pu

17
Standarisasi Harga Dinas Pekerjaan Umum NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN SELATAN (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) A. PROGRAM PENYEDIAAN DAN PENGELOLAAN AIR BERSIH (PAB) 1. Sistim Pengambilan a. Perpompaan Pompa Submersible Non Clogging (H < 40 Meter) Lengkap dengan Accessories - 2,5 liter/detik Unit/Bhn/Psg 46,858,070.56 47,795,231.97 48,751,136.61 48,263,812.68 48,732,393.38 49,200,974.09 84,344,527.01 98,401,948.18 - 5,0 liter/detik Unit/Bhn/Psg 58,572,588.20 59,744,039.96 60,938,920.76 60,329,765.85 60,915,491.73 61,501,217.61 105,430,658.76 123,002,435.22 - 10 liter/detik Unit/Bhn/Psg 70,287,105.84 71,692,847.96 73,126,704.92 72,395,719.02 73,098,590.07 73,801,461.13 126,516,790.51 147,602,922.26 - 20 liter/detik Unit/Bhn/Psg 87,858,882.30 89,616,059.95 91,408,381.14 90,494,648.77 91,373,237.59 92,251,826.41 158,145,988.14 184,503,652.83 - 30 liter/detik Unit/Bhn/Psg 210,861,317.52 215,078,543.87 219,380,114.75 217,187,157.05 219,295,770.22 221,404,383.40 379,550,371.54 442,808,766.79 - 40 liter/detik Unit/Bhn/Psg 351,435,529.20 358,464,239.78 365,633,524.58 361,978,595.08 365,492,950.37 369,007,305.66 632,583,952.56 738,014,611.32 - 50 liter/detik Unit/Bhn/Psg 468,580,705.60 477,952,319.71 487,511,366.11 482,638,126.77 487,323,933.82 492,009,740.88 843,445,270.08 984,019,481.76 - 100 liter/detik Unit/Bhn/Psg 585,725,882.00 597,440,399.64 609,389,207.63 603,297,658.46 609,154,917.28 615,012,176.10 1,054,306,587.60 1,230,024,352.20 Pompa Centrifugal (H > 40 Meter) - 2,5 liter/detik H = 40 Unit/Bhn/Psg 35,143,552.92 35,846,423.98 36,563,352.46 36,197,859.51 36,549,295.04 36,900,730.57 63,258,395.26 73,801,461.13 - 5 liter/detik H = 40 Unit/Bhn/Psg 37,486,456.45 38,236,185.58 39,000,909.29 38,611,050.14 38,985,914.71 39,360,779.27 67,475,621.61 78,721,558.54 - 10 liter/detik H = 40 Unit/Bhn/Psg 41,000,811.74 41,820,827.97 42,657,244.53 42,230,836.09 42,640,844.21 43,050,852.33 73,801,461.13 86,101,704.65 - 20 liter/detik H = 40 Unit/Bhn/Psg 46,858,070.56 47,795,231.97 48,751,136.61 48,263,812.68 48,732,393.38 49,200,974.09 84,344,527.01 98,401,948.18 - 30 liter/detik H = 40 Unit/Bhn/Psg 76,144,364.66 77,667,251.95 79,220,596.99 78,428,695.60 79,190,139.25 79,951,582.89 137,059,856.39 159,903,165.79 - 40 liter/detik H = 40 Unit/Bhn/Psg 111,287,917.58 113,513,675.93 115,783,949.45 114,626,555.11 115,739,434.28 116,852,313.46 200,318,251.64 233,704,626.92 - 50 liter/detik H = 40 Unit/Bhn/Psg 140,574,211.68 143,385,695.91 146,253,409.83 144,791,438.03 146,197,180.15 147,602,922.26 253,033,581.02 295,205,844.53 - 100 liter/detik H = 40 Unit/Bhn/Psg 205,004,058.70 209,104,139.87 213,286,222.67 211,154,180.46 213,204,221.05 215,254,261.63 369,007,305.66 430,508,523.27 2. Sistem Penampungan a. Hidrant Umum ( HU ) tidak termasuk pondasi - 100 M3 Unit 1,207,063.90 1,231,205.18 1,255,829.28 1,243,275.81 1,255,346.45 1,267,417.09 2,172,715.02 2,534,834.19 - 200 M3 Unit 1,554,094.77 1,585,176.66 1,616,880.20 1,600,717.61 1,616,258.56 1,631,799.51 2,797,370.58 3,263,599.01 - 300 M3 Unit 9,929,609.39 10,128,201.58 10,330,765.61 10,227,497.67 10,326,793.76 10,426,089.86 17,873,296.90 20,852,179.71 - 400 M3 Unit 12,898,986.58 13,156,966.31 13,420,105.63 13,285,956.17 13,414,946.04 13,543,935.90 23,218,175.84 27,087,871.81 - 500 M3 Unit 16,328,556.88 16,655,128.01 16,988,230.57 16,818,413.58 16,981,699.15 17,144,984.72 29,391,402.38 34,289,969.44 b. Terminal Air XVIII. STANDARISASI HARGA DINAS PEKERJAAN UMUM NO. URAIAN SATUAN K E C A M A T A N Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 110

description

Standarisasi Harga

Transcript of pu

Page 1: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

A. PROGRAM PENYEDIAAN DAN PENGELOLAAN AIR BERSIH (PAB)

1. Sistim Pengambilan

a. Perpompaan

Pompa Submersible Non Clogging (H < 40 Meter)

Lengkap dengan Accessories

- 2,5 liter/detik Unit/Bhn/Psg 46,858,070.56 47,795,231.97 48,751,136.61 48,263,812.68 48,732,393.38 49,200,974.09 84,344,527.01 98,401,948.18

- 5,0 liter/detik Unit/Bhn/Psg 58,572,588.20 59,744,039.96 60,938,920.76 60,329,765.85 60,915,491.73 61,501,217.61 105,430,658.76 123,002,435.22

- 10 liter/detik Unit/Bhn/Psg 70,287,105.84 71,692,847.96 73,126,704.92 72,395,719.02 73,098,590.07 73,801,461.13 126,516,790.51 147,602,922.26

- 20 liter/detik Unit/Bhn/Psg 87,858,882.30 89,616,059.95 91,408,381.14 90,494,648.77 91,373,237.59 92,251,826.41 158,145,988.14 184,503,652.83

- 30 liter/detik Unit/Bhn/Psg 210,861,317.52 215,078,543.87 219,380,114.75 217,187,157.05 219,295,770.22 221,404,383.40 379,550,371.54 442,808,766.79

- 40 liter/detik Unit/Bhn/Psg 351,435,529.20 358,464,239.78 365,633,524.58 361,978,595.08 365,492,950.37 369,007,305.66 632,583,952.56 738,014,611.32

- 50 liter/detik Unit/Bhn/Psg 468,580,705.60 477,952,319.71 487,511,366.11 482,638,126.77 487,323,933.82 492,009,740.88 843,445,270.08 984,019,481.76

- 100 liter/detik Unit/Bhn/Psg 585,725,882.00 597,440,399.64 609,389,207.63 603,297,658.46 609,154,917.28 615,012,176.10 1,054,306,587.60 1,230,024,352.20

Pompa Centrifugal (H > 40 Meter)

- 2,5 liter/detik H = 40 Unit/Bhn/Psg 35,143,552.92 35,846,423.98 36,563,352.46 36,197,859.51 36,549,295.04 36,900,730.57 63,258,395.26 73,801,461.13

- 5 liter/detik H = 40 Unit/Bhn/Psg 37,486,456.45 38,236,185.58 39,000,909.29 38,611,050.14 38,985,914.71 39,360,779.27 67,475,621.61 78,721,558.54

- 10 liter/detik H = 40 Unit/Bhn/Psg 41,000,811.74 41,820,827.97 42,657,244.53 42,230,836.09 42,640,844.21 43,050,852.33 73,801,461.13 86,101,704.65

- 20 liter/detik H = 40 Unit/Bhn/Psg 46,858,070.56 47,795,231.97 48,751,136.61 48,263,812.68 48,732,393.38 49,200,974.09 84,344,527.01 98,401,948.18

- 30 liter/detik H = 40 Unit/Bhn/Psg 76,144,364.66 77,667,251.95 79,220,596.99 78,428,695.60 79,190,139.25 79,951,582.89 137,059,856.39 159,903,165.79

- 40 liter/detik H = 40 Unit/Bhn/Psg 111,287,917.58 113,513,675.93 115,783,949.45 114,626,555.11 115,739,434.28 116,852,313.46 200,318,251.64 233,704,626.92

- 50 liter/detik H = 40 Unit/Bhn/Psg 140,574,211.68 143,385,695.91 146,253,409.83 144,791,438.03 146,197,180.15 147,602,922.26 253,033,581.02 295,205,844.53

- 100 liter/detik H = 40 Unit/Bhn/Psg 205,004,058.70 209,104,139.87 213,286,222.67 211,154,180.46 213,204,221.05 215,254,261.63 369,007,305.66 430,508,523.27

2. Sistem Penampungan

a. Hidrant Umum ( HU ) tidak termasuk pondasi

- 100 M3 Unit 1,207,063.90 1,231,205.18 1,255,829.28 1,243,275.81 1,255,346.45 1,267,417.09 2,172,715.02 2,534,834.19

- 200 M3 Unit 1,554,094.77 1,585,176.66 1,616,880.20 1,600,717.61 1,616,258.56 1,631,799.51 2,797,370.58 3,263,599.01

- 300 M3 Unit 9,929,609.39 10,128,201.58 10,330,765.61 10,227,497.67 10,326,793.76 10,426,089.86 17,873,296.90 20,852,179.71

- 400 M3 Unit 12,898,986.58 13,156,966.31 13,420,105.63 13,285,956.17 13,414,946.04 13,543,935.90 23,218,175.84 27,087,871.81

- 500 M3 Unit 16,328,556.88 16,655,128.01 16,988,230.57 16,818,413.58 16,981,699.15 17,144,984.72 29,391,402.38 34,289,969.44

b. Terminal Air

XVIII. STANDARISASI HARGA DINAS PEKERJAAN UMUM

NO. URAIAN SATUAN

K E C A M A T A N

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 110

Page 2: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

- Terminal Air 3 M3 Unit 18,037,733.11 18,398,487.78 18,766,457.53 18,578,865.11 18,759,242.44 18,939,619.77 32,467,919.60 37,879,239.54

