydrant umum polyethylene 500 liter

Tangki air fiberglass (oranye) 1.000 liter

Tangki air fiberglass (oranye) 2.000 liter

Tangki air fiberglass (oranye) 3.000 liter

Tangki air fiberglass (oranye) 500 liter

Teak wood 0,30 x 0,60 (m), tebal 4 mm

Teak wood 0,90 x 2,10 (m), tebal 4 mm

Teak wood 1,20 x 2,40 (m), tebal 4 mm

Teak wood 1,20 x 2,40 (m), tebal 4 mm

Tee all socket PVC ø 100 x 50 (mm)

Tee all socket PVC ø 225 x 100 (mm)

Tee all socket PVC ø 50 x 50 (mm)

Tee all socket PVC ø 80 x 50 (mm)

Page 12: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

523 Ubin wafel buah Rp 7,140.00

524 Unit Rp 1,155,420.00

525 Ventilasi dia 80 mm unit Rp 511,796.38

526 Venetion blinds m² Rp 94,500.00

527 Vertical blinds m² Rp 7,350.00

528 m² Rp 337,260.00

529 m² Rp 134,400.00

530 Wallcast dia 200 mm unit Rp 1,790,703.43

531 Wastapel keramik uk.besar bh Rp 1,050,000.00

532 Wastapel keramik uk.kecil bh Rp 1,050,000.00

533 Wastafel buah Rp 654,780.00

534 unit Rp 1,198,400.00

535 Water stop m' Rp 149,940.00

536 Zinc alum m2 Rp 97,020.00

C. PERALATAN (BIAYA PEMILIKAN DAN OPERASI)

1 Bulldozer jam Rp 588,000.00

2 Stone Crusher jam Rp 560,000.00

3 Motor grader jam Rp 467,600.00

4 Pemecah batu jam Rp 982,800.00

5 Mesin penyaring jam Rp 389,620.00

6 Wheel loader jam Rp 446,040.00

7 Wheel tractor jam Rp 173,880.00

8 Track Loader jam Rp 420,000.00

9 Mesin gilas roda tiga 8 - 10 ton jam Rp 189,840.00

10 Mesin gilas tandem 6 - 10 ton jam Rp 295,260.00

11 Mesin gilas bergetar 10 ton jam Rp 356,860.00

12 Mesin gilas bergetar 8 - 15 ton jam Rp 388,080.00

13 Mesin gilas bergetar 1 ton jam Rp 85,400.00

14 Tamper / handy compactor jam Rp 14,840.00

15 Alat penggetar beton jam Rp 11,340.00

16 Mesin penyemprot aspal 1.000 liter jam Rp 138,460.00

17 Mesin penyemprot aspal 400 liter jam Rp 39,900.00

18 Mesin penyampur aspal 30 T / J + generator jam Rp 1,595,020.00

19 Mesin penghampar aspal jam Rp 231,140.00

20 Truk tangki air jam Rp 171,920.00

21 Trailer 1 Ton jam Rp 18,480.00

22 Concrete Vibratur jam Rp 141,400.00

23 Concrete Mixer jam Rp 141,960.00

24 Vibrator Roller jam Rp 194,880.00

25 Dump Truck 3-4 m3 jam Rp 158,480.00

26 Drump Truck jam Rp 253,960.00

27 Excavator jam Rp 438,200.00

28 Pulvi Mixer jam Rp 367,850.00

29 Generator set jam Rp 217,840.00

30 Water Pump 70-100 mm jam Rp 54,320.00

31 Tamper jam Rp 57,750.00

32 Jack Hammer jam Rp 140,000.00

33 Pedestrian Roller jam Rp 322,000.00

34 Crane 10-15 ton jam Rp 1,575,000.00

35 Dump truck 3,5 Ton jam Rp 242,480.00

36 Dump truck 5,0 Ton jam Rp 304,220.00

Urinoir terasso

Wallpaper bermotif

Wallpaper polos

Water meter ø 1 (inch) + pipa GIP

Page 13: Rab Sarana Pendukung Pariwisata

No. URAIAN / NAMA / JENIS BARANG SATUAN KET.

1 2 3 5 6

HARGA SATUAN (Rp)

37 Truk bak terbuka 3,5 Ton jam Rp 219,380.00

38 Flat Bed Truck jam Rp 174,720.00

39 Tree Wheel Roller 6-8 ton jam Rp 348,600.00

40 Mesin pengaduk beton 125 liter jam Rp 16,660.00

41 Mesin pengaduk beton 250 liter jam Rp 55,300.00

42 Mesin pengaduk beton 500 liter jam Rp 110,740.00

43 Compressor 210 m3 / jam jam Rp 102,200.00

44 Pompa air 5 cm, 30 m3 / jam jam Rp 13,720.00

45 Peralatan traktor jam Rp 79,800.00

46 Asphalt Finisher jam Rp 476,840.00

47 asphalt Mixing Plant jam Rp 2,999,920.00

48 Tandem Roller jam Rp 268,520.00

49 Pneumanic Tire Roller jam Rp 280,000.00

C. LAIN-LAIN

1 a.Biaya Penyambungan Daya Listrik PLN

- 900 Watt Ls Rp 4,763,364.00

- 1300 Watt Ls Rp 55,896,294.44

- 2200 Watt Ls Rp 9,160,265.14

- 220000 Watt Ls Rp 91,602,651.42

b.Biaya Pemasangan Instalasi Listrik Titik Rp 274,764.31

2 Biaya Penyambungan Air bersih (PDAM) Ls Rp 2,381,511.64

3 Biaya Penyambungan Telepon Unit Rp 2,198,450.56

Page 14: Rab Sarana Pendukung Pariwisata

KABUPATEN RAJA AMPAT

TAHUN ANGGARAN 2013

DAFTAR ANALISA BIAYA KONSTRUKSI

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m' Pagar sementara dari kayu tinggi 2 m

1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 33,419.54

2.5000 kg Semen PC @ 50 kg 3,000.00 7,500.00

0.0050 m³ Pasir ayak untuk beton 588,000.00 2,940.00

0.0090 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 9,450.00

0.0720 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 193,467.33

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.4000 ltr Residu 25,900.00 10,360.00

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0200 Oh Mandor 175,000.00 3,500.00

335,236.87

A.2 1 m' Pagar sementara dari seng gelombang tinggi 2 m

1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 33,419.54

2.5000 kg Semen PC @ 50 kg 3,000.00 7,500.00

1.2000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 72,100.00 86,520.00

0.0050 m³ Pasir ayak untuk beton 588,000.00 2,940.00

0.0090 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 9,450.00

0.0720 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 193,467.33

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.4500 ltr Cat menie 50,000.00 22,500.00

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0200 Oh Mandor 175,000.00 3,500.00

433,896.87

A.3 1 m' Pagar sementara dari kawat berduri tinggi 1,8 m

1.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 26,735.63

2.0000 kg Semen PC @ 50 kg 3,000.00 6,000.00

25.0000 kg Kawat berduri 26,460.00 661,500.00

0.0050 m³ Pasir ayak untuk beton 588,000.00 2,940.00

0.0090 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 9,450.00

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0200 Oh Mandor 175,000.00 3,500.00

774,925.63

A.4 1 m' Pengukuran dan pemasangan bouwplank, papan 2/20

0.0070 m³ Kayu gergajian kelas IV, papan 2,347,520.00 16,432.64

0.0120 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 32,244.55

0.0200 kg Paku berbagai ukuran (2" - 5") 35,000.00 700.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0050 Oh Mandor 175,000.00 875.00

76,702.19

KODE ANALISA

Page 15: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

KODE ANALISA

A.5 1 m² Pembuatan kantor sementara dengan lantai plesteran

1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 33,419.54

0.1800 m³ Kayu gergajian kelas IV, papan 2,347,520.00 422,553.60

0.8500 kg Paku berbagai ukuran (2" - 5") 35,000.00 29,750.00

1.1000 kg Besi strip 74,970.00 82,467.00

35.0000 kg Semen PC @ 50 kg 3,000.00 105,000.00

0.1500 m³ Pasir pasang 588,000.00 88,200.00

0.1000 m³ Pasir ayak untuk beton 588,000.00 58,800.00

0.1500 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 157,500.00

30.0000 bh Batu bata merah (lokal) 7,500.00 225,000.00

0.2500 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m) 98,840.00 24,710.00

2.0000 bh Jendela nako (kerangka + kaca 5 mm) 333,620.00 667,240.00

0.0800 m² Kaca bening tebal 3 mm 350,000.00 28,000.00

0.1500 bh Kunci tanam 175,000.00 26,250.00

0.0600 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 10,231.20

2.0000 Oh Pekerja tak terlatih 98,000.00 196,000.00

1.0000 Oh Tukang batu 150,000.00 150,000.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.3000 Oh Kepala tukang 165,000.00 49,500.00

0.0500 Oh Mandor 175,000.00 8,750.00

2,663,371.34

A.6 1 m² Pembuatan gudang semen dan alat - alat

1.7000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 45,450.57

0.2100 m³ Kayu gergajian kelas IV, papan 2,347,520.00 492,979.20

0.3000 kg Paku berbagai ukuran (2" - 5") 35,000.00 10,500.00

10.5000 kg Semen PC @ 50 kg 3,000.00 31,500.00

0.0300 m³ Pasir ayak untuk beton 588,000.00 17,640.00

0.0500 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 52,500.00

1.5000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 72,100.00 108,150.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

1,198,469.77

A.7 1 m² Membersihkan lapangan dan peralatan

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0050 Oh Mandor 175,000.00 875.00

10,675.00

A.8 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm

0.0360 m³ Kayu gergajian kelas IV, papan 2,347,520.00 84,510.72

0.0800 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,800.00

0.0140 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 37,618.65

0.3000 Oh Tukang kayu 150,000.00 45,000.00

0.0015 Oh Mandor 175,000.00 262.50

170,191.87

A.9 1 m² Pembuatan bedeng buruh

1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 33,419.54

0.1860 m³ Kayu gergajian kelas IV, papan 2,347,520.00 436,638.72

0.3000 kg Paku berbagai ukuran (2" - 5") 35,000.00 10,500.00

18.0000 kg Semen PC @ 50 kg 3,000.00 54,000.00

0.0300 m³ Pasir ayak untuk beton 588,000.00 17,640.00

0.0500 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 52,500.00

1.5000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 72,100.00 108,150.00

1.3500 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 230,202.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

1,382,800.26

Page 16: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

KODE ANALISA

A.10 1 m² Pembuatan stegger

1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 26,735.63 33,419.54

0.3000 kg Paku berbagai ukuran (2" - 5") 35,000.00 10,500.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.0170 Oh Tukang kayu 150,000.00 2,550.00

0.0020 Oh Kepala tukang 165,000.00 330.00

0.0130 Oh Mandor 175,000.00 2,275.00

73,574.54

A.11 1 m² Pembuatan jalan sementara (dengan tenaga)

0.1500 m³ Batu belah 10 - 15 (cm) 1,500,000.00 225,000.00

0.0900 m³ Batu kerikil dari galian bukit 938,000.00 84,420.00

0.0100 m³ Pasir urug / timbun 448,000.00 4,480.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

420,650.00

A.12 1 m² Pembuatan jalan sementara, tebal 25 cm (dengan tenaga)

0.2750 m³ Batu belah 10 - 15 (cm) 1,500,000.00 412,500.00

0.0300 m³ Batu kerikil dari galian bukit 938,000.00 28,140.00

0.0500 m³ Pasir urug / timbun 448,000.00 22,400.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

0.1000 Oh Mandor 175,000.00 17,500.00

578,540.00

A.13 1 m³ Bongkaran beton bertulang

6.6670 Oh Pekerja tak terlatih 98,000.00 653,366.00

0.3330 Oh Mandor 175,000.00 58,275.00

711,641.00

A.14 1 m³ Bongkaran dinding tembok bata merah

6.6670 Oh Pekerja tak terlatih 98,000.00 653,366.00

0.3330 Oh Mandor 175,000.00 58,275.00

711,641.00

A.15 1 m² Bongkaran lantai

Untuk 10 m² membongkar lantai diperlukan:

2.0000 Oh Pekerja tak terlatih 98,000.00 196,000.00

0.1000 Oh Mandor 175,000.00 17,500.00

Jadi untuk 10 m² membongkar lantai diperlukan 213,500.00

Maka untuk 1 m² membongkar lantai diperlukan 1/10-nya 21,350.00

A.16 1 m² Menurunkan atap genteng/sirap

Untuk 10 m² menurunkan atap genteng/sirap diperlukan:

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1000 Oh Mandor 175,000.00 17,500.00

Jadi untuk 10 m² menurunkan genteng/sirap diperlukan 37,100.00

Maka untuk 1 m² menurunkan genteng/sirap diperlukan 1/10-nya 3,710.00

A.17 1 m² Menurunkan atap seng

Untuk 10 m² menurunkan atap seng diperlukan:

0.5000 Oh Pekerja tak terlatih 98,000.00 49,000.00

1.0000 Oh Mandor 175,000.00 175,000.00

Jadi untuk 10 m² menurunkan atap seng diperlukan 224,000.00

Maka untuk 1 m² menurunkan atap seng diperlukan 1/10-nya 22,400.00

Page 17: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

KODE ANALISA

A.18 1 m² Membongkar rangka atap

Untuk 10 m² membongkar rangka atap diperlukan:

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

Jadi untuk 10 m² menurunkan membongkar rangka atap diperlukan 148,375.00

Maka untuk 1 m² membongkat rangka atap diperlukan 1/10-nya 14,837.50

A.19 1 m³ Membongkar rangka kuda-kuda kayu

6.0000 Oh Tukang kayu 150,000.00 900,000.00

0.6000 Oh Kepala tukang 165,000.00 99,000.00

4.0000 Oh Pekerja tak terlatih 98,000.00 392,000.00

0.2000 Oh Mandor 175,000.00 35,000.00

1,426,000.00

A.20 1 m² Membongkar langit-langit + rangka

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

2.0000 Oh Pekerja tak terlatih 98,000.00 196,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

Jadi untuk 10 m² menurunkan membongkar rangka atap diperlukan 246,375.00

Maka untuk 1 m² membongkat rangka atap diperlukan 1/10-nya 24,637.50

Page 18: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

B.1 1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga)

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.0400 Oh Mandor 175,000.00 7,000.00

46,200.00

B.2 1 m³ Galian Tanah biasa Sedalam 2 m (dengan tenaga)

0.5260 Oh Pekerja tak terlatih 98,000.00 51,548.00

0.0520 Oh Mandor 175,000.00 9,100.00

60,648.00

B.3 1 m³ Galian Tanah biasa Sedalam 3 m (dengan tenaga)

0.7350 Oh Pekerja tak terlatih 98,000.00 72,030.00

0.0730 Oh Mandor 175,000.00 12,775.00

84,805.00

B.4 1 m³ Galian Tanah Keras Sedalam 1 m (dengan tenaga)

0.6250 Oh Pekerja tak terlatih 98,000.00 61,250.00

0.0620 Oh Mandor 175,000.00 10,850.00

72,100.00

B.5 1 m³ Galian Tanah Cadas Sedalam 1 m (dengan tenaga)

1.2500 Oh Pekerja tak terlatih 98,000.00 122,500.00

0.1250 Oh Mandor 175,000.00 21,875.00

144,375.00

B.6 1 m³ Galian Tanah Lumpur Sedalam 1 m (dengan tenaga)

0.8230 Oh Pekerja tak terlatih 98,000.00 80,654.00

0.0830 Oh Mandor 175,000.00 14,525.00

95,179.00

B.7 1 m³ Pekerjaan Stripping Setinggi 1 m (dengan tenaga)

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.0050 Oh Mandor 175,000.00 875.00

5,775.00

B.8 1 m³ Pembuangan Tanah Sejauh 150 m (dengan tenaga)

0.5160 Oh Pekerja tak terlatih 98,000.00 50,568.00

0.0500 Oh Mandor 175,000.00 8,750.00

59,318.00

B.9 1 m³ Urugan Kembali (dengan tenaga)

0.1920 Oh Pekerja tak terlatih 98,000.00 18,816.00

0.0190 Oh Mandor 175,000.00 3,325.00

22,141.00

B.10 1 m³ Pemadatan Tanah (dengan tenaga)

0.5000 Oh Pekerja tak terlatih 98,000.00 49,000.00

0.0500 Oh Mandor 175,000.00 8,750.00

57,750.00

B.11 1 m³ Urugan Pasir (dengan tenaga)

1.2000 m³ Pasir urug / timbun 448,000.00 537,600.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.0100 Oh Mandor 175,000.00 1,750.00

568,750.00

B.12 1 m³ Urugan Sirtu (dengan tenaga)

1.2000 m³ Sirtu 350,000.00 420,000.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.0250 Oh Mandor 175,000.00 4,375.00

448,875.00

B.13 1 m³ Urugan Tanah Puru (dengan tenaga)

1.2000 m³ Timbunan pilihan / tanah puru 300,000.00 360,000.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.0100 Oh Mandor 175,000.00 1,750.00

391,150.00

KODE ANALISA

Page 19: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

KODE ANALISA

Page 20: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 2 Ps

1.1000 m³ Batu belah 10 - 15 (cm) 1,500,000.00 1,650,000.00

267.0000 kg Semen PC @ 50 kg 3,000.00 801,000.00

0.4270 m³ Pasir pasang 588,000.00 251,076.00

1.5000 Oh Pekerja tak terlatih 98,000.00 147,000.00

0.6000 Oh Tukang batu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0750 Oh Mandor 175,000.00 13,125.00

2,962,101.00

C.2 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps

1.1000 m³ Batu belah 15 - 20 (cm) 1,500,000.00 1,650,000.00

163.0000 kg Semen PC @ 50 kg 3,000.00 489,000.00

0.5200 m³ Pasir pasang 588,000.00 305,760.00

1.5000 Oh Pekerja tak terlatih 98,000.00 147,000.00

0.6000 Oh Tukang batu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0750 Oh Mandor 175,000.00 13,125.00

2,704,785.00

C.3 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps

1.1000 m³ Batu belah 10 - 15 (cm) 1,500,000.00 1,650,000.00

136.0000 kg Semen PC @ 50 kg 3,000.00 408,000.00

0.5440 m³ Pasir pasang 588,000.00 319,872.00

1.5000 Oh Pekerja tak terlatih 98,000.00 147,000.00

0.6000 Oh Tukang batu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0750 Oh Mandor 175,000.00 13,125.00

2,637,897.00

C.4 1 m³ Pasang Pondasi Batu Kali. 1 PC : 6 Ps

1.1000 m³ Batu belah 10 - 15 (cm) 1,500,000.00 1,650,000.00

117.0000 kg Semen PC @ 50 kg 3,000.00 351,000.00

0.5610 m³ Pasir pasang 588,000.00 329,868.00

1.5000 Oh Pekerja tak terlatih 98,000.00 147,000.00

0.6000 Oh Tukang batu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0750 Oh Mandor 175,000.00 13,125.00

2,590,893.00

C.5 1 m³ Pasang pondasi batu kosong

1.2000 m³ Batu belah 15 - 20 (cm) 1,500,000.00 1,800,000.00

0.3000 m³ Pasir urug / timbun 448,000.00 134,400.00

0.7800 Oh Pekerja tak terlatih 98,000.00 76,440.00

0.3900 Oh Tukang batu 150,000.00 58,500.00

0.0390 Oh Kepala tukang 165,000.00 6,435.00

0.0390 Oh Mandor 175,000.00 6,825.00

2,082,600.00

C.6 1 m³ Pasang pondasi siklop, 40% batu pecah 2-3 cm

75.0000 kg Besi beton 17,500.00 1,312,500.00

202.0000 kg Semen PC @ 50 kg 3,000.00 606,000.00

0.3200 m³ Pasir ayak untuk beton 588,000.00 188,160.00

0.4900 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 514,500.00

0.8000 kg Kawat beton 30,870.00 24,696.00

3.0000 Oh Pekerja tak terlatih 98,000.00 294,000.00

0.8500 Oh Tukang batu 150,000.00 127,500.00

0.0850 Oh Kepala tukang 165,000.00 14,025.00

0.1500 Oh Mandor 175,000.00 26,250.00

3,107,631.00

C.7 1 m³ Pasang pondasi bored pile ø 40 cm

280.0000 kg Semen PC @ 50 kg 3,000.00 840,000.00

0.4500 m³ Pasir ayak untuk beton 588,000.00 264,600.00

0.6700 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 703,500.00

7.4720 Kg Cassing Plat Baja 44,100.00 329,515.20

2.3800 Oh Pekerja tak terlatih 98,000.00 233,240.00

0.3000 Oh Tukang batu 150,000.00 45,000.00

0.0300 Oh Kepala tukang 165,000.00 4,950.00

0.0800 Oh Mandor 175,000.00 14,000.00

2,434,805.20

KODE ANALISA

Page 21: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

KODE ANALISA

C.8 1 m³ Pembuatan tiang pancang 40 cm x 40 cm beton bertulang

0.0190 m³ Pasir urug / timbun 448,000.00 8,512.00

0.0940 m³ Pasir ayak untuk beton 588,000.00 55,272.00

0.1500 m³ Batu pecah 1 - 2 (cm) 1,050,000.00 157,500.00

60.5000 kg Semen PC @ 50 kg 3,000.00 181,500.00

45.0000 kg Besi beton 17,500.00 787,500.00

0.9000 kg Kawat beton 30,870.00 27,783.00

0.0320 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 85,985.48

0.1200 kg Paku berbagai ukuran (2" - 5") 35,000.00 4,200.00

0.0900 ltr Minyak bekisting 13,580.00 1,222.20

0.2400 kg Plamuer 50,000.00 12,000.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

0.6700 Oh Tukang batu 150,000.00 100,500.00

0.0670 Oh Kepala tukang 165,000.00 11,055.00

0.0500 Oh Mandor 175,000.00 8,750.00

1,539,779.68

C.9 1 m³ Pembuatan tiang pancang 35 cm x 35 cm beton bertulang

0.0160 m³ Pasir urug / timbun 448,000.00 7,168.00

0.0800 m³ Pasir ayak untuk beton 588,000.00 47,040.00

0.1250 m³ Batu pecah 1 - 2 (cm) 1,050,000.00 131,250.00

49.0000 kg Semen PC @ 50 kg 3,000.00 147,000.00

34.5000 kg Besi beton 17,500.00 603,750.00

0.7000 kg Kawat beton 30,870.00 21,609.00

0.0270 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 72,550.25

0.1200 kg Paku berbagai ukuran (2" - 5") 35,000.00 4,200.00

0.0900 ltr Minyak bekisting 13,580.00 1,222.20

0.2000 kg Plamuer 50,000.00 10,000.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

0.5000 Oh Tukang batu 150,000.00 75,000.00

0.0500 Oh Kepala tukang 165,000.00 8,250.00

0.0400 Oh Mandor 175,000.00 7,000.00

1,214,439.45

C.10 1 m³ Pembuatan tiang pancang 30 cm x 30 cm beton bertulang

0.0118 m³ Pasir urug / timbun 448,000.00 5,266.29

0.0588 m³ Pasir ayak untuk beton 588,000.00 34,560.00

0.0918 m³ Batu pecah 1 - 2 (cm) 1,050,000.00 96,428.57

36.0000 kg Semen PC @ 50 kg 3,000.00 108,000.00

25.3469 kg Besi beton 17,500.00 443,571.43

0.5143 kg Kawat beton 30,870.00 15,876.00

0.0198 m³ Kayu gergajian kelas IV, balok kasau 5/7 2,687,046.19 53,302.22

0.0882 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,085.71

0.0661 ltr Minyak bekisting 13,580.00 897.94

0.1469 kg Plamuer 50,000.00 7,346.94

0.5878 Oh Pekerja tak terlatih 98,000.00 57,600.00

0.3673 Oh Tukang batu 150,000.00 55,102.04

0.0367 Oh Kepala tukang 165,000.00 6,061.22

0.0294 Oh Mandor 175,000.00 5,142.86

892,241.23

Page 22: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps

13.0000 bh Bataco 2,961.00 38,493.00

5.8333 kg Semen PC @ 50 kg 3,000.00 17,500.00

0.0133 m³ Pasir pasang 588,000.00 7,840.00

0.0833 Oh Pekerja tak terlatih 98,000.00 8,166.67

0.0833 Oh Tukang batu 150,000.00 12,500.00

0.0083 Oh Kepala tukang 165,000.00 1,375.00

0.0080 Oh Mandor 175,000.00 1,400.00

87,274.67

D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps

140.0000 bh Batu bata merah (lokal) 7,500.00 1,050,000.00

43.5000 kg Semen PC @ 50 kg 3,000.00 130,500.00

0.0800 m³ Pasir pasang 588,000.00 47,040.00

0.6500 Oh Pekerja tak terlatih 98,000.00 63,700.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0300 Oh Mandor 175,000.00 5,250.00

1,329,790.00

D.3 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 4 Ps

140.0000 bh Batu bata merah (lokal) 7,500.00 1,050,000.00

26.5500 kg Semen PC @ 50 kg 3,000.00 79,650.00

0.0930 m³ Pasir pasang 588,000.00 54,684.00

0.6500 Oh Pekerja tak terlatih 98,000.00 63,700.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0300 Oh Mandor 175,000.00 5,250.00

1,286,584.00

D.4 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 5 Ps

140.0000 bh Batu bata merah (lokal) 7,500.00 1,050,000.00

22.2000 kg Semen PC @ 50 kg 3,000.00 66,600.00

0.1020 m³ Pasir pasang 588,000.00 59,976.00

0.6500 Oh Pekerja tak terlatih 98,000.00 63,700.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0300 Oh Mandor 175,000.00 5,250.00

1,278,826.00

D.5 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps

70.0000 bh Batu bata merah (lokal) 7,500.00 525,000.00

18.9500 kg Semen PC @ 50 kg 3,000.00 56,850.00

0.0380 m³ Pasir pasang 588,000.00 22,344.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

654,829.00

D.6 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps

70.0000 bh Batu bata merah (lokal) 7,500.00 525,000.00

11.5000 kg Semen PC @ 50 kg 3,000.00 34,500.00

0.0430 m³ Pasir pasang 588,000.00 25,284.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

635,419.00

D.7 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 5 Ps

70.0000 bh Batu bata merah (lokal) 7,500.00 525,000.00

9.6800 kg Semen PC @ 50 kg 3,000.00 29,040.00

0.0450 m³ Pasir pasang 588,000.00 26,460.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

KODE ANALISA

Page 23: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

KODE ANALISA

0.0150 Oh Mandor 175,000.00 2,625.00

631,135.00

Page 24: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

KODE ANALISA

D.8 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 6 Ps

70.0000 kg Batu bata merah (lokal) 7,500.00 525,000.00

8.3200 kg Semen PC @ 50 kg 3,000.00 24,960.00

0.0490 m³ Pasir pasang 588,000.00 28,812.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

629,407.00

D.9 1 m² Pasang dinding hollowblock (H.B. 20)

12.5000 bh Hollow block (H.B. 20) 105,000.00 1,312,500.00

13.5000 kg Semen PC @ 50 kg 3,000.00 40,500.00

0.0480 m³ Pasir pasang 588,000.00 28,224.00

1.9500 kg Besi beton 17,500.00 34,125.00

0.3500 Oh Pekerja tak terlatih 98,000.00 34,300.00

0.1500 Oh Tukang batu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0170 Oh Mandor 175,000.00 2,975.00

1,477,599.00

D.10 1 m² Pasang dinding hollowblock (H.B. 15)

12.5000 bh Hollow block (H.B. 15) 87,780.00 1,097,250.00

10.4500 kg Semen PC @ 50 kg 3,000.00 31,350.00

0.0380 m³ Pasir pasang 588,000.00 22,344.00

1.9500 kg Besi beton 17,500.00 34,125.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1200 Oh Tukang batu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0150 Oh Mandor 175,000.00 2,625.00

1,239,034.00

D.11 1 m² Pasang dinding hollowblock (H.B. 10)

12.5000 bh Hollow block (H.B. 10) 80,360.00 1,004,500.00

7.5000 kg Semen PC @ 50 kg 3,000.00 22,500.00

0.0270 m³ Pasir pasang 588,000.00 15,876.00

1.9500 kg Besi beton 17,500.00 34,125.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

1,127,636.00

D.12 1 m² Pasang dinding conblock (C.B. 10)

