MASTERFORMAT BY ARIE ASMIKEGIATAN:PEMBANGUNANPEKERJAAN:LOKASI:KABUPATEN KOLAKATAHUN ANGGARAN:NILAI: Terbilang : ""PERUSAHAAN: CV/PTTANGGAL:Kolaka,..2014WAKTU PENGERJAAN:1BULAN

RABRENCANA ANGGARAN BIAYAPEKERJAAN:PEMBANGUNANLOKASI:KABUPATEN KOLAKATAHUN:0

NOU R A I A NSATUANVOLUMEHARGA SATUAN (Rp)JUMLAH HARGA (Rp)

IBIAYA LANGSUNG PERSONILA.STAFF AHLI1.Team LeaderBln1.0010,320,750.0010,320,750.002.Ahli StrukturBln1.007,350,000.007,350,000.003.EstimatorBln1.000.0

B.STAFF PENDUKUNG1.Juru Gambar (Drafter)Bln1.003,313,728.003,313,728.002.SurveyorBln2.003,083,300.006,166,600.003.Administrasi/Operator KomputerBln2.001,650,000.003,300,000.00

Sub Total30,451,078.00

IIBIAYA LANGSUNG NON PERSONILA.PERALATAN KANTOR1.Alat tulis kantor (ATK)Paket1.000.02.Sewa komputer dan PrinterBln1.000.0

B.OPERASIONAL1.Sewa MotorBln2.00561,000.001,122,000.002.Survey LapanganBln2.000.0

C.LAPORAN1.Buku I Rencana Kerja & SyaratBuku5.0055,000.00275,000.002.Buku II GambarBuku5.000.03.Buku III BQBuku5.000.04.Buku IV EEBuku5.000.05.Soft CopyBh2.000.0

Sub Total1,397,000.00

REKAP

REKAPITULASIRENCANA ANGGARAN BIAYA

PEKERJAAN:PEMBANGUNANLOKASI:KABUPATEN KOLAKATAHUN:0

NOU R A I A NJUMLAH HARGA (Rp)

IBIAYA LANGSUNG PERSONIL27,250,000.00

IIBIAYA LANGSUNG NON PERSONIL3,891,000.00

J U M L A H31,141,000.00PPN (10%)3,114,100.00TOTAL KESELURUHAN34,255,100.00DIBULATKAN34,250,000.00Terbilang : ""

Kolaka,..2014Dibuat :CV/PT

MUCHLIS BAKKARENG, ST Wakil Direktur

PERSONELDAFTAR HARGA PERSONELKABUPATEN KOLAKA

NOJABATANSTRATATAHUNHARGA1Team LeaderS11210,322,400.002Team LeaderS2810,320,750.003Highway EngineerS157,350,000.004Ahli Sipil TransportasiS157,350,000.005Ahli StrukturS157,350,000.006Ahli Estimasi BiayaS3107,350,000.007Quality/Quantity EngineerS167,350,000.008SurveyorD355,497,800.009SurveyorD333,083,300.0010Drafter CAD/CAM OperatorD363,983,100.0011Drafter CAD/CAM OperatorD333,313,728.0012InspectorD321,997,160.0013Administrasi/Operator KomputerD3/SMA41,570,800.0014Administrasi/Operator KomputerD3/SMA21,650,000.0015Office Boy/PesuruhSMA6684,420.00

NON PERSONELDAFTAR HARGA PERSONELKABUPATEN KOLAKA

NOKEGIATANSATUANHARGA1Tunjangan Harian/Akomodasi168,300.002Sewa/Pemeliharaan Kendaraan Roda 4Unit/Bulan8,250,000.003Sewa/Pemeliharaan Kendaraan Roda 2Unit/Bulan1,650,000.004Biaya Komunikasi (Telp, Fax, HP)Bulan1,100,000.005Pemeliharaan/Sewa KomputerUnit/Bulan561,000.006Pemeliharaan/Sewa Printer Colour A4Unit/Bulan561,000.007Pemeliharaan/Sewa Printer Colour A3Unit/Bulan561,000.008Pemeliharaan/Sewa ScannerUnit/Bulan374,000.009Pemeliharaan/Sewa TheodolitUnit/Hari330,000.0010Pemeliharaan/Sewa WaterpassUnit/Hari330,000.0011Pemeliharaan/Sewa KameraUnit/Hari11,000.0012Pengukuran Theodolit/WaterpassHari320,000.0013Pekerjaan SondirUnit6,600,000.0014Pembuatan Laporan PendahuluanBuku110,000.0015Pembuatan Laporan Akhira. Pengaddan RKS dan BOQBuku55,000.00b. Pengadaan Gambar KerjaBuku55,000.00c. Pengadaan Buku Engineer EstimateBuku55,000.00