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 111

Page 3: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

- Terminal Air 4 M3 Unit 20,694,533.23 21,108,423.90 21,530,592.38 21,315,369.23 21,522,314.56 21,729,259.90 37,250,159.82 43,458,519.79

3. Sistem Transmisi dan Distrubusi

a. Pipa steel

a. Pengadaan pipa Steel (Medium Class)

steel Diameter 20" Meter 2,509,249.68 2,559,434.67 2,610,623.37 2,584,527.17 2,609,619.67 2,634,712.16 4,516,649.42 5,269,424.32

steel Diameter 18" Meter 2,214,043.83 2,258,324.71 2,303,491.20 2,280,465.15 2,302,605.59 2,324,746.03 3,985,278.90 4,649,492.05

steel Diameter 16" Meter 1,613,791.95 1,646,067.79 1,678,989.14 1,662,205.71 1,678,343.63 1,694,481.55 2,904,825.51 3,388,963.10

steel Diameter 14" Meter 1,264,465.03 1,289,754.33 1,315,549.42 1,302,398.99 1,315,043.64 1,327,688.29 2,276,037.06 2,655,376.57

steel Diameter 12" Meter 1,047,980.75 1,068,940.36 1,090,319.17 1,079,420.17 1,089,899.98 1,100,379.79 1,886,365.35 2,200,759.57

steel Diameter 10" Meter 774,423.33 789,911.80 805,710.03 797,656.03 805,400.27 813,144.50 1,393,962.00 1,626,289.00

steel Diameter 8" Meter 600,251.88 612,256.92 624,502.06 618,259.44 624,261.96 630,264.48 1,080,453.39 1,260,528.96

steel Diameter 6" Meter 452,648.96 461,701.94 470,935.98 466,228.43 470,754.92 475,281.41 814,768.13 950,562.82

b. Pipa GIP MEDIUM SNI

GIP Diameter 12" Per/Batang 13,254,742.42 13,519,837.27 13,790,234.01 13,652,384.69 13,784,932.12 13,917,479.54 23,858,536.35 27,834,959.08

GIP Diameter 10" Per/Batang 9,318,664.49 9,505,037.78 9,695,138.54 9,598,224.43 9,691,411.07 9,784,597.72 16,773,596.09 19,569,195.43

GIP Diameter 8" Per/Batang 7,439,187.28 7,587,971.03 7,739,730.45 7,662,362.90 7,736,754.77 7,811,146.65 13,390,537.11 15,622,293.29

GIP Diameter 6" Per/Batang 5,069,106.07 5,170,488.19 5,273,897.96 5,221,179.26 5,271,870.32 5,322,561.38 9,124,390.93 10,645,122.75

GIP Diameter 4" Per/Batang 3,193,846.09 3,257,723.01 3,322,877.47 3,289,661.47 3,321,599.93 3,353,538.39 5,748,922.96 6,707,076.79

GIP Diameter 3" Per/Batang 2,249,187.39 2,294,171.13 2,340,054.56 2,316,663.01 2,339,154.88 2,361,646.76 4,048,537.30 4,723,293.51

GIP Diameter 2 1/2" Per/Batang 1,727,657.06 1,762,210.20 1,797,454.41 1,779,486.77 1,796,763.34 1,814,039.91 3,109,782.71 3,628,079.83

GIP Diameter 2" Per/Batang 1,346,700.95 1,373,634.97 1,401,107.67 1,387,101.98 1,400,568.99 1,414,036.00 2,424,061.71 2,828,071.99

GIP Diameter 1 1/2" Per/Batang 964,339.09 983,625.87 1,003,298.39 993,269.26 1,002,912.66 1,012,556.05 1,735,810.37 2,025,112.09

GIP Diameter 1 1/4" Per/Batang 843,445.27 860,314.18 877,520.46 868,748.63 877,183.08 885,617.53 1,518,201.49 1,771,235.07

GIP Diameter 1" Per/Batang 643,829.89 656,706.49 669,840.62 663,144.79 669,583.09 676,021.38 1,158,893.80 1,352,042.77

GIP Diameter 3/4" Per/Batang 421,722.64 430,157.09 438,760.23 434,374.31 438,591.54 442,808.77 759,100.74 885,617.53

GIP Diameter 1/2" Per/Batang 321,914.94 328,353.24 334,920.31 331,572.39 334,791.54 338,010.69 579,446.90 676,021.38

c. Pipa ACP

ACP Diameter 12" M'/Psg 313,902.21 320,180.26 326,583.86 323,319.28 326,458.30 329,597.33 565,023.99 659,194.65

ACP Diameter 10" M'/Psg 287,202.49 292,946.54 298,805.47 295,818.56 298,690.59 301,562.61 516,964.47 603,125.22

ACP Diameter 8" M'/Psg 232,720.61 237,375.02 242,122.52 239,702.23 242,029.43 244,356.64 418,897.09 488,713.28

ACP Diameter 6" M'/Psg 178,238.73 181,803.50 185,439.57 183,585.89 185,368.28 187,150.67 320,829.71 374,301.33

d. Pipa PVC Tekanan 10 Kg/Cm², Panjang = 6 Meter

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 112

Page 4: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

PVC Diameter 22" Per/Batang 16,756,595.04 17,091,726.94 17,433,561.48 17,259,292.89 17,426,858.84 17,594,424.79 30,161,871.07 35,188,849.59

PVC Diameter 20" Per/Batang 10,548,320.54 10,759,286.95 10,974,472.69 10,864,770.16 10,970,253.36 11,075,736.57 18,986,976.97 22,151,473.13

PVC Diameter 16" Per/Batang 6,723,878.22 6,858,355.78 6,995,522.90 6,925,594.56 6,992,833.35 7,060,072.13 12,102,980.79 14,120,144.26

PVC Diameter 12" Per/Batang 4,139,055.84 4,221,836.96 4,306,273.70 4,263,227.52 4,304,618.08 4,346,008.63 7,450,300.52 8,692,017.27

PVC Diameter 10" Per/Batang 2,598,801.07 2,650,777.10 2,703,792.64 2,676,765.11 2,702,753.12 2,728,741.13 4,677,841.93 5,457,482.26

PVC Diameter 8" Per/Batang 1,673,237.97 1,706,702.73 1,740,836.79 1,723,435.11 1,740,167.49 1,756,899.87 3,011,828.35 3,513,799.74

PVC Diameter 6" Per/Batang 1,073,669.28 1,095,142.67 1,117,045.52 1,105,879.36 1,116,616.05 1,127,352.74 1,932,604.70 2,254,705.49

PVC Diameter 4" Per/Batang 511,768.85 522,004.23 532,444.31 527,121.92 532,239.61 537,357.29 921,183.93 1,074,714.59

PVC Diameter 3" Per/Batang 340,746.27 347,561.19 354,512.42 350,968.65 354,376.12 357,783.58 613,343.28 715,567.16

PVC Diameter 2" Per/Batang 166,321.78 169,648.22 173,041.18 171,311.44 172,974.66 174,637.87 299,379.21 349,275.75

e. Pipa DCIP

DCIP Diameter 16" M'/Bhn 2,151,722.60 2,194,757.05 2,238,652.19 2,216,274.28 2,237,791.50 2,259,308.73 3,873,100.68 4,518,617.46

DCIP Diameter 14" M'/Bhn 1,685,953.38 1,719,672.45 1,754,065.90 1,736,531.98 1,753,391.51 1,770,251.05 3,034,716.08 3,540,502.10

DCIP Diameter 12" M'/Bhn 1,397,307.66 1,425,253.82 1,453,758.89 1,439,226.89 1,453,199.97 1,467,173.05 2,515,153.80 2,934,346.09

DCIP Diameter 10" M'/Bhn 1,032,564.44 1,053,215.73 1,074,280.05 1,063,541.38 1,073,867.02 1,084,192.67 1,858,616.00 2,168,385.33

DCIP Diameter 8" M'/Bhn 800,335.85 816,342.56 832,669.41 824,345.92 832,349.28 840,352.64 1,440,604.52 1,680,705.27

DCIP Diameter 6" M'/Bhn 603,531.95 615,602.59 627,914.64 621,637.91 627,673.23 633,708.55 1,086,357.51 1,267,417.09

DCIP Diameter 4" M'/Bhn 308,326.10 314,492.63 320,782.48 317,575.89 320,659.15 323,742.41 554,986.99 647,484.82

DCIP Diameter 3" M'/Bhn 250,596.96 255,608.90 260,721.08 258,114.87 260,620.84 263,126.81 451,074.53 526,253.62

f. Pipa PVC Tekanan 10 Kg/Cm², Panjang = 4 Meter

PVC Diameter 1/2" Per/Batang 13,588.84 13,860.62 14,137.83 13,996.51 14,132.39 14,268.28 24,459.91 28,536.56

PVC Diameter 3/4" Per/Batang 20,031.83 20,432.46 20,841.11 20,632.78 20,833.10 21,033.42 36,057.29 42,066.83

PVC Diameter 1" Per/Batang 34,089.25 34,771.03 35,466.45 35,111.92 35,452.82 35,793.71 61,360.64 71,587.42

PVC Diameter 1 1/4" Per/Batang 49,903.85 50,901.92 51,919.96 51,400.96 51,900.00 52,399.04 89,826.92 104,798.07

PVC Diameter 1 1/2", P = 6 Meter Per/Batang 115,388.00 117,695.76 120,049.67 118,849.64 120,003.52 121,157.40 207,698.40 242,314.80

4. Pelayanan

a. Genzet lengkap dgn Panel & Accessories

- 15 KVA Unit/Bhn/Psg 109,852,889.17 - - - - - - -

- 25 KVA Unit/Bhn/Psg 141,204,452.73 - - - - - - -

- 45 KVA Unit/Bhn/Psg 216,162,136.75 - - - - - - -

- 60 KVA Unit/Bhn/Psg 242,191,794.95 - - - - - - -

- 80 KVA Unit/Bhn/Psg 293,233,119.76 - - - - - - -

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 113

Page 5: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

- 125 KVA Unit/Bhn/Psg 496,305,688.79 - - - - - - -

- 300 KVA Unit/Bhn/Psg 699,378,257.82 - - - - - - -

b. Sambungan Rumah

- Diameter 1/2" Unit/Bhn 1,092,917.64 1,114,775.99 1,137,071.51 1,125,705.17 1,136,634.34 1,147,563.52 1,967,251.75 2,295,127.04

- Diameter 3/4" Unit/Bhn 1,574,431.17 1,605,919.79 1,638,038.19 1,621,664.11 1,637,408.42 1,653,152.73 2,833,976.11 3,306,305.46

- Diameter 1" Unit/Bhn 2,671,284.89 2,724,710.58 2,779,204.80 2,751,423.43 2,778,136.28 2,804,849.13 4,808,312.80 5,609,698.26

c. Water Meter

- Diameter 2" Unit/Bhn 613,372.14 625,639.59 638,152.38 631,773.31 637,907.03 644,040.75 1,104,069.86 1,288,081.50

- Diameter 4" Unit/Bhn 829,856.43 846,453.56 863,382.63 854,752.12 863,050.69 871,349.25 1,493,741.57 1,742,698.50

- Diameter 6" Unit/Bhn 923,666.29 942,139.61 960,982.40 951,376.28 960,612.94 969,849.60 1,662,599.32 1,939,699.20

- Diameter 8" Unit/Bhn 1,515,390.00 1,545,697.80 1,576,611.76 1,560,851.70 1,576,005.60 1,591,159.50 2,727,702.00 3,182,319.00

- Diameter 10" Unit/Bhn 1,717,442.00 1,751,790.84 1,786,826.66 1,768,965.26 1,786,139.68 1,803,314.10 3,091,395.60 3,606,628.20

d Hidran Umum (HU).