12.5000 bh Conblock (C.B. 10) 97,580.00 1,219,750.00

7.2000 kg Semen PC @ 50 kg 3,000.00 21,600.00

0.0020 m³ Pasir ayak untuk beton 588,000.00 1,176.00

0.0210 m³ Pasir pasang 588,000.00 12,348.00

2.5400 kg Besi beton 17,500.00 44,450.00

0.0030 kg Paku berbagai ukuran (2" - 5") 35,000.00 105.00

0.0010 m³ Kayu gergajian kelas IV, papan 2,347,520.00 2,347.52

0.0150 kg Kawat beton 30,870.00 463.05

0.0030 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 3,150.00

0.3400 Oh Pekerja tak terlatih 98,000.00 33,320.00

0.1070 Oh Tukang batu 150,000.00 16,050.00

0.0070 Oh Tukang besi / tukang las 150,000.00 1,050.00

0.0114 Oh Kepala tukang 165,000.00 1,881.00

0.0170 Oh Mandor 175,000.00 2,975.00

1,360,665.57

D.13 1 m² Pasang dinding conblock (C.B. 15)

12.5000 bh Conblock (C.B. 15) 80,360.00 1,004,500.00

10.4600 kg Semen PC @ 50 kg 3,000.00 31,380.00

0.0030 m³ Pasir ayak untuk beton 588,000.00 1,764.00

Page 25: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

KODE ANALISA

0.0320 m³ Pasir pasang 588,000.00 18,816.00

0.8700 kg Besi beton 17,500.00 15,225.00

0.0040 kg Paku berbagai ukuran (2" - 5") 35,000.00 140.00

0.0010 m³ Kayu gergajian kelas IV, papan 2,347,520.00 2,347.52

0.0200 kg Kawat beton 30,870.00 617.40

0.0040 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 4,200.00

0.3400 Oh Pekerja tak terlatih 98,000.00 33,320.00

0.1300 Oh Tukang batu 150,000.00 19,500.00

0.0070 Oh Tukang besi / tukang las 150,000.00 1,050.00

0.0137 Oh Kepala tukang 165,000.00 2,260.50

0.0170 Oh Mandor 175,000.00 2,975.00

1,138,095.42

D.14 1 m² Pasang dinding lantai

2.5000 bh Bondbeam uk. 40 x 20 x 20 (cm) 90,160.00 225,400.00

5.1000 kg Semen PC @ 50 kg 3,000.00 15,300.00

0.0800 m³ Pasir ayak untuk beton 588,000.00 47,040.00

1.5000 kg Besi beton 17,500.00 26,250.00

0.1500 m³ Batu pecah 2 - 3 (cm) 1,050,000.00 157,500.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0300 Oh Tukang batu 150,000.00 4,500.00

0.0300 Oh Tukang besi / tukang las 150,000.00 4,500.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0050 Oh Mandor 175,000.00 875.00

492,155.00

D.15 1 m² Pasang dinding roster uk. 20 cm x 20 cm

25.0000 bh Rooster block uk. 20 x 20 (cm) 8,085.00 202,125.00

12.8000 kg Semen PC @ 50 kg 3,000.00 38,400.00

0.0350 m³ Pasir pasang 588,000.00 20,580.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

309,780.00

D.16 1 m² Pasang dinding rooster / krawang uk. 12 cm x 11 cm x 24 cm

36.0000 bh Rooster block uk. 12 x 11 x 24 (cm) 14,280.00 514,080.00

12.8000 kg Semen PC @ 50 kg 3,000.00 38,400.00

0.0350 m³ Pasir pasang 588,000.00 20,580.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

621,735.00

D.17 1 m² Pasang dinding bata berongga uk. 5 cm x 11 cm x 24 cm

80.0000 bh Batu bata berongga uk. 5 x 11 x 24 (cm) 3,640.00 291,200.00

23.6500 kg Semen PC @ 50 kg 3,000.00 70,950.00

0.5700 m³ Pasir pasang 588,000.00 335,160.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.1500 Oh Tukang batu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0150 Oh Mandor 175,000.00 2,625.00

756,270.00

D.18 1 m² Pasang dinding anyaman bambu, rangka kayu

0.1500 lbr Bilik bambu kering, uk. 1,5 x 4 (m) 86,520.00 12,978.00

0.0140 m³ Kayu gergajian kelas I, balok kasau 5/7 3,850,000.00 53,900.00

0.0120 kg Paku berbagai ukuran (2" - 5") 35,000.00 420.00

0.0030 m³ Kayu gergajian kelas III, balok list 2/4 3,713,149.33 11,139.45

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0020 Oh Mandor 175,000.00 350.00

96,912.45

Page 26: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 2 Ps, tebal 15 mm

8.5200 kg Semen PC @ 50 kg 3,000.00 25,560.00

0.0170 m³ Pasir pasang 588,000.00 9,996.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1500 Oh Tukang batu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0100 Oh Mandor 175,000.00 1,750.00

81,881.00

E.2 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm

5.2000 kg Semen PC @ 50 kg 3,000.00 15,600.00

0.0200 m³ Pasir pasang 588,000.00 11,760.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1500 Oh Tukang batu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0100 Oh Mandor 175,000.00 1,750.00

73,685.00

E.3 1 m² Plesteran 1 PC : 5 Ps, tebal 15 mm

4.3200 kg Semen PC @ 50 kg 3,000.00 12,960.00

0.0220 m³ Pasir pasang 588,000.00 12,936.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1500 Oh Tukang batu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0100 Oh Mandor 175,000.00 1,750.00

72,221.00

E.4 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm

14.2800 kg Semen PC @ 50 kg 3,000.00 42,840.00

0.0230 m³ Pasir pasang 588,000.00 13,524.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0125 Oh Mandor 175,000.00 2,187.50

116,351.50

E.5 1 m² Plesteran 1 PC : 4 Ps, tebal 20 mm

8.6800 kg Semen PC @ 50 kg 3,000.00 26,040.00

0.0280 m³ Pasir pasang 588,000.00 16,464.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0125 Oh Mandor 175,000.00 2,187.50

102,491.50

E.6 1 m² Plesteran 1 PC : 5 Ps, tebal 20 mm

7.2900 kg Semen PC @ 50 kg 3,000.00 21,870.00

0.0280 m³ Pasir pasang 588,000.00 16,464.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0125 Oh Mandor 175,000.00 2,187.50

98,321.50

E.7 1 m² Plesteran 1 PC : 2 Ps, tebal 25 mm

15.5000 kg Semen PC @ 50 kg 3,000.00 46,500.00

0.0130 m³ Pasir pasang 588,000.00 7,644.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0130 Oh Mandor 175,000.00 2,275.00

119,119.00

KODE ANALISA

Page 27: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

KODE ANALISA

E.8 1 m² Plesteran 1 PC : 4 Ps, tebal 25 mm

9.4800 kg Semen PC @ 50 kg 3,000.00 28,440.00

0.0380 m³ Pasir pasang 588,000.00 22,344.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0130 Oh Mandor 175,000.00 2,275.00

115,759.00

E.9 1 m² Plesteran 1 PC : 5 Ps, tebal 25 mm

7.9400 kg Semen PC @ 50 kg 3,000.00 23,820.00

0.0390 m³ Pasir pasang 588,000.00 22,932.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0130 Oh Mandor 175,000.00 2,275.00

111,727.00

E.10 1 m² Plesteran 1 PC : 2 Ps, tebal 30 mm

18.6500 kg Semen PC @ 50 kg 3,000.00 55,950.00

0.0350 m³ Pasir pasang 588,000.00 20,580.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.2500 Oh Tukang batu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0150 Oh Mandor 175,000.00 2,625.00

152,140.00

E.11 1 m² Plesteran 1 PC : 4 Ps, tebal 30 mm

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.2500 Oh Tukang batu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0150 Oh Mandor 175,000.00 2,625.00

134,446.00

E.12 1 m² Plesteran 1 PC : 5 Ps, tebal 30 mm

8.1900 kg Semen PC @ 50 kg 3,000.00 24,570.00

0.0450 m³ Pasir pasang 588,000.00 26,460.00

0.3200 Oh Pekerja tak terlatih 98,000.00 31,360.00

0.2500 Oh Tukang batu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0150 Oh Mandor 175,000.00 2,625.00

126,640.00

E.13 1 m² Plesteran beton 1 PC : 2 Ps, tebal 15 mm

9.3000 kg Semen PC @ 50 kg 3,000.00 27,900.00

0.0180 m³ Pasir pasang 588,000.00 10,584.00

0.2600 Oh Pekerja tak terlatih 98,000.00 25,480.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0130 Oh Mandor 175,000.00 2,275.00

99,539.00

E.14 1 m² Plesteran beton 1 PC : 3 Ps, tebal 15 mm

7.0700 kg Semen PC @ 50 kg 3,000.00 21,210.00

0.0210 m³ Pasir pasang 588,000.00 12,348.00

0.2600 Oh Pekerja tak terlatih 98,000.00 25,480.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0130 Oh Mandor 175,000.00 2,275.00

94,613.00

Page 28: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

KODE ANALISA

E.15 1 m² Plesteran ciprat 1Pc : 2 Ps

4.3200 kg Semen PC @ 50 kg 3,000.00 12,960.00

0.0160 m³ Pasir pasang 588,000.00 9,408.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0150 Oh Mandor 175,000.00 2,625.00

66,143.00

E.16 1 m² Plesteran siar, 1 PC : 2 Ps

4.3200 kg Semen PC @ 50 kg 3,000.00 12,960.00

0.0160 m³ Pasir pasang 588,000.00 9,408.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0700 Oh Tukang batu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0080 Oh Mandor 175,000.00 1,400.00

50,123.00

E.17 1 m² Plesteran waterproof batacote, 3 lapis

0.5000 kg Semen PC @ 50 kg 3,000.00 1,500.00

2.9000 m² Batacote 86,520.00 250,908.00

0.0060 m³ Pasir pasang 588,000.00 3,528.00

0.3000 Oh Pekerja tak terlatih 98,000.00 29,400.00

0.2000 Oh Tukang batu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0150 Oh Mandor 175,000.00 2,625.00

321,261.00

Page 29: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas I

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

6.0000 Oh Pekerja tak terlatih 98,000.00 588,000.00

20.0000 Oh Tukang kayu 150,000.00 3,000,000.00

2.0000 Oh Kepala tukang 165,000.00 330,000.00

0.3000 Oh Mandor 175,000.00 52,500.00

8,205,500.00

F.2 1 m³ Pasang balok profil, kayu kelas I (non SNI)

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

0.0300 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,050.00

0.0250 Oh Pekerja tak terlatih 98,000.00 2,450.00

0.6250 Oh Tukang kayu 150,000.00 93,750.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0400 Oh Mandor 175,000.00 7,000.00

4,343,375.00

F.3 1 m² Pasang daun pintu / jendela panel, kayu kelas I

0.0400 m³ Kayu gergajian kelas I, papan 3,850,000.00 154,000.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

2.5000 Oh Tukang kayu 150,000.00 375,000.00

0.2500 Oh Kepala tukang 165,000.00 41,250.00

0.0500 Oh Mandor 175,000.00 8,750.00

677,000.00

F.4 1 m² Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas I

0.0350 m³ Kayu gergajian kelas I, papan 3,850,000.00 134,750.00

1.0000 m² Kaca bening tebal 3 mm 350,000.00 350,000.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0400 Oh Mandor 175,000.00 7,000.00

904,032.00

F.5 1 m² Pasang daun pintu / jendela kaca bening tebal 5 mm, kayu kelas I

0.0350 m³ Kayu gergajian kelas I, papan 3,850,000.00 134,750.00

1.0000 m² Kaca bening tebal 5 mm 350,000.00 350,000.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0400 Oh Mandor 175,000.00 7,000.00

904,032.00

F.5a 1 m² Pasang daun pintu / jendela kaca ryben tebal 5 mm, kayu kelas I

0.0350 m³ Kayu gergajian kelas I, papan 3,850,000.00 134,750.00

1.0000 m² Kaca ryben tebal 5mm 8,120.00 8,120.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0400 Oh Mandor 175,000.00 7,000.00

562,152.00

F.6 1m² Pasang Daun pintu/ jendela dg Jalusi, Kayu kelas I

0.0640 m³ Kayu gergajian kelas I, papan 3,850,000.00 246,400.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

3.0000 Oh Tukang kayu 150,000.00 450,000.00

0.3000 Oh Kepala tukang 165,000.00 49,500.00

0.3000 Oh Mandor 175,000.00 52,500.00

896,400.00

KODE ANALISA

Page 30: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

KODE ANALISA

F.7 1 m² Pasang daun pintu plywood rangkap, rangka kayu kelas I

0.0196 m³ Kayu gergajian kelas I, papan 3,850,000.00 75,460.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.3000 Lt Lem (standar Aica Aibond) 40,600.00 12,180.00

1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 170,520.00

0.6000 Oh Pekerja tak terlatih 98,000.00 58,800.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0300 Oh Mandor 175,000.00 5,250.00

656,092.00

F.8 1 m² Pasang daun pintu teakwood rangkap, rangka kayu kelas I

0.0196 m³ Kayu gergajian kelas I, papan 3,850,000.00 75,460.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.3000 Lt Lem (standar Aica Aibond) 40,600.00 12,180.00

1.0000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 308,840.00 308,840.00

0.6000 Oh Pekerja tak terlatih 98,000.00 58,800.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0300 Oh Mandor 175,000.00 5,250.00

794,412.00

F.9 1 m² Pasang daun pintu plywood dan formika, rangka kayu kelas I

0.0196 m³ Kayu gergajian kelas I, papan 3,850,000.00 75,460.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.8000 Lt Lem (standar Aica Aibond) 40,600.00 32,480.00

1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 170,520.00

0.5000 lbr Formica 4" x 8" 111,160.00 55,580.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

2.5000 Oh Tukang kayu 150,000.00 375,000.00

0.2500 Oh Kepala tukang 165,000.00 41,250.00

0.0400 Oh Mandor 175,000.00 7,000.00

836,572.00

F.10 1 m² Pasang daun pintu teakwood dan formika, rangka kayu kelas I

0.0196 m³ Kayu gergajian kelas I, papan 3,850,000.00 75,460.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.8000 Lt Lem (standar Aica Aibond) 40,600.00 32,480.00

0.5000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 308,840.00 154,420.00

0.5000 lbr Formica 4" x 8" 111,160.00 55,580.00

0.8000 Oh Pekerja tak terlatih 98,000.00 78,400.00

2.5000 Oh Tukang kayu 150,000.00 375,000.00

0.2500 Oh Kepala tukang 165,000.00 41,250.00

0.0400 Oh Mandor 175,000.00 7,000.00

820,472.00

F.11 1 m² Pasang daun pintu formika double, rangka kayu kelas I

0.0196 m³ Kayu gergajian kelas I, papan 3,850,000.00 75,460.00

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

1.2000 Lt Lem (standar Aica Aibond) 40,600.00 48,720.00

1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 170,520.00

1.0000 lbr Formica 4" x 8" 111,160.00 111,160.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

2.6000 Oh Tukang kayu 150,000.00 390,000.00

0.2600 Oh Kepala tukang 165,000.00 42,900.00

0.0500 Oh Mandor 175,000.00 8,750.00

946,392.00

Page 31: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

KODE ANALISA

F.12 1 m² Pasang jalusi mati, kayu kelas I

0.0600 m³ Kayu gergajian kelas I, papan 3,850,000.00 231,000.00

0.1500 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 4,410.00

0.5000 Oh Pekerja tak terlatih 98,000.00 49,000.00

2.0000 Oh Tukang kayu 150,000.00 300,000.00

0.2000 Oh Kepala tukang 165,000.00 33,000.00

0.0250 Oh Mandor 175,000.00 4,375.00

621,785.00

F.13 1 m³ Pasang konstruksi kuda-kuda, kayu kelas I

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

15.0000 kg Besi strip 74,970.00 1,124,550.00

0.8000 kg Paku berbagai ukuran (2" - 5") 35,000.00 28,000.00

4.0000 Oh Pekerja tak terlatih 98,000.00 392,000.00

12.0000 Oh Tukang kayu 150,000.00 1,800,000.00

1.2000 Oh Kepala tukang 165,000.00 198,000.00

0.2000 Oh Mandor 175,000.00 35,000.00

7,812,550.00

F.14 1 m³ Pasang gording kuda-kuda, kayu kelas I (non SNI)

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

0.8000 kg Paku berbagai ukuran (2" - 5") 35,000.00 28,000.00

2.0000 Oh Pekerja tak terlatih 98,000.00 196,000.00

6.0000 Oh Tukang kayu 150,000.00 900,000.00

0.6000 Oh Kepala tukang 165,000.00 99,000.00

0.1000 Oh Mandor 175,000.00 17,500.00

5,475,500.00

F.15 1 m² Pasang kaso + reng untuk genteng, kayu kelas I

0.0165 m³ Kayu gergajian kelas I, balok 3,850,000.00 63,525.00

0.2000 kg Paku berbagai ukuran (2" - 5") 35,000.00 7,000.00

0.1200 Oh Pekerja tak terlatih 98,000.00 11,760.00

0.1200 Oh Tukang kayu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0060 Oh Mandor 175,000.00 1,050.00

103,315.00

F.16 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas I

0.0120 m³ Kayu gergajian kelas I, balok 3,850,000.00 46,200.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0750 Oh Mandor 175,000.00 13,125.00

119,150.00

F.17 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas I

0.0230 m³ Kayu gergajian kelas I, balok 3,850,000.00 88,550.00

0.1500 kg Paku berbagai ukuran (2" - 5") 35,000.00 5,250.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.3000 Oh Tukang kayu 150,000.00 45,000.00

0.0300 Oh Kepala tukang 165,000.00 4,950.00

0.0100 Oh Mandor 175,000.00 1,750.00

165,100.00

F.18 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas I

0.0270 m³ Kayu gergajian kelas I, balok 3,850,000.00 103,950.00

0.2000 kg Paku berbagai ukuran (2" - 5") 35,000.00 7,000.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.3500 Oh Tukang kayu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0125 Oh Mandor 175,000.00 2,187.50

195,912.50

F.19 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas I

0.0072 m³ Kayu gergajian kelas I, papan 3,850,000.00 27,720.00

0.0500 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,750.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0050 Oh Mandor 175,000.00 875.00

73,445.00

Page 32: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

KODE ANALISA

F.20 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas I

0.0110 m³ Kayu gergajian kelas I, papan 3,850,000.00 42,350.00

0.0500 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,750.00

0.1100 Oh Pekerja tak terlatih 98,000.00 10,780.00

0.2200 Oh Tukang kayu 150,000.00 33,000.00

0.0220 Oh Kepala tukang 165,000.00 3,630.00

0.0050 Oh Mandor 175,000.00 875.00

92,385.00

F.21 1 m² Pasang lisplank 2 x (3 cm x 20 cm), kayu kelas I

0.0145 m³ Kayu gergajian kelas I, papan 3,850,000.00 55,825.00

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0750 Oh Mandor 175,000.00 13,125.00

127,375.00

F.22 1 m² Pasang lisplank 2 x (2 cm x 20 cm), kayu kelas I

0.0086 m³ Kayu gergajian kelas I, papan 3,850,000.00 33,110.00

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0500 Oh Mandor 175,000.00 8,750.00

70,410.00

F.23 1 m² Pasang rangka dinding pemisah papan, kayu kelas I

0.0195 m³ Kayu gergajian kelas I, balok 3,850,000.00 75,075.00

0.0070 m³ Kayu gergajian kelas I, papan 3,850,000.00 26,950.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.4500 Oh Tukang kayu 150,000.00 67,500.00

0.0450 Oh Kepala tukang 165,000.00 7,425.00

0.0750 Oh Mandor 175,000.00 13,125.00

208,275.00

F.24 1 m³ Pasang rangka dinding pemisah triplek rangkap rangka kayu kelas I

0.0195 m³ Kayu gergajian kelas I, balok 3,850,000.00 75,075.00

0.0070 m³ Kayu gergajian kelas I, papan 3,850,000.00 26,950.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.5600 ltr Lem (standar Aica Aibond) 40,600.00 22,736.00

1.0000 lbr Triplek tebal 2.5 mm uk. 1.22 x 2.44 (m) 104,720.00 104,720.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.6000 Oh Tukang kayu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0100 Oh Mandor 175,000.00 1,750.00

354,231.00

F.25 1 m² Pasang rangka dinding pemisah teakwood rangkap, kayu kelas I

0.0195 m³ Kayu gergajian kelas I, balok 3,850,000.00 75,075.00

0.0070 m³ Kayu gergajian kelas I, papan 3,850,000.00 26,950.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.5600 ltr Lem (standar Aica Aibond) 40,600.00 22,736.00

1.0000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 308,840.00 308,840.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.4500 Oh Tukang kayu 150,000.00 67,500.00

0.0450 Oh Kepala tukang 165,000.00 7,425.00

0.0750 Oh Mandor 175,000.00 13,125.00

539,851.00

F.26 1 m² Pasang rangka dinding pemisah plywood rangkap, kayu kelas I

0.0195 m³ Kayu gergajian kelas I, balok 3,850,000.00 75,075.00

0.0070 m³ Kayu gergajian kelas I, papan 3,850,000.00 26,950.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.5600 ltr Lem (standar Aica Aibond) 40,600.00 22,736.00

1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 170,520.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.6000 Oh Tukang kayu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0100 Oh Mandor 175,000.00 1,750.00

420,031.00

F.27 1 m² Pasang dinding plywood,

0.4000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 68,208.00

0.0500 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 1,470.00

0.0250 Oh Pekerja tak terlatih 98,000.00 2,450.00

0.0750 Oh Tukang kayu 150,000.00 11,250.00

0.0075 Oh Kepala tukang 165,000.00 1,237.50

0.0013 Oh Mandor 175,000.00 227.50

Page 33: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

KODE ANALISA

84,843.00

Page 34: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

KODE ANALISA

F.28 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas I

1.0500 m' Kayu gergajian kelas I, profil 27,160.00 28,518.00

0.0500 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,750.00

0.0210 Oh Pekerja tak terlatih 98,000.00 2,058.00

0.0210 Oh Tukang kayu 150,000.00 3,150.00

0.0020 Oh Kepala tukang 165,000.00 330.00

0.0010 Oh Mandor 175,000.00 175.00

35,981.00

F.29 1 m² Pasang papan nama proyek, kayu kelas I

0.0195 m³ Kayu gergajian kelas I, balok 3,850,000.00 75,075.00

0.0070 m³ Kayu gergajian kelas I, papan 3,850,000.00 26,950.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

2.0000 kg Cat minyak 50,000.00 100,000.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.7500 Oh Tukang kayu 150,000.00 112,500.00

0.7500 Oh Tukang cat 60,000.00 45,000.00

0.0750 Oh Kepala tukang 165,000.00 12,375.00

0.0075 Oh Mandor 175,000.00 1,312.50

401,212.50

F.30 1 m³ Pasang balok gelegar kayu, kayu kelas I

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0025 Oh Mandor 175,000.00 437.50

4,248,662.50

F.31 1 m³ Pasang balok sandaran jembatan kayu / balok pemikul, kayu kelas I

1.1000 m³ Kayu gergajian kelas I, balok 3,850,000.00 4,235,000.00

0.0800 Oh Pekerja tak terlatih 98,000.00 7,840.00

0.2400 Oh Tukang kayu 150,000.00 36,000.00

0.0240 Oh Kepala tukang 165,000.00 3,960.00

0.0040 Oh Mandor 175,000.00 700.00

4,283,500.00

F.32 1 m² Pasang lantai jembatan dengan papan t = 8 cm, kayu kelas I

0.0800 m³ Kayu gergajian kelas I, papan 3,850,000.00 308,000.00

0.4000 kg Paku jembatan 86,520.00 34,608.00

0.0020 Oh Pekerja tak terlatih 98,000.00 196.00

0.0050 Oh Tukang kayu 150,000.00 750.00

0.0005 Oh Kepala tukang 165,000.00 82.50

0.0001 Oh Mandor 175,000.00 17.50

343,654.00

F.33 1 m² Pasang lantai jembatan dengan papan t = 8 cm di atas gelegar besi, kayu kelas I

0.0800 m³ Kayu gergajian kelas I, papan 3,850,000.00 308,000.00

8.0000 bh Baut klem 11,060.00 88,480.00

0.0025 Oh Pekerja tak terlatih 98,000.00 245.00

0.0075 Oh Tukang kayu 150,000.00 1,125.00

0.0008 Oh Kepala tukang 165,000.00 123.75

0.0001 Oh Mandor 175,000.00 21.88

397,995.63

F.34 1 m² Pasang lantai jembatan dengan papan t = 5 cm, kayu kelas I

0.0500 m³ Kayu gergajian kelas I, papan 3,850,000.00 192,500.00

0.4000 kg Paku jembatan 86,520.00 34,608.00

0.0020 Oh Pekerja tak terlatih 98,000.00 196.00

0.0050 Oh Tukang kayu 150,000.00 750.00

0.0005 Oh Kepala tukang 165,000.00 82.50

0.0001 Oh Mandor 175,000.00 17.50

228,154.00

F.35 1 m² Pasang lantai jembatan dengan papan t = 5 cm di atas gelegar besi, kayu kelas I

0.0500 m³ Kayu gergajian kelas I, papan 3,850,000.00 192,500.00

8.0000 bh Bubungan atap (nok) asbes sepasang 86,520.00 692,160.00

0.0025 Oh Pekerja tak terlatih 98,000.00 245.00

0.0075 Oh Tukang kayu 150,000.00 1,125.00

0.0008 Oh Kepala tukang 165,000.00 123.75

0.0001 Oh Mandor 175,000.00 21.88

886,175.63

Page 35: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m² Membuat lantai kerja beton tumbuk, 1 PC : 3 Ps : 5 krk, tebal 5 cm (n0n SNI)

10.0000 kg 3,000.00 30,000.00

0.0260 m³ 588,000.00 15,288.00

0.0440 m³ 1,050,000.00 46,200.00

1.1500 Oh 98,000.00 112,700.00

0.0200 Oh 150,000.00 3,000.00

0.0020 Oh 165,000.00 330.00

0.0060 Oh 175,000.00 1,050.00

208,568.00

G.2 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk

232.0000 kg 3,000.00 696,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,038,085.00

G.3 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk

218.0000 kg 3,000.00 654,000.00

0.5200 m³ 588,000.00 305,760.00

0.8700 m³ 1,050,000.00 913,500.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,090,585.00

G.4 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 6 krk

197.0000 kg 3,000.00 591,000.00

0.4700 m³ 588,000.00 276,360.00

0.9400 m³ 1,050,000.00 987,000.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,071,685.00

G.5 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 krk

357.0000 kg 3,000.00 1,071,000.00

0.4200 m³ 588,000.00 246,960.00

0.5400 m³ 1,050,000.00 567,000.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,102,285.00

G.6 1 m³ Membuat profil ad. 1 PC : 1,5 Ps (non SNI)

782.0000 kg 3,000.00 2,346,000.00

0.9200 m³ 588,000.00 540,960.00

2.0000 Oh 98,000.00 196,000.00

4.2000 Oh 150,000.00 630,000.00

0.3000 Oh 165,000.00 49,500.00

1.0000 Oh 175,000.00 175,000.00

3,937,460.00

KODE ANALISA

Page 36: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.7 1 m³ Membuat beton bertulang, 1 PC : 1 Ps : 2 krk

479.0000 kg 3,000.00 1,437,000.00

0.3700 m³ 588,000.00 217,560.00

0.7400 m³ 1,050,000.00 777,000.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,648,885.00

G.8 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk

280.0000 kg 3,000.00 840,000.00

0.4500 m³ 588,000.00 264,600.00

0.9000 m³ 1,050,000.00 945,000.00

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,266,925.00

G.9 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split

367.0000 kg 3,000.00 1,101,000.00

0.4400 m³ 588,000.00 258,720.00

0.8800 m³ 1,050,000.00 924,000.00

2.0000 Oh 98,000.00 196,000.00

0.3500 Oh 150,000.00 52,500.00

0.0350 Oh 165,000.00 5,775.00

1.0000 Oh 175,000.00 175,000.00

2,712,995.00

G.10 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 3 split

336.0000 kg 3,000.00 1,008,000.00

0.5400 m³ 588,000.00 317,520.00

0.8100 m³ 1,050,000.00 850,500.00

2.0000 Oh 98,000.00 196,000.00

0.3500 Oh 150,000.00 52,500.00

0.0350 Oh 165,000.00 5,775.00

1.0000 Oh 175,000.00 175,000.00

2,605,295.00

G.11 1 m³ Membuat tiang pancang prestressed beton

440.0000 kg 3,000.00 1,320,000.00

0.5000 m³ 588,000.00 294,000.00

0.8000 m³ 1,050,000.00 840,000.00

2.4600 Gln 4,760.00 11,709.60

1.6500 Oh 98,000.00 161,700.00

0.2500 Oh 150,000.00 37,500.00

0.0250 Oh 165,000.00 4,125.00

0.0800 Oh 175,000.00 14,000.00

2,683,034.60

G.12 1 m³ Membuat beton kedap air dengan strorox-100

400.0000 kg 3,000.00 1,200,000.00

0.4800 m³ 588,000.00 282,240.00

0.8000 m³ 1,050,000.00 840,000.00

1.2000 kg 7,420.00 8,904.00

2.0000 Oh 98,000.00 196,000.00

0.3500 Oh 150,000.00 52,500.00

0.0350 Oh 165,000.00 5,775.00

1.0000 Oh 175,000.00 175,000.00

2,760,419.00

Page 37: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.13 1 kg Pembesian dengan besi polos/ulir