Tipe A (Kran Umum) Unit/Bhn 2,525,650.00 2,576,163.00 2,627,686.26 2,601,419.50 2,626,676.00 2,651,932.50 4,546,170.01 5,303,865.01

Tipe B (Fibre Glass) Unit/Bhn 8,608,202.43 8,780,366.47 8,955,973.80 8,866,448.50 8,952,530.52 9,038,612.55 15,494,764.37 18,077,225.10

Tipe C (Fibre Glass) Unit/Bhn 10,993,465.65 11,213,334.96 11,437,601.66 11,323,269.62 11,433,204.28 11,543,138.93 19,788,238.17 23,086,277.87

e. Terminal Air (TA)

Tipe A Unit/Bhn 10,319,084.30 10,525,465.98 10,735,975.30 10,628,656.83 10,731,847.67 10,835,038.51 18,574,351.74 21,670,077.03

Tipe B Unit/Bhn 16,105,118.85 16,427,221.23 16,755,765.65 16,588,272.42 16,749,323.61 16,910,374.79 28,989,213.93 33,820,749.59

Tipe C Unit/Bhn 18,477,261.82 18,846,807.05 19,223,743.19 19,031,579.67 19,216,352.29 19,401,124.91 33,259,071.27 38,802,249.81

5. Pembuangan Limbah

1. Sistem pengolahan Terpusat

a. Pipa PVC

Diameter 150 mm M'/Bhn 163,806.44 167,082.57 170,424.22 168,720.64 170,358.70 171,996.77 294,851.60 343,993.53

Diameter 200 mm M'/Bhn 250,400.16 255,408.16 260,516.32 257,912.16 260,416.16 262,920.17 450,720.28 525,840.33

Diameter 250 mm M'/Bhn 407,712.07 415,866.31 424,183.64 419,943.43 424,020.55 428,097.68 733,881.73 856,195.35

Diameter 300 mm M'/Bhn 645,844.79 658,761.68 671,936.92 665,220.13 671,678.58 678,137.03 1,162,520.62 1,356,274.05

b. Pipa Clay

Diameter 100 mm M'/Bhn 24,174.08 24,657.56 25,150.71 24,899.30 25,141.04 25,382.78 43,513.34 50,765.57

Diameter 150 mm M'/Bhn 41,132.01 41,954.65 42,793.75 42,365.97 42,777.29 43,188.62 74,037.63 86,377.23

Diameter 200 mm M'/Bhn 45,822.51 46,738.96 47,673.74 47,197.18 47,655.41 48,113.63 82,480.51 96,227.27

Diameter 300 mm M'/Bhn 134,581.06 137,272.69 140,018.14 138,618.50 139,964.31 141,310.12 242,245.92 282,620.24

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 114

Page 6: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

Diameter 350 mm M'/Bhn 196,639.89 200,572.69 204,584.14 202,539.09 204,505.49 206,471.89 353,951.81 412,943.78

Diameter 400 mm M'/Bhn 250,400.16 255,408.16 260,516.32 257,912.16 260,416.16 262,920.17 450,720.28 525,840.33

Diameter 450 mm M'/Bhn 420,340.32 428,747.13 437,322.07 432,950.53 437,153.93 441,357.34 756,612.58 882,714.68

Diameter 500 mm M'/Bhn 523,170.36 533,633.76 544,306.44 538,865.47 544,097.17 549,328.88 941,706.64 1,098,657.75

Diameter 600 mm M'/Bhn 730,634.47 745,247.15 760,152.10 752,553.50 759,859.84 767,166.19 1,315,142.04 1,534,332.38

c. Pipa Beton

Diameter 150 mm M'/Bhn 101,386.81 103,414.54 105,482.83 104,428.41 105,442.28 106,456.15 182,496.25 212,912.30

Diameter 200 mm M'/Bhn 142,158.01 145,001.17 147,901.20 146,422.75 147,844.34 149,265.92 255,884.43 298,531.83

Diameter 250 mm M'/Bhn 203,856.04 207,933.16 212,091.82 209,971.72 212,010.28 214,048.84 366,940.86 428,097.68

Diameter 300 mm M'/Bhn 268,801.32 274,177.35 279,660.90 276,865.36 279,553.37 282,241.39 483,842.38 564,482.78

Diameter 350 mm M'/Bhn 304,882.04 310,979.68 317,199.27 314,028.50 317,077.32 320,126.14 548,787.66 640,252.28

Diameter 400 mm M'/Bhn 377,043.46 384,584.33 392,276.02 388,354.77 392,125.20 395,895.64 678,678.24 791,791.28

Diameter 500 mm M'/Bhn 510,902.91 521,120.97 531,543.39 526,230.00 531,339.03 536,448.06 919,625.25 1,072,896.12

Diameter 600 mm M'/Bhn 829,856.43 846,453.56 863,382.63 854,752.12 863,050.69 871,349.25 1,493,741.57 1,742,698.50

Diameter 700 mm M'/Bhn 1,214,116.04 1,238,398.36 1,263,166.33 1,250,539.52 1,262,680.68 1,274,821.84 2,185,408.87 2,549,643.68

Diameter 800 mm M'/Bhn 1,403,539.79 1,431,610.58 1,460,242.79 1,445,645.98 1,459,681.38 1,473,716.78 2,526,371.62 2,947,433.55

d. Manhole Pipa D.150-600 mm

-H = 2,2 M Unt/Bhn 3,716,313.58 3,790,639.85 3,866,452.64 3,827,802.98 3,864,966.12 3,902,129.25 6,689,364.44 7,804,258.51

-H = 4,5 M Unt/Bhn 4,155,725.13 4,238,839.64 4,323,616.43 4,280,396.89 4,321,954.14 4,363,511.39 7,480,305.24 8,727,022.78

e. Manhole Pipa D. 650-1300 mm

- H = 5,5 M Unt/Bhn 6,571,844.40 6,703,281.28 6,837,346.91 6,768,999.73 6,834,718.17 6,900,436.62 11,829,319.91 13,800,873.23

- H = 8,0 M Unt/Bhn 9,342,327.82 9,529,174.37 9,719,757.86 9,622,597.65 9,716,020.93 9,809,444.21 16,816,190.07 19,618,888.42

6. Accessories Pipa

1 Air Valve ø 25 mm Bh 211,759.68 215,994.87 220,314.77 218,112.47 220,230.07 222,347.66 381,167.42 444,695.33

2 Air Valve ø 50 mm Bh 1,443,228.57 1,472,093.14 1,501,535.01 1,486,525.43 1,500,957.72 1,515,390.00 2,597,811.43 3,030,780.00

3 Bend All Flange ø 150 mm x 90° Bh 256,660.59 261,793.80 267,029.68 264,360.41 266,927.02 269,493.62 461,989.06 538,987.24

4 Bend All Socket PVC ø 100 mm x 22° Bh 102,338.03 104,384.79 106,472.48 105,408.17 106,431.55 107,454.93 184,208.45 214,909.85

5 Bend All Socket PVC ø 100 mm x 45° Bh 262,405.20 267,653.30 273,006.37 270,277.35 272,901.40 275,525.45 472,329.35 551,050.91

6 Bend All Socket PVC ø 100 mm x 90° Bh 293,237.81 299,102.56 305,084.61 302,034.94 304,967.32 307,899.70 527,828.05 615,799.39

7 Bend All Socket PVC ø 150 mm x 11° Bh 137,762.73 140,517.98 143,328.34 141,895.61 143,273.24 144,650.86 247,972.91 289,301.73

8 Bend All Socket PVC ø 150 mm x 22° Bh 196,803.90 200,739.97 204,754.77 202,708.01 204,676.05 206,644.09 354,247.01 413,288.18

9 Bend All Socket PVC ø 150 mm x 45° Bh 248,628.92 253,601.50 258,673.53 256,087.79 258,574.08 261,060.37 447,532.06 522,120.74

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 115

Page 7: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

10 Bend All Socket PVC ø 150 mm x 90° Bh 125,484.79 127,994.48 130,554.37 129,249.33 130,504.18 131,759.03 225,872.62 263,518.06

11 Bend All Socket PVC ø 200 mm x 45° Bh 135,911.46 138,629.69 141,402.28 139,988.80 141,347.92 142,707.03 244,640.63 285,414.06

12 Bend All Socket PVC ø 200 mm x 90° Bh 544,490.78 555,380.60 566,488.21 560,825.50 566,270.41 571,715.32 980,083.40 1,143,430.64

13 Bend All Socket PVC ø 250 mm x 90° Bh 1,044,424.64 1,065,313.13 1,086,619.39 1,075,757.38 1,086,201.62 1,096,645.87 1,879,964.35 2,193,291.74

14 Bend All Socket PVC ø 50 mm x 90° Bh 31,597.60 32,229.55 32,874.14 32,545.53 32,861.50 33,177.48 56,875.68 66,354.95

15 Bend All Socket PVC ø 75 mm x 90° Bh 64,801.85 66,097.89 67,419.85 66,745.91 67,393.93 68,041.95 116,643.33 136,083.89