1.0500 kg 17,500.00 18,375.00

0.0150 kg 30,870.00 463.05

0.0070 Oh 98,000.00 686.00

0.0070 Oh 150,000.00 1,050.00

0.0007 Oh 165,000.00 115.50

0.0003 Oh 175,000.00 52.50

20,742.05

G.14 1 kg Kabel prestressed polos / strands

1.0500 kg 32,060.00 33,663.00

0.0100 kg 30,870.00 308.70

0.0050 Oh 98,000.00 490.00

0.0050 Oh 150,000.00 750.00

0.0005 Oh 165,000.00 82.50

0.0003 Oh 175,000.00 52.50

35,346.70

G.15 1 kg Jaring kawat baja

1.0200 kg 30,000.00 30,600.00

0.8050 kg 30,870.00 24,850.35

0.0250 Oh 98,000.00 2,450.00

0.0250 Oh 150,000.00 3,750.00

0.0025 Oh 165,000.00 412.50

0.0015 Oh 175,000.00 262.50

62,325.35

G.16 Pembongkaran Bekisting 1 m³ beton

2.0000 Oh 98,000.00 196,000.00

196,000.00

G.17 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting)

0.2400 m³ 2,347,520.00 563,404.80

3.2000 kg 35,000.00 112,000.00

1.6000 ltr 13,580.00 21,728.00

150.0000 kg 17,500.00 2,625,000.00

2.2500 kg 30,870.00 69,457.50

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

0.1600 m³ 2,687,046.19 429,927.39

2.8000 lbr 170,520.00 477,456.00

24.0000 btg 26,735.63 641,655.17

5.6000 Oh 98,000.00 548,800.00

0.3500 Oh 150,000.00 52,500.00

2.6400 Oh 150,000.00 396,000.00

1.0500 Oh 150,000.00 157,500.00

0.4000 Oh 165,000.00 66,000.00

0.1930 Oh 175,000.00 33,775.00

8,288,963.86

G.18 1 m² Pasang bekisting untuk pondasi

0.0400 m³ 2,347,520.00 93,900.80

0.3000 kg 35,000.00 10,500.00

0.1000 ltr 13,580.00 1,358.00

0.3000 Oh 98,000.00 29,400.00

0.0260 Oh 150,000.00 3,900.00

0.0260 Oh 165,000.00 4,290.00

0.0050 Oh 175,000.00 875.00

144,223.80

Page 38: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.19 1 m² Pasang bekisting untuk sloof

0.0450 m³ 2,347,520.00 105,638.40

0.3000 kg 35,000.00 10,500.00

0.1000 ltr 13,580.00 1,358.00

0.3000 Oh 98,000.00 29,400.00

0.0260 Oh 150,000.00 3,900.00

0.0260 Oh 165,000.00 4,290.00

0.0050 Oh 175,000.00 875.00

155,961.40

155,961.40 899,897.28

G.20 1 m² Pasang bekisting untuk kolom

0.0400 m³ 2,347,520.00 93,900.80

0.4000 kg 35,000.00 14,000.00

0.2000 ltr 13,580.00 2,716.00

0.0150 m³ 2,687,046.19 40,305.69

0.3500 lbr 182,840.00 63,994.00

2.0000 btg 26,735.63 53,471.26

0.3000 Oh 98,000.00 29,400.00

0.3300 Oh 150,000.00 49,500.00

0.0330 Oh 165,000.00 5,445.00

0.0060 Oh 175,000.00 1,050.00

353,782.76

353,782.76 4,082,653.01

G.21 1 m² Pasang bekisting untuk balok

0.0400 m³ 2,347,520.00 93,900.80

0.4000 kg 35,000.00 14,000.00

0.2000 ltr 13,580.00 2,716.00

0.0180 m³ 2,687,046.19 48,366.83

0.3500 lbr 182,840.00 63,994.00

2.0000 btg 26,735.63 53,471.26

0.3200 Oh 98,000.00 31,360.00

0.3300 Oh 150,000.00 49,500.00

0.0330 Oh 165,000.00 5,445.00

0.0060 Oh 175,000.00 1,050.00

363,803.90

363,803.90 3,146,903.70

G.22 1 m² Pasang bekisting untuk lantai

0.0400 m³ 2,347,520.00 93,900.80

0.4000 kg 35,000.00 14,000.00

0.2000 ltr 13,580.00 2,716.00

0.0150 m³ 2,687,046.19 40,305.69

0.3500 lbr 182,840.00 63,994.00

6.0000 btg 26,735.63 160,413.79

0.3200 Oh 98,000.00 31,360.00

0.3300 Oh 150,000.00 49,500.00

0.0330 Oh 165,000.00 5,445.00

0.0060 Oh 175,000.00 1,050.00

462,685.28

462,685.28 3,854,168.42

Page 39: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.23 1 m³ Membuat beton mutu K. 225

338.0000 kg 3,000.00 1,014,000.00

0.6500 m³ 588,000.00 382,200.00

0.6500 m³ 1,050,000.00 682,500.00

6.0000 Oh 98,000.00 588,000.00

1.0000 Oh 150,000.00 150,000.00

0.1000 Oh 165,000.00 16,500.00

0.3000 Oh 175,000.00 52,500.00

2,885,700.00

G.24 1 m³ Membuat beton mutu K. 275

400.0000 kg 3,000.00 1,200,000.00

0.4000 m³ 588,000.00 235,200.00

0.8200 m³ 1,050,000.00 861,000.00

6.0000 Oh 98,000.00 588,000.00

1.0000 Oh 150,000.00 150,000.00

0.1000 Oh 165,000.00 16,500.00

0.3000 Oh 175,000.00 52,500.00

3,103,200.00

G.25 1 m² Pasang bekisting untuk jembatan cor

0.0264 m³ 2,347,520.00 61,974.53

0.6000 kg 35,000.00 21,000.00

0.5000 btg 26,735.63 13,367.82

0.1500 Oh 98,000.00 14,700.00

0.0500 Oh 150,000.00 7,500.00

0.0050 Oh 165,000.00 825.00

0.0070 Oh 175,000.00 1,225.00

120,592.34

G.26 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting)

0.2000 m³ 2,347,520.00 469,504.00

1.5000 kg 35,000.00 52,500.00

0.4000 ltr 13,580.00 5,432.00

150.0000 kg 17,500.00 2,625,000.00

2.2500 kg 30,870.00 69,457.50

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

3.9000 Oh 98,000.00 382,200.00

0.3500 Oh 150,000.00 52,500.00

1.0400 Oh 150,000.00 156,000.00

1.0500 Oh 150,000.00 157,500.00

0.2450 Oh 165,000.00 40,425.00

0.1650 Oh 175,000.00 28,875.00

6,133,153.50

G.27 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting)

0.2700 m³ 2,347,520.00 633,830.40

2.0000 kg 35,000.00 70,000.00

0.6000 ltr 13,580.00 8,148.00

200.0000 kg 17,500.00 3,500,000.00

3.0000 kg 30,870.00 92,610.00

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

4.8500 Oh 98,000.00 475,300.00

0.3500 Oh 150,000.00 52,500.00

1.5600 Oh 150,000.00 234,000.00

1.4000 Oh 150,000.00 210,000.00

0.3310 Oh 165,000.00 54,615.00

0.1700 Oh 175,000.00 29,750.00

Page 40: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

7,454,513.40

Page 41: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.28 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting)

0.3200 m³ 2,347,520.00 751,206.40

3.2000 kg 35,000.00 112,000.00

1.6000 ltr 13,580.00 21,728.00

150.0000 kg 17,500.00 2,625,000.00

2.2500 kg 30,870.00 69,457.50

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

0.1200 m³ 2,687,046.19 322,445.54

2.8000 lbr 182,840.00 511,952.00

32.0000 btg 26,735.63 855,540.22

5.8000 Oh 98,000.00 568,400.00

0.3500 Oh 150,000.00 52,500.00

2.8000 Oh 150,000.00 420,000.00

1.0500 Oh 1,050,000.00 1,102,500.00

0.4200 Oh 165,000.00 69,300.00

0.1850 Oh 175,000.00 32,375.00

9,608,164.67

G.29 1 m³ Membuat kolom beton bertulang (300 kg besi + bekisting)

0.4000 m³ 2,347,520.00 939,008.00

4.0000 kg 35,000.00 140,000.00

2.0000 ltr 13,580.00 27,160.00

300.0000 kg 17,500.00 5,250,000.00

4.5000 kg 30,870.00 138,915.00

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

0.1500 m³ 2,687,046.19 403,056.93

3.5000 lbr 182,840.00 639,940.00

20.0000 btg 26,735.63 534,712.64

7.3000 Oh 98,000.00 715,400.00

0.3500 Oh 150,000.00 52,500.00

3.3000 Oh 150,000.00 495,000.00

2.1000 Oh 150,000.00 315,000.00

0.5700 Oh 165,000.00 94,050.00

0.2500 Oh 175,000.00 43,750.00

11,882,252.57

G.30 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting)

0.2400 m³ 2,347,520.00 563,404.80

3.2000 kg 35,000.00 112,000.00

1.6000 ltr 13,580.00 21,728.00

150.0000 kg 17,500.00 2,625,000.00

2.2500 kg 30,870.00 69,457.50

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

0.1600 m³ 2,687,046.19 429,927.39

2.8000 lbr 182,840.00 511,952.00

24.0000 btg 26,735.63 641,655.17

5.6000 Oh 98,000.00 548,800.00

0.3500 Oh 150,000.00 52,500.00

2.6400 Oh 150,000.00 396,000.00

1.0500 Oh 150,000.00 157,500.00

0.4000 Oh 165,000.00 66,000.00

0.1930 Oh 175,000.00 33,775.00

8,323,459.86

Page 42: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.31 1 m³ Membuat dinding beton bertulang (200 kg besi + bekisting)/(non SNI)

0.2500 m³ 2,347,520.00 586,880.00

3.0000 kg 35,000.00 105,000.00

1.2000 ltr 13,580.00 16,296.00

200.0000 kg 17,500.00 3,500,000.00

3.0000 kg 30,870.00 92,610.00

323.0000 kg 3,000.00 969,000.00

0.5200 m³ 588,000.00 305,760.00

0.7800 m³ 1,050,000.00 819,000.00

0.1050 m³ 2,687,046.19 282,139.85

2.5000 lbr 182,840.00 457,100.00

14.0000 btg 26,735.63 374,298.85

5.6000 Oh 98,000.00 548,800.00

0.3500 Oh 150,000.00 52,500.00

2.3000 Oh 150,000.00 345,000.00

1.4000 Oh 150,000.00 210,000.00

0.4050 Oh 165,000.00 66,825.00

0.2020 Oh 175,000.00 35,350.00

8,766,559.70

G.32 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm

0.0020 m³ 2,347,520.00 4,695.04

0.0100 kg 35,000.00 350.00

3.0000 kg 17,500.00 52,500.00

0.4500 kg 30,870.00 13,891.50

4.0000 kg 3,000.00 12,000.00

0.0060 m³ 588,000.00 3,528.00

0.0090 m³ 1,050,000.00 9,450.00

0.0600 Oh 98,000.00 5,880.00

0.0200 Oh 150,000.00 3,000.00

0.0200 Oh 150,000.00 3,000.00

0.0200 Oh 150,000.00 3,000.00

0.0060 Oh 165,000.00 990.00

0.0030 Oh 175,000.00 525.00

112,809.54

G.33 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm

0.0030 m³ 2,347,520.00 7,042.56

0.0200 kg 35,000.00 700.00

3.6000 kg 17,500.00 63,000.00

0.0500 kg 30,870.00 1,543.50

5.5000 kg 3,000.00 16,500.00

0.0090 m³ 588,000.00 5,292.00

0.0150 m³ 1,050,000.00 15,750.00

0.1000 Oh 98,000.00 9,800.00

0.0330 Oh 150,000.00 4,950.00

0.0330 Oh 150,000.00 4,950.00

0.0330 Oh 150,000.00 4,950.00

0.0100 Oh 165,000.00 1,650.00

0.0050 Oh 175,000.00 875.00

137,003.06

Page 43: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

KODE ANALISA

G.34 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 100 kg

G.19 899,897.28

G.10 2,605,295.00

G.13 2,074,205.00

G.16 196,000.00

5,775,397.28

G.35 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 100 kg

G.20 4,082,653.01

G.10 2,605,295.00

G.13 2,074,205.00

G.16 196,000.00

8,958,153.01

G.36 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk balok, dengan pembesian 100 kg

G.21 3,146,903.70

G.10 2,605,295.00

G.13 2,074,205.00

G.16 196,000.00

8,022,403.70

G.37 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 100 kg

G.22 3,854,168.42

G.10 2,605,295.00

G.13 2,074,205.00

G.16 196,000.00

8,729,668.42

G.38 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg

G.22 3,854,168.42

G.10 2,605,295.00

G.13 1,555,653.75

G.16 196,000.00

8,211,117.17

G.39 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan Pembesian 200 kg

G.27 7,454,513.40

G.13 4,148,410.00

G.16 196,000.00

11,798,923.40

G.40 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg

G.19 899,897.28

G.10 2,605,295.00

G.13 1,555,653.75

G.16 196,000.00

5,256,846.03

Page 44: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur

25.0000 bh Atap genteng kodok 2,000.00 50,000.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0750 Oh Tukang kayu 150,000.00 11,250.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0080 Oh Mandor 175,000.00 1,400.00

78,670.00

H.2 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm

0.6000 lbr Rooflight fibreglass uk. 1,8 x 0,9 (m) 173,040.00 103,824.00

0.0500 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 1,470.00

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

131,444.00

H.3 1 m² Pasang atap asbes gelombang uk. 2.500 mm x 920 mm, tebal 5 mm

0.5000 lbr Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm 200,200.00 100,100.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0750 Oh Tukang kayu 150,000.00 11,250.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0080 Oh Mandor 175,000.00 1,400.00

132,981.20

H.4 1 m² Pasang atap asbes gelombang uk. 2.250 mm x 920 mm, tebal 5 mm

0.6000 lbr Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm 180,180.00 108,108.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0750 Oh Tukang kayu 150,000.00 11,250.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0080 Oh Mandor 175,000.00 1,400.00

140,989.20

H.5 1 m² Pasang atap asbes gelombang uk. 2.000 mm x 920 mm, tebal 5 mm

0.6000 lbr Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm 160,160.00 96,096.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0750 Oh Tukang kayu 150,000.00 11,250.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0080 Oh Mandor 175,000.00 1,400.00

128,977.20

H.6 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 920 mm, tebal 5 mm

0.7500 lbr Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm 57,400.00 43,050.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

74,841.20

H.7 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.050 mm, tebal 4 mm

0.3500 lbr Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm 177,520.00 62,132.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

93,923.20

H.8 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.050 mm, tebal 4 mm

0.4200 lbr Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm 163,380.00 68,619.60

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

100,410.80

KODE ANALISA

Page 45: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

KODE ANALISA

H.9 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.050 mm, tebal 4 mm

0.4400 lbr Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm 134,960.00 59,382.40

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

90,723.60

H.10 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.050 mm, tebal 4 mm

0.5100 lbr Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm 128,240.00 65,402.40

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

96,743.60

H.11 1 m² Pasang atap asbes gelombang uk. 1.500 mm x 1.050 mm, tebal 4 mm

0.8000 lbr Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm 100,100.00 80,080.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

111,421.20

H.12 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.080 mm, tebal 6 mm

0.3700 lbr Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm 265,580.00 98,264.60

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

129,605.80

H.13 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.080 mm, tebal 6 mm

0.3800 lbr Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm 245,000.00 93,100.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

124,441.20

H.14 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.080 mm, tebal 6 mm

0.4600 lbr Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm 202,440.00 93,122.40

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

124,463.60

H.15 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.080 mm, tebal 6 mm

0.4900 lbr Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm 191,940.00 94,050.60

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

125,391.80

H.16 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 1.080 mm, tebal 6 mm

0.5700 lbr Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm 77,700.00 44,289.00

0.1200 kg Paku asbes 43,260.00 5,191.20

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0670 Oh Tukang kayu 150,000.00 10,050.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

75,630.20

Page 46: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

KODE ANALISA

H.17 1 m² Pasang atap genteng beton

11.0000 bh Atap genteng beton ( jenis press) 7,000.00 77,000.00

0.0300 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,050.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0100 Oh Mandor 175,000.00 1,750.00

116,050.00

H.18 1 m² Pasang atap metal

1.0200 lbr Atap metal (biasa / polos) 123,620.00 126,092.40

0.2000 kg Paku anti Karat 53,060.00 10,612.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0100 Oh Mandor 175,000.00 1,750.00

174,704.40

H.19 1 m² Pasang atap alumunium super sheet

1.0500 m² Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna) 372,120.00 390,726.00

0.0200 kg Paku kait 2,380.00 47.60

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.7500 Oh Tukang kayu 150,000.00 112,500.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0060 Oh Mandor 175,000.00 1,050.00

520,343.60

H.20 1 m² Pasang atap seng gelombang

0.7000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 72,100.00 50,470.00

0.0200 kg Paku seng 36,400.00 728.00

0.1200 Oh Pekerja tak terlatih 98,000.00 11,760.00

0.0600 Oh Tukang kayu 150,000.00 9,000.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0060 Oh Mandor 175,000.00 1,050.00

73,998.00

H.21 1 m² Pasang atap nok seng

0.3000 lbr Seng plat BJLS 27 uk. 0.3 x 1.83 (m) 79,100.00 23,730.00

0.0400 kg Paku seng 36,400.00 1,456.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0080 Oh Kepala tukang 165,000.00 1,320.00

0.0060 Oh Mandor 175,000.00 1,050.00

52,756.00

H.22 1 m' Pasang atap nok genteng kodok

5.0000 bh Bubungan atap (nok) genteng kodok 10,080.00 50,400.00

8.0000 kg Semen PC @ 50 kg 3,000.00 24,000.00

0.0320 m³ Pasir pasang 588,000.00 18,816.00

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0020 Oh Mandor 175,000.00 350.00

166,066.00

H.23 1 m' Pasang atap nok genteng beton

3.5000 lbr Bubungan atap (nok) genteng beton 7,607.25 26,625.38

0.0500 kg Paku berbagai ukuran (2" - 5") 35,000.00 1,750.00

10.8000 kg Semen PC @ 50 kg 3,000.00 32,400.00

0.0320 m³ Pasir pasang 588,000.00 18,816.00

1.0000 kg Semen Warna 25,000.00 25,000.00

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0200 Oh Mandor 175,000.00 3,500.00

180,591.38

Page 47: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

KODE ANALISA

H.24 1 m' Pasang atap nok genteng metal

1.1000 lbr Bubungan atap (nok) metal (standar Rainbow) 49,000.00 53,900.00

0.0500 kg Paku anti Karat 53,060.00 2,653.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.1500 Oh Kepala tukang 165,000.00 24,750.00

0.0130 Oh Mandor 175,000.00 2,275.00

130,578.00

H.25 1 m' Pasang atap nok alumunium

1.2000 m² Bubungan atap (nok) alumunium standar 40 cm, swg. 22 119,840.00 143,808.00

0.0400 kg Paku kait 2,380.00 95.20

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

1.0000 Oh Tukang kayu 150,000.00 150,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0100 Oh Mandor 175,000.00 1,750.00

307,103.20

H.26 1 m' Pasang atap nok genteng soka

4.0000 bh Bubungan atap (nok) genteng soka 6,552.00 26,208.00

8.0000 kg Semen PC @ 50 kg 3,000.00 24,000.00

0.0320 m³ Pasir pasang 588,000.00 18,816.00

0.4000 Oh Pekerja tak terlatih 98,000.00 39,200.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0020 Oh Mandor 175,000.00 350.00

141,874.00

H.27 1 m² Pasang Aluminium Foil

1.0500 m² Aluminium foil 128,800.00 135,240.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.0200 Oh Tukang kayu 150,000.00 3,000.00

0.0020 Oh Kepala tukang 165,000.00 330.00

0.0080 oh Mandor 175,000.00 1,400.00

159,570.00

H.28 1 m² Pasang atap metal batuan /tekstur

1.0200 lbr Atap metal batuan /tekstur 135,940.00 138,658.80

0.2000 kg Paku anti Karat 53,060.00 10,612.00

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0100 Oh Mandor 175,000.00 1,750.00

187,270.80

Page 48: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

I.1 1 m² Langit-langit asbes 1 m x 1 m, tebal 4 mm

1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 4 mm 45,780.00 50,358.00

0.0100 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 294.00

0.0300 Oh Pekerja tak terlatih 98,000.00 2,940.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0015 Oh Mandor 175,000.00 262.50

65,509.50

I.2 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm

1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 5 mm 48,160.00 52,976.00

0.0100 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 294.00

0.0300 Oh Pekerja tak terlatih 98,000.00 2,940.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0015 Oh Mandor 175,000.00 262.50

68,127.50

I.3 1 m² Langit-langit asbes 1 m x 1 m, tebal 6 mm

1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 6 mm 51,940.00 57,134.00

0.0100 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 294.00

0.0300 Oh Pekerja tak terlatih 98,000.00 2,940.00

0.0700 Oh Tukang kayu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0015 Oh Mandor 175,000.00 262.50

72,285.50

I.4 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka alumunium (non SNI)

11.2000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) 96,320.00 1,078,784.00

0.8500 m' Rangka / frame accoustic board - main tee 77,840.00 66,164.00

1.6750 m' Rangka / frame accoustic board - cross tee 64,260.00 107,635.50

0.0650 m' Rangka / frame accoustic board - wall angle 86,520.00 5,623.80

0.6000 m' Rangka / frame accoustic board - rod / adjustable dia. 4 mm 37,100.00 22,260.00

1.0000 bh Dina bolt / ramset 3,080.00 3,080.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.1200 Oh Tukang kayu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0030 Oh Mandor 175,000.00 525.00

1,309,932.30

I.5 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium

0.5600 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) 98,840.00 55,350.40

0.8500 m' Profil aluminium T 64,260.00 54,621.00

0.1500 kg Kawat seng polos 28,420.00 4,263.00

1.0000 bh Dina bolt / ramset 3,080.00 3,080.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.1200 Oh Tukang kayu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0030 Oh Mandor 175,000.00 525.00

143,699.40

I.6 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium

1.5000 lbr Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m) 121,100.00 181,650.00

3.6000 m' Profil Aluminium T 64,260.00 231,336.00

0.1500 kg Kawat seng polos 28,420.00 4,263.00

1.0000 bh Dina bolt / ramset 3,080.00 3,080.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0500 Oh Kepala tukang 165,000.00 8,250.00

0.0075 Oh Mandor 175,000.00 1,312.50

519,591.50

I.7 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 4 mm

0.3600 lbr Plywood uk. 0,30 x 0,60 (m), tebal 4mm 102,480.00 36,892.80

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0035 Oh Mandor 175,000.00 612.50

61,897.30

KODE ANALISA

Page 49: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

KODE ANALISA

I.8 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 6 mm

0.3600 lbr Plywood uk. 0,30 x 0,60 (m), tebal 6mm 111,160.00 40,017.60

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0035 Oh Mandor 175,000.00 612.50

65,022.10

I.9 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 4 mm

0.3750 lbr Plywood uk. 0,60 x 1,20 (m), tebal 4mm 108,780.00 40,792.50

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0035 Oh Mandor 175,000.00 612.50

65,797.00

I.10 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 6 mm

0.3750 lbr Plywood uk. 0,60 x 1,20 (m), tebal 4mm 108,780.00 40,792.50

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0035 Oh Mandor 175,000.00 612.50

65,797.00

I.11 1 m² Langit-langit teakwood uk. 30 cm x 60 cm, tebal 4 mm

0.3600 lbr Teak wood 0,30 x 0,60 (m), tebal 4 mm 158,760.00 57,153.60

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0035 Oh Mandor 175,000.00 612.50

82,158.10

I.12 1 m² Langit-langit soft board

0.0350 lbr Softboard uk. 1,20 x 2,40 (m), tebal 4 mm 86,520.00 3,028.20

0.0300 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 882.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0030 Oh Mandor 175,000.00 525.00

26,965.20

I.13 1 m² Langit-langit gypsum board, tebal 9 mm

0.3640 lbr Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm 175,000.00 63,700.00

0.1100 kg Paku sekrup 2,520.00 277.20

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0050 Oh Mandor 175,000.00 875.00

82,977.20

I.14 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka kayu kelas III

0.0270 m³ Kayu gergajian kelas III, balok 3,713,149.33 100,255.03

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

11.5000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) 96,320.00 1,107,680.00

0.3100 Oh Pekerja tak terlatih 98,000.00 30,380.00

0.4700 Oh Tukang kayu 150,000.00 70,500.00

0.0470 Oh Kepala tukang 165,000.00 7,755.00

0.0155 Oh Mandor 175,000.00 2,712.50

1,321,382.53

I.15 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka kayu kelas III

0.0230 m³ Kayu gergajian kelas III, balok 3,713,149.33 85,402.43

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

5.8000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) 98,840.00 573,272.00

0.2600 Oh Pekerja tak terlatih 98,000.00 25,480.00

0.4000 Oh Tukang kayu 150,000.00 60,000.00

0.0400 Oh Kepala tukang 165,000.00 6,600.00

Page 50: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

KODE ANALISA

0.0130 Oh Mandor 175,000.00 2,275.00

755,129.43

Page 51: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

KODE ANALISA

I.16 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III

0.3900 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 170,520.00 66,502.80

0.0600 kg Paku berbagai ukuran (2" - 5") 35,000.00 2,100.00

0.0230 m³ Kayu gergajian kelas III, balok 3,713,149.33 85,402.43

0.2700 Oh Pekerja tak terlatih 98,000.00 26,460.00

0.4000 Oh Tukang kayu 150,000.00 60,000.00

0.0400 Oh Kepala tukang 165,000.00 6,600.00

0.0135 Oh Mandor 175,000.00 2,362.50

249,427.73

I.17 1 m² Kompon Gypsum (nonSNI)

0.3640 lbr Kompon gypsum 66,780.00 24,307.92

0.1100 kg Kain kassa 23,100.00 2,541.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0050 Oh Mandor 175,000.00 875.00

45,848.92

I.18 1 m² Amplas Gypsum (non SNI)

0.3640 lbr Amplas 15,000.00 5,460.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0050 Oh Mandor 175,000.00 875.00

24,460.00

I.19 1 m' List langit-langit kayu profil

1.1000 m' Kayu gergajian kelas III, profil 14,140.00 15,554.00

0.0100 kg Paku berbagai ukuran (2" - 5") 35,000.00 350.00

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.0500 Oh Tukang kayu 150,000.00 7,500.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0030 Oh Mandor 175,000.00 525.00

29,654.00

Page 52: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock

1.0000 bh Closed duduk (lokal) 2,250,000.00 2,250,000.00

6.0000 % Perlengkapan (dari harga closed) - 135,000.00

3.3000 Oh Pekerja tak terlatih 98,000.00 323,400.00

1.1000 Oh Tukang batu 150,000.00 165,000.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.1600 Oh Mandor 175,000.00 28,000.00

2,901,565.00

J.2 Memasang 1 buah klosed jongkok porselin

1.0000 bh Closed jongkok porcelaint (lokal) 200,000.00 200,000.00

6.0000 kg Semen PC @ 50 kg 3,000.00 18,000.00

0.0100 m³ Pasir pasang 588,000.00 5,880.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

1.5000 Oh Tukang batu 150,000.00 225,000.00

1.5000 Oh Kepala tukang 165,000.00 247,500.00

0.1600 Oh Mandor 175,000.00 28,000.00

822,380.00

J.3 Memasang 1 buah klosed jongkok keramik

1.0000 bh Closed jongkok keramik 400,000.00 400,000.00

7.0000 bh Batu bata merah (lokal) 7,500.00 52,500.00

6.0000 kg Semen PC @ 50 kg 3,000.00 18,000.00

0.0100 m³ Pasir pasang 588,000.00 5,880.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

1.5000 Oh Tukang batu 150,000.00 225,000.00

0.3000 Oh Kepala tukang 165,000.00 49,500.00

0.1100 Oh Mandor 175,000.00 19,250.00

868,130.00

J.4 Memasang 1 buah urinoir

1.0000 bh Urinoir terasso 1,155,420.00 1,155,420.00

30.0000 % Perlengkapan (dari harga urinoir) - 346,626.00

6.0000 kg Semen PC @ 50 kg 3,000.00 18,000.00

0.0100 m³ Pasir pasang 588,000.00 5,880.00

1.0000 Oh Pekerja tak terlatih 98,000.00 98,000.00

1.0000 Oh Tukang batu 150,000.00 150,000.00

0.1000 Oh Kepala tukang 165,000.00 16,500.00

0.1000 Oh Mandor 175,000.00 17,500.00

1,807,926.00

J.5 Memasang 1 buah wastafel

1.0000 bh Wastafel 654,780.00 654,780.00

12.0000 % Perlengkapan (dari harga wastafel) - 78,573.60

6.0000 kg Semen PC @ 50 kg 3,000.00 18,000.00

0.0100 m³ Pasir pasang 588,000.00 5,880.00

1.2000 Oh Pekerja tak terlatih 98,000.00 117,600.00

1.4500 Oh Tukang batu 150,000.00 217,500.00

0.1500 Oh Kepala tukang 165,000.00 24,750.00

0.1000 Oh Mandor 175,000.00 17,500.00

1,134,583.60

J.6 Memasang 1 buah bak mandi fibreglass vol. 0,3 m³

1.0000 bh Bak mandi fibreglass volume 0,30 m³ 494,200.00 494,200.00

18.0000 % Perlengkapan (dari harga bak) - 88,956.00

1.8000 Oh Pekerja tak terlatih 98,000.00 176,400.00

2.7000 Oh Tukang batu 150,000.00 405,000.00

0.5400 Oh Kepala tukang 165,000.00 89,100.00

0.1100 Oh Mandor 175,000.00 19,250.00

1,272,906.00

KODE ANALISA

Page 53: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

KODE ANALISA

J.7 Memasang 1 buah bak mandi fibreglass vol. 1 m³

1.0000 bh Bak mandi fibreglass volume 1,00 m³ 691,880.00 691,880.00

12.0000 % Perlengkapan (dari harga bak) - 83,025.60

3.0000 Oh Pekerja tak terlatih 98,000.00 294,000.00

4.5000 Oh Tukang batu 150,000.00 675,000.00

0.9000 Oh Kepala tukang 165,000.00 148,500.00

0.9000 Oh Mandor 175,000.00 157,500.00

2,049,905.60

J.8 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + porselin 11 cm x 11 cm

180.0000 bh Batu bata merah (lokal) 7,500.00 1,350,000.00

120.0000 kg Semen PC @ 50 kg 3,000.00 360,000.00

0.3000 m³ Pasir pasang 588,000.00 176,400.00

360.0000 bh Porcelaint uk. 11 cm x 11 cm 2,240.00 806,400.00

6.0000 kg Semen putih 9,800.00 58,800.00

6.0000 Oh Pekerja tak terlatih 98,000.00 588,000.00

3.0000 Oh Tukang batu 150,000.00 450,000.00

0.3000 Oh Kepala tukang 165,000.00 49,500.00

0.3000 Oh Mandor 175,000.00 52,500.00

3,891,600.00

J.9 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + keramik 10 cm x 20 cm

180.0000 bh Batu bata merah (lokal) 7,500.00 1,350,000.00

120.0000 kg Semen PC @ 50 kg 3,000.00 360,000.00

0.3000 m³ Pasir pasang 588,000.00 176,400.00

4.4000 m² Keramik 10 x 20 (cm) terang 103,740.00 456,456.00

6.0000 kg Semen putih 9,800.00 58,800.00

6.0000 Oh Pekerja tak terlatih 98,000.00 588,000.00

3.0000 Oh Tukang batu 150,000.00 450,000.00

0.3000 Oh Kepala tukang 165,000.00 49,500.00

0.3000 Oh Mandor 175,000.00 52,500.00

3,541,656.00

J.10 Memasang 1 buah bak beton vol. 1 m³ air dengan keramik 10 cm x 20 cm

0.9000 m³ Beton adukan 1 pc : 1 ps : 2 krk 2,648,885.00 2,383,996.50

180.0000 kg Besi beton 17,500.00 3,150,000.00

0.8000 m³ Kayu gergajian kelas IV, papan 2,347,520.00 1,878,016.00

10.7600 m² Keramik 10 x 20 (cm) terang 103,740.00 1,116,242.40

10.0000 % Perlengkapan (dari harga total bahan) - 741,201.25

2.3000 Oh Pekerja tak terlatih 98,000.00 225,400.00

3.2000 Oh Tukang batu 150,000.00 480,000.00

0.7000 Oh Kepala tukang 165,000.00 115,500.00

0.7000 Oh Mandor 175,000.00 122,500.00

10,212,856.15

J.11 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm

0.9000 m³ Beton adukan 1 pc : 1 ps : 2 krk 2,648,885.00 2,383,996.50

180.0000 kg Besi beton 17,500.00 3,150,000.00

0.8000 m³ Kayu gergajian kelas IV, papan 2,347,520.00 1,878,016.00

1,115.0000 bh Porcelaint uk. 11 cm x 11 cm 2,240.00 2,497,600.00

10.0000 % Perlengkapan (dari harga total bahan) - 990,961.25

3.5000 Oh Pekerja tak terlatih 98,000.00 343,000.00

4.5000 Oh Tukang batu 150,000.00 675,000.00

0.9000 Oh Kepala tukang 165,000.00 148,500.00

0.9000 Oh Mandor 175,000.00 157,500.00

12,224,573.75

Page 54: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

KODE ANALISA

J.12 Memasang 1 buah bathtub (non SNI)

1.0000 bh Bak mandi jenis bathtub 2,450,000.00 2,450,000.00

20.0000 % Perlengkapan (dari harga bathtub) - 490,000.00

0.0750 Oh Tukang batu 150,000.00 11,250.00

0.0750 Oh Kepala tukang 165,000.00 12,375.00

0.2500 Oh Mandor 175,000.00 43,750.00

3,007,375.00

J.13 Memasang 1 m' pipa beton ø 15 cm - 20 cm

1.1000 bh Pipa beton ø 20 cm, panjang 1 m' 197,680.00 217,448.00

13.0000 bh Batu bata merah (lokal) 7,500.00 97,500.00

3.9200 kg Semen PC @ 50 kg 3,000.00 11,760.00

0.0560 m³ Pasir pasang 588,000.00 32,928.00

0.0240 m³ Pasir urug / timbun 448,000.00 10,752.00

0.1400 Oh Pekerja tak terlatih 98,000.00 13,720.00

0.0700 Oh Tukang batu 150,000.00 10,500.00

0.0070 Oh Kepala tukang 165,000.00 1,155.00

0.0070 Oh Mandor 175,000.00 1,225.00

396,988.00

J.14 Memasang 1 m' pipa beton ø 30 cm - 100 cm

1.1000 bh Pipa beton ø 60 cm, panjang 1 m' 324,940.00 357,434.00

25.0000 bh Batu bata merah (lokal) 7,500.00 187,500.00

10.3000 kg Semen PC @ 50 kg 3,000.00 30,900.00

0.0610 m³ Pasir pasang 588,000.00 35,868.00

0.0690 m³ Pasir urug / timbun 448,000.00 30,912.00

0.3800 Oh Pekerja tak terlatih 98,000.00 37,240.00

0.1900 Oh Tukang batu 150,000.00 28,500.00

0.0190 Oh Kepala tukang 165,000.00 3,135.00

0.0190 Oh Mandor 175,000.00 3,325.00

714,814.00

J.15 Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 35 cm

66.0000 bh Batu bata merah (lokal) 7,500.00 495,000.00

44.0000 kg Semen PC @ 50 kg 3,000.00 132,000.00

0.0700 m³ Pasir pasang 588,000.00 41,160.00

0.0700 m³ Batu kerikil ayak / batu saring / kerai 290,360.00 20,325.20

1.6000 kg Besi beton 17,500.00 28,000.00

0.0600 m³ Pasir ayak untuk beton 588,000.00 35,280.00

3.2000 Oh Pekerja tak terlatih 98,000.00 313,600.00

1.1050 Oh Tukang batu 150,000.00 165,750.00

0.0015 Oh Kepala tukang 165,000.00 247.50

0.0160 Oh Mandor 175,000.00 2,800.00

1,234,162.70

J.16 Memasang 1 bh bak kontrol pas. batu bata uk. 45 cm x 45 cm, tinggi 50 cm

113.0000 bh Batu bata merah (lokal) 7,500.00 847,500.00

77.0000 kg Semen PC @ 50 kg 3,000.00 231,000.00

0.1300 m³ Pasir pasang 588,000.00 76,440.00

0.0200 m³ Batu kerikil ayak / batu saring / kerai 290,360.00 5,807.20

2.6000 kg Besi beton 17,500.00 45,500.00

0.0900 m³ Pasir ayak untuk beton 588,000.00 52,920.00

1.4200 Oh Pekerja tak terlatih 98,000.00 139,160.00

0.4730 Oh Tukang batu 150,000.00 70,950.00

0.0470 Oh Kepala tukang 165,000.00 7,755.00

0.0710 Oh Mandor 175,000.00 12,425.00

1,489,457.20

Page 55: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

KODE ANALISA

J.17 Memasang 1 bh bak kontrol pas. batu bata uk. 60 cm x 60 cm, tinggi 65 cm

167.0000 bh Batu bata merah (lokal) 7,500.00 1,252,500.00

114.0000 kg Semen PC @ 50 kg 3,000.00 342,000.00

0.1840 m³ Pasir pasang 588,000.00 108,192.00

0.0330 m³ Batu kerikil ayak / batu saring / kerai 290,360.00 9,581.88

4.8500 kg Besi beton 17,500.00 84,875.00

0.1200 m³ Pasir ayak untuk beton 588,000.00 70,560.00

2.1600 Oh Pekerja tak terlatih 98,000.00 211,680.00

0.7200 Oh Tukang batu 150,000.00 108,000.00

0.0720 Oh Kepala tukang 165,000.00 11,880.00

0.1080 Oh Mandor 175,000.00 18,900.00

2,218,168.88

J.18 Memasang 1 m' pipa galvanis ø 1/2"

1.2000 m' Pipa besi galvanis ø 0,5 (inch) 45,780.00 54,936.00

35.0000 % Perlengkapan (dari harga pipa) - 19,227.60

0.0540 Oh Pekerja tak terlatih 98,000.00 5,292.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0270 Oh Mandor 175,000.00 4,725.00

99,165.60

J.19 Memasang 1 m' pipa galvanis ø 3/4"

1.2000 m' Pipa besi galvanis ø 0,75 (inch) 59,360.00 71,232.00

35.0000 % Perlengkapan (dari harga pipa) - 24,931.20

0.0540 Oh Pekerja tak terlatih 98,000.00 5,292.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0270 Oh Mandor 175,000.00 4,725.00

121,165.20

J.20 Memasang 1 m' pipa galvanis ø 1"

1.2000 m' Pipa besi galvanis ø 1 (inch) 91,980.00 110,376.00

35.0000 % Perlengkapan (dari harga pipa) - 38,631.60

0.0540 Oh Pekerja tak terlatih 98,000.00 5,292.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0270 Oh Mandor 175,000.00 4,725.00

174,009.60

J.21 Memasang 1 m' pipa galvanis ø 1,5"

1.2000 m' Pipa besi galvanis ø 1,5 (inch) 137,200.00 164,640.00

35.0000 % Perlengkapan (dari harga pipa) - 57,624.00

0.1080 Oh Pekerja tak terlatih 98,000.00 10,584.00

0.1800 Oh Tukang batu 150,000.00 27,000.00

0.0180 Oh Kepala tukang 165,000.00 2,970.00

0.0054 Oh Mandor 175,000.00 945.00

263,763.00

J.22 Memasang 1 m' pipa galvanis ø 2"

1.2000 m' Pipa besi galvanis ø 2 (inch) 188,440.00 226,128.00

35.0000 % Perlengkapan (dari harga pipa) - 79,144.80

0.1080 Oh Pekerja tak terlatih 98,000.00 10,584.00

0.1800 Oh Tukang batu 150,000.00 27,000.00

0.0180 Oh Kepala tukang 165,000.00 2,970.00

0.0054 Oh Mandor 175,000.00 945.00

346,771.80

J.23 Memasang 1 m' pipa galvanis ø 4"

1.2000 m' Pipa besi galvanis ø 4 (inch) 579,460.00 695,352.00

35.0000 % Perlengkapan (dari harga pipa) - 243,373.20

0.1350 Oh Pekerja tak terlatih 98,000.00 13,230.00

0.2250 Oh Tukang batu 150,000.00 33,750.00

0.0225 Oh Kepala tukang 165,000.00 3,712.50

0.0068 Oh Mandor 175,000.00 1,190.00

990,607.70

Page 56: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

KODE ANALISA

J.24 Memasang 1 m' pipa PVC tipe AW ø 1/2"

1.2000 m' Pipa PVC ø 1/2 (inch) AW, panjang 4 m 10,080.00 12,096.00

35.0000 % Perlengkapan (dari harga pipa) - 4,233.60

0.0360 Oh Pekerja tak terlatih 98,000.00 3,528.00

0.0600 Oh Tukang batu 150,000.00 9,000.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0018 Oh Mandor 175,000.00 315.00

30,162.60

J.25 Memasang 1 m' pipa PVC tipe AW ø 3/4"

1.2000 m' Pipa PVC ø 3/4 (inch) AW, panjang 4 m 13,300.00 15,960.00

35.0000 % Perlengkapan (dari harga pipa) - 5,586.00

0.0360 Oh Pekerja tak terlatih 98,000.00 3,528.00

0.0600 Oh Tukang batu 150,000.00 9,000.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0018 Oh Mandor 175,000.00 315.00

35,379.00

J.26 Memasang 1 m' pipa PVC tipe AW ø 1"

1.2000 m' Pipa PVC ø 1(inch) AW, panjang 4 m 17,780.00 21,336.00

35.0000 % Perlengkapan (dari harga pipa) - 7,467.60

0.0360 Oh Pekerja tak terlatih 98,000.00 3,528.00

0.0600 Oh Tukang batu 150,000.00 9,000.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0018 Oh Mandor 175,000.00 315.00

42,636.60

J.27 Memasang 1 m' pipa PVC tipe AW ø 1,5"

1.2000 m' Pipa PVC ø 1,5 (inch) AW, panjang 4 m 30,940.00 37,128.00

35.0000 % Perlengkapan (dari harga pipa) - 12,994.80

0.0360 Oh Pekerja tak terlatih 98,000.00 3,528.00

0.0600 Oh Tukang batu 150,000.00 9,000.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0018 Oh Mandor 175,000.00 315.00

63,955.80

J.28 Memasang 1 m' pipa PVC type AW ø 3"

1.2000 m' Pipa PVC ø 3 (inch) AW, panjang 4 m 79,100.00 94,920.00

35.0000 % Perlengkapan (dari harga pipa) - 33,222.00

0.0810 Oh Pekerja tak terlatih 98,000.00 7,938.00

0.1350 Oh Tukang batu 150,000.00 20,250.00

0.1350 Oh Kepala tukang 165,000.00 22,275.00

0.0041 Oh Mandor 175,000.00 717.50

179,322.50

J.29 Memasang 1 m' pipa PVC type AW ø 4" - 6"

1.2000 m' Pipa PVC ø 4 - 6 (inch) AW, panjang 4 m 129,780.00 155,736.00

35.0000 % Perlengkapan (dari harga pipa) - 54,507.60

0.0810 Oh Pekerja tak terlatih 98,000.00 7,938.00

0.1350 Oh Tukang batu 150,000.00 20,250.00

0.1350 Oh Kepala tukang 165,000.00 22,275.00

0.0041 Oh Mandor 175,000.00 717.50

261,424.10

J.30 Memasang 1 bh kran air ø 3/4" atau 1/2"

1.0000 bh Kran air ø 0,75 (inch) 55,580.00 55,580.00

0.0250 bh seal tape - 13.90

0.0100 Oh Pekerja tak terlatih 98,000.00 980.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0050 Oh mandor 175,000.00 875.00

74,098.90

Page 57: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

KODE ANALISA

J.31 Memasang 1 bh floor drain

1.0000 bh Floor drain 67,760.00 67,760.00

0.0100 Oh Pekerja tak terlatih 98,000.00 980.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0050 Oh Mandor 175,000.00 875.00

86,265.00

J.32 Memasang 1 bh tempat sabun keramik (non SNI)

1.0000 bh Tempat sabun keramik 90,160.00 90,160.00

0.0020 kg Semen putih 9,800.00 19.60

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

106,829.60

J.33 Memasang 1 bh septic tank, volume air 1 m³ (non SNI)

3.7170 m³ Galian tanah 46,200.00 171,725.40

2.0380 m³ Urugan kembali 22,141.00 45,123.36

0.3600 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 635,419.00 228,750.84

3.5672 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 81,881.00 292,085.90

0.0560 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 8,958,153.01 501,656.57

0.1300 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 5,775,397.28 750,801.65

0.0200 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 8,022,403.70 160,448.07

2.6000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 2,071,685.00 5,386,381.00

0.6000 m' Pas. pipa galvanis ø 1,5" 263,763.00 158,257.80

7,695,230.59

J.34 Memasang 1 bh septic tank, volume air 1,5 m³ (non SNI)

5.5800 m³ Galian tanah 46,200.00 257,796.00

3.0500 m³ Urugan kembali 22,141.00 67,530.05

0.5400 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 635,419.00 343,126.26

5.3508 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 81,881.00 438,128.85

0.0840 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 8,958,153.01 752,484.85

0.2000 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 5,775,397.28 1,155,079.46

0.0300 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 8,022,403.70 240,672.11

3.9000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 2,071,685.00 8,079,571.50

0.6000 m' Pas. pipa galvanis ø 1,5" 263,763.00 158,257.80

11,492,646.88

J.35 Memasang 1 bh septic tank, volume air 2 m³ (non SNI)

7.4340 m³ Galian tanah 46,200.00 343,450.80

4.0760 m³ Urugan kembali 22,141.00 90,246.72

0.7200 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 635,419.00 457,501.68

7.1344 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 81,881.00 584,171.81

0.1120 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 8,958,153.01 1,003,313.14

0.2600 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 5,775,397.28 1,501,603.29

0.0400 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 8,022,403.70 320,896.15

5.2000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 2,071,685.00 10,772,762.00

0.6000 m' Pas. pipa galvanis ø 1,5" 263,763.00 158,257.80

15,232,203.38

J.36 Memasang 1 bh Peresapan, dalam 5 m'

5.0000 m³ Galian Tanah 46,200.00 231,000.00

2.4880 m³ Urugan Kembali 22,141.00 55,086.81

2.5120 m³ Pas.Buis Beton tak bertulang ø 80 cm 49,000.00 123,088.00

0.3840 m² Pas. Plesteran dinding(dalam) pd pertemuan buis , ad. 1 : 2, tebal 15mm 81,881.00 31,442.30

0.6000 m' Pas. Pipa galvanis ø 1,5" 263,763.00 158,257.80

598,874.91

Page 58: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)

0.1000 kg Cat dasar 31,600.00 3,160.00

0.2600 kg Cat tembok 34,552.00 8,983.52

0.0250 kg Plamuer 50,000.00 1,250.00

0.0200 Oh Pekerja tak terlatih 98,000.00 1,960.00

0.0630 Oh Tukang cat 150,000.00 9,450.00

0.0063 Oh Kepala tukang 165,000.00 1,039.50

0.0025 Oh Mandor 175,000.00 437.50

26,280.52

K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)

0.2000 kg Cat menie 50,000.00 10,000.00

0.1500 kg Plamuer 50,000.00 7,500.00

0.1700 kg Cat dasar 31,600.00 5,372.00

0.2600 kg Cat minyak 50,000.00 13,000.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.0090 Oh Tukang cat 150,000.00 1,350.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0025 Oh Mandor 175,000.00 437.50

45,509.50

K.3 1 m² Mengecat Genteng

0.3000 ltr Cat genteng 33,250.00 9,975.00

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1500 Oh Tukang cat 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0050 Oh Mandor 175,000.00 875.00

45,625.00

K.4 1 m² Mengeter 1X rangka kayu

0.3500 kg Ter 12,568.50 4,398.97

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0030 Oh Mandor 175,000.00 525.00

14,723.97

K.5 1 m² Mengeter rangka kayu

0.3500 kg Ter 12,568.50 4,398.97

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.0060 Oh Mandor 175,000.00 1,050.00

15,248.97

K.6 1 m² Mengapur dinding baru

0.1500 kg Kapur sirih 51,940.00 7,791.00

0.1000 lbr Amplas 15,000.00 1,500.00

0.2500 ikat Alang-alang 1,500.00 375.00

0.0020 Kayu untuk perancah 1,692,600.00 3,385.20

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.0100 Oh Tukang cat 150,000.00 1,500.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.0025 Oh Mandor 175,000.00 437.50

21,033.70

K.7 1 m² Memeni besi 2X

0.1000 kg Cat menie 50,000.00 5,000.00

0.0100 bh Kuas uk. 3" 23,800.00 238.00

0.0200 Oh Pekerja tak terlatih 98,000.00 1,960.00

0.2000 Oh Tukang cat 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0100 Oh Mandor 175,000.00 1,750.00

42,248.00

K.8 1 m' Pasang talang datar, seng BJLS 27

0.5000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m) 98,840.00 49,420.00

0.0150 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 441.00

0.0096 m³ Kayu gergajian kelas I, papan 3,850,000.00 36,960.00

0.0250 kg Cat menie 50,000.00 1,250.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.4000 Oh Tukang kayu 150,000.00 60,000.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0013 Oh Mandor 175,000.00 218.75

167,114.75

KODE ANALISA

Page 59: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

KODE ANALISA

K.9 1 m' Pasang talang miring, seng BJLS 27

0.5000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m) 98,840.00 49,420.00

0.0150 kg Paku berbagai ukuran (2" - 5") 35,000.00 525.00

0.0019 m³ Kayu gergajian kelas I, papan 3,850,000.00 7,315.00

0.3000 kg Cat menie 50,000.00 15,000.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.4000 Oh Tukang kayu 150,000.00 60,000.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0013 Oh Mandor 175,000.00 218.75

151,303.75

K.10 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27

0.3000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m) 98,840.00 29,652.00

0.1000 kg Paku berbagai ukuran (2" - 5") 35,000.00 3,500.00

0.5000 m³ Besi strip 74,970.00 37,485.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

126,962.00

K.11 1 m² Mengecat bidang kayu lama

0.1500 kg Plamuer 50,000.00 7,500.00

0.1700 kg Cat dasar 31,600.00 5,372.00

0.1700 kg Cat Minyak 50,000.00 8,500.00

0.0700 Oh Pekerja tak terlatih 98,000.00 6,860.00

0.0750 Oh Tukang cat 150,000.00 11,250.00

0.0075 Oh Kepala tukang 165,000.00 1,237.50

0.0025 Oh Mandor 175,000.00 437.50

41,157.00

K.12 1 m² Mengecat tembok lama ( 1 lapis cat dasar , 2 lapis cat penutup)

0.1200 kg Cat dasar 31,600.00 3,792.00

0.1800 kg Cat tembok 34,552.00 6,219.36

0.0280 Oh Pekerja tak terlatih 98,000.00 2,744.00

0.0420 Oh Tukang cat 150,000.00 6,300.00

0.0042 Oh Kepala tukang 165,000.00 693.00

0.0025 Oh Mandor 175,000.00 437.50

20,185.86

K.13 1 m² Mengikis /mengerok permukaan cat tembok lama

0.0500 kg Soda api 54,320.00 2,716.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0025 Oh Mandor 175,000.00 437.50

17,853.50

K.14 1 m² Mendempul dan menggosok kayu

0.0800 kg Dempul jadi 205,100.00 16,408.00

0.0200 kg Minyak pelarut cat (solvent) 40,460.00 809.20

0.0100 kg Batu apung 3,640.00 36.40

0.0400 Oh Pekerja tak terlatih 98,000.00 3,920.00

0.0400 Oh Tukang cat 150,000.00 6,000.00

0.0040 Oh Kepala tukang 165,000.00 660.00

0.0025 Oh Mandor 175,000.00 437.50

11,863.10

K.15 1 m² Mengerok karat cat lama permukaan baja/besi dengan cara manual

0.0500 kg Sabun 13,020.00 651.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0025 Oh Mandor 175,000.00 437.50

15,788.50

K.16 1 m² Menyabun permukaan tembok lama

0.0500 kg Sabun 13,020.00 651.00

0.1500 Oh Pekerja tak terlatih 98,000.00 14,700.00

0.0025 Oh Mandor 175,000.00 437.50

15,788.50

K.17 1 m² Pelaburan bidang kayu dengan politur

0.1500 ltr Politur 83,580.00 12,537.00

0.3720 ltr Politur jadi 137,620.00 51,194.64

2.0000 lbr Amplas 15,000.00 30,000.00

0.0600 Oh Tukang cat 150,000.00 9,000.00

0.0160 Oh Kepala tukang 165,000.00 2,640.00

0.0025 Oh Mandor 175,000.00 437.50

105,809.14

K.18 1 m² Pelaburan bidang kayu dengan vernis

Page 60: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

KODE ANALISA

0.1500 ltr Cat Vernis 27,300.00 4,095.00

0.0500 kg Dempul 45,500.00 2,275.00

0.1000 lbr Amplas 15,000.00 1,500.00

0.0100 bh Kuas uk. 3" 23,800.00 238.00

0.1600 Oh Pekerja tak terlatih 98,000.00 15,680.00

0.1600 Oh Tukang cat 150,000.00 24,000.00

0.0160 Oh Kepala tukang 165,000.00 2,640.00

0.0025 Oh Mandor 175,000.00 437.50

50,865.50

Page 61: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

L.1 1 m² Pasangan lantai keramik 10 cm x 20 cm

1.0000 m² Keramik 10 x 20 (cm) gelap 103,740.00 103,740.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

324,361.00

L.2 1 m² Pasangan lantai keramik 15 cm x 15 cm

1.0000 m² Keramik 15 x 15 cm -

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

220,621.00

L.3 1 m² Pasangan lantai keramik 20 cm x 20 cm

1.0000 m² Keramik 20 x 20 (cm) polos 91,000.00 91,000.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

311,621.00

L.4 1 m² Pasangan lantai keramik 25 cm x 25 cm

1.0000 m² Keramik 25 x 25 cm 113,680.00 113,680.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

334,301.00

L.5 1 m² Pasangan lantai keramik 15 cm x 20 cm

1.0000 m² Keramik 15 x 20 cm 106,260.00 106,260.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

326,881.00

L.6 1 m² Pasangan lantai keramik 30 cm x 30 cm

1.0000 m² Keramik 30 x 30 (cm) terang 118,580.00 118,580.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

339,201.00

KODE ANALISA

Page 62: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

KODE ANALISA

L.7 1 m² Pasangan lantai keramik 40 cm x 40 cm

1.0000 m² Keramik 40 x 40 (cm) putih / berwarna 105,000.00 105,000.00

11.3800 kg Semen PC @ 50 kg 3,000.00 34,140.00

0.0420 m³ Pasir pasang 588,000.00 24,696.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

325,621.00

L.8 1 m² Pasangan lantai ubin granito 40 cm x 40 cm

1.0000 m² ubin granito 40 x 40 cm -

9.8000 kg Semen PC @ 50 kg 3,000.00 29,400.00

0.0215 m³ Pasir pasang 588,000.00 12,642.00

1.3000 kg Semen warna 25,000.00 32,500.00

0.2500 Oh Pekerja tak terlatih 98,000.00 24,500.00

0.1200 Oh Tukang batu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0125 Oh Mandor 175,000.00 2,187.50

121,209.50

L.9 1 m² Pasangan lantai ubin granito 30 cm x 30 cm

1.0000 m² ubin granito 30 x 30 cm -

10.0000 kg Semen PC @ 50 kg 3,000.00 30,000.00

0.0215 m³ Pasir pasang 588,000.00 12,642.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.2600 Oh Pekerja tak terlatih 98,000.00 25,480.00

0.1250 Oh Tukang batu 150,000.00 18,750.00

0.0125 Oh Kepala tukang 165,000.00 2,062.50

0.0130 Oh Mandor 175,000.00 2,275.00

128,709.50

L.10 1 m' Pasangan plint ubin granito 10 cm x 40 cm

2.6500 bh plint ubin granito 10 x 40 cm 14,840.00 39,326.00

1.2000 kg Semen PC @ 50 kg 3,000.00 3,600.00

0.0030 m³ Pasir pasang 588,000.00 1,764.00

0.1000 kg Semen warna 25,000.00 2,500.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.0300 Oh Tukang batu 150,000.00 4,500.00