16 Bend ø 100 mm Bh 101,068.66 103,090.04 105,151.84 104,100.72 105,111.41 106,122.10 181,923.60 212,244.20

17 Bend ø 100 mm x 22° CL Bh 92,873.91 94,731.39 96,626.01 95,660.13 96,588.86 97,517.60 167,173.03 195,035.21

18 Bend ø 150 mm x 45° CL Bh 207,054.18 211,195.27 215,419.17 213,265.81 215,336.35 217,406.89 372,697.53 434,813.78

19 Bend ø 150 mm x 90° CL Bh 458,142.03 467,304.87 476,650.96 471,886.29 476,467.71 481,049.13 824,655.65 962,098.26

20 Bend ø 50 mm x 90° CL Bh 32,232.71 32,877.36 33,534.91 33,199.69 33,522.02 33,844.34 58,018.88 67,688.69

21 Bend ø 600 mm x 11¼ Steel Bh 27,488,521.59 28,038,292.02 28,599,057.86 28,313,177.24 28,588,062.45 28,862,947.67 49,479,338.86 57,725,895.34

22 Bend ø 600 mm x 22½ Steel Bh 28,300,418.85 28,866,427.23 29,443,755.77 29,149,431.42 29,432,435.61 29,715,439.80 50,940,753.94 59,430,879.59

23 Bend ø 600 mm x 45° Steel Bh 28,648,374.82 29,221,342.32 29,805,769.17 29,507,826.07 29,794,309.82 30,080,793.56 51,567,074.68 60,161,587.13

24 Bend ø 600 mm x 90° Steel Bh 32,359,905.16 33,007,103.27 33,667,245.33 33,330,702.32 33,654,301.37 33,977,900.42 58,247,829.30 67,955,800.84

25 Bend ø 75 mm x 22° CL Bh 59,002.25 60,182.29 61,385.94 60,772.31 61,362.34 61,952.36 106,204.05 123,904.72

26 Bend PVC ø 150 mm x 90° Bh 264,204.36 269,488.45 274,878.22 272,130.49 274,772.53 277,414.58 475,567.85 554,829.15

27 Box Air Valve Bh 1,338,465.92 1,365,235.24 1,392,539.95 1,378,619.90 1,392,004.56 1,405,389.22 2,409,238.66 2,810,778.44

28 Dismanthing Joint ø 100 mm Bh 337,398.08 344,146.04 351,028.96 347,520.02 350,894.00 354,267.98 607,316.54 708,535.96

29 Dismanthing Joint ø 75 mm Bh 121,281.06 123,706.68 126,180.81 124,919.49 126,132.30 127,345.11 218,305.90 254,690.22

30 Doble Air Valve ø 100 mm CL Bh 12,642,400.23 12,895,248.23 13,153,153.19 13,021,672.23 13,148,096.23 13,274,520.24 22,756,320.41 26,549,040.47

31 Dop ø 100 mm Bh 58,778.76 59,954.34 61,153.43 60,542.13 61,129.91 61,717.70 105,801.77 123,435.40

32 Dop ø 150 mm Bh 103,518.85 105,589.23 107,701.01 106,624.41 107,659.60 108,694.79 186,333.93 217,389.58

33 Dop ø 50 mm Bh 31,882.23 32,519.88 33,170.27 32,838.70 33,157.52 33,476.34 57,388.02 66,952.69

34 Dop ø 75 mm Bh 53,661.86 54,735.10 55,829.80 55,271.72 55,808.34 56,344.96 96,591.35 112,689.91

35 Flange Socket PVC ø 100 mm Bh 162,691.22 165,945.05 169,263.95 167,571.96 169,198.87 170,825.78 292,844.20 341,651.56

36 Flange Socket PVC ø 150 mm Bh 301,897.18 307,935.12 314,093.82 310,954.09 313,973.06 316,992.04 543,414.92 633,984.07

37 Flange Socket PVC ø 200 mm Bh 486,630.43 496,363.04 506,290.30 501,229.35 506,095.65 510,961.96 875,934.78 1,021,923.91

38 Flange Socket PVC ø 50 mm Bh 112,834.23 115,090.92 117,392.74 116,219.26 117,347.60 118,475.95 203,101.62 236,951.89

39 Flange Socket PVC ø 75 mm Bh 123,330.44 125,797.05 128,312.99 127,030.35 128,263.66 129,496.96 221,994.80 258,993.93

40 Flange Spigot ø 100 mm Bh 163,740.84 167,015.66 170,355.97 168,653.07 170,290.48 171,927.88 294,733.52 343,855.77

41 Flange Spigot ø 150 mm Bh 367,367.27 374,714.62 382,208.91 378,388.29 382,061.96 385,735.64 661,261.09 771,471.27

42 Flange Spigot ø 50 mm Bh 112,834.23 115,090.92 117,392.74 116,219.26 117,347.60 118,475.95 203,101.62 236,951.89

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 116

Page 8: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

43 Flange Spigot ø 75 mm Bh 124,117.66 126,600.01 129,132.01 127,841.19 129,082.36 130,323.54 223,411.78 260,647.08

44 Flange Steel ø 100 mm Bh 338,677.14 345,450.69 352,359.70 348,837.46 352,224.23 355,611.00 609,618.86 711,222.00

45 Flange Steel ø 150 mm Bh 363,613.99 370,886.27 378,303.99 374,522.41 378,158.55 381,794.69 654,505.18 763,589.38

46 Flange Steel ø 600 mm Bh 3,363,574.37 3,430,845.86 3,499,462.78 3,464,481.60 3,498,117.35 3,531,753.09 6,054,433.87 7,063,506.18

47 Gate Valve All Flange (CL) ø 100 mm CL Bh 2,181,902.12 2,225,540.16 2,270,050.96 2,247,359.18 2,269,178.20 2,290,997.22 3,927,423.81 4,581,994.45

48 Gate Valve All Flange (CL) ø 150 mm CL Bh 3,445,108.61 3,514,010.78 3,584,291.00 3,548,461.87 3,582,912.95 3,617,364.04 6,201,195.50 7,234,728.08

49 Gate Valve All Flange (CL) ø 50 mm CL Bh 172,255.43 175,700.54 179,214.55 177,423.09 179,145.65 180,868.20 310,059.77 361,736.40

50 Gate Valve All Flange (CL) ø 75 mm CL Bh 1,469,913.01 1,499,311.27 1,529,297.49 1,514,010.40 1,528,709.53 1,543,408.66 2,645,843.41 3,086,817.31

51 Gate Valve ø 100 mm Bh 2,035,099.50 2,075,801.49 2,117,317.52 2,096,152.49 2,116,503.48 2,136,854.48 3,663,179.10 4,273,708.95

52 Gate Valve ø 100 mm CL Bh 338,677.14 345,450.69 352,359.70 348,837.46 352,224.23 355,611.00 609,618.86 711,222.00

53 Gate Valve ø 150 mm CL Bh 6,715,550.21 6,849,861.22 6,986,858.44 6,917,016.72 6,984,172.22 7,051,327.72 12,087,990.38 14,102,655.44

54 Gate Valve ø 50 mm Bh 546,317.11 557,243.45 568,388.32 562,706.62 568,169.79 573,632.96 983,370.79 1,147,265.92

55 Gate Valve ø 600 mm CL Bh 182,096,957.37 185,738,896.52 189,453,674.45 187,559,866.10 189,380,835.67 191,201,805.24 327,774,523.27 382,403,610.49

56 Gate Valve ø 75 mm Bh 2,035,099.50 2,075,801.49 2,117,317.52 2,096,152.49 2,116,503.48 2,136,854.48 3,663,179.10 4,273,708.95

57 Manometer Bh 1,017,549.75 1,037,900.75 1,058,658.76 1,048,076.24 1,058,251.74 1,068,427.24 1,831,589.55 2,136,854.48

58 Mekanikal Joint ø 600 mm CL Bh 3,363,574.37 3,430,845.86 3,499,462.78 3,464,481.60 3,498,117.35 3,531,753.09 6,054,433.87 7,063,506.18

59 Mur Baut Baja +Ring ø 5/8" x 2,5" Bh 13,388.81 13,656.59 13,929.72 13,790.48 13,924.37 14,058.25 24,099.86 28,116.51

60 Reducer PVC ø 100 x 75 mm Bh 66,407.25 67,735.40 69,090.10 68,399.47 69,063.54 69,727.61 119,533.05 139,455.23

61 Reducer PVC ø 150 x 100 mm Bh 389,297.27 397,083.22 405,024.88 400,976.19 404,869.16 408,762.14 700,735.09 817,524.27

62 Reducer PVC ø 150 x 50 mm Bh 66,408.51 67,736.68 69,091.41 68,400.77 69,064.85 69,728.94 119,535.32 139,457.87

63 Reducer PVC ø 200 x 150 mm Bh 2,208,139.72 2,252,302.51 2,297,348.56 2,274,383.91 2,296,465.31 2,318,546.70 3,974,651.49 4,637,093.41

64 Reducer PVC ø 75 x 50 mm Bh 21,946.26 22,385.18 22,832.89 22,604.65 22,824.11 23,043.57 39,503.27 46,087.14

65 Ruber Packing Flange ø 100 mm Bh 23,197.06 23,661.01 24,134.23 23,892.98 24,124.95 24,356.92 41,754.72 48,713.84

66 Ruber Packing Flange ø 150 mm Bh 57,992.66 59,152.51 60,335.57 59,732.44 60,312.37 60,892.29 104,386.79 121,784.59

67 Ruber Packing Flange ø 600 mm Bh 289,963.31 295,762.57 301,677.83 298,662.21 301,561.84 304,461.47 521,933.95 608,922.95

68 Ruber Packing Flange ø 75 mm Bh 5,772.91 5,888.37 6,006.14 5,946.10 6,003.83 6,061.56 10,391.25 12,123.12

69 Tee All Flange ø 150 mm x 100 mm Bh 399,357.80 407,344.96 415,491.86 411,338.54 415,332.12 419,325.69 718,844.05 838,651.39

70 Tee All Flange ø 600 mm x 100 mm CL Bh 6,321,200.11 6,447,624.11 6,576,576.60 6,510,836.12 6,574,048.12 6,637,260.12 11,378,160.20 13,274,520.24

71 Tee All Flange ø 600 mm x 150 mm CL Bh 6,408,189.11 6,536,352.89 6,667,079.94 6,600,434.78 6,664,516.67 6,728,598.56 11,534,740.39 13,457,197.12

72 Tee All Socket PVC ø 100 mm x 100 mm Bh 207,258.82 211,403.99 215,632.07 213,476.58 215,549.17 217,621.76 373,065.87 435,243.52