0.0030 Oh Kepala tukang 165,000.00 495.00

0.0030 Oh Mandor 175,000.00 525.00

58,590.00

L.11 1 m' Pasangan plint ubin granito 10 cm x 30 cm

3.3300 bh plint ubin granito 10 x 30 cm 12,320.00 41,025.60

1.6500 kg Semen PC @ 50 kg 3,000.00 4,950.00

0.0032 m³ Pasir pasang 588,000.00 1,881.60

0.1000 kg Semen warna 25,000.00 2,500.00

0.9000 Oh Pekerja tak terlatih 98,000.00 88,200.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0045 Oh Mandor 175,000.00 787.50

154,329.70

L.12 1 m' Pasangan plint keramik 10 cm x 20 cm

5.0000 bh Plint keramik 10 x 20 cm 3,640.00 18,200.00

1.6500 kg Semen PC @ 50 kg 3,000.00 4,950.00

0.0032 m³ Pasir pasang 588,000.00 1,881.60

0.1000 kg Semen warna 25,000.00 2,500.00

0.0900 Oh Pekerja tak terlatih 98,000.00 8,820.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0045 Oh Mandor 175,000.00 787.50

52,124.10

Page 63: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

KODE ANALISA

L.13 1 m' Pasangan plint keramik 10 cm x 15 cm

6.6700 bh Plint keramik 10 x 15 cm 2,520.00 16,808.40

1.6500 kg Semen PC @ 50 kg 3,000.00 4,950.00

0.0032 m³ Pasir pasang 588,000.00 1,881.60

0.1000 kg Semen warna 25,000.00 2,500.00

0.0900 Oh Pekerja tak terlatih 98,000.00 8,820.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0045 Oh Mandor 175,000.00 787.50

50,732.50

L.14 1 m' Pasangan plint keramik 10 cm x 20 cm

5.0000 bh Plint keramik 10 x 20 cm 3,640.00 18,200.00

1.6500 kg Semen PC @ 50 kg 3,000.00 4,950.00

0.0032 m³ Pasir pasang 588,000.00 1,881.60

0.1000 kg Semen warna 25,000.00 2,500.00

0.0900 Oh Pekerja tak terlatih 98,000.00 8,820.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0045 Oh Mandor 175,000.00 787.50

52,124.10

L.15 1 m' Pasangan plint keramik 10 cm x 40 cm

2.5000 bh Plint keramik 10 x 40 cm 4,900.00 12,250.00

1.6500 kg Semen PC @ 50 kg 3,000.00 4,950.00

0.0032 m³ Pasir pasang 588,000.00 1,881.60

0.1000 kg Semen warna 25,000.00 2,500.00

0.0900 Oh Pekerja tak terlatih 98,000.00 8,820.00

0.0900 Oh Tukang batu 150,000.00 13,500.00

0.0090 Oh Kepala tukang 165,000.00 1,485.00

0.0045 Oh Mandor 175,000.00 787.50

46,174.10

L.16 1 m² Pasangan dinding dengan keramik 10 cm x 20 cm

1.0000 m² Keramik 10 x 20 (cm) terang 103,740.00 103,740.00

9.3000 kg Semen PC @ 50 kg 3,000.00 27,900.00

0.0180 m³ Pasir pasang 588,000.00 10,584.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6000 Oh Pekerja tak terlatih 98,000.00 58,800.00

0.4500 Oh Tukang batu 150,000.00 67,500.00

0.0450 Oh Kepala tukang 165,000.00 7,425.00

0.0300 Oh Mandor 175,000.00 5,250.00

318,699.00

L.17 1 m² Pasangan dinding keramik 20 cm x 25 cm

1.0000 m² Keramik 20 x 25 (cm) 91,000.00 91,000.00

9.3000 m³ Semen PC @ 50 kg 3,000.00 27,900.00

0.0180 m³ Pasir pasang 588,000.00 10,584.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6000 Oh Pekerja tak terlatih 98,000.00 58,800.00

0.4000 Oh Tukang batu 150,000.00 60,000.00

0.0400 Oh Kepala tukang 165,000.00 6,600.00

0.0300 Oh Mandor 175,000.00 5,250.00

297,634.00

L.18 1 m² Pasangan dinding keramik 20 cm x 20 cm

1.0000 m² Keramik 20 x 20 (cm) polos 91,000.00 91,000.00

9.3000 m³ Semen PC @ 50 kg 3,000.00 27,900.00

0.0180 m³ Pasir pasang 588,000.00 10,584.00

1.5000 kg Semen warna 25,000.00 37,500.00

0.6000 Oh Pekerja tak terlatih 98,000.00 58,800.00

0.1000 Oh Tukang batu 150,000.00 15,000.00

0.0450 Oh Kepala tukang 165,000.00 7,425.00

0.0300 Oh Mandor 175,000.00 5,250.00

253,459.00

Page 64: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

KODE ANALISA

L.19 1 m² Pasangan dinding batu paras

1.0500 m² Batu paras 617,820.00 648,711.00

11.7500 m³ Semen PC @ 50 kg 3,000.00 35,250.00

0.0350 m³ Pasir pasang 588,000.00 20,580.00

0.6200 Oh Pekerja tak terlatih 98,000.00 60,760.00

0.3500 Oh Tukang batu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0300 Oh Mandor 175,000.00 5,250.00

828,826.00

L.20 1 m² Pasangan dinding batu tempel hitam

1.0500 m² Batu alam tempel 617,820.00 648,711.00

11.7500 m³ Semen PC @ 50 kg 3,000.00 35,250.00

0.0350 m³ Pasir pasang 588,000.00 20,580.00

0.6200 kg Semen warna 25,000.00 15,500.00

0.3500 Oh Pekerja tak terlatih 98,000.00 34,300.00

0.0350 Oh Tukang batu 150,000.00 5,250.00

0.0300 Oh Kepala tukang 165,000.00 4,950.00

764,541.00

L.21

0.0024 m³ Kayu gergajian kelas I, papan 3,850,000.00 9,240.00

0.0500 kg Paku sekrup 2,520.00 126.00

0.1200 Oh Pekerja tak terlatih 98,000.00 11,760.00

0.1200 Oh Tukang kayu 150,000.00 18,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0060 Oh Mandor 175,000.00 1,050.00

42,156.00

L.22 1 m² Pasangan lantai dari conblock, tebal 6 cm

1.0000 m² Conblock tebal 6 cm 2,822.40 2,822.40

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.1600 Oh Tukang batu 150,000.00 24,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.2500 Oh Mandor 175,000.00 43,750.00

77,122.40

1 m² Pasangan plint kayu 10 x 20 cm

Page 65: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 1 kg Pasang rangka atap baja

1.1000 kg Besi baja profil IWF 45,000.00 49,500.00

0.0800 kg Cat menie 50,000.00 4,000.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.0060 Oh Tukang besi / tukang las 150,000.00 900.00

0.0060 Oh Kepala tukang 165,000.00 990.00

0.0003 Oh Mandor 175,000.00 52.50

61,322.50

M.2 1 m² Pasang pintu besi

1.0000 m² Pintu besi 741,300.00 741,300.00

0.6500 Oh Pekerja tak terlatih 98,000.00 63,700.00

0.6500 Oh Tukang besi / tukang las 150,000.00 97,500.00

0.0650 Oh Kepala tukang 165,000.00 10,725.00

0.0320 Oh Mandor 175,000.00 5,600.00

913,225.00

M.3 1 m² Pasang jendela besi

1.0000 m² Jendela besi 563,360.00 563,360.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.0500 Oh Tukang besi / tukang las 150,000.00 157,500.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

0.0053 Oh Mandor 175,000.00 918.75

841,085.00

M.4 1 m² Pasang pintu besi lipat

1.0000 m² Pintu besi lipat 1,235,500.00 1,235,500.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.0500 Oh Tukang besi / tukang las 150,000.00 157,500.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

0.0052 Oh Mandor 175,000.00 910.00

1,513,225.00

M.5 1 m² Pasang pintu sunscreen alumunium

1.0000 m² Sunscreen alumunium 111,160.00 111,160.00

0.0800 Oh Pekerja tak terlatih 98,000.00 7,840.00

0.8000 Oh Tukang besi / tukang las 150,000.00 120,000.00

0.0800 Oh Kepala tukang 165,000.00 13,200.00

0.0040 Oh Mandor 175,000.00 700.00

252,200.00

M.6 1 m² Pasang rolling door

1.0000 m² Rolling dor - alumunium tipis 580,720.00 580,720.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.5000 Oh Tukang besi / tukang las 150,000.00 225,000.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

0.0052 Oh Mandor 175,000.00 910.00

925,945.00

M.7 1 m² Pasang kusen pintu / jendela alumunium biasa

1.0000 m² Kusen pintu / jendela alumunium 3" 856,940.00 856,940.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.0500 Oh Tukang besi / tukang las 150,000.00 157,500.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

1,134,665.00

M.8 1 m² Pasang pintu alumunium biasa

1.0000 m² Pintu alumunium - swing + door closer 3,298,820.00 3,298,820.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.0500 Oh Tukang besi / tukang las 150,000.00 157,500.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

0.0052 Oh Mandor 175,000.00 910.00

3,576,545.00

M.9 1 m² Pasang daun pintu alumunium dengan kaca rayband 12 mm

1.0000 m² Pintu alumunium - swing + door closer 3,298,820.00 3,298,820.00

1.1000 m² Kaca gelap (ray band) tebal 12 mm 741,300.00 815,430.00

1.0500 Oh Pekerja tak terlatih 98,000.00 102,900.00

1.0500 Oh Tukang besi / tukang las 150,000.00 157,500.00

0.1050 Oh Kepala tukang 165,000.00 17,325.00

4,391,975.00

KODE ANALISA

Page 66: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

KODE ANALISA

M.10 1 m² Pasang venetion blinds

1.0000 m² Venetion blinds 94,500.00 94,500.00

0.3500 Oh Pekerja tak terlatih 98,000.00 34,300.00

0.3500 Oh Tukang kayu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0018 Oh Mandor 175,000.00 306.25

187,075.00

M.11 1 m² Pasang vertical blinds

1.0000 m² Vertical blinds 7,350.00 7,350.00

0.3500 Oh Pekerja tak terlatih 98,000.00 34,300.00

0.3500 Oh Tukang kayu 150,000.00 52,500.00

0.0350 Oh Kepala tukang 165,000.00 5,775.00

0.0018 Oh Mandor 175,000.00 306.25

99,925.00

M.12 1 m² Pasang teralis besi

11.5000 m' Besi strip 2 x 3 40,740.00 468,510.00

1.2000 Oh Pekerja tak terlatih 98,000.00 117,600.00

1.2000 Oh Tukang besi / tukang las 150,000.00 180,000.00

0.0120 Oh Kepala tukang 165,000.00 1,980.00

0.0006 Oh Mandor 175,000.00 105.00

768,090.00

M.13 1 m² Pasang kawat harmonika, dengan rangka kayu kelas III

1.1000 m' Kawat harmonika 38,500.00 42,350.00

0.0200 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 588.00

0.0018 m³ Kayu gergajian kelas III, papan 3,447,080.00 6,204.74

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.0005 Oh Mandor 175,000.00 87.50

74,107.74

M.14 1 m² Pasang kawat nyamuk, dengan rangka kayu kelas III

1.1000 m² Kawat nyamuk plastik 21,107.80 23,218.58

0.0200 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 588.00

0.0018 m³ Kayu gergajian kelas III, papan 3,447,080.00 6,204.74

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.0005 Oh Mandor 175,000.00 87.50

55,063.82

Page 67: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

KODE ANALISA

M.15 1 m² Pasang kawat kassa, dengan rangka kayu kelas III

1.1000 m² Kawat kassa / kawat loket 27,160.00 29,876.00

0.0200 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 588.00

0.0018 m³ Kayu gergajian kelas III, papan 3,447,080.00 6,204.74

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.0005 Oh Mandor 175,000.00 87.50

61,633.74

M.16 1 m² Pasang kawat burung, dengan rangka kayu kelas III

1.1000 m² Kawat burung 32,060.00 35,266.00

0.0200 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 588.00

0.0018 m³ Kayu gergajian kelas III, papan 3,447,080.00 6,204.74

0.1000 Oh Pekerja tak terlatih 98,000.00 9,800.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0010 Oh Kepala tukang 165,000.00 165.00

0.0005 Oh Mandor 175,000.00 87.50

67,023.74

M.17 1 m² Pasang kaca rayband tebal 10 mm

1.1000 m² Kaca gelap (ray band) tebal 10 mm 617,820.00 679,602.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

706,047.00

M.18 1 m² Pasang jendela nako (dengan kaca dan teralis besi)

1.1000 m² Jendela nako (kerangka + kaca 5 mm) 333,620.00 366,982.00

0.0200 kg Paku berbagai ukuran (1/2" - 1") 29,400.00 588.00

0.0250 m² Besi strip 74,970.00 1,874.25

0.2000 Oh Pekerja tak terlatih 98,000.00 19,600.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0010 Oh Mandor 175,000.00 175.00

422,344.25

M.19 1 m² Pasang kaca bening tebal 3 mm

1.1000 m² Kaca bening tebal 3 mm 350,000.00 385,000.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

411,576.25

Page 68: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

KODE ANALISA

M.20 1 m² Pasang kaca bening tebal 5 mm

1.1000 m² Kaca bening tebal 5 mm 350,000.00 385,000.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

411,445.00

M.21 1 m² Pasang kaca bening tebal 8 mm

1.1000 m² Kaca bening tebal 8 mm 350,000.00 385,000.00

0.0165 Oh Pekerja tak terlatih 98,000.00 1,617.00

0.1650 Oh Tukang kayu 150,000.00 24,750.00

0.0165 Oh Kepala tukang 165,000.00 2,722.50

0.0008 Oh Mandor 175,000.00 140.00

414,089.50

M.22 1 m² Pasang kaca buram, tebal 12 mm

1.1000 m² Kaca buram tebal 12 mm 605,360.00 665,896.00

0.0500 kg Sealent 86,520.00 4,326.00

0.0250 Oh Pekerja tak terlatih 98,000.00 2,450.00

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0013 Oh Mandor 175,000.00 218.75

714,297.00

M.23 1 m² Pasang kaca cermin tebal 5 mm

1.1000 m² Kaca cermin tebal 5 mm 109,200.00 120,120.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

146,565.00

Page 69: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.)

JUMLAH (Rp.)BAHAN UPAH

1 2 3 4 5

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

KODE ANALISA

M.24 1 m² Pasang kaca cermin tebal 6 mm

1.1000 m² Kaca cermin tebal 6 mm 109,200.00 120,120.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

146,696.25

M.25 1 m² Pasang kaca cermin tebal 8 mm

1.1000 m² Kaca cermin tebal 8 mm 109,200.00 120,120.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

146,696.25

M.26 1 m² Pasang kaca wireglass tebal 5 mm

1.1000 m² Kaca wireglass tebal 5 mm 1,224,440.00 1,346,884.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

1,373,460.25

M.27 1 m² Pasang kaca patri tebal 5 mm

1.1000 m² Kaca patri tebal 5 mm 2,992,920.00 3,292,212.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

3,318,788.25

Page 70: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.) JUMLAH (Rp.)

BAHAN UPAH

1 2 3 4 5

N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 1 Buah pasang kunci tanam antik

1.0000 bh Kunci tanam antik 210,000.00 210,000.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.6000 Oh Tukang kayu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0030 Oh Mandor 175,000.00 525.00

316,305.00

N.2 1 Buah pasang kunci tanam

1.0000 bh Kunci tanam 175,000.00 175,000.00

0.0100 Oh Pekerja tak terlatih 98,000.00 980.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0050 Oh Mandor 175,000.00 875.00

253,505.00

N.3 1 Buah pasang kunci tanam kamar mandi

1.0000 bh Kunci tanam kamar mandi 88,900.00 88,900.00

0.0050 Oh Pekerja tak terlatih 98,000.00 490.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0025 Oh Mandor 175,000.00 437.50

165,652.50

N.4 1 Buah pasang kunci silinder

1.0000 bh Kunci silinder 258,160.00 258,160.00

0.0050 Oh Pekerja tak terlatih 98,000.00 490.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0050 Oh Kepala tukang 165,000.00 825.00

0.0003 Oh Mandor 175,000.00 43.75

334,518.75

N.5 1 Buah pasang engsel pintu/jendela 3"

1.0000 bh Engsel pintu / jendela 3" 21,000.00 21,000.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

47,576.25

N.6 1 Buah pasang engsel pintu/jendela 4"

1.0000 bh Engsel pintu / jendela 4" 28,420.00 28,420.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

54,996.25

N.7 1 Buah pasang engsel pintu/jendela 5"

1.0000 bh Engsel pintu / jendela 5" 39,480.00 39,480.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

66,056.25

N.8 1 Buah pasang kait angin biasa

1.0000 bh Kait angin (biasa) 15,258.60 15,258.60

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

41,834.85

KODE ANALISA

Page 71: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN HARGA SATUAN (Rp.) JUMLAH (Rp.)

BAHAN UPAH

1 2 3 4 5

KODE ANALISA

N.9 1 Buah pasang kait angin istimewa

1.0000 bh Kait angin (istimewa) 23,520.00 23,520.00

0.0150 Oh Pekerja tak terlatih 98,000.00 1,470.00

0.1500 Oh Tukang kayu 150,000.00 22,500.00

0.0150 Oh Kepala tukang 165,000.00 2,475.00

0.0008 Oh Mandor 175,000.00 131.25

50,096.25

N.10 1 Buah pasang door closer

1.0000 bh Pintu alumunium - swing + door closer 3,298,820.00 3,298,820.00

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0500 Oh Kepala tukang 165,000.00 8,250.00

0.0025 Oh Mandor 175,000.00 437.50

3,387,407.50

N.11 1 Buah pasang kunci slot

1.0000 bh Slot pintu 22,260.00 22,260.00

0.0200 Oh Pekerja tak terlatih 98,000.00 1,960.00

0.2000 Oh Tukang kayu 150,000.00 30,000.00

0.0200 Oh Kepala tukang 165,000.00 3,300.00

0.0010 Oh Mandor 175,000.00 175.00

57,695.00

N.12 1 Buah pasang pegangan pintu/door holder

1.0000 bh Pegangan pintu/door holder 123,620.00 123,620.00

0.0500 Oh Pekerja tak terlatih 98,000.00 4,900.00

0.5000 Oh Tukang kayu 150,000.00 75,000.00

0.0500 Oh Kepala tukang 165,000.00 8,250.00

0.0025 Oh Mandor 175,000.00 437.50

212,207.50

N.13 1 Buah pasang door stop

1.0000 bh Door stop 123,620.00 123,620.00

0.0100 Oh Pekerja tak terlatih 98,000.00 980.00

0.1000 Oh Tukang kayu 150,000.00 15,000.00

0.0100 Oh Kepala tukang 165,000.00 1,650.00

0.0005 Oh Mandor 175,000.00 87.50

141,337.50

N.14 1 Buah pasang rel pintu dorong

1.0000 bh Rel pintu dorong 308,840.00 308,840.00

0.0600 Oh Pekerja tak terlatih 98,000.00 5,880.00

0.6000 Oh Tukang kayu 150,000.00 90,000.00

0.0600 Oh Kepala tukang 165,000.00 9,900.00

0.0030 Oh Mandor 175,000.00 525.00

415,145.00

N.15 1 Buah pasang kunci lemari

1.0000 bh Kunci lemari 56,840.00 56,840.00

0.0250 Oh Pekerja tak terlatih 98,000.00 2,450.00

0.2500 Oh Tukang kayu 150,000.00 37,500.00

0.0250 Oh Kepala tukang 165,000.00 4,125.00

0.0013 Oh Mandor 175,000.00 218.75

101,133.75

Page 72: Rab Sarana Pendukung Pariwisata

5 1.000 buah Pengadaan Tiang Pancang Baja f 60 cm 54,863,114.88

1.000 buah Tiang Pancang Baja 46,456,114.88 46,456,114.88

1.000 buah Pengangkutan tiang Pancang Baja dari pabrik 665,000.00 665,000.00

ke Tanjung Perak Surabaya

1.000 buah Bongkar muat di pelabuhan T. Perak 532,000.00 532,000.00

1.000 buah Transport dari Pelab. Tanjung Perak ke 5,600,000.00 5,600,000.00

Pelabuhan Waisai

1.000 buah Bongkar muat di Pelabuhan Waisai 770,000.00 770,000.00

1.000 buah Pengangkutan tiang Pancang Baja dari pela 840,000.00 840,000.00

ke lokasi proyek

19,840.24

Untuk 1 kg Tiang Pancang 19,840.24

6 1.000 buah Pembuatan Sepatu Tiang Pancang 2,454,200.00

10.000 kg Kawat las / electrode 42,000.00 420,000.00

47.000 kg Plat baja 35,000.00 1,645,000.00

1.000 ho Tukang Las 84,000.00 84,000.00

0.400 OH Mandor 98,000.00 39,200.00

1.000 OH Pekerja 63,000.00 63,000.00

1.000 jam Mesin las listrik dan perlengkapannya 84,000.00 84,000.00

1.000 jam Generator 98,000.00 98,000.00

1.000 Ls Alat bantu pemotongan 21,000.00 21,000.00

7 1.000 m2 Pengecatan Tiang Pancang 160,076.00

0.400 kg Cat anti karat 168,000.00 67,200.00

1.000 Ls Alat bantu pengecatan 28,000.00 28,000.00

0.150 OH Tukang cat 186,200.00 27,930.00

0.015 OH Kepala tukang 215,600.00 3,234.00

0.200 OH Pekerja 156,800.00 31,360.00

0.010 OH Mandor 235,200.00 2,352.00

8 1.000 m' Pengangkutan Tiang Pancang ke Titik PancangA Biaya Crawel Crane per Hari 8,106,000.00

1.000 OH Operator Alat Berat 154,000.00 154,000.00

2.000 OH Pembantu Operator 126,000.00 252,000.00

2.500 liter Olie 56,000.00 140,000.00

70.000 liter Solar 16,800.00 1,176,000.00

2.000 kg Grease 42,000.00 84,000.00

6.000 jam Crane 1,050,000.00 6,300,000.00

B Biaya Ponton Transport per Hari 5,297,000.00

1.000 OH Operator Alat Berat 154,000.00 154,000.00

2.000 OH Pembantu Operator 126,000.00 252,000.00

10.000 OH Pekerja 186,200.00 1,862,000.00

2.500 liter Olie 56,000.00 140,000.00

100.00 liter Solar 16,800.00 1,680,000.00

2.000 kg Grease 42,000.00 84,000.00

1.000 hari Ponton Transport 975,000.00 975,000.00

0.250 hari Motor Johnson 40 PK 600,000.00 150,000.00

Dalam sehari dapat diangkut tiang pancang sepanjang (L1)

10 batang x panjang 12 m = 120 m

Biaya transport tiang pancang per meter = (A+B)/L1 111,691.67

9 1.000 titik Pemancangan Tiang PancangC Biaya Diesel Hammer 9,916,200.00

1.000 OH Operator Alat Berat 154,000.00 154,000.00

2.000 OH Pembantu Operator 126,000.00 252,000.00

6.000 OH Pekerja 186,200.00 1,117,200.00

4.000 liter Olie 56,000.00 224,000.00

200.00 liter Solar 16,800.00 3,360,000.00

2.000 kg Grease 42,000.00 84,000.00

1.500 hari Sewa Diesel Hammer 3,150,000.00 4,725,000.00

D Biaya Ponton Pancang 12,942,000.00

1.000 OH Operator Alat Berat 154,000.00 154,000.00

2.000 OH Pembantu Operator 126,000.00 252,000.00

6.000 OH Tukang Pancang 133,000.00 798,000.00

4.000 liter Olie 56,000.00 224,000.00

100.00 liter Solar 16,800.00 1,680,000.00

2.000 kg Grease 42,000.00 84,000.00

Page 73: Rab Sarana Pendukung Pariwisata

1.000 hari Ponton Pancang 9,750,000.00 9,750,000.00

Page 74: Rab Sarana Pendukung Pariwisata

TIANG TEGAK

Sehari dapat dipancang tiang tegak sepanjang (L2)

2.5 batang x panjang 12 m = 30 m

Harga pemancangan tiang tegak per meter = (C+D)/L2 761,940.00

TIANG MIRING

Sehari dapat dipancang tiang miring sepanjang (L3)

2 batang x panjang 12 m = 24 m

Harga pemancangan tiang miring per meter = (C+D)/L3 952,425.00

10 1.000 buah Pemotongan Tiang Pancang 376,220.00

0.030 botol Oksigen 770,000.00 23,100.00

1.000 kg Karbit 42,000.00 42,000.00

0.400 OH Tukang Las 133,000.00 53,200.00

0.040 OH Mandor 168,000.00 6,720.00

0.100 OH Pekerja 112,000.00 11,200.00

0.800 jam Mesin Las Karbit dan Perlengkapannya 150,000.00 120,000.00

1.000 Ls Alat Bantu Pemotongan 120,000.00 120,000.00

11 1.000 buah Penyambungan Tiang Pancang 2,025,840.00

26.000 kg Basi Plat 42,000.00 1,092,000.00

4.500 kg Kawat Las / Electrode 70,000.00 315,000.00

0.800 OH Tukang Las 133,000.00 106,400.00

0.080 OH Mandor 168,000.00 13,440.00

0.750 OH Pekerja 112,000.00 84,000.00

2.100 jam Mesin Las Karbit dan Perlengkapannya 150,000.00 315,000.00

1.000 Ls Alat Bantu Penyambungan 100,000.00 100,000.00

12 1.000 m2 Pengecetan Tiang Pancang 168,476.00

0.450 kg Cat anti karat 168,000.00 75,600.00

1.000 Ls Alat bantu pengecatan 28,000.00 28,000.00

0.150 OH Tukang cat 186,200.00 27,930.00

0.015 OH Kepala tukang 215,600.00 3,234.00

0.200 OH Pekerja 156,800.00 31,360.00

0.010 OH Mandor 235,200.00 2,352.00

Page 75: Rab Sarana Pendukung Pariwisata

O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA STAINLESS

O. 1 Memasang 1 Unit Pintu Type PD1(Pintu Utama)

0.4250 M3 Beton Balok/Kolom Lintle 25/25 8,022,403.70 3,409,521.57

10.5600 M2 Dinding Granit Tile 40x40 " Indogress" 350,000.00 3,696,000.00

2.0000 Unit Pintu stainless- swing + floorhinge 4,969,160.00 9,938,320.00

7.0000 bh Paku Skrup 1,500.00 10,500.00

7.0000 bh Pisher 3,000.00 21,000.00

1.0000 Ls Upah Pasang 1,495,473.00 1,495,473.00

1.0000 Ls Alat Bantu 498,491.00 498,491.00 498,491.00

Jumlah 17,573,832.57 1,495,473.00 19,069,305.57

Dibulatkan 17,573,800.00 1,495,400.00 19,069,300.00

O. 2 Memasang 1 Unit Pintu type PD2

8.3000 M1 Kusen Stainless Warna 4" 125,000.00 1,037,500.00

3.2250 M2 Daun Pintu Panel Multi,rangka kayu kamper 794,412.00 2,561,978.70

4.0000 M' List Karet Kaca 3,000.00 12,000.00

13.6000 M' Sealan Karet Kusen 2,500.00 34,000.00

1.5000 Psg Engsel Pintu 39,480.00 59,220.00

1.0000 Bh Kunci Pintu Double slaag 258,160.00 258,160.00

0.7250 M2 Kaca Polos 5 mm 399,000.00 289,275.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 643,220.06 643,220.06

1.0000 Ls Alat Bantu 214,406.69 214,406.69

6.4500 m2 Politur Melamik 66,700.00 430,215.00

Jumlah 4,932,755.39 643,220.06 5,575,975.44

Dibulatkan 4,932,700.00 643,200.00 5,575,900.00

O. 3 Memasang 1 Unit Pintu type P1

6.9000 M1 Kusen Stainless Warna 4" 125,000.00 862,500.00

1.0000 Unit Pintu stainless- swing + door closer 3,298,820.00 3,298,820.00

13.8000 M' Sealan Karet Kusen 2,500.00 34,500.00

7.0000 bh Paku Skrup 1,500.00 10,500.00

7.0000 bh Pisher 3,000.00 21,000.00

1.0000 Ls Upah Pasang 634,098.00 634,098.00

1.0000 Ls Alat Bantu 211,366.00 211,366.00

Jumlah 4,438,686.00 634,098.00 5,072,784.00

Dibulatkan 4,438,600.00 634,000.00 5,072,700.00

O. 4 Memasang 1 Unit Pintu type P2

5.0000 M1 Kusen Stainless Warna 4" 125,000.00 625,000.00

1.0000 Unit Pintu stainless- swing + door closer 3,298,820.00 3,298,820.00

10.0000 M' Sealan Karet Kusen 2,500.00 25,000.00

7.0000 bh Paku Skrup 1,500.00 10,500.00

7.0000 bh Pisher 3,000.00 21,000.00

1.0000 Ls Upah Pasang 597,048.00 597,048.00

1.0000 Ls Alat Bantu 199,016.00 199,016.00

Jumlah 4,179,336.00 597,048.00 4,776,384.00

Dibulatkan 4,179,300.00 597,000.00 4,776,300.00

O. 5 Memasang 1 Unit Pintu type P2a

3.8000 Kg Kusen Besi C 150x50 61,322.50 233,025.50

3.1500 M2 Pintu Besi 913,225.00 2,876,658.75

1.0000 Ls Upah Pasang 466,452.64 466,452.64

1.0000 Ls Alat Bantu 155,484.21 155,484.21

Jumlah 3,265,168.46 466,452.64 3,731,621.10

Dibulatkan 3,265,100.00 466,400.00 3,731,600.00

O. 6 Memasang 1 Unit Pintu type P3

7.4000 M' Kusen Stainless Warna 4" 125,000.00 925,000.00

1.0000 Unit Pintu stainless- swing + door closer 913,225.00 913,225.00

13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 301,008.75 301,008.75

1.0000 Ls Alat Bantu 100,336.25 100,336.25

Jumlah 2,107,061.25 301,008.75 2,408,070.00

Dibulatkan 2,107,000.00 301,000.00 2,408,000.00

O. 7 Memasang 1 Unit Pintu type PJ1

15.3000 M' Kusen Stainless Warna 4" 125,000.00 1,912,500.00

1.0000 Unit Pintu stainless- swing + door closer 913,225.00 913,225.00

13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

12.0000 bh Paku Skrup 1,500.00 18,000.00

12.0000 bh Pisher 3,000.00 36,000.00

1.0000 Ls Upah Pasang 451,833.75 451,833.75

1.0000 Ls Alat Bantu 150,611.25 150,611.25

Jumlah 3,162,836.25 451,833.75 3,614,670.00

Dibulatkan 3,162,800.00 451,800.00 3,614,600.00

O. 8 Memasang 1 Unit Pintu type PVC

1.0000 Unit Kusen +Daun Pintu PVC lengkap engsel/kunci 350,000.00 350,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 57,900.00 57,900.00

1.0000 Ls Alat Bantu 19,300.00 19,300.00

Jumlah 405,300.00 57,900.00 463,200.00

Dibulatkan 405,300.00 57,900.00 463,200.00

Page 76: Rab Sarana Pendukung Pariwisata

O. 9 Memasang 1 Unit Pintu type J1

12.2500 M' Kusen Stainless Warna 4" 125,000.00 1,531,250.00

9.5000 M' Sealan Karet Kusen 2,500.00 23,750.00

5.7750 M2 Kaca Polos 6 mm 350,000.00 2,021,250.00

15.2000 M' List Karet 2,500.00 38,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 547,537.50 547,537.50

1.0000 Ls Alat Bantu 182,512.50 182,512.50

Jumlah 3,832,762.50 547,537.50 4,380,300.00

Dibulatkan 3,832,700.00 547,500.00 4,380,300.00

O. 10 Memasang 1 Unit Pintu type J6

12.5500 M' Kusen Stainless Warna 4" 125,000.00 1,568,750.00

9.7000 M' Sealan Karet Kusen 2,500.00 24,250.00

5.2725 M2 Kaca Polos 5 mm 350,000.00 1,845,375.00

15.1000 M' List Karet 2,500.00 37,750.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 526,818.75 526,818.75

1.0000 Ls Alat Bantu 175,606.25 175,606.25

Jumlah 3,687,731.25 526,818.75 4,214,550.00

Dibulatkan 3,687,700.00 526,800.00 4,214,500.00

O. 11 Memasang 1 Unit Pintu type BV

2.6000 M' Kusen Stainless Warna 4" 125,000.00 325,000.00

5.2000 M' Sealan Karet Kusen 2,500.00 13,000.00

0.3250 M2 Kaca Polos 5 mm 350,000.00 113,750.00

2.3000 M' List Karet 2,500.00 5,750.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 72,675.00 72,675.00

1.0000 Ls Alat Bantu 24,225.00 24,225.00

Jumlah 508,725.00 72,675.00 581,400.00

Dibulatkan 508,700.00 72,600.00 581,400.00

O. 12 Memasang 1 Unit Jendela type J7

8.9000 M' Kusen Stainless Warna 4" 125,000.00 1,112,500.00

12.9000 M1 Bingkai Daun Pintu Stainless Warna 913,225.00 11,780,602.50

13.8000 M' Sealan Karet Kusen 2,500.00 34,500.00

3.3000 M2 Kaca Polos 5 mm 350,000.00 1,155,000.00

14.8000 M' List Karet 2,500.00 37,000.00

2.0000 Psg Engsel Pintu 126,000.00 252,000.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

1.0000 Psg Slot Pintu Tanam 105,000.00 105,000.00

10.0000 bh Paku Skrup 1,500.00 15,000.00

10.0000 bh Pisher 3,000.00 30,000.00

1.0000 Ls Upah Pasang 2,193,240.38 2,193,240.38

1.0000 Ls Alat Bantu 731,080.13 731,080.13

Jumlah 15,352,682.63 2,193,240.38 17,545,923.00

Dibulatkan 15,352,600.00 2,193,200.00 17,545,900.00

O. 13 Memasang 1 Unit Pintu type P2

10.3000 M' Kusen Stainless Warna 4" 125,000.00 1,287,500.00

4.0000 M2 Daun Pintu Double Teakwood 794,412.00 3,177,648.00

15.2000 M' Sealan Karet Kusen 2,500.00 38,000.00

1.5000 M2 Kaca Polos 5 mm 350,000.00 525,000.00

7.0000 M' List Karet 2,500.00 17,500.00

2.0000 Psg Engsel Pintu 28,420.00 56,840.00

1.0000 Psg Kunci Pintu 258,160.00 258,160.00

1.0000 Psg Slot Pintu Tanam 105,000.00 105,000.00

10.0000 bh Paku Skrup 1,500.00 15,000.00

10.0000 bh Pisher 3,000.00 30,000.00

1.0000 Ls Upah Pasang 826,597.20 826,597.20

1.0000 Ls Alat Bantu 275,532.40 275,532.40

3.4000 M2 Pengecatan Politur Melamik Daun Pintu 105,809.14 359,751.08

Jumlah 6,145,931.48 826,597.20 6,972,528.68

Dibulatkan 6,145,900.00 826,500.00 6,972,500.00

O. 14 Memasang 1 Unit Pintu type P3 ( MUSHOLA)

51.4900 Kg Kusen Baja C 125.50 61,322.50 3,157,495.53

2.7750 m2 Daun Pintu baja 913,225.00 2,534,199.38

1.0000 Ls Upah Pasang 853,754.24 853,754.24

1.0000 Ls Alat Bantu 284,584.75 284,584.75

5.5500 M2 Pengecatan Daun Pintu Besi 42,248.00 234,476.40

Jumlah 6,210,756.05 853,754.24 7,064,510.28

Dibulatkan 6,210,700.00 853,700.00 7,064,500.00

O. 15 Memasang 1 Unit Pintu type P4

7.4000 M' Kusen Stainless Warna 4" 125,000.00 925,000.00

1.5000 M2 Daun Pintu Double Teakwood+Formika 533,700.00 800,550.00

13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00

0.6375 M2 Kaca Polos 5 mm 350,000.00 223,125.00

3.2000 M' List Karet 2,500.00 8,000.00

1.0000 Psg Engsel Pintu 28,420.00 28,420.00

1.0000 Psg Kunci Pintu 258,160.00 258,160.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 345,413.25 345,413.25

1.0000 Ls Alat Bantu 115,137.75 115,137.75

1.7000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 113,390.00

Page 77: Rab Sarana Pendukung Pariwisata

Jumlah 2,531,282.75 345,413.25 2,876,696.00

Dibulatkan 2,531,200.00 345,400.00 2,876,600.00

Page 78: Rab Sarana Pendukung Pariwisata

O. 16 Memasang 1 Unit Pintu type PJ1

16.3000 M' Kusen Stainless Warna 4" 125,000.00 2,037,500.00

4.0000 M2 Daun Pintu Double Teakwood 794,412.00 3,177,648.00

1.8200 M2 Daun Jendela Kayu 562,152.00 1,023,116.64

9.8000 M' Sealan Karet Kusen 2,500.00 24,500.00

3.1060 M2 Kaca Polos 5 mm 350,000.00 1,087,100.00

1.0000 Psg Engsel Pintu 39,480.00 39,480.00

2.0000 Psg Engsel Jendela 21,000.00 42,000.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

2.0000 Psg Slot Jendela 19,740.00 39,480.00

2.0000 Psg Kait angin Jendela 45,000.00 90,000.00

12.0000 bh Paku Skrup 1,500.00 18,000.00

12.0000 bh Pisher 3,000.00 36,000.00

1.0000 Ls Upah Pasang 1,157,223.70 1,157,223.70

1.0000 Ls Alat Bantu 385,741.23 385,741.23

11.6400 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 776,388.00

Jumlah 8,876,953.87 1,157,223.70 10,034,177.57

Dibulatkan 8,876,900.00 1,157,200.00 10,034,100.00

O. 17 Memasang 1 Unit Jendela type J8

13.3500 M' Kusen Stainless Warna 4" 125,000.00 1,668,750.00

1.8200 M2 Daun Jendela Kayu 562,152.00 1,023,116.64

17.8000 M' Sealan Karet Kusen 2,500.00 44,500.00

3.7560 M2 Kaca Polos 5 mm 350,000.00 1,314,600.00

2.0000 Psg Engsel Jendela 21,000.00 42,000.00

2.0000 Psg Slot Jendela 19,740.00 39,480.00

2.0000 Psg Kait angin Jendela 45,000.00 90,000.00

10.0000 bh Paku Skrup 1,500.00 15,000.00

10.0000 bh Pisher 3,000.00 30,000.00

1.0000 Ls Upah Pasang 640,117.00 640,117.00

1.0000 Ls Alat Bantu 213,372.33 213,372.33

3.6400 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 242,788.00

Jumlah 4,723,606.97 640,117.00 5,363,723.97

Dibulatkan 4,723,600.00 640,100.00 5,363,700.00

O. 18 Memasang 1 Unit Jendela type BV-1 ( MUSHOLA)

4.6000 M' Kusen Stainless Warna 4" 125,000.00 575,000.00

0.4200 M2 Daun Jendela Kayu 562,152.00 236,103.84

7.8000 M' Sealan Karet Kusen 2,500.00 19,500.00

0.7200 M2 Kaca Polos 5 mm 350,000.00 252,000.00

4.8000 M' List Karet 2,500.00 12,000.00

1.0000 Psg Engsel Jendela 21,000.00 21,000.00

1.0000 Psg Slot Jendela 19,740.00 19,740.00

1.0000 Psg Kait angin Jendela 45,000.00 45,000.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 181,101.58 181,101.58

1.0000 Ls Alat Bantu 60,367.19 60,367.19

Jumlah 1,267,711.03 181,101.58 1,448,812.61

Dibulatkan 1,267,700.00 181,100.00 1,448,800.00

O. 19 Memasang 1 Unit Jendela type BV-2 ( MUSHOLA)

6.4000 M' Kusen Stainless Warna 4" 125,000.00 800,000.00

0.8400 M2 Daun Jendela Kayu 562,152.00 472,207.68

10.0000 M' Sealan Karet Kusen 2,500.00 25,000.00

1.0800 M2 Kaca Polos 5 mm 350,000.00 378,000.00

7.2000 M' List Karet 2,500.00 18,000.00

2.0000 Psg Engsel Jendela 21,000.00 42,000.00

2.0000 Psg Slot Jendela 19,740.00 39,480.00

2.0000 Psg Kait angin Jendela 45,000.00 90,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 285,103.15 285,103.15

1.0000 Ls Alat Bantu 95,034.38 95,034.38

Jumlah 1,995,722.06 285,103.15 2,280,825.22

Dibulatkan 1,995,700.00 285,100.00 2,280,800.00

O. 20 Memasang 1 Unit Jendela type BV-3( MUSHOLA)

7.3000 M' Kusen Stainless Warna 4" 125,000.00 912,500.00

12.2000 M' Sealan Karet Kusen 2,500.00 30,500.00

1.5600 M2 Kaca Polos 5 mm 350,000.00 546,000.00

8.7000 M' List Karet 2,500.00 21,750.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 232,012.50 232,012.50

1.0000 Ls Alat Bantu 77,337.50 77,337.50

Jumlah 1,624,087.50 232,012.50 1,856,100.00

Dibulatkan 1,624,000.00 232,000.00 1,856,100.00

O. 21 Memasang 1 Unit Jendela type BV-4( MUSHOLA)

5.9000 M' Kusen Stainless Warna 4" 125,000.00 737,500.00

10.6000 M' Sealan Karet Kusen 2,500.00 26,500.00

1.3000 M2 Kaca Polos 5 mm 350,000.00 455,000.00

6.6000 M' List Karet 2,500.00 16,500.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 189,375.00 189,375.00

1.0000 Ls Alat Bantu 63,125.00 63,125.00

Jumlah 1,325,625.00 189,375.00 1,515,000.00

Dibulatkan 1,325,600.00 189,300.00 1,515,000.00

Page 79: Rab Sarana Pendukung Pariwisata

O. 22 Memasang 1 Unit Pintu type PJ1 ( ATM)

14.0500 M' Kusen Stainless Warna 4" 125,000.00 1,756,250.00

6.7500 M1 Bingkai Daun Pintu Stainless Warna 913,225.00 6,164,268.75

13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00

5.8275 M2 Kaca Polos 5 mm 350,000.00 2,039,625.00

21.1000 M' List Karet 2,500.00 52,750.00

5.8275 M2 Stiker Etsa Kaca 15,000.00 87,412.50

1.0000 Psg Engsel Pintu 126,000.00 126,000.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

12.0000 bh Paku Skrup 1,500.00 18,000.00

12.0000 bh Pisher 3,000.00 36,000.00

1.0000 Ls Upah Pasang 1,561,920.94 1,561,920.94

1.0000 Ls Alat Bantu 520,640.31 520,640.31

Jumlah 10,933,446.56 1,561,920.94 12,495,367.50

Dibulatkan 10,933,400.00 1,561,900.00 12,495,300.00

O. 23 Memasang 1 Unit Pintu type PJ2 ( ATM)

15.8000 M' Kusen Stainless Warna 4" 125,000.00 1,975,000.00

6.7500 M1 Bingkai Daun Pintu Stainless Warna 913,225.00 6,164,268.75

13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00

7.8150 M2 Kaca Polos 5 mm 350,000.00 2,735,250.00

24.1000 M' List Karet 2,500.00 60,250.00

7.8150 M2 Stiker Etsa Kaca 15,000.00 117,225.00

1.0000 Psg Engsel Tanam (Floor Hinges) ex Dorma 1,000,000.00 1,000,000.00

1.0000 Psg Kunci Pintu Tanam 450,000.00 450,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 1,885,574.06 1,885,574.06

1.0000 Ls Alat Bantu 628,524.69 628,524.69

Jumlah 13,199,018.44 1,885,574.06 15,084,592.50

Dibulatkan 13,199,000.00 1,885,500.00 15,084,500.00

O. 24 Memasang 1 Unit Jendela type J-1( ATM)

12.3500 M' Kusen Stainless Warna 4" 125,000.00 1,543,750.00

19.6000 M' Sealan Karet Kusen 913,225.00 17,899,210.00

5.9625 M2 Kaca Polos 5 mm 350,000.00 2,086,875.00

14.3000 M' List Karet 2,500.00 35,750.00

5.9625 M2 Stiker Etsa Kaca 15,000.00 89,437.50

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 3,253,653.38 3,253,653.38

1.0000 Ls Alat Bantu 1,084,551.13 1,084,551.13

Jumlah 22,775,573.63 3,253,653.38 26,029,227.00

Dibulatkan 22,775,500.00 3,253,600.00 26,029,200.00

O. 25 Memasang 1 Unit Jendela type J-2( ATM)

8.7000 M' Kusen Stainless Warna 4" 125,000.00 1,087,500.00

13.1000 M' Sealan Karet Kusen 913,225.00 11,963,247.50

2.1525 M2 Kaca Polos 5 mm 350,000.00 753,375.00

6.2500 M' List Karet 2,500.00 15,625.00

2.1525 M2 Stiker Etsa Kaca 15,000.00 32,287.50

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 2,081,855.25 2,081,855.25

1.0000 Ls Alat Bantu 693,951.75 693,951.75

Jumlah 14,572,986.75 2,081,855.25 16,654,842.00

Dibulatkan 14,572,900.00 2,081,800.00 16,654,800.00

O. 26 Memasang 1 Unit Pintu type PJ3 ( ATM)

13.1130 M' Kusen Stainless Warna 4" 125,000.00 1,639,125.00

11.4000 M1 Bingkai Daun Pintu Stainless Warna 913,225.00 10,410,765.00

8.7540 M' Sealan Karet Kusen 2,500.00 21,885.00

5.5554 M2 Kaca Polos 5 mm 350,000.00 1,944,390.00

25.1480 M' List Karet 2,500.00 62,870.00

5.5554 M2 Stiker Etsa Kaca 15,000.00 83,331.00

2.0000 Psg Engsel Pintu 126,000.00 252,000.00

2.0000 Psg Kunci Pintu Silinder 100,000.00 200,000.00

2.0000 Psg Door Closer 350,000.00 700,000.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 2,302,554.90 2,302,554.90

1.0000 Ls Alat Bantu 767,518.30 767,518.30

Jumlah 16,117,884.30 2,302,554.90 18,420,439.20

Dibulatkan 16,117,800.00 2,302,500.00 18,420,400.00

O. 27 Memasang 1 Unit Jendela type J-1( LOKET)

11.7000 M' Kusen Stainless Warna 4" 125,000.00 1,462,500.00

23.4000 M' Sealan Karet Kusen 2,500.00 58,500.00

6.3000 M2 Kaca Polos 5 mm 350,000.00 2,205,000.00

10.3000 M' List Karet 2,500.00 25,750.00

8.0000 bh Paku Skrup 1,500.00 12,000.00

8.0000 bh Pisher 3,000.00 24,000.00

1.0000 Ls Upah Pasang 568,162.50 568,162.50

1.0000 Ls Alat Bantu 189,387.50 189,387.50

Jumlah 3,977,137.50 568,162.50 4,545,300.00

Dibulatkan 3,977,100.00 568,100.00 4,545,300.00

Page 80: Rab Sarana Pendukung Pariwisata

O. 28 Memasang 1 Unit Pintu type P1 ( MESS)

7.2000 M' Kusen Stainless Warna 4" 125,000.00 900,000.00

1.7000 M2 Daun Pintu Double Teakwood+Formika 533,700.00 907,290.00

12.8000 M' Sealan Karet Kusen 2,500.00 32,000.00

0.5100 M2 Kaca Polos 5 mm 350,000.00 178,500.00

2.9000 M' List Karet 2,500.00 7,250.00

1.0000 Psg Engsel Pintu 28,420.00 28,420.00

1.0000 Psg Kunci Pintu 258,160.00 258,160.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 350,793.00 350,793.00

1.0000 Ls Alat Bantu 116,931.00 116,931.00

1.7000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 113,390.00

Jumlah 2,568,941.00 350,793.00 2,919,734.00

Dibulatkan 2,568,900.00 350,700.00 2,919,700.00

O. 29 Memasang 1 Unit Pintu type PJ1 ( MESS)

12.6500 M' Kusen Stainless Warna 4" 125,000.00 1,581,250.00

1.7000 M2 Daun Pintu Double Teakwood 794,412.00 1,350,500.40

0.7500 M2 Daun Jendela Kayu 562,152.00 421,614.00

14.4000 M' Sealan Karet Kusen 2,500.00 36,000.00

1.5850 M2 Kaca Polos 5 mm 350,000.00 554,750.00

8.8000 M' List Karet 2,500.00 22,000.00

1.0000 Psg Engsel Pintu 39,480.00 39,480.00

1.0000 Psg Engsel Jendela 21,000.00 21,000.00

1.0000 Psg Kunci Pintu 100,000.00 100,000.00

1.0000 Psg Slot Jendela 19,740.00 19,740.00

1.0000 Psg Kait angin Jendela 45,000.00 45,000.00

10.0000 bh Paku Skrup 1,500.00 15,000.00

10.0000 bh Pisher - -

1.0000 Ls Upah Pasang 630,950.16 630,950.16

1.0000 Ls Alat Bantu 210,316.72 210,316.72

4.9000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 326,830.00

Jumlah 4,743,481.12 630,950.16 5,374,431.28

Dibulatkan 4,743,400.00 630,900.00 5,374,400.00

O. 30 Memasang 1 Unit Pintu type J1 ( MESS)

10.9500 M' Kusen Stainless Warna 4" 125,000.00 1,368,750.00

1.5000 M2 Daun Jendela Kayu 562,152.00 843,228.00

14.6000 M' Sealan Karet Kusen 2,500.00 36,500.00

2.2800 M2 Kaca Polos 5 mm 350,000.00 798,000.00

2.0000 Psg Engsel Jendela 21,000.00 42,000.00

2.0000 Psg Slot Jendela 19,740.00 39,480.00

2.0000 Psg Kait angin Jendela 45,000.00 90,000.00

10.0000 bh Paku Skrup 1,500.00 15,000.00

10.0000 bh Pisher 3,000.00 30,000.00

1.0000 Ls Upah Pasang 489,443.70 489,443.70

1.0000 Ls Alat Bantu 163,147.90 163,147.90

3.0000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 200,100.00

Jumlah 3,626,205.90 489,443.70 4,115,649.60

Dibulatkan 3,626,200.00 489,400.00 4,115,600.00

O. 31 Memasang 1 Unit Jendela type BV-1 ( MESS)

8.1000 M' Kusen Stainless Warna 4" 125,000.00 1,012,500.00

10.8000 M' Sealan Karet Kusen 2,500.00 27,000.00

1.5200 M2 Kaca Polos 5 mm 350,000.00 532,000.00

7.0000 M' List Karet 2,500.00 17,500.00

6.0000 bh Paku Skrup 1,500.00 9,000.00

6.0000 bh Pisher 3,000.00 18,000.00

1.0000 Ls Upah Pasang 242,400.00 242,400.00

1.0000 Ls Alat Bantu 80,800.00 80,800.00

Jumlah 1,696,800.00 242,400.00 1,939,200.00

Dibulatkan 1,696,800.00 242,400.00 1,939,200.00

O. 32 Memasang 1 M2 Pasang Partisi Toilet lapis Melamik

1.3333 Btg Rangka Hollow 40x40 mm 150,000.00 200,000.00

0.6719 Lbr Melamito 4 mm 112,000.00 75,248.59

6.0000 bh Paku Repet 500.00 3,000.00

25.0000 bh Paku Skrup 1,500.00 37,500.00

25.0000 bh Pisher 3,000.00 75,000.00

1.0000 Ls Upah Pasang 58,612.29 58,612.29

1.0000 Ls Alat Bantu 19,537.43 19,537.43

Jumlah 210,286.02 58,612.29 268,898.31

Keuntungan Max 21,028.60 5,861.23 26,889.83

Jumlah Total 231,314.62 64,473.52 295,788.14

Dibulatkan 231,300.00 64,400.00 295,700.00

O. 33 Memasang 1 M1 Railling Tangga lengkap

0.50 kg Plat Dudukan Tiang Railling 17,300.00 8,650.00

2.00 bh DinaBolt dia.12 mm 13,100.00 26,200.00

0.25 btg Pipa Tiang Stainlesstell dia. 1,5" 470,550.00 117,637.50

0.15 btg Railling Pipa Bawah Stainlesstell dia. 1" 264,960.00 39,744.00

0.15 btg Railling Pipa Tengah Stainlesstell dia. 3/4" 230,400.00 34,560.00

0.15 btg Railling Pipa Atas Stainlesstell dia. 1" 264,960.00 39,744.00

1.20 btg Railling Pipa Vertikal Stainlesstell dia. 3/4" 230,400.00 276,480.00

1.0000 Ls Upah Pasang Pabrikasi Teralis besi 81,452.33 81,452.33

1.0000 Ls Upah Pasang +Pabikasi Railling 27,150.78 27,150.78

` 1.00 Ls Poles Stainlesstel 13,575.39 13,575.39

Jumlah 556,590.89 108,603.10 665,193.99

Keuntungan Max 55,659.09 10,860.31 66,519.40

Page 81: Rab Sarana Pendukung Pariwisata

Jumlah Total 612,249.98 119,463.41 731,713.39

Dibulatkan 612,200.00 119,400.00 731,700.00

Page 82: Rab Sarana Pendukung Pariwisata

DAFTAR REKAPITULASI ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHANKABUPATEN RAJA AMPATTAHUN ANGGARAN 2013

URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN

1 2 3 4

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m' Pagar sementara dari kayu tinggi 2 m 335,236.87 Harga satuan

A.2 1 m' Pagar sementara dari seng gelombang tinggi 2 m 433,896.87 tidak termasuk PPN

A.3 1 m' Pagar sementara dari kawat berduri tinggi 1,8 m 774,925.63

A.4 1 m' Pengukuran dan pemasangan bouwplank, papan 2/20 76,702.19

A.5 1 m² Pembuatan kantor sementara dengan lantai plesteran 2,663,371.34

A.6 1 m² Pembuatan gudang semen dan alat - alat 1,198,469.77

A.7 1 m² Membersihkan lapangan dan peralatan 10,675.00

A.8 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm 170,191.87

A.9 1 m² Pembuatan bedeng buruh 1,382,800.26

A.10 1 m² Pembuatan stegger 73,574.54

A.11 1 m² Pembuatan jalan sementara (dengan tenaga) 420,650.00

A.12 1 m² Pembuatan jalan sementara, tebal 25 cm (dengan tenaga) 578,540.00

A.13 1 m³ Bongkaran beton bertulang 711,641.00

A.14 1 m³ Bongkaran dinding tembok bata merah 711,641.00

A.15 1 m² Bongkaran lantai 21,350.00

A.16 1 m² Menurunkan atap genteng/sirap 3,710.00

A.17 1 m² Menurunkan atap seng 22,400.00

A.18 1 m² Membongkar rangka atap 14,837.50

A.19 1 m³ Membongkar rangka kuda-kuda kayu 1,426,000.00

A.20 1 m² Membongkar langit-langit + rangka 24,637.50

B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

B.1 1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga) 46,200.00

B.2 1 m³ Galian Tanah biasa Sedalam 2 m (dengan tenaga) 60,648.00

B.3 1 m³ Galian Tanah biasa Sedalam 3 m (dengan tenaga) 84,805.00

B.4 1 m³ Galian Tanah Keras Sedalam 1 m (dengan tenaga) 72,100.00

B.5 1 m³ Galian Tanah Cadas Sedalam 1 m (dengan tenaga) 144,375.00

B.6 1 m³ Galian Tanah Lumpur Sedalam 1 m (dengan tenaga) 95,179.00

B.7 1 m³ Pekerjaan Stripping Setinggi 1 m (dengan tenaga) 5,775.00

B.8 1 m³ Pembuangan Tanah Sejauh 150 m (dengan tenaga) 59,318.00

B.9 1 m³ Urugan Kembali (dengan tenaga) 22,141.00

B.10 1 m³ Pemadatan Tanah (dengan tenaga) 57,750.00

B.11 1 m³ Urugan Pasir (dengan tenaga) 568,750.00

B.12 1 m³ Urugan Sirtu (dengan tenaga) 448,875.00

B.13 1 m³ Urugan Tanah Puru (dengan tenaga) 391,150.00

C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 2 Ps 2,962,101.00

C.2 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps 2,704,785.00

C.3 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps 2,637,897.00

C.4 1 m³ Pasang Pondasi Batu Kali. 1 PC : 6 Ps 2,590,893.00

C.5 1 m³ Pasang pondasi batu kosong 2,082,600.00

C.6 1 m³ Pasang pondasi siklop, 40% batu pecah 2-3 cm 3,107,631.00

C.7 1 m³ Pasang pondasi bored pile ø 40 cm 2,434,805.20

C.8 1 m³ Pembuatan tiang pancang 40 cm x 40 cm beton bertulang 1,539,779.68

C.9 1 m³ Pembuatan tiang pancang 35 cm x 35 cm beton bertulang 1,214,439.45

C.10 1 m³ Pembuatan tiang pancang 30 cm x 30 cm beton bertulang 892,241.23

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps 87,274.67

D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps 1,329,790.00

D.3 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 4 Ps 1,286,584.00

D.4 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 5 Ps 1,278,826.00

D.5 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps 654,829.00

D.6 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps 635,419.00

D.7 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 5 Ps 631,135.00

D.8 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 6 Ps 629,407.00

D.9 1 m² Pasang dinding hollowblock (H.B. 20) 1,477,599.00

D.10 1 m² Pasang dinding hollowblock (H.B. 15) 1,239,034.00

D.11 1 m² Pasang dinding hollowblock (H.B. 10) 1,127,636.00

D.12 1 m² Pasang dinding conblock (C.B. 10) 1,360,665.57

D.13 1 m² Pasang dinding conblock (C.B. 15) 1,138,095.42

D.14 1 m² Pasang dinding lantai 492,155.00

D.15 1 m² Pasang dinding roster uk. 20 cm x 20 cm 309,780.00

D.16 1 m² Pasang dinding rooster / krawang uk. 12 cm x 11 cm x 24 cm 621,735.00

D.17 1 m² Pasang dinding bata berongga uk. 5 cm x 11 cm x 24 cm 756,270.00

D.18 1 m² Pasang dinding anyaman bambu, rangka kayu 96,912.45

KODE ANALISA

Page 83: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN

1 2 3 4

KODE ANALISA

E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 2 Ps, tebal 15 mm 81,881.00