73 Tee All Socket PVC ø 100 mm x 50 mm Bh 58,868.36 60,045.72 61,246.64 60,634.41 61,223.09 61,811.77 105,963.04 123,623.55

74 Tee All Socket PVC ø 100 mm x 75 mm Bh 78,190.67 79,754.48 81,349.57 80,536.38 81,318.29 82,100.20 140,743.20 164,200.40

75 Tee All Socket PVC ø 150 mm x 100 mm Bh 983,004.32 1,002,664.41 1,022,717.70 1,012,494.45 1,022,324.50 1,032,154.54 1,769,407.78 2,064,309.08

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 117

Page 9: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

76 Tee All Socket PVC ø 150 mm x 50 mm Bh 863,573.89 880,845.37 898,462.28 889,481.11 898,116.85 906,752.59 1,554,433.00 1,813,505.17

77 Tee All Socket PVC ø 150 mm x 75 mm Bh 977,262.48 996,807.72 1,016,743.88 1,006,580.35 1,016,352.97 1,026,125.60 1,759,072.46 2,052,251.20

78 Tee All Socket PVC ø 200 mm x 150 mm Bh 2,189,366.52 2,233,153.85 2,277,816.93 2,255,047.52 2,276,941.18 2,298,834.85 3,940,859.74 4,597,669.69

79 Tee All Socket PVC ø 50 mm x 50 mm Bh 48,199.73 49,163.72 50,146.99 49,645.72 50,127.71 50,609.71 86,759.51 101,219.42

80 Tee All Socket PVC ø 75 mm x 75 mm Bh 19,251.36 19,636.38 20,029.11 19,828.90 20,021.41 20,213.92 34,652.44 40,427.85

81 Tee All Socket PVC ø 75 mm x 75° mm Bh 20,790.36 21,206.17 21,630.29 21,414.07 21,621.98 21,829.88 37,422.65 43,659.76

82 Tee PVR RRJ ø 100 mm x 100 mm Bh 211,424.72 215,653.21 219,966.28 217,767.46 219,881.71 221,995.96 380,564.50 443,991.91

83 Tee PVR RRJ ø 100 mm x 50 mm Bh 202,792.91 206,848.77 210,985.74 208,876.70 210,904.63 212,932.55 365,027.24 425,865.11

84 Tee PVR RRJ ø 150 mm x 100 mm Bh 935,294.88 954,000.78 973,080.80 963,353.73 972,706.68 982,059.63 1,683,530.79 1,964,119.26

85 Tee PVR RRJ ø 150 mm x 150 mm Bh 1,023,798.26 1,044,274.22 1,065,159.70 1,054,512.20 1,064,750.19 1,074,988.17 1,842,836.86 2,149,976.34

86 Tee PVR RRJ ø 150 mm x 50 mm Bh 874,107.37 891,589.52 909,421.31 900,330.59 909,071.66 917,812.74 1,573,393.26 1,835,625.47

87 Tee PVR RRJ ø 150 mm x 75 mm Bh 929,831.71 948,428.35 967,396.91 957,726.66 967,024.98 976,323.30 1,673,697.08 1,952,646.60

88 Tee PVR RRJ ø 50 mm x 50 mm Bh 136,579.28 139,310.86 142,097.08 140,676.65 142,042.45 143,408.24 245,842.70 286,816.48

89 Tee PVR RRJ ø 75 mm x 50 mm Bh 152,968.79 156,028.17 159,148.73 157,557.85 159,087.54 160,617.23 275,343.82 321,234.46

90 Tee PVR RRJ ø 75 mm x 75 mm Bh 158,431.96 161,600.60 164,832.61 163,184.92 164,769.24 166,353.56 285,177.53 332,707.12

91 Wash Aot Bh 12,733,673.93 12,988,347.41 13,248,114.35 13,115,684.14 13,243,020.88 13,370,357.62 22,920,613.07 26,740,715.25

B. UPAH KERJA

1 Mandor Lapangan Hari 80,000.00 85,000.00 85,000.00 92,000.00 92,000.00 92,000.00 120,000.00 126,000.00

2 Mekanik Hari 75,000.00 80,000.00 80,000.00 86,250.00 90,000.00 90,000.00 115,000.00 120,750.00

3 Mekanik Pembantu Hari 60,000.00 70,000.00 70,000.00 70,000.00 80,000.00 80,000.00 105,000.00 110,250.00

4 Kepala Tukang Besi, Kayu, Batu Hari 75,000.00 70,000.00 70,000.00 86,250.00 86,250.00 86,250.00 105,000.00 110,250.00

5 Tukang Besi, Kayu, Batu Hari 60,000.00 60,000.00 60,000.00 75,000.00 75,000.00 75,000.00 100,000.00 105,000.00

6 Operator Hari 75,000.00 70,000.00 70,000.00 86,250.00 86,250.00 86,250.00 110,000.00 115,500.00

7 Operator Pembantu Hari 60,000.00 60,000.00 60,000.00 70,000.00 70,000.00 70,000.00 90,000.00 94,500.00

8 Sopir Hari 65,000.00 60,000.00 60,000.00 75,000.00 75,000.00 75,000.00 95,000.00 99,750.00

9 Pembantu Sopir Hari 55,000.00 60,000.00 60,000.00 70,000.00 70,000.00 70,000.00 90,000.00 94,500.00

10 Buruh Lapangan/Pekerja Hari 50,000.00 60,000.00 60,000.00 70,000.00 70,000.00 70,000.00 85,000.00 89,250.00

C. BAHAN BANGUNAN

1 Abu Batu M3

400,000.00 269,500.00 269,500.00 460,000.00 460,000.00 460,000.00 462,000.00 531,300.00

2 Aspal Kg 9,750.00 11,000.00 11,000.00 11,212.50 11,212.50 11,212.50 154,712.00 177,918.80

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 118

Page 10: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

3 Batu Bata Merah Bj 1,250.00 1,375.00 1,375.00 1,500.00 1,500.00 1,500.00 2,000.00 2,500.00

4 Batu Batako Bj 1,250.00 1,375.00 1,375.00 1,650.00 1,650.00 1,650.00 5,000.00 5,500.00

5 Batu Gunung/Batu Kali M3

250,000.00 275,000.00 275,000.00 287,500.00 287,500.00 287,500.00 495,000.00 569,250.00

6 Batu Palimanan M2

235,000.00 235,000.00 235,000.00 270,250.00 270,250.00 270,250.00 440,000.00 506,000.00

7 Batu Pecah 0.5 - 1 cm (Luar Nunukan) M3

330,000.00 368,500.00 368,500.00 379,500.00 379,500.00 379,500.00 715,000.00 822,250.00

8 Batu Pecah 1 - 2 cm (Luar Nunukan) M3

330,000.00 368,500.00 368,500.00 379,500.00 379,500.00 379,500.00 715,000.00 822,250.00

9 Batu Pecah 2 - 3 cm (Luar Nunukan) M3

330,000.00 368,500.00 368,500.00 379,500.00 379,500.00 379,500.00 715,000.00 822,250.00

10 Batu Pecah 3 - 5 cm (Luar Nunukan) M3

330,000.00 368,500.00 368,500.00 379,500.00 379,500.00 379,500.00 715,000.00 822,250.00

11 Batu Pecah 5 - 7 cm (Luar Nunukan) M3

330,000.00 368,500.00 368,500.00 379,500.00 379,500.00 379,500.00 715,000.00 822,250.00

12 Baut Baja/Skrup Kg 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 28,750.00 33,062.00

13 Bensin Industri Liter 8,000.00 8,800.00 8,800.00 12,000.00 12,000.00 12,000.00 40,000.00 48,000.00

14 Besi Baut 1/2" Kg 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 33,450.00 48,450.00

15 Besi Klem "U" Bh 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 28,500.00 34,200.00

16 Floor Drain Bh 32,000.00 35,200.00 35,200.00 36,800.00 36,800.00 36,800.00 60,000.00 72,000.00

17 Kawat Bronjong Kg 51,000.00 56,100.00 56,100.00 58,650.00 58,650.00 58,650.00 57,613.00 66,254.95

18 Kerikil Sungai M3

260,000.00 346,500.00 346,500.00 299,000.00 299,000.00 299,000.00 550,000.00 632,500.00

19 Lapis Penutup Stabilisasi Tanah M2

105172.88 104,964.19 107,829.85 107,829.85 127,829.85 368,890.85 368,890.00 398,700.00

20 Lapis Penutup Stabilisasi Tanah M2

105172.88 104,964.19 107,829.85 107,829.85 127,829.85 368,890.85 368,890.00 398,700.00

21 Lapis Perkuat Geogrid (Secugrid 40/40 Q1) M2

75,608.00 75,638.00 76,358.00 79,154.00 79,154.00 79,154.00 110,185.00 152,133.00

22 Lapis Perkuat Geogrid (Secugrid 40/40 Q1) M2

75,608.00 75,638.00 76,358.00 79,154.00 79,154.00 79,154.00 110,185.00 152,133.00

23 Lapis Perkuat Geokomposit (Combigrid 40/40 Q1/51 6 RK 5C)M2

98,168.00 98,168.00 98,168.00 108,172.00 108,172.00 108,172.00 145,124.00 189,104.00

24 Lapis Perkuat Geokomposit (Combigrid 40/40 Q1/51 6 RK 5C)M2

98,168.00 98,168.00 98,168.00 108,172.00 108,172.00 108,172.00 145,124.00 189,104.00

25 Lapis Stabilisasi Tanah M3

147,060.88 152,495.23 152,495.23 152,495.23 155,212.40 175,212.40 190,540.06 208,875.11

26 Lapis Stabilisasi Tanah M3

147,060.88 152,495.23 152,495.23 152,495.23 155,212.40 175,212.40 190,540.06 208,875.11

27 Les Propil (Gypsum) M' 10,000.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 20,000.00 20,000.00

28 Minyak Pelumas Liter 30,000.00 33,000.00 33,000.00 38,000.00 38,000.00 38,000.00 50,600.00 60,750.00

29 Pagar Besi Biasa M² 500,000.00 550,000.00 550,000.00 575,000.00 575,000.00 575,000.00 770,000.00 924,000.00

30 Pagar Besi Stanless Steel M² 850,000.00 935,000.00 935,000.00 977,500.00 977,500.00 977,500.00 1,150,000.00 1,380,000.00

31 Pagar BRC Tinggi 120 Cm M' 285,000.00 313,500.00 313,500.00 327,750.00 327,750.00 327,750.00 450,000.00 495,000.00

32 Pagar BRC Tinggi 150 Cm M' 335,000.00 368,500.00 368,500.00 406,250.00 406,250.00 406,250.00 550,000.00 605,000.00

33 Pagar BRC Tinggi 190 Cm M' 460,000.00 506,000.00 506,000.00 562,500.00 562,500.00 562,500.00 700,000.00 770,000.00

34 Pagar BRC Tinggi 90 Cm M' 225,000.00 247,500.00 247,500.00 258,750.00 258,750.00 258,750.00 400,000.00 440,000.00

35 Pasir Beton (Luar Nunukan) M3

280,000.00 220,000.00 220,000.00 322,000.00 322,000.00 322,000.00 385,000.00 442,750.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 119

Page 11: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

36 Pasir Pasangan M3

180,000.00 220,000.00 220,000.00 207,000.00 225,000.00 225,000.00 385,000.00 385,000.00

37 Pasir Urug/Pasir Timbunan M3

135,000.00 165,000.00 165,000.00 155,250.00 155,250.00 155,250.00 330,000.00 330,000.00

38 Pemasangan Soft Rock 451 Containes (0.6) M3

451,126.00 451,126.00 451,126.00 572,112.00 572,112.00 725,000.00 725,000.00 850,000.00

39 Pemasangan Soft Rock 451 Containes (0.6) M3

451,126.00 451,126.00 451,126.00 572,112.00 572,112.00 725,000.00 725,000.00 850,000.00

40 Pemasangan Soft Rock 451 Containes (1.2) M3

102,400,000.00 102,400,000.00 102,400,000.00 1,235,144.00 1,235,114.00 1,235,114.00 1,300,000.00 1,400,000.00

41 Pemasangan Soft Rock 451 Containes (1.2) M3

102,400,000.00 102,400,000.00 102,400,000.00 1,235,144.00 1,235,114.00 1,235,114.00 1,300,000.00 1,400,000.00

42 Roster Bh 25,000.00 27,500.00 27,500.00 28,750.00 28,750.00 28,750.00 35,000.00 42,000.00

43 Semen Kg 1,200.00 1,300.00 1,500.00 1,500.00 1,500.00 1,500.00 27,000.00 30,000.00

44 Semen PC Zak 61,000.00 71,500.00 71,500.00 74,000.00 85,000.00 85,000.00 440,000.00 500,000.00

45 Semen Putih Zak 96,000.00 104,500.00 104,500.00 110,400.00 110,400.00 110,400.00 495,000.00 525,000.00

46 Sirtu M3

210,000.00 211,000.00 211,000.00 241,500.00 241,500.00 241,500.00 385,000.00 442,750.00

47 Solar Industri Liter 9,500.00 10,450.00 10,450.00 13,000.00 13,000.00 13,000.00 40,000.00 48,000.00

48 Tanah Timbunan/Material Dilokasi Pekerjaan (Gedung) M3

60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 70,000.00 80,500.00

49 Tandon Air 1.100 L Bh 1,350,000.00 1,485,000.00 1,485,000.00 1,562,500.00 1,562,500.00 1,562,500.00 2,970,000.00 3,564,000.00

50 Tandon Air 2.200 L Bh 2,500,000.00 2,750,000.00 2,750,000.00 2,875,000.00 2,875,000.00 2,875,000.00 5,500,000.00 6,600,000.00

51 Tandon Air 650 L Bh 925,000.00 1,017,500.00 1,017,500.00 1,063,750.00 1,063,750.00 1,063,750.00 2,035,000.00 2,442,000.00

52 Tear Aspal Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 42,000.00

53 Teralis Anti Karat M² 850,000.00 935,000.00 935,000.00 977,500.00 977,500.00 977,500.00 1,150,000.00 1,380,000.00

54 Teralis Biasa M² 500,000.00 550,000.00 550,000.00 575,000.00 575,000.00 575,000.00 770,500.00 925,000.00

55 Tiang Pancang Beton ( 20 x 20 ) M' 220,000.00 242,000.00 242,000.00 253,000.00 253,000.00 253,000.00 - -

56 Tiang Pancang Beton ( 25 x 25 ) M' 350,000.00 385,000.00 385,000.00 402,500.00 402,500.00 402,500.00 - -

57 Tiang Pancang Beton ( 30 x 30 ) M' 510,000.00 561,000.00 561,000.00 586,500.00 586,500.00 586,500.00 - -

58 Tiang Pancang Beton Bulat D 35 M' 635,000.00 698,500.00 698,500.00 730,250.00 730,250.00 730,250.00 - -

59 Tiang Pancang Beton Bulat D 40 M' 675,000.00 742,500.00 742,500.00 776,250.00 776,250.00 776,250.00 - -

60 Tiang Pancang Beton Bulat D 50 M' 700,000.00 770,000.00 770,000.00 805,000.00 805,000.00 805,000.00 - -

61 Tiang Pancang Beton Bulat D 60 M' 800,000.00 880,000.00 880,000.00 920,000.00 920,000.00 920,000.00 - -

D. BAHAN KAYU

1 Kayu Bangkirai (Sejenis) M3

2,150,000.00 2,365,000.00 2,365,000.00 1,400,000.00 1,400,000.00 1,400,000.00

3 Kayu Nyatoh M3

2,500,000.00 2,500,000.00

4 Kayu Kapur M3

2,070,000.00 2,277,000.00 2,277,000.00 1,200,000.00 1,200,000.00 1,200,000.00

5 Kayu Kapur untuk Reng 2 x 3 x 4 m M3

1,900,000.00 2,090,000.00 2,090,000.00 1,040,000.00 1,040,000.00 1,040,000.00

8 Kayu Lambersiring Lbr 35,000.00 38,500.00 38,500.00 35,000.00 35,000.00 35,000.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 120

Page 12: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

9 Kayu Laut Dia. 10 mm - 15 mm / 4 m Btg 45,000.00 49,500.00 49,500.00 36,000.00 36,000.00 36,000.00 46,000.00 50,600.00

10 Kayu Meranti M3

1,725,000.00 1,897,500.00 1,897,500.00 1,000,000.00 1,000,000.00 1,000,000.00

11 Kayu Ulin M3

2,875,000.00 3,162,500.00 3,162,500.00 2,250,000.00 2,250,000.00 2,250,000.00

12 Lem Kayu Ltr 18,000.00 19,800.00 19,800.00 20,700.00 20,700.00 20,700.00 25,900.00 28,500.00

E. BAHAN BESI / LOGAM

1 Baja Jembatan Kg 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 65,000.00 80,000.00

2 Baja Profil C Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 29,000.00 31,500.00

3 Baja Profil WF Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 29,000.00 31,500.00

4 Baja Siku L Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 38,000.00

5 Baut Baja Kg 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 38,000.00 45,500.00

6 Besi Baja Profil C 125.50.20.2,3 Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 38,500.00

7 Besi Baja Profil L 75.75.1.2 Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00

8 Besi Baja Profil WF 200.100.5,5.8 Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 38,500.00

9 Besi Beton 10 mm-12mm Btg 55,200.00 60,720.00 60,720.00 63,480.00 63,480.00 63,480.00 80,000.00 88,000.00

10 Besi Beton 12 mm-12mm Btg 78,200.00 86,100.00 86,100.00 89,930.00 89,930.00 89,930.00 120,000.00 132,000.00

11 Besi Beton 14 mm-12mm Btg 109,250.00 120,175.00 120,175.00 125,637.50 125,637.50 125,637.50 145,000.00 159,500.00

12 Besi Beton 16 mm-12mm Btg 143,750.00 158,125.00 158,125.00 165,312.50 165,312.50 165,312.50 195,000.00 214,500.00

13 Besi Beton 19 mm-12mm Btg 287,500.00 316,250.00 316,250.00 330,625.00 330,625.00 330,625.00 350,000.00 385,000.00

14 Besi Beton 20 mm-12mm Btg 402,500.00 442,750.00 442,750.00 462,875.00 462,875.00 462,875.00 475,000.00 522,500.00

15 Besi Beton 5 mm-12 mm Btg 15,295.00 16,824.50 16,824.50 17,589.25 17,589.25 17,589.25 35,000.00 38,500.00

16 Besi Beton 6 mm-12 mm Btg 21,850.00 24,035.00 24,035.00 25,127.50 25,127.50 25,127.50 40,000.00 44,000.00

17 Besi Holo M' 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 38,000.00

18 Besi Plat Tebal 1 mm Lbr 287,500.00 316,250.00 316,250.00 330,625.00 330,625.00 330,625.00 500,000.00 550,000.00

19 Besi Plat Tebal 1,2 mm Lbr 310,000.00 341,000.00 341,000.00 356,500.00 356,500.00 356,500.00 525,000.00 577,500.00

20 Besi Plat Tebal 1,5 mm Lbr 344,000.00 378,400.00 378,400.00 395,600.00 395,600.00 395,600.00 595,000.00 654,500.00

21 Besi Plat Tebal 3 mm Lbr 655,500.00 721,050.00 721,050.00 753,825.00 753,825.00 753,825.00 1,267,500.00 1,437,500.00

22 Besi Tulangan Beton Polos Kg 18,000.00 19,800.00 19,800.00 23,500.00 23,500.00 23,500.00 33,000.00 40,500.00

23 Besi Tulangan Beton Ulir Kg 19,000.00 20,900.00 20,900.00 23,950.00 23,950.00 23,950.00 34,000.00 41,500.00

24 Kawat Ayam M² 30,000.00 33,000.00 33,000.00 34,500.00 34,500.00 34,500.00 38,000.00 41,000.00

25 Kawat Baja (Bindrat) Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 35,000.00 42,500.00

26 Kawat Duri Rol 147,000.00 162,000.00 162,000.00 169,500.00 169,500.00 169,500.00 187,000.00 187,000.00

27 Kawat Harmonika 4 x 4 cm M² 31,000.00 34,100.00 34,100.00 35,650.00 35,650.00 35,650.00 39,000.00 42,000.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 121