E.2 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm 73,685.00

E.3 1 m² Plesteran 1 PC : 5 Ps, tebal 15 mm 72,221.00

E.4 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm 116,351.50

E.5 1 m² Plesteran 1 PC : 4 Ps, tebal 20 mm 102,491.50 Harga satuan

E.6 1 m² Plesteran 1 PC : 5 Ps, tebal 20 mm 98,321.50 tidak termasuk PPN

E.7 1 m² Plesteran 1 PC : 2 Ps, tebal 25 mm 119,119.00

E.8 1 m² Plesteran 1 PC : 4 Ps, tebal 25 mm 115,759.00

E.9 1 m² Plesteran 1 PC : 5 Ps, tebal 25 mm 111,727.00

E.10 1 m² Plesteran 1 PC : 2 Ps, tebal 30 mm 152,140.00

E.11 1 m² Plesteran 1 PC : 4 Ps, tebal 30 mm 134,446.00

E.12 1 m² Plesteran 1 PC : 5 Ps, tebal 30 mm 126,640.00

E.13 1 m² Plesteran beton 1 PC : 2 Ps, tebal 15 mm 99,539.00

E.14 1 m² Plesteran beton 1 PC : 3 Ps, tebal 15 mm 94,613.00

E.15 1 m² Plesteran ciprat 1Pc : 2 Ps 66,143.00

E.16 1 m² Plesteran siar, 1 PC : 2 Ps 50,123.00

E.17 1 m² Plesteran waterproof batacote, 3 lapis 321,261.00

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas I 8,205,500.00

F.2 1 m³ Pasang balok profil, kayu kelas I (non SNI) 4,343,375.00

F.3 1 m² Pasang daun pintu / jendela panel, kayu kelas I 677,000.00

F.4 1 m² Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas I 904,032.00

F.5 1 m² Pasang daun pintu / jendela kaca bening tebal 5 mm, kayu kelas I 904,032.00

F.5a 1 m² Pasang daun pintu / jendela kaca ryben tebal 5 mm, kayu kelas I 562,152.00

F.6 1m² Pasang Daun pintu/ jendela dg Jalusi, Kayu kelas I 896,400.00

F.7 1 m² Pasang daun pintu plywood rangkap, rangka kayu kelas I 656,092.00

F.8 1 m² Pasang daun pintu teakwood rangkap, rangka kayu kelas I 794,412.00

F.9 1 m² Pasang daun pintu plywood dan formika, rangka kayu kelas I 836,572.00

F.10 1 m² Pasang daun pintu teakwood dan formika, rangka kayu kelas I 820,472.00

F.11 1 m² Pasang daun pintu formika double, rangka kayu kelas I 946,392.00

F.12 1 m² Pasang jalusi mati, kayu kelas I 621,785.00

F.13 1 m³ Pasang konstruksi kuda-kuda, kayu kelas I 7,812,550.00

F.14 1 m³ Pasang gording kuda-kuda, kayu kelas I (non SNI) 5,475,500.00

F.15 1 m² Pasang kaso + reng untuk genteng, kayu kelas I 103,315.00

F.16 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas I 119,150.00

F.17 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas I 165,100.00

F.18 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas I 195,912.50

F.19 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas I 73,445.00

F.20 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas I 92,385.00

F.21 1 m² Pasang lisplank 2 x (3 cm x 20 cm), kayu kelas I 127,375.00

F.22 1 m² Pasang lisplank 2 x (2 cm x 20 cm), kayu kelas I 70,410.00

F.23 1 m² Pasang rangka dinding pemisah papan, kayu kelas I 208,275.00

F.24 1 m³ Pasang rangka dinding pemisah triplek rangkap rangka kayu kelas I 354,231.00

F.25 1 m² Pasang rangka dinding pemisah teakwood rangkap, kayu kelas I 539,851.00

F.26 1 m² Pasang rangka dinding pemisah plywood rangkap, kayu kelas I 420,031.00

F.27 1 m² Pasang dinding plywood, 84,843.00

F.28 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas I 35,981.00

F.29 1 m² Pasang papan nama proyek, kayu kelas I 401,212.50

F.30 1 m³ Pasang balok gelegar kayu, kayu kelas I 4,248,662.50

F.31 1 m³ Pasang balok sandaran jembatan kayu / balok pemikul, kayu kelas I 4,283,500.00

F.32 1 m² Pasang lantai jembatan dengan papan t = 8 cm, kayu kelas I 343,654.00

F.33 1 m² Pasang lantai jembatan dengan papan t = 8 cm di atas gelegar besi, kayu kelas I 397,995.63

F.34 1 m² Pasang lantai jembatan dengan papan t = 5 cm, kayu kelas I 228,154.00

F.35 1 m² Pasang lantai jembatan dengan papan t = 5 cm di atas gelegar besi, kayu kelas I 886,175.63

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m² Membuat lantai kerja beton tumbuk, 1 PC : 3 Ps : 5 krk, tebal 5 cm (n0n SNI) 208,568.00

G.2 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk 2,038,085.00

G.3 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk 2,090,585.00

G.4 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 6 krk 2,071,685.00

G.5 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 krk 2,102,285.00

G.6 1 m³ Membuat profil ad. 1 PC : 1,5 Ps (non SNI) 3,937,460.00

G.7 1 m³ Membuat beton bertulang, 1 PC : 1 Ps : 2 krk 2,648,885.00

G.8 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk 2,266,925.00

G.9 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split 2,712,995.00

G.10 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 3 split 2,605,295.00

G.11 1 m³ Membuat tiang pancang prestressed beton 2,683,034.60

G.12 1 m³ Membuat beton kedap air dengan strorox-100 2,760,419.00

G.13 1 kg Pembesian dengan besi polos/ulir 20,742.05

G.14 1 kg Kabel prestressed polos / strands 35,346.70

G.15 1 kg Jaring kawat baja 62,325.35

G.16 Pembongkaran Bekisting 1 m³ beton 196,000.00

G.17 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting) 8,288,963.86

G.18 1 m² Pasang bekisting untuk pondasi 144,223.80

G.19 1 m² Pasang bekisting untuk sloof 155,961.40

Page 84: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN

1 2 3 4

KODE ANALISA

G.20 1 m² Pasang bekisting untuk kolom 353,782.76

G.21 1 m² Pasang bekisting untuk balok 363,803.90

G.22 1 m² Pasang bekisting untuk lantai 462,685.28

G.23 1 m³ Membuat beton mutu K. 225 2,885,700.00

G.24 1 m³ Membuat beton mutu K. 275 3,103,200.00

G.25 1 m² Pasang bekisting untuk jembatan cor 120,592.34

G.26 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting) 6,133,153.50

G.27 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting) 7,454,513.40

G.28 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting) 9,608,164.67

G.29 1 m³ Membuat kolom beton bertulang (300 kg besi + bekisting) 11,882,252.57 Harga satuan

G.30 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting) 8,323,459.86 tidak termasuk PPN

G.31 1 m³ Membuat dinding beton bertulang (200 kg besi + bekisting)/(non SNI) 8,766,559.70

G.32 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm 112,809.54

G.33 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm 137,003.06

G.34 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 100 kg 5,775,397.28

G.35 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 100 kg 8,958,153.01

G.36 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk balok, dengan pembesian 100 kg 8,022,403.70

G.37 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 100 kg 8,729,668.42

G.38 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg 8,211,117.17

G.39 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan Pembesian 200 kg 11,798,923.40

G.40 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg 5,256,846.03

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur 78,670.00

H.2 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm 131,444.00

H.3 1 m² Pasang atap asbes gelombang uk. 2.500 mm x 920 mm, tebal 5 mm 132,981.20

H.4 1 m² Pasang atap asbes gelombang uk. 2.250 mm x 920 mm, tebal 5 mm 140,989.20

H.5 1 m² Pasang atap asbes gelombang uk. 2.000 mm x 920 mm, tebal 5 mm 128,977.20

H.6 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 920 mm, tebal 5 mm 74,841.20

H.7 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.050 mm, tebal 4 mm 93,923.20

H.8 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.050 mm, tebal 4 mm 100,410.80

H.9 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.050 mm, tebal 4 mm 90,723.60

H.10 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.050 mm, tebal 4 mm 96,743.60

H.11 1 m² Pasang atap asbes gelombang uk. 1.500 mm x 1.050 mm, tebal 4 mm 111,421.20

H.12 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.080 mm, tebal 6 mm 129,605.80

H.13 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.080 mm, tebal 6 mm 124,441.20

H.14 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.080 mm, tebal 6 mm 124,463.60

H.15 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.080 mm, tebal 6 mm 125,391.80

H.16 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 1.080 mm, tebal 6 mm 75,630.20

H.17 1 m² Pasang atap genteng beton 116,050.00

H.18 1 m² Pasang atap metal 174,704.40

H.19 1 m² Pasang atap alumunium super sheet 520,343.60

H.20 1 m² Pasang atap seng gelombang 73,998.00

H.21 1 m² Pasang atap nok seng 52,756.00

H.22 1 m' Pasang atap nok genteng kodok 166,066.00

H.23 1 m' Pasang atap nok genteng beton 180,591.38

H.24 1 m' Pasang atap nok genteng metal 130,578.00

H.25 1 m' Pasang atap nok alumunium 307,103.20

H.26 1 m' Pasang atap nok genteng soka 141,874.00

H.27 1 m² Pasang Aluminium Foil 159,570.00

H.28 1 m² Pasang atap metal batuan /tekstur 187,270.80

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

I.1 1 m² Langit-langit asbes 1 m x 1 m, tebal 4 mm 65,509.50

I.2 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm 68,127.50

I.3 1 m² Langit-langit asbes 1 m x 1 m, tebal 6 mm 72,285.50

I.4 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka alumunium (non SNI) 1,309,932.30

I.5 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium 143,699.40

I.6 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium 519,591.50

I.7 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 4 mm 61,897.30

I.8 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 6 mm 65,022.10

I.9 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 4 mm 65,797.00

I.10 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 6 mm 65,797.00

I.11 1 m² Langit-langit teakwood uk. 30 cm x 60 cm, tebal 4 mm 82,158.10

I.12 1 m² Langit-langit soft board 26,965.20

I.13 1 m² Langit-langit gypsum board, tebal 9 mm 82,977.20

I.14 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka kayu kelas III 1,321,382.53

I.15 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka kayu kelas III 755,129.43

I.16 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III 249,427.73

I.17 1 m² Kompon Gypsum (nonSNI) 45,848.92

I.18 1 m² Amplas Gypsum (non SNI) 24,460.00

I.19 1 m' List langit-langit kayu profil 29,654.00

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock 2,901,565.00

J.2 Memasang 1 buah klosed jongkok porselin 822,380.00

J.3 Memasang 1 buah klosed jongkok keramik 868,130.00

Page 85: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN

1 2 3 4

KODE ANALISA

J.4 Memasang 1 buah urinoir 1,807,926.00

J.5 Memasang 1 buah wastafel 1,134,583.60

J.6 Memasang 1 buah bak mandi fibreglass vol. 0,3 m³ 1,272,906.00

J.7 Memasang 1 buah bak mandi fibreglass vol. 1 m³ 2,049,905.60

J.8 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + porselin 11 cm x 11 cm 3,891,600.00

J.9 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + keramik 10 cm x 20 cm 3,541,656.00

J.10 Memasang 1 buah bak beton vol. 1 m³ air dengan keramik 10 cm x 20 cm 10,212,856.15

J.11 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm 12,224,573.75

J.12 Memasang 1 buah bathtub (non SNI) 3,007,375.00

J.13 Memasang 1 m' pipa beton ø 15 cm - 20 cm 396,988.00

J.14 Memasang 1 m' pipa beton ø 30 cm - 100 cm 714,814.00 Harga satuan

J.15 Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 35 cm 1,234,162.70 tidak termasuk PPN

J.16 Memasang 1 bh bak kontrol pas. batu bata uk. 45 cm x 45 cm, tinggi 50 cm 1,489,457.20

J.17 Memasang 1 bh bak kontrol pas. batu bata uk. 60 cm x 60 cm, tinggi 65 cm 2,218,168.88

J.18 Memasang 1 m' pipa galvanis ø 1/2" 99,165.60

J.19 Memasang 1 m' pipa galvanis ø 3/4" 121,165.20

J.20 Memasang 1 m' pipa galvanis ø 1" 174,009.60

J.21 Memasang 1 m' pipa galvanis ø 1,5" 263,763.00

J.22 Memasang 1 m' pipa galvanis ø 2" 346,771.80

J.23 Memasang 1 m' pipa galvanis ø 4" 990,607.70

J.24 Memasang 1 m' pipa PVC tipe AW ø 1/2" 30,162.60

J.25 Memasang 1 m' pipa PVC tipe AW ø 3/4" 35,379.00

J.26 Memasang 1 m' pipa PVC tipe AW ø 1" 42,636.60

J.27 Memasang 1 m' pipa PVC tipe AW ø 1,5" 63,955.80

J.28 Memasang 1 m' pipa PVC type AW ø 3" 179,322.50

J.29 Memasang 1 m' pipa PVC type AW ø 4" - 6" 261,424.10

J.30 Memasang 1 bh kran air ø 3/4" atau 1/2" 74,098.90

J.31 Memasang 1 bh floor drain 86,265.00

J.32 Memasang 1 bh tempat sabun keramik (non SNI) 106,829.60

J.33 Memasang 1 bh septic tank, volume air 1 m³ (non SNI) 7,695,230.59

J.34 Memasang 1 bh septic tank, volume air 1,5 m³ (non SNI) 11,492,646.88

J.35 Memasang 1 bh septic tank, volume air 2 m³ (non SNI) 15,232,203.38

J.36 Memasang 1 bh Peresapan, dalam 5 m' 598,874.91

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) 26,280.52

K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) 45,509.50

K.3 1 m² Mengecat Genteng 45,625.00

K.4 1 m² Mengeter 1X rangka kayu 14,723.97

K.5 1 m² Mengeter rangka kayu 15,248.97

K.6 1 m² Mengapur dinding baru 21,033.70

K.7 1 m² Memeni besi 2X 42,248.00

K.8 1 m' Pasang talang datar, seng BJLS 27 167,114.75

K.9 1 m' Pasang talang miring, seng BJLS 27 151,303.75

K.10 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27 126,962.00

K.11 1 m² Mengecat bidang kayu lama 41,157.00

K.12 1 m² Mengecat tembok lama ( 1 lapis cat dasar , 2 lapis cat penutup) 20,185.86

K.13 1 m² Mengikis /mengerok permukaan cat tembok lama 17,853.50

K.14 1 m² Mendempul dan menggosok kayu 11,863.10

K.15 1 m² Mengerok karat cat lama permukaan baja/besi dengan cara manual 15,788.50

K.16 1 m² Menyabun permukaan tembok lama 15,788.50

K.17 1 m² Pelaburan bidang kayu dengan politur 105,809.14

K.18 1 m² Pelaburan bidang kayu dengan vernis 50,865.50

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

L.1 1 m² Pasangan lantai keramik 10 cm x 20 cm 324,361.00

L.2 1 m² Pasangan lantai keramik 15 cm x 15 cm 220,621.00

L.3 1 m² Pasangan lantai keramik 20 cm x 20 cm 311,621.00

L.4 1 m² Pasangan lantai keramik 25 cm x 25 cm 334,301.00

L.5 1 m² Pasangan lantai keramik 15 cm x 20 cm 326,881.00

L.6 1 m² Pasangan lantai keramik 30 cm x 30 cm 339,201.00

L.7 1 m² Pasangan lantai keramik 40 cm x 40 cm 325,621.00

L.8 1 m² Pasangan lantai ubin granito 40 cm x 40 cm 121,209.50

L.9 1 m² Pasangan lantai ubin granito 30 cm x 30 cm 128,709.50

L.10 1 m' Pasangan plint ubin granito 10 cm x 40 cm 58,590.00

L.11 1 m' Pasangan plint ubin granito 10 cm x 30 cm 154,329.70

L.12 1 m' Pasangan plint keramik 10 cm x 20 cm 52,124.10

L.13 1 m' Pasangan plint keramik 10 cm x 15 cm 50,732.50

L.14 1 m' Pasangan plint keramik 10 cm x 20 cm 52,124.10

L.15 1 m' Pasangan plint keramik 10 cm x 40 cm 46,174.10

L.16 1 m² Pasangan dinding dengan keramik 10 cm x 20 cm 318,699.00

L.17 1 m² Pasangan dinding keramik 20 cm x 25 cm 297,634.00

L.18 1 m² Pasangan dinding keramik 20 cm x 20 cm 253,459.00

L.19 1 m² Pasangan dinding batu paras 828,826.00

L.20 1 m² Pasangan dinding batu tempel hitam 764,541.00

L.21 1 m² Pasangan plint kayu 10 x 20 cm 42,156.00

L.22 1 m² Pasangan lantai dari conblock, tebal 6 cm 77,122.40

Page 86: Rab Sarana Pendukung Pariwisata

URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN

1 2 3 4

KODE ANALISA

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 1 kg Pasang rangka atap baja 61,322.50

M.2 1 m² Pasang pintu besi 913,225.00

M.3 1 m² Pasang jendela besi 841,085.00

M.4 1 m² Pasang pintu besi lipat 1,513,225.00

M.5 1 m² Pasang pintu sunscreen alumunium 252,200.00

M.6 1 m² Pasang rolling door 925,945.00

M.7 1 m² Pasang kusen pintu / jendela alumunium biasa 1,134,665.00

M.8 1 m² Pasang pintu alumunium biasa 3,576,545.00

M.9 1 m² Pasang daun pintu alumunium dengan kaca rayband 12 mm 4,391,975.00

M.10 1 m² Pasang venetion blinds 187,075.00

M.11 1 m² Pasang vertical blinds 99,925.00

M.12 1 m² Pasang teralis besi 768,090.00

M.13 1 m² Pasang kawat harmonika, dengan rangka kayu kelas III 74,107.74

M.14 1 m² Pasang kawat nyamuk, dengan rangka kayu kelas III 55,063.82

M.15 1 m² Pasang kawat kassa, dengan rangka kayu kelas III 61,633.74

M.16 1 m² Pasang kawat burung, dengan rangka kayu kelas III 67,023.74

M.17 1 m² Pasang kaca rayband tebal 10 mm 706,047.00

M.18 1 m² Pasang jendela nako (dengan kaca dan teralis besi) 422,344.25

M.19 1 m² Pasang kaca bening tebal 3 mm 411,576.25

M.20 1 m² Pasang kaca bening tebal 5 mm 411,445.00

M.21 1 m² Pasang kaca bening tebal 8 mm 414,089.50

M.22 1 m² Pasang kaca buram, tebal 12 mm 714,297.00

M.23 1 m² Pasang kaca cermin tebal 5 mm 146,565.00

M.24 1 m² Pasang kaca cermin tebal 6 mm 146,696.25

M.25 1 m² Pasang kaca cermin tebal 8 mm 146,696.25

M.26 1 m² Pasang kaca wireglass tebal 5 mm 1,373,460.25

M.27 1 m² Pasang kaca patri tebal 5 mm 3,318,788.25

N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 1 Buah pasang kunci tanam antik 316,305.00

N.2 1 Buah pasang kunci tanam 253,505.00

N.3 1 Buah pasang kunci tanam kamar mandi 165,652.50

N.4 1 Buah pasang kunci silinder 334,518.75

N.5 1 Buah pasang engsel pintu/jendela 3" 47,576.25

N.6 1 Buah pasang engsel pintu/jendela 4" 54,996.25

N.7 1 Buah pasang engsel pintu/jendela 5" 66,056.25

N.8 1 Buah pasang kait angin biasa 41,834.85

N.9 1 Buah pasang kait angin istimewa 50,096.25

N.10 1 Buah pasang door closer 3,387,407.50

N.11 1 Buah pasang kunci slot 57,695.00

N.12 1 Buah pasang pegangan pintu/door holder 212,207.50

N.13 1 Buah pasang door stop 141,337.50

N.14 1 Buah pasang rel pintu dorong 415,145.00

N.15 1 Buah pasang kunci lemari 101,133.75

O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA STAINLESS

O.1 Memasang 1 Unit Pintu Type PD1(Pintu Utama) 19,069,300.00

O.2 Memasang 1 Unit Pintu type PD2 5,575,900.00

O.3 Memasang 1 Unit Pintu type P1 5,072,700.00

O.4 Memasang 1 Unit Pintu type P2 4,776,300.00

O.5 Memasang 1 Unit Pintu type P2a 3,731,600.00

O.6 Memasang 1 Unit Pintu type PJ1 3,614,600.00

O.7 Memasang 1 Unit Pintu type PVC 463,200.00

O.8 Memasang 1 Unit Pintu type J1 4,380,300.00

O.9 Memasang 1 Unit Pintu type J6 4,214,500.00

O.10 Memasang 1 Unit Pintu type BV 581,400.00

O.11 Memasang 1 Unit Jendela type J7 17,545,900.00

O.12 Memasang 1 Unit Pintu type P2 6,972,500.00

O.13 Memasang 1 Unit Pintu type P3 ( MUSHOLA) 7,064,500.00

O.14 Memasang 1 Unit Pintu type P4 2,876,600.00

O.15 Memasang 1 Unit Pintu type PJ1 10,034,100.00

O.16 Memasang 1 Unit Jendela type J8 1,448,800.00

O.17 Memasang 1 Unit Jendela type BV-2 ( MUSHOLA) 2,280,800.00

O.18 Memasang 1 Unit Jendela type BV-3( MUSHOLA) 1,515,000.00

O.19 Memasang 1 Unit Pintu type PJ1 ( ATM) 12,495,300.00

O.20 Memasang 1 Unit Pintu type PJ2 ( ATM) 15,084,500.00

O.21 Memasang 1 Unit Jendela type J-1( ATM) 26,029,200.00

O.22 Memasang 1 Unit Jendela type J-2( ATM) 16,654,800.00

O.23 Memasang 1 Unit Pintu type PJ3 ( ATM) 18,420,400.00

O.24 Memasang 1 Unit Jendela type J-1( LOKET) 4,545,300.00

O.25 Memasang 1 Unit Pintu type PJ1 ( MESS) 5,374,400.00

O.26 Memasang 1 Unit Pintu type J1 ( MESS) 4,115,600.00

O.27 Memasang 1 Unit Jendela type BV-1 ( MESS) 1,939,200.00

O.28 Memasang 1 M2 Pasang Partisi Toilet lapis Melamik 295,700.00

O.29 Memasang 1 M1 Railling Tangga lengkap 731,700.00

Page 87: Rab Sarana Pendukung Pariwisata

REKAPITULASI

RENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG PELABUHAN

KABUPATEN RAJA AMPAT

TAHUN ANGGARAN 2013

NO URAIAN PEKERJAANSUB TOTAL TOTAL

(RP.) (RP.)

I. PEKERJAAN PERSIAPAN 49,326,532.94

II. PEKERJAAN STANDARD

A. PEKERJAAN STRUKTUR 2,774,089,420.45

B. PEKERJAAN ATAP 5,128,619,294.26

C. PEKERJAAN ARSITEKTUR 1,738,668,927.47

D. PEKERJAAN MEKANIKAL & SANITARY 156,574,786.32

E. PEKERJAAN ELEKTRIKAL 116,623,912.03

TOTAL PEKERJAAN STANDARD 9,914,576,340.54

III. PEKERJAAN NON STANDARD

A. PEKERJAAN PAGAR SAMPING DAN BELAKANG 516,678,162.01

B. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA 356,557,671.98

C. PEKERJAAN LANSEKAP 152,898,509.01

TOTAL PEKERJAAN NON STANDARD 1,026,134,342.99

IV. PEKERJAAN BANGUNAN PENDUKUNG

A. PEK. PEMBUATAN POS JAGA (1 Unit) 121,249,692.04

TOTAL PEKERJAAN BANGUNAN PENDUKUNG 121,249,692.04

JUMLAH TOTAL ( A ) 11,111,286,908.51

PERENCANAAN ( B ) 444,000,000.00

PENGAWASAN ( C ) 333,000,000.00

JUMLAH ( A + B + C ) 11,888,286,908.51

PPN (10%) 1,188,828,690.85

JUMLAH + PPN 13,077,115,599.36

DIBULATKAN 13,077,000,000.00 Terbilang :

Terbilang : Tiga Belas Milyar Tujuh Puluh Tujuh Juta

Waisai, 1 Juli 2013

Dibuat Oleh

Konsultan Perencana

PT.SULAWESI CONSULTANT

Ir.A.Taufik Assegaf Direktur utama

Page 88: Rab Sarana Pendukung Pariwisata

RINCIAN

RENCANA ANGGARAN BIAYA

PEMBANGUNAN GEDUNG PELABUHAN

KABUPATEN RAJA AMPAT

TAHUN ANGGARAN 2013

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

I. PEKERJAAN PERSIAPAN

1 Pek. Pengukuran kembali lokasi site 1,000.00 -

2 Pek. Pembersihan Lokasi Site 4,620.75 10,675.00 49,326,532.94

3 Pek. Pemasangan Pagar Sementara keliling site plan 335,236.87 -

4 Pek. Pembuatan Kantor Direksikeet 2,663,371.34 -

5 Pek. Pengadaan Air & Listrik kerja Ls 2,500,000.00 -

6 Pek. Pembersihan sisa bekas pekerjaan Ls 1,000,000.00 -

7 Biaya Perijinan ( IMB ) 25,000.00 -

TOTAL PERSIAPAN 49,326,532.94

II. PEKERJAAN STANDARDA. PEKERJAAN STRUKTUR

I. PEKERJAAN GALIAN & URUGAN

1 Pek. Pasang Papan Bouplank 389.10 76,702.19 29,844,823.81

2 Pek. Galian Tanah Pondasi Plat Setempat 60,648.00 -

3 Pek. Galian Tanah Sloof 20/30 77.82 46,200.00 3,595,284.00

4 Pek. Galian Tanah Pondasi Batu kali menerus 311.28 46,200.00 14,381,136.00

5 Pek. Urugan Pasir Bawah Pondasi Plat & Sloof t=10cm 7.78 568,750.00 4,426,012.50

6 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 31.13 568,750.00 17,704,050.00

7 Pek. Urugan Tanah Kembali bks Galian 22,141.00 -

8 Pek. Urugan Tanah Peninggian Bangunan t=40 cm(Tanah dari luar) 391,150.00 -

9 Pek. Urugan Tanah Peninggian Bangunan (Tanah bks galian) 22,141.00 -

JUMLAH - I 69,951,306.31

II. PEKERJAAN PONDASI & STRUKTUR DASAR 63

1 Pek. Aanstamping Batukali 46.69 2,082,600.00 97,240,759.20

2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 122.57 2,704,785.00 331,516,030.70

3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 4.33 208,568.00 904,017.14