Page 13: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

28 Kawat Nyamuk Hitam M² 28,000.00 30,800.00 30,800.00 32,200.00 32,200.00 32,200.00 37,000.00 40,000.00

29 Kawat Nyamuk Putih M² 28,000.00 30,800.00 30,800.00 32,200.00 32,200.00 32,200.00 37,000.00 40,000.00

30 Nako Besi (6 Daun) psg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 25,000.00 27,500.00

31 Nako Besi (8 Daun) psg 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 28,000.00 30,500.00

32 Paku Biasa Kg 19,872.00 21,859.00 21,859.00 22,852.00 22,852.00 22,852.00 34,872.00 42,372.00

33 Paku Genteng Metal Kg 35,000.00 38,500.00 38,500.00 40,250.00 40,250.00 40,250.00 44,000.00 46,500.00

34 Paku Gipsum/sirap/plywood Kg 25,000.00 27,500.00 27,500.00 28,750.00 28,750.00 28,750.00 40,000.00 47,500.00

35 Paku Payung (Seng) Kg 25,000.00 27,500.00 27,500.00 28,750.00 28,750.00 28,750.00 40,000.00 47,500.00

37 Paku Ulin Kg 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 38,000.00 45,500.00

38 Rangka Aluminium M' 65,000.00 71,500.00 71,500.00 74,750.00 74,750.00 74,750.00 85,000.00 93,500.00

39 Tepung Gypsum Kg 13,000.00 14,300.00 14,300.00 14,950.00 14,950.00 14,950.00 22,000.00 25,000.00

F. BAHAN LANTAI

1 Batu Alam Kotak 250,000.00 275,000.00 275,000.00 287,500.00 287,500.00 287,500.00 340,000.00 365,000.00

2 Granit Tile Esenza 30 x 30 cm Kotak 250,000.00 275,000.00 275,000.00 312,500.00 312,500.00 312,500.00 321,000.00 336,000.00

3 Keramik Essenza 40 x 40 cm Kotak 380,000.00 418,000.00 418,000.00 437,000.00 437,000.00 437,000.00 443,000.00 458,000.00

4 Paving Biasa Bh 2,500.00 2,750.00 2,750.00 3,125.00 3,125.00 3,125.00 5,500.00 6,500.00

5 Paving Warna Bh 3,000.00 3,300.00 3,300.00 3,750.00 3,750.00 3,750.00 6,000.00 7,000.00

6 Tegel Kramik 20 x 20 cm Kotak 70,000.00 77,000.00 77,000.00 80,500.00 80,500.00 80,500.00 124,000.00 139,000.00

7 Tegel Kramik 30 x 30 cm Kotak 75,000.00 82,500.00 82,500.00 86,250.00 86,250.00 86,250.00 129,000.00 144,000.00

8 Tegel Kramik 40 x 40 cm Kotak 80,000.00 88,000.00 88,000.00 93,750.00 93,750.00 93,750.00 134,000.00 149,000.00

9 Tegel Kramik 60 x 60 cm Kotak 215,000.00 236,500.00 236,500.00 247,250.00 247,250.00 247,250.00 269,000.00 284,000.00

10 Tegel Mozaik 20 x 20 cm Kotak 60,000.00 66,000.00 66,000.00 69,000.00 69,000.00 69,000.00 114,000.00 129,000.00

11 Tegel Mozaik 20 x 25 cm Kotak 60,000.00 66,000.00 66,000.00 69,000.00 69,000.00 69,000.00 114,000.00 129,000.00

12 Tegel Mozaik 30 x 30 cm Kotak 76,000.00 83,700.00 83,700.00 87,500.00 87,500.00 87,500.00 130,000.00 145,000.00

G. BAHAN ATAP

1 Atap Multi Roof Lbr 97,750.00 107,525.00 107,525.00 112,500.00 112,500.00 112,500.00 115,750.00 120,750.00

2 Atap Sakura Roof Lbr 60,000.00 66,000.00 66,000.00 69,000.00 69,000.00 69,000.00 73,500.00 77,250.00

3 Atap Surya Roof Lbr 75,000.00 82,500.00 82,500.00 86,250.00 86,250.00 86,250.00 88,500.00 92,250.00

4 Atap Zincalum Lbr 1,980,000.00 2,178,000.00 2,178,000.00 2,277,000.00 2,277,000.00 2,277,000.00

5 Bubungan Multi Roof (Biasa) Lbr 40,250.00 44,275.00 44,275.00 46,300.00 46,300.00 46,300.00 49,250.00 54,250.00

6 Bubungan Multi Roof (Raja) Lbr 80,500.00 88,550.00 88,550.00 92,575.00 92,575.00 92,575.00 94,000.00 97,750.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 122

Page 14: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

7 Bubungan Sakura Roof (Biasa) Lbr 28,750.00 31,625.00 31,625.00 33,100.00 33,100.00 33,100.00 42,250.00 46,000.00

8 Bubungan Sakura Roof (Raja) Lbr 50,000.00 55,000.00 55,000.00 57,500.00 57,500.00 57,500.00 63,500.00 67,250.00

9 Bubungan Surya Roof Lbr 50,000.00 55,000.00 55,000.00 57,500.00 57,500.00 57,500.00 63,500.00 67,250.00

10 Seng Gelombang (6 Kaki) BJLS Lbr 45,000.00 49,500.00 49,500.00 51,750.00 51,750.00 51,750.00 75,000.00 80,000.00

11 Seng Gelombang (8 Kaki) BJLS Lbr 59,800.00 65,780.00 65,780.00 68,770.00 68,770.00 68,770.00 85,000.00 90,000.00

12 Seng Plat (Lebar 40 cm) M¹ 17,500.00 19,250.00 19,250.00 20,125.00 20,125.00 20,125.00 26,500.00 29,000.00

13 Seng Plat (Lebar 60 cm) M¹ 19,550.00 21,600.00 21,600.00 22,500.00 22,500.00 22,500.00 28,550.00 31,050.00

14 Seng Plat 0.90 x 1.80 cm Lbr 68,000.00 74,800.00 74,800.00 78,200.00 78,200.00 78,200.00 90,000.00 95,000.00

H. BAHAN LANGIT - LANGIT

1 Gypsum Board Lbr 97,750.00 107,525.00 107,525.00 112,500.00 112,500.00 112,500.00 - -

2 Gypsum Lem Kg 10,700.00 11,800.00 11,800.00 12,500.00 12,500.00 12,500.00 - -

3 Gypsum List M' 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 - -

4 Plywood (Multifleks) 12 mm Lbr 189,750.00 208,725.00 208,725.00 218,300.00 218,300.00 218,300.00 234,750.00 238,500.00

5 Plywood (Multifleks) 16 mm Lbr 247,250.00 271,975.00 271,975.00 284,500.00 284,500.00 284,500.00 310,250.00 314,000.00

6 Plywood (Multifleks) 3 mm Lbr 63,250.00 69,575.00 69,575.00 72,800.00 72,800.00 72,800.00 76,750.00 80,500.00

7 Plywood (Multifleks) 4 mm Lbr 80,500.00 88,550.00 88,550.00 92,600.00 92,600.00 92,600.00 94,000.00 97,750.00

8 Plywood (Multifleks) 6 mm Lbr 120,750.00 133,000.00 133,000.00 139,000.00 139,000.00 139,000.00 143,500.00 147,250.00

9 Plywood (Multifleks) 9 mm Lbr 166,750.00 183,425.00 183,425.00 160,000.00 160,000.00 160,000.00 180,250.00 184,000.00

I. BAHAN KACA

1 Kaca Buram T. 3 mm M2

125,000.00 137,500.00 137,500.00 143,750.00 143,750.00 143,750.00 185,000.00 194,000.00

2 Kaca Buram T. 5 mm M2

145,000.00 159,500.00 159,500.00 166,750.00 166,750.00 166,750.00 205,000.00 214,000.00

3 Kaca Polos T. 3 mm M2

115,000.00 126,500.00 126,500.00 132,250.00 132,250.00 132,250.00 175,000.00 180,000.00

4 Kaca Polos T. 5 mm M2

130,000.00 143,000.00 143,000.00 149,500.00 149,500.00 149,500.00 190,000.00 199,000.00

5 Kaca Riben T. 3 mm M2

145,000.00 159,500.00 159,500.00 166,750.00 166,750.00 166,750.00 205,000.00 214,000.00

6 Kaca Riben T. 5 mm M2

175,000.00 192,500.00 192,500.00 201,250.00 201,250.00 201,250.00 250,000.00 259,000.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 123

Page 15: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

J. KUNCI & PENGGANTUNG

1 Engsel Pintu 3'' Psg 11,500.00 12,650.00 12,650.00 15,000.00 15,000.00 15,000.00 16,000.00 18,000.00

2 Engsel Pintu 4'' Psg 17,250.00 18,975.00 18,975.00 19,900.00 19,900.00 19,900.00 21,500.00 23,500.00

3 Grendel Besar Psg 35,000.00 38,500.00 38,500.00 40,250.00 40,250.00 40,250.00 44,000.00 46,000.00

4 Grendel Kecil Psg 28,750.00 31,625.00 31,625.00 33,100.00 33,100.00 33,100.00 36,000.00 38,000.00

5 Grendel Tanam Psg 55,000.00 60,500.00 60,500.00 63,250.00 63,250.00 63,250.00 68,000.00 70,000.00

6 Hak Angin Psg 17,250.00 18,975.00 18,975.00 19,900.00 19,900.00 19,900.00 21,500.00 23,500.00

7 Handle Jendela Psg 14,375.00 15,900.00 15,900.00 16,600.00 16,600.00 16,600.00 185,000.00 187,000.00

8 Kunci Tanam ( Ses ) 2 x Putar Psg 258,750.00 284,700.00 284,700.00 297,600.00 297,600.00 297,600.00 319,000.00 324,000.00

9 Kunci Tanam (Exelusive) 1 x Putar Psg 250,000.00 275,000.00 275,000.00 287,500.00 287,500.00 287,500.00 308,000.00 313,000.00

10 Kunci Tanam (Exelusive) 2 X Putar Psg 300,000.00 330,000.00 330,000.00 345,000.00 345,000.00 345,000.00 370,000.00 375,000.00

11 Kunci Tanam Biasa 1 x Putar Psg 132,250.00 145,475.00 145,475.00 153,000.00 153,000.00 153,000.00 164,000.00 169,000.00

12 Kunci Tanam Biasa 2 x Putar Psg 178,250.00 196,500.00 196,500.00 205,000.00 205,000.00 205,000.00 220,000.00 225,000.00