4 Pek Sloof Kayu Besi Klas I 10/10 3.89 4,343,375.00 16,900,072.13

5 Pek. Dinding Papan Klas I 2/20 1,430.35 84,843.00 121,355,354.74

6 Pek Kolom Kayu Besi Klas I 10/10 3.53 4,343,375.00 15,336,457.13

JUMLAH - II 583,252,691.03

III. PEKERJAAN BETON 1 Pekerjaan kolom Beton 15/15 2.23 2,885,700.00 6,427,896.75

2 Pekerjaan Plat Beton 45.52 8,729,668.42 397,404,798.58

3 Pekerjaan Pondasi Pile D 60 cm 20.00 buah 84,956,836.83 1,699,136,736.64

4 Pekerjaan Sloof Beton 2.40 7,454,513.40 17,915,991.14

JUMLAH - III 2,120,885,423.11

SUB TOTAL STRUKTURE 2,774,089,420.45

HARGA SATUAN

TOTAL JUMLAH HARGA

m2

m2

m1

m2

m2

m1

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m3

m3

m3

m3

m3

m3

Page 89: Rab Sarana Pendukung Pariwisata

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

HARGA SATUAN

TOTAL JUMLAH HARGA

B. PEKERJAAN ATAP1 Pekerjaan Kuda-kuda 78.00 7,812,550.00 609,378,900.00

2 Balok Gording 6/10 748.74 5,475,500.00 4,099,725,870.00

3 Kasau 5/7 1,454.16 103,315.00 150,236,540.40

4 Atap Seng 743.77 73,998.00 55,037,462.86

5 Atap Rumbia 743.77 100,000.00 74,376,960.00

6 Bubung Metal Roof 312.00 m' 130,578.00 40,740,336.00

7 Lisplang Plat GRC Lbr.30cm tebat 12 mm 778.20 m' 127,375.00 99,123,225.00

SUB TOTAL ATAP 5,128,619,294.26

C. PEKERJAAN ARSITEKTURI. PEKERJAAN DINDING & PLESTERAN

1 Pek. Dinding Papan Klas I 2/20 1,430.35 84,843.00 121,355,354.74

2 Pasangan dinding 1/2 bata 1 : 2 80.05 654,829.00 52,419,061.45

3 Pekerjaan plester dan acian dinding 1 : 2 160.10 81,881.00 13,109,148.10

4 Pekerjaan dinding keramik Toilet 20X25 h=3.3m 112.00 297,634.00 33,335,603.27

5 Pekerjaan Border dinding keramik 10X20 56.00 m' 25,000.00 1,400,025.00

JUMLAH - I 100,263,837.82

II. PEK. KUSEN PINTU/JENDELA LENGKAP ASSESORIES1 Pasang Kusen+Pintu Stainless 50.40 Unit 19,069,300.00 961,092,720.00

2 Pasang Kusen+jendela Type J1 10.00 Unit 4,380,300.00 43,803,000.00

3 Pasang Kusen+jendela Type J2 5.00 Unit 4,380,300.00 21,901,500.00

4 Pasang Kusen+jendela Type J3 10.00 Unit 4,380,300.00 43,803,000.00

JUMLAH - II 1,226,705,320.00

III. PEKERJAAN PLAFOND1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 526.51 250,000.00 131,628,600.00

2 Pekerjaan profil gipsum 544.74 m' 13,000.00 7,081,620.00

JUMLAH - III 138,710,220.00

IV. PEKERJAAN LANTAI 1 Urugan pasir bawah lantai t=10 cm 87.67 568,750.00 49,863,415.88

2 Lantai kerja t = 5 cm 43.84 208,568.00 9,142,780.59

6 Pekerjaan lantai keramik 40X40 586.73 325,621.00 191,051,479.08

JUMLAH - IV 250,057,675.55

V. PEKERJAAN FINISHING & PENGECATAN1 Pekerjaan Finishing Opening Kusen pada dinding bata 217.40 7,500.00 1,630,500.00

2 Pekerjaan pengecatan dinding Exterior Watershiel 33.94 32,850.65 1,114,951.06

3 Pekerjaan pengecatan dinding bata & partisi (Interior) 80.05 26,280.52 2,103,755.63

4 Pengecatan Tiang Pancang 18.00 235,866.40 4,245,595.20

5 Pekerjaan pengecatan plafond 526.51 26,280.52 13,837,072.22

JUMLAH - V 22,931,874.11

SUB TOTAL ARSITEKTURE 1,738,668,927.47

D. PEKERJAAN MEKANIKAL & SANITARYI PEKERJAAN INSTALASI AIR BERSIH

a. PIPA AIR BERSIH (PPR PN 16)

- PPR dia 3/4 inc 42.30 m 121,165.20 5,125,287.96

b. Valve (Class 125 psi)

- Gate valve dia 3/4 inc 2.00 unit 100,000.00 200,000.00

JUMLAH - I 5,325,287.96

m2

m2

m2

m2

m2

m3

m2

m2

m2

m2

m3

m2

m2

m1

m2

m2

m2

m2

Page 90: Rab Sarana Pendukung Pariwisata

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

HARGA SATUAN

TOTAL JUMLAH HARGA

II. PEKERJAAN INSTALASI AIR KOTORc. PIPA AIR KOTOR (PVC Class 10 kg/cm2)

- PVC dia 6 inc 390.60 m 261,424.10 102,110,946.34

JUMLAH - II 102,110,946.34

III. PEKERJAAN SANITARY1 Kran air 1/2" 15.00 bh 74,098.90 1,111,483.43

2 Closet Duduk "TOTO" 9.00 bh 2,901,565.00 26,114,085.00

3 Urinoir U57M "TOTO" 7.00 bh 1,807,926.00 12,655,482.00

4 Sekat Urinoir Porselin "TOTO" 7.00 bh 350,000.00 2,450,000.00

5 Washtafel Bulat + Accecories "TOTO" 6.00 bh 1,134,583.60 6,807,501.60

JUMLAH - III 49,138,552.03

SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY 156,574,786.32

E. PEKERJAAN ELEKTRIKAL

1. PEMASANGAN PANEL

a PP-D/LP-D

- Panel box (800x600x250) mm 6.00 bh 2,750,000.00 16,500,000.00

- Busbar+Wiring Material 6.00 lot 1,950,000.00 11,700,000.00

Input

- MCCB 3P 32 A 6.00 bh 325,000.00 1,950,000.00

- Pilot Lamp Tlmq+MCB 1P 2A 18.00 set 80,500.00 1,449,000.00

Output

- MCB 1P 6A 72.00 bh 70,000.00 5,040,000.00

- MCB 1P 16A 36.00 bh 70,000.00 2,520,000.00

- MCB 3P 6A 6.00 bh 285,000.00 1,710,000.00

b SDP

- Panel box (800x600x250) mm 6.00 bh 2,750,000.00 16,500,000.00

- Busbar+Wiring Material 6.00 lot 1,950,000.00 11,700,000.00

Input

- MCB 3P 80 A 6.00 bh 825,000.00 4,950,000.00

- Pilot Lamp Tlmq+MCB 1P 2A 18.00 set 80,500.00 1,449,000.00

Output

- MCB 3P 32A 24.00 bh 325,000.00 7,800,000.00

SUB JUMLAH 83,268,000.00

2 PASANG KABEL TRAY

kabel tray elektrikal (300 x 50) mm 114.00 m 222,000.00 25,308,000.00

kabel ladder elektrikal (300 x 100) mm 15.00 m 218,000.00 3,270,000.00

SUB JUMLAH 28,578,000.00

3 PASANG GROUNDING SYSTEM

Grounding system max. 2 Ohm + Box Control 6.00 titik 2,950,000.00 17,700,000.00

SUB JUMLAH 17,700,000.00

4 PEMASANGAN INSTALASI PENERANGAN/LAMPU

1 Installasi

Baret Lamp 20 W 91.00 titik 274,764.31 25,003,552.03

2 Material

Baret Lamp 20 W 91.00 bh 375,000.00 34,125,000.00

Down Light 20 W 92.00 bh 315,000.00 28,980,000.00

Stop kontak 20.00 bh 65,268.00 1,305,360.00

Saklar ganda 22.00 bh 50,000.00 1,100,000.00

Saklar tunggal 10.00 bh 25,000.00 250,000.00

JUMLAH - I 90,763,912.03

III. PENANGKAL PETIRCable BC 50 mm2 84.00 m 65,000.00 5,460,000.00

Road Protection 6.00 bh 200,000.00 1,200,000.00

Installasi & accessories 6.00 titik 250,000.00 1,500,000.00

Grounding system max. 2 Ohm + Box Control 6.00 titik 2,950,000.00 17,700,000.00

JUMLAH - II 25,860,000.00

SUB TOTAL PEK. ELEKTRIKAL STANDARD 116,623,912.03

TOTAL JUMLAH PEKERJAAN GEDUNG 9,914,576,340.54

Page 91: Rab Sarana Pendukung Pariwisata

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

HARGA SATUAN

TOTAL JUMLAH HARGA

III. PEKERJAAN NON STANDARD

A. PEKERJAAN PAGAR SAMPING DAN BELAKANG

I. PEKERJAAN GALIAN & URUGAN

1 Pekerjaan Pasang papan Bouwplank 193.35 m' 76,702.19 14,830,369.27

2 Pek. Galian Tanah 386.70 m³ 46,200.00 17,865,540.00

3 Pek. Urugan Pasir 38.67 m³ 568,750.00 21,993,562.50

SUB JUMLAH 54,689,471.77

II. PEKERJAAN PONDASI & BETON

1 Pek. Aanstamping Batu Kali 23.20 m³ 2,082,600.00 48,320,485.20

2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 60.91 m³ 2,704,785.00 164,735,606.62

3 Pekerjaan Beton Sloof 15/20 11.60 m³ 5,775,397.28 67,000,383.82

4 Pekerjaan beton Kolom Praktis 15/15 193.35 m' 112,809.54 21,811,724.56

SUB JUMLAH 301,868,200.20

III. PEKERJAAN DINDING & FINISHING

1 Pek. Pasangan Bata 1 : 5 193.35 m² 631,135.00 122,029,952.25

2 Pek. Plester dan Acian 1 : 5 (Dinding & Kolom) 386.70 m² 72,221.00 27,927,860.70

3 Pek. Pengecatan Dinding 386.70 m² 26,280.52 10,162,677.08

SUB JUMLAH 160,120,490.03

SUB TOTAL 516,678,162.01

B. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA

I. PEKERJAAN GALIAN & URUGAN

1 Pekerjaan Pasang Bouwplank 86.45 m' 76,702.19 6,630,904.70

2 Pek. Galian Tanah 172.90 m³ 46,200.00 7,987,980.00

3 Pek. Urugan Pasir 17.29 m³ 568,750.00 9,833,687.50

SUB JUMLAH 24,452,572.20

II. PEKERJAAN PONDASI & BETON

1 Pek. Aanstamping Batu Kali 10.37 m³ 2,082,600.00 21,604,892.40

2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 27.23 m³ 2,704,785.00 73,656,028.92

3 Pek. Sloof Beton 15/20 5.19 m³ 5,775,397.28 29,956,985.68

4 Pek. Kolom Praktis 15/15 86.45 m' 112,809.54 9,752,384.73

SUB JUMLAH 134,970,291.74

III. PEKERJAAN DINDING & FINISHING

1 Pek. Pasangan Bata (Dinding Pagar+Bungkus Kolom 15/15) 86.45 m² 631,135.00 54,561,620.75

2 Pek. Plester dan Acian (Dinding & Kolom) 172.90 m² 72,221.00 12,487,010.90

3 Pek. Pengecatan Dinding 172.90 m² 26,280.52 4,543,901.91

4 Pek.Pasang Dinding Keramik Granit 20x20 Polis "Indogress" 28.82 253,459.00 7,303,843.52

5 Pek. Pintu Gerbang (Besi Hollow 40x40&20x40) lengkap 2.00 Unit 5,000,000.00 10,000,000.00

SUB JUMLAH 88,896,377.07

SUB TOTAL 356,557,671.98

C. PEKERJAAN LANSEKAPI. PEKERJAAN JALAN & PEDESTRIAN

1 Pekerjaan Pembentukan Badan Jalan 29.38 29,400.00 863,913.12

2 Pekerjaan Lapisan Pondasi Bawah (LPB) t= 20 cm 29.38 68,460.00 2,011,683.41

3 Pekerjaan Lapisan Pondasi Atas (LPA) t= 10 cm 29.38 30,660.00 900,937.97

4 Pekerjaan Lapisan Penetrasi (Lapen) t=5 cm 29.38 38,220.00 1,123,087.06

5 Pekerjaan Lapisan Hotmix (AS-WC) t=5 cm 29.38 142,520.00 4,187,921.70

6 Pekerjaan Pedestrian Pasir 5.98 568,750.00 3,403,400.00

7 Pekerjaan Pedestrian Paving Block 6 cm Natural 81.16 28,224.00 2,290,565.76

SUB JUMLAH 14,781,509.01

II. PEKERJAAN TAMAN

- Tanaman Rumput Gajah 233.25 336,000.00 78,372,000.00

- Tanaman Pohon Impor 50.00 Tnmn 1,050,000.00 52,500,000.00

- Tanaman Pohon Palm Raja 6.00 Tnmn 1,050,000.00 6,300,000.00

- Semak Lokal 21.00 Tnmn 45,000.00 945,000.00

SUB JUMLAH 138,117,000.00

m2

m3

m2

m2

m2

m2

m3

m2

m2

Page 92: Rab Sarana Pendukung Pariwisata

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

HARGA SATUAN

TOTAL JUMLAH HARGA

SUB TOTAL C 152,898,509.01

TOTAL JUMLAH NON STANDARD 1,026,134,342.99

IV. PEKERJAAN BANGUNAN PENDUKUNGA. PEK. PEMBUATAN POS JAGA (1 Unit) 3.00 I. PEKERJAAN GALIAN

1 Pek. Pasang Papan Bouwplang 16.00 76,702.19 1,227,235.11

2 Galian tanah pondasi batu kali 5.12 46,200.00 236,544.00

3 Urugan pasir urug t=10 cm 0.64 568,750.00 364,000.00

SUB JUMLAH 1,827,779.11

II. PEKERJAAN PONDASI & BETON 8.00

1 Pekerjaan aanstamping batu kosong 0.96 195,400.00 187,584.00

2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 2.70 440,200.00 1,188,540.00

3 Urugan tanah ex galian pondasi 0.82 8,000.00 6,560.00

4 Beton Sloof 15/20 0.24 3,346,900.00 803,256.00

5 Beton Kolom 15/15 12.80 112,809.54 1,443,962.11

6 Beton Balok Dak 15/20 8.00 137,003.06 1,096,024.48

SUB JUMLAH 4,725,926.59

III. PEKERJAAN DINDING & PLESTERAN

1 Pasangan dinding bata 1 : 5 17.28 65,400.00 1,130,112.00

2 Pekerjaan plester dan acian dinding 1 : 5 34.56 22,600.00 781,056.00

3 Pekerjaan dinding keramik 20/25 h= 1,5m 2.35 119,600.00 281,060.00

4 Pekerjaan plester dan acian ban 1 : 2 6.47 32,500.00 210,166.67

SUB JUMLAH 2,402,394.67

IV. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES

1 Pasang Pintu Type-P1 1.00 Unit 2,504,000.00 2,504,000.00

2 Jendela Type - J1 2.00 Unit 1,500,000.00 3,000,000.00

SUB JUMLAH 5,504,000.00

V. PEKERJAAN ATAP & PLAFOND

1 Pek. Kuda-kuda rangka baja ringan 12.25 7,812,550.00 95,703,737.50

2 Pek. Penutup Atap Metal 12.25 73,998.00 906,475.50

3 Pek. Pasang Nok Genteng Metal 6.00 130,578.00 783,468.00

4 Lisplang Plat GRC Lbr.30cm tebat 12 mm 16.00 127,375.00 2,038,000.00

5 Pek. Pasang Plafong Gypsum rangka Hollow 4.00 250,000.00 1,000,000.00

6 Pek. Pasang Plafong GRC rangka Hollow 4.00 245,000.00 980,000.00

7 Pek. Pasang List Plafong 32.00 13,000.00 416,000.00

SUB JUMLAH 101,827,681.00

m1

m3

m3

m3

m3

m3

m3

m1

m1

m2

m2

m2

m1

m2

m2

m1

m1

m2

m2

m1

Page 93: Rab Sarana Pendukung Pariwisata

NO URAIAN PEKERJAAN VOLUME SAT

(RP.) (RP.)

1 2 3 4 5 6 = 5 X 3

HARGA SATUAN

TOTAL JUMLAH HARGA

VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN

1 Urugan pasir bawah lantai t=10 cm 0.18 568,750.00 99,531.25

2 Lantai kerja t = 5 cm 4.00 208,568.00 834,272.00

3 Pekerjaan lantai keramik 30x30 5.33 339,201.00 1,809,072.00

4 Pekerjaan Pengecatan Dinding 32.21 26,280.52 846,495.55

5 Pekerjaan Pengecatan Plafond 8.00 26,280.52 210,244.16

6 Lantai Rabat t = 5 cm 1.33 208,568.00 278,090.67

7 Saluran Gravel U 20 cm 1.33 160,500.00 214,000.00

SUB JUMLAH 4,291,705.63

VII. PEKERJAAN INSTALASI LISTRIK

1 Titik cahaya 1.00 titik 274,764.31 274,764.31

2 Titik stop kontak 1 fasa 1.00 titik 302,240.74 302,240.74

3 Stop Kontak 1.00 bh 24,100.00 24,100.00

4 Saklar Ganda 1.00 bh 24,100.00 24,100.00

5 Pasang Lampu SL 25 watt 1.00 bh 45,000.00 45,000.00

SUB JUMLAH 670,205.05

SUB TOTAL - A 121,249,692.04

TOTAL JUMLAH PEK.BANGUNAN PENDUKUNG 121,249,692.04

m3

m2

m2

m2

m2

m3

m1

Page 94: Rab Sarana Pendukung Pariwisata

BACK UP DATAPERHITUNGAN VOLUME

PEMBANGUNAN GEDUNG PELABUHANKABUPATEN RAJA AMPAT

Page 95: Rab Sarana Pendukung Pariwisata

DATA PERHITUNGAN VOLUME+A251

I. PEKERJAAN PERSIAPAN1 Pek. Pembersihan Lokasi Site

PANJANG X LEBAR

86.45 53.45 = 4620.7534620.753 M2

2 Pek. Pasang BouwplankPANJANG X UNIT

Art Shop 77.82 1 = 77.82

Mini Café 0 1 = 0

Ruang Tunggu 77.82 1 = 77.82

Ruang Informasi 77.82 1 = 77.82

Toilet 77.82 1 = 77.82

Mini Market 77.82 1 = 77.82

389.1 M'3 Luas Bangunan (IMB)

Luas X UNIT

Art Shop 86.6274 1 = 86.6274

Mini Café 93.3774 1 = 93.3774

Ruang Tunggu 86.6274 1 = 86.6274

Ruang Informasi 86.6274 1 = 86.6274

Toilet 86.6274 1 = 86.6274

Mini Market 86.6274 1 = 86.6274

526.51 M2

II. PEKERJAAN STRUKTURA. PEKERJAAN GALIAN TANAH & URUGAN PASIR 1 Pek. Galian Tanah

SLOOF PANJANG X LEBAR X UNIT X DALAM

Art Shop 77.82 0.4 1 0.5 = 15.56

Mini Café 0 0.4 1 0.5 = -

Ruang Tunggu 77.82 0.4 1 0.5 = 15.56

Ruang Informasi 77.82 0.4 1 0.5 = 15.56

Toilet 77.82 0.4 1 0.5 = 15.56

Mini Market 77.82 0.4 1 0.5 = 15.56

77.82 M3

2 Pek. Galian Tanah Pondasi batu belahPANJANG X LEBAR X DALAM =

389.1 1 0.8 311.28 M3

3 Pek. Urugan Pasir Bawah Sloof S1 t=10cmSLOOF PANJANG X LEBAR X TEBAL X UNIT

Art Shop 77.82 0.2 0.1 1 = 1.56

Mini Café 0 0.2 0.1 1 = -

Ruang Tunggu 77.82 0.2 0.1 1 = 1.56

Ruang Informasi 77.82 0.2 0.1 1 = 1.56

Toilet 77.82 0.2 0.1 1 = 1.56

Mini Market 77.82 0.2 0.1 1 = 1.56

7.78 M3

4 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cmPANJANG X LEBAR X TEBAL =

389.1 0.8 0.1 31.128 M3

B. PEKERJAAN PONDASI & STRUKTUR DASAR1 Pek. Aanstamping Batukali

PANJANG X LEBAR X TEBAL =

389.1 0.8 0.15 46.692 M3

2 Pek. Pondasi Batu kali camp. 1Pc:4Psr PANJANG X PENAMPANG PONDASI X TINGGI =

389.1 0.3 + 0.6 0.7 122.5665 M3

23 Pek. Lantai Kerja dibawah Sloof t=5 cm

SLOOF PANJANG X LEBAR X TEBAL X UNIT

Art Shop 77.82 0.2 0.05 1 = 0.78

Mini Café 44.34 0.2 0.05 1 = 0.44

Ruang Tunggu 77.82 0.2 0.05 1 = 0.78

Ruang Informasi 77.82 0.2 0.05 1 = 0.78

Toilet 77.82 0.2 0.05 1 = 0.78

Mini Market 77.82 0.2 0.05 1 = 0.78

4.33 M3

4 Sloof Kayu Besi/klas I 10/10PANJANG X UNIT = PANJANG X LEBAR X TINGGI = VOLUME

Art Shop 77.82 1 77.82 0.1 0.1 = 0.7782Ruang Tunggu 77.82 1 77.82 0.1 0.1 = 0.7782

Ruang Informasi 77.82 1 77.82 0.1 0.1 = 0.7782Toilet 77.82 1 77.82 0.1 0.1 = 0.7782

Mini Market 77.82 1 77.82 0.1 0.1 = 0.77823.891 M3

5 Pek Dinding PapanPENAMPANG PAPAN TINGGI X PANJANG =

Dinding Papan Klas I 2/20 0.2 X 0.02 3.3 433.44 = 1,430.35 M2 1,430.35 M2

6 Pekerjaan kolom kayu besi/Klas I 10/10 (K1)TINGGI X PANJANG X LEBAR X UNIT =

Art Shop 3.3 0.1 0.1 18 = 0.594

Mini Café 3.3 0.1 0.1 17 = 0.561

Ruang Tunggu 3.3 0.1 0.1 18 = 0.594

Ruang Informasi 3.3 0.1 0.1 18 = 0.594

Toilet 3.3 0.1 0.1 18 = 0.594

Mini Market 3.3 0.1 0.1 18 = 0.594

3.531 M3

Page 96: Rab Sarana Pendukung Pariwisata

C. PEKERJAAN BETON 1 Pekerjaan kolom Beton 15/15(K2)

TINGGI X PANJANG X LEBAR X UNIT =Mini Café 3.3 0.15 0.15 4.00 = 0.297Toilet 3.3 0.15 0.15 26.00 = 1.9305

2.23 M32 Pekerjaan Pondasi Pile D 60 cm

JUMLAHMini Café 10

10 Buah

3 Pek plat LUAS X TEBAL = 45.52347Mini Café 151.7449 0.3

= 45.52 M34 Sloof Beton

PANJANG UNIT = PANJANG X LEBAR X TINGGIMini Café

Sloof Utama 40/80 31.09 1 31.09 0.15 0.25 = 1.165875Sloof Teras 15/25 64.09 1 64.09 0.15 0.25 = 2.403375

2.403375 M3

E. PEKERJAAN ATAP1 Bubung atap Metal

PANJANG X UNIT =

NOK 52.00 6 312.00 312.00 M'

2 Lisplang PANJANG X UNIT =

389.10 2 778.20

778.20 M'3

JUMLAH UNIT8 X 6 = 48 Bh

4 Pekerjaan Kuda-kuda PANJANG JUMLAH UNIT

Kuda-Kuda 6/12 6.50 X 2 X 6 78.00 M' 78.00 M'

5 Pekerjaan GordingGording 6/12 PANJANG JUMLAH UNIT

124.79 X 1 X 6 748.74 M' 748.74 M'

6 Pekerjaan KasauKasau 5/7 PANJANG JUMLAH UNIT

242.36 X 1 X 6 1,454.16 M' 1,454.16 M'

7 Pekerjaan Atap LUAS UNIT

Atap Seng 123.9616 X 6 743.77 M' Atap Rumbia 123.9616 X 6 743.77 M'

1,487.54 M'

II. PEKERJAAN ARSITEKTUR

A. PEKERJAAN KUSEN 1 Pek. Kusen Pintu

UNIT PANJANGPintu Utama (P1) 6 8.4 50.4 M'Pintu Toilet (P2) 2 5.6Pintu Toilet (P3) 9 5.6

50.4 M'2 Pek. Daun Jendela Stainless (tanpa kaca)

UNIT PANJANG JUMLAHKusen Type J1 5 5.6 2 56 M'Kusen Type J2 5 9 1 45 M'Kusen Type J3 5 6.6 2 66 M'

167 M'3 Pek. Pasang Kaca

UNIT PANJANG LEBAR JUMLAHKaca Polos 10 mm 6 0.85 2.5 2 25.5

25.5 M2Kaca Polos 5 mm

UNIT PANJANG LEBAR JUMLAH LUASKusen Type J1 5 0.6 2.2 2 13.2 M2Kusen Type J2 5 2.5 2 1 25 M2Kusen Type J3 5 1.3 2 2 26 M2

64.2 M2

B. PEKERJAAN PENGGANTUNG & PENGUNCI1 Pek. Kunci Pintu tanam aluminium

BH6

2 Pek. Kunci Pintu Bulat(KM/WC)BH9

3 Pek. Engsel PintuBH54

Pekerjaan Pasang Angkur baut Ø 12 mm, Pjg 25 cm

Page 97: Rab Sarana Pendukung Pariwisata

C. PEKERJAAN PLAFOND1 Pek. Plafond Gypsum 9mm+(Rangka Hollow 20x40 dan 40x40)

LUAS X UNIT = JUMLAH'

Art Shop 86.6274 1 86.63

Mini Café 93.3774 1 93.38

Ruang Tunggu 86.6274 1 86.63

Ruang Informasi 86.6274 1 86.63

Toilet 86.6274 1 86.63

Mini Market 86.6274 1 86.63

526.51 M2

3 Pekerjaan profil gipsumPANJANG x JMLH

Art Shop 77.82 2 = 155.64 m'Mini Café 0.00 2 = 0 m'Ruang Tunggu 77.82 2 = 155.64 m'Ruang Informasi 77.82 2 = 155.64 m'Toilet 77.82Mini Market 77.82 1 = 77.82 m'

544.74 M'

C. PEKERJAAN LANTAI1 Urugan pasir bawah lantai t=10 cm

LUAS X UNIT X TEBAL = JUMLAH

Art Shop 144.99 1 0.1 14.50

Mini Café 151.74 1 0.1 15.17

Ruang Tunggu 144.99 1 0.1 14.50

Ruang Informasi 144.99 1 0.1 14.50

Toilet 144.99 1 0.1 14.50

Mini Market 144.99 1 0.1 14.50

87.67 M3

2 Lantai kerja t = 5 cm (Plur)Luas X UNIT X TEBAL = JUMLAH

Art Shop 144.99 1.00 0.05 7.25

Mini Café 151.74 1.00 0.05 7.59

Ruang Tunggu 144.99 1.00 0.05 7.25

Ruang Informasi 144.99 1.00 0.05 7.25

Toilet 144.99 1.00 0.05 7.25

Mini Market 144.99 1.00 0.05 7.25

43.84 M3

1 Pekerjaan lantai keramik Rabat 40X40Luas X UNIT = JUMLAH

Art Shop 144.99 1 144.99

Mini Café 151.74 1 151.74

Ruang Tunggu 144.99 1 144.99

Ruang Informasi 144.99 1 144.99

Toilet 144.99 1 144.99

Mini Market 144.99 1 144.99

586.73 M2

Page 98: Rab Sarana Pendukung Pariwisata

Tiang 30x30x100

Vol/ 0.090000 0.000471 0.000723 Vol. /m³ 11.111111 0.005233 0.008038

jumlah vol. besi = 0.010257 sisa 1 m³ beton = 0.989743

spesi = 1 Pc : 2 Psr : 3 Agrt

1Pc = 0.164957 0.164957 2 Psr = 0.329914

3 Agrt = 0.494871 0.989743 semen

10mm X 12 M 7.4 Kg12mm X 12 M 10.7 Kg

0.6166666670.891666667

Besi ø10 3.70 kg 41.111111Besi ø12 3.57 kg 39.62963Besi Tambah 6.42 kg 6.420000

87.160741

Papan Cor 0.105 m³

C4
Relion: volume(m³) 1 tiang
F4
Relion: vol. besi sengkang ø10mm
H4
Relion: vol. besiø12mm + tambahan stek 30cm x 8
C5
Relion: 1 M³ beton =jmlh tiang
D14
Relion: m³ pasir ayak untuk beton tiang pancang 30/30
D15
Relion: m³ batu pecah 1-2 cmuntuk tiang pancang 30/30
F32
Relion: kg besi beton untuk tiang pancang 30/30
Page 99: Rab Sarana Pendukung Pariwisata

0.000452 0.005024

0.548433 1Pc = 0.109971 0.109971 0.479100 3 Psr = 0.329914

5 Agrt = 0.549857 0.12342 0.989743

222.181575 kg 194.093340

K4
Relion: vol. besiø12mm
N14
Relion: m³ pasir ayak untuk beton tiang pancang 30/30
N15
Relion: m³ batu pecah 1-2 cmuntuk tiang pancang 30/30
I18
Relion: kg semen untuk tiang pancang 30/30