K. HAK FINISHING

1 Amplas Kayu/Besi Lbr 7,500.00 8,250.00 8,250.00 9,375.00 9,375.00 9,375.00 10,000.00 12,000.00

2 Angkur Bh 2,500.00 2,750.00 2,750.00 2,875.00 2,875.00 2,875.00 11,500.00 13,800.00

3 Cat Air Kg 10,000.00 11,000.00 11,000.00 11,500.00 11,500.00 11,500.00 12,500.00 14,500.00

4 Cat Kilap Altek Ltr 36,750.00 40,425.00 40,425.00 42,300.00 42,300.00 42,300.00 45,750.00 54,900.00

5 Cat Kilap Glotek Kg 37,000.00 40,700.00 40,700.00 42,550.00 42,550.00 42,550.00 44,700.00 46,700.00

6 Cat Meny Kg 24,725.00 27,200.00 27,200.00 28,500.00 28,500.00 28,500.00 33,725.00 40,500.00

7 Cat Nippon Paint (Dempul) Kg 29,200.00 32,200.00 32,200.00 33,580.00 33,580.00 33,580.00 38,200.00 45,900.00

8 Cat Nippon Paint (Melamin) Kg 31,050.00 34,155.00 34,155.00 35,800.00 35,800.00 35,800.00 40,100.00 48,200.00

9 Cat Nippon Paint (Pewarna) Kg 37,200.00 41,000.00 41,000.00 42,800.00 42,800.00 42,800.00 46,200.00 55,500.00

10 Cat Nippon Paint (Sanding) Kg 34,500.00 37,950.00 37,950.00 39,675.00 39,675.00 39,675.00 43,500.00 52,200.00

11 Cat Tembok Dulux Dalam ICI Kg 85,000.00 93,500.00 93,500.00 97,750.00 97,750.00 97,750.00 94,000.00 112,800.00

12 Cat Tembok Dulux Luar Kg 95,000.00 104,500.00 104,500.00 109,250.00 109,250.00 109,250.00 104,000.00 124,800.00

13 Cat Tembok Mowi Lex Dalam Kg 85,000.00 93,500.00 93,500.00 97,750.00 97,750.00 97,750.00 94,000.00 112,800.00

14 Cat Tembok Mowi Lex Luar Kg 95,000.00 104,500.00 104,500.00 109,250.00 109,250.00 109,250.00 104,000.00 124,800.00

15 Cat Tembok/Altex Kg 20,000.00 22,000.00 22,000.00 23,000.00 23,000.00 23,000.00 29,000.00 34,800.00

16 Cat Tembok/Metrolite Kg 25,000.00 27,500.00 27,500.00 28,750.00 28,750.00 28,750.00 34,000.00 40,800.00

17 Cat Tembok/Paragon/Aries Putih Kg 9,000.00 9,900.00 9,900.00 10,350.00 10,350.00 10,350.00 18,000.00 21,600.00

18 Dempul/Plamir Kg 29,000.00 31,900.00 31,900.00 33,350.00 33,350.00 33,350.00 35,100.00 37,100.00

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 124

Page 16: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

19 Godler/Residu Liter 26,000.00 28,600.00 28,600.00 29,900.00 29,900.00 29,900.00 31,400.00 33,400.00

20 Kapur Kg 3,000.00 3,300.00 3,300.00 3,450.00 3,450.00 3,450.00 12,000.00 14,400.00

21 Meni Kayu Kg 30,500.00 33,550.00 33,550.00 35,075.00 35,075.00 35,075.00 36,900.00 38,900.00

22 Minyak Cat Kg 40,250.00 44,275.00 44,275.00 46,300.00 46,300.00 46,300.00 49,250.00 59,100.00

23 Plitur/Sirlak Ons/Kg 24,500.00 26,950.00 26,950.00 28,175.00 28,175.00 28,175.00 29,600.00 31,600.00

24 Seal Tape Bh 6,000.00 6,600.00 6,600.00 6,900.00 6,900.00 6,900.00 10,000.00 12,000.00

25 Talang Air Plastik (4 m) Btg 75,000.00 82,500.00 82,500.00 86,250.00 86,250.00 86,250.00 93,000.00 111,600.00

26 Tear Oli Liter 31,500.00 34,650.00 34,650.00 36,225.00 36,225.00 36,225.00 38,100.00 40,100.00

27 Tiner A Biasa Ltr 28,750.00 31,625.00 31,625.00 33,100.00 33,100.00 33,100.00 37,750.00 45,300.00

28 Tiner A Special Ltr 40,250.00 44,275.00 44,275.00 46,300.00 46,300.00 46,300.00 49,250.00 59,100.00

29 Tiner B Special Ltr 23,000.00 25,300.00 25,300.00 26,450.00 26,450.00 26,450.00 32,000.00 38,400.00

L. BAHAN SANITASI

1 Bak Cuci Alumunium 1 Lubang Bh 250,000.00 275,000.00 275,000.00 312,500.00 312,500.00 312,500.00 420,000.00 504,000.00

2 Bak Cuci Alumunium 2 Lubang Bh 450,000.00 495,000.00 495,000.00 562,500.00 562,500.00 562,500.00 600,000.00 720,000.00

3 Closet Duduk Porselin Bh 1,000,000.00 1,100,000.00 1,100,000.00 1,150,000.00 1,150,000.00 1,150,000.00 1,009,000.00 1,210,800.00

4 Closet Duduk Porselin (Toto) Bh 2,500,000.00 2,750,000.00 2,750,000.00 2,875,000.00 2,875,000.00 2,875,000.00 3,600,000.00 4,320,000.00

5 Closet Jongkok Porselin Bh 100,000.00 110,000.00 110,000.00 115,000.00 115,000.00 115,000.00 109,000.00 130,800.00

6 Closet Jongkok Porselin (Toto) Bh 250,000.00 275,000.00 275,000.00 287,500.00 287,500.00 287,500.00 450,000.00 540,000.00

7 Uranior Proselin Set 1,250,000.00 1,375,000.00 1,375,000.00 1,562,500.00 1,562,500.00 1,562,500.00 2,500,000.00 3,000,000.00

8 Wastefel Proselin Set 2,000,000.00 2,200,000.00 2,200,000.00 2,500,000.00 2,500,000.00 2,500,000.00 3,150,000.00 3,780,000.00

M. ALAT BERAT DAN PERALATAN LAINNYA

1 Air Compressor Jam 75,000.00 82,500.00 82,500.00 86,250.00 86,250.00 86,250.00 112,500.00 118,125.00

2 AMP Kap. 35 Ton Jam 3,821,000.00 4,203,100.00 4,203,100.00 4,394,150.00 4,394,150.00 4,394,150.00 5,731,500.00 6,018,075.00

3 Asphalt Finisher Jam 450,000.00 495,000.00 495,000.00 517,500.00 517,500.00 517,500.00 675,000.00 708,750.00

4 Asphatl Sprayer Jam 125,000.00 137,500.00 137,500.00 143,750.00 143,750.00 143,750.00 187,500.00 196,875.00

5 Bulldozer Jam 650,000.00 715,000.00 715,000.00 747,500.00 747,500.00 747,500.00 975,000.00 1,023,750.00

6 Concrete Mixer (Molen) Jam 47,000.00 51,700.00 51,700.00 54,050.00 54,050.00 54,050.00 70,500.00 74,025.00

7 Concrete Mixer (Ready Mix) Jam 150,000.00 165,000.00 165,000.00 172,500.00 172,500.00 172,500.00 225,000.00 236,250.00

8 Concrete Vibrator Jam 170,000.00 187,000.00 187,000.00 195,500.00 195,500.00 195,500.00 255,000.00 267,750.00

9 Crane 10 - 15 Ton Jam 390,000.00 429,000.00 429,000.00 448,500.00 448,500.00 448,500.00 585,000.00 614,250.00

10 Dump Truck Kap. 6 Ton / 3 - 4 M³ Jam 125,000.00 137,500.00 137,500.00 143,750.00 143,750.00 143,750.00 187,500.00 196,875.00

11 Excavator PC 200 - 6 Jam 600,000.00 660,000.00 660,000.00 690,000.00 690,000.00 690,000.00 900,000.00 945,000.00

12 Genset Kap. 80 KVA Jam 218,500.00 240,350.00 240,350.00 251,275.00 251,275.00 251,275.00 327,750.00 344,137.50

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 125

Page 17: pu

Standarisasi Harga Dinas Pekerjaan Umum

NUNUKAN SEBATIK SEBATIK BARAT SEBUKU SEMBAKUNG LUMBIS KRAYAN KRAYAN

SELATAN

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)

NO. URAIAN SATUAN

K E C A M A T A N

13 Jack Hummer Jam 150,000.00 165,000.00 165,000.00 172,500.00 172,500.00 172,500.00 225,000.00 236,250.00

14 Mesin Las Jam 150,000.00 165,000.00 165,000.00 172,500.00 172,500.00 172,500.00 225,000.00 236,250.00

15 Motor Grader GD 5 10 R-1 Jam 650,000.00 715,000.00 715,000.00 747,500.00 747,500.00 747,500.00 975,000.00 1,023,750.00

16 Pedestrian Roller Jam 150,000.00 165,000.00 165,000.00 172,500.00 172,500.00 172,500.00 225,000.00 236,250.00

17 Plate Stamper Kap. 0,2 Ton Jam 47,000.00 51,700.00 51,700.00 54,050.00 54,050.00 54,050.00 70,500.00 74,025.00

18 PTR (Pneumatic Tire Roller) Jam 250,000.00 275,000.00 275,000.00 287,500.00 287,500.00 287,500.00 375,000.00 393,750.00

19 Tandem Roller Kap. 8 Ton Jam 350,000.00 385,000.00 385,000.00 402,500.00 402,500.00 402,500.00 525,000.00 551,250.00

20 Three Wheel Roller Jam 550,000.00 605,000.00 605,000.00 632,500.00 632,500.00 632,500.00 825,000.00 866,250.00

21 Vibrator Roller Kap. 8 Ton Jam 454,994.00 500,493.40 500,493.40 523,243.10 523,243.10 523,243.10 682,491.00 716,615.55

22 Water Tank Truck 3000 - 4500 L Jam 252,000.00 277,200.00 277,200.00 289,800.00 289,800.00 289,800.00 378,000.00 396,900.00

23 Wheel Loader 1,0 - 1,6 M³ Jam 600,000.00 660,000.00 660,000.00 690,000.00 690,000.00 690,000.00 900,000.00 945,000.00

24 Wheel Loader WA-180-35 TD SPEC, Kap. Bak. 1,6 M Jam 373,765.00 411,141.50 411,141.50 429,829.75 429,829.75 429,829.75 560,647.50 588,679.88

Standar Satuan Harga Barang / Jasa dan Belanja Pegawai Pemerintah Kabupaten Nunukan 126