Ponda Timesing Dimension Squaring 1 1 1 1 1 1 2 40 80 2 12 16.272 0.6 1.13 1 8 5.424 0.6 1.13 1 10.37 9.374 0.8 1.13 4 1.58 4.171 0.8 1.13 1 0.825 0.746 0.8 1.13 1 3.075 2.780 0.8 1.13 1 1.5 1.356 0.8 1.13 2 0.575 1.040 0.8 1.13 1 2.075 1.876 0.8 1.13 2 1.7 3.074 0.8 1.13 1 3.3 2.983 0.8 1.13 1 80 80 1 80 8 0.1

description

pondasi

Transcript of pondasi

Page 1: pondasi

Pondasi dan Struktur

Timesing Dimension Squaring

1 1 1

1 1 1

2 40 80

2 12 16.2720.6

1.131 8 5.424

0.61.13

1 10.37 9.3740.8

1.134 1.58 4.171

0.81.13

1 0.825 0.7460.8

1.131 3.075 2.780

0.81.13

1 1.5 1.3560.8

1.132 0.575 1.040

0.81.13

1 2.075 1.8760.8

1.132 1.7 3.074

0.81.13

1 3.3 2.9830.8

1.131 80 801 80 8

0.1

2 12 0.8220.685

Page 2: pondasi

0.051 8 0.274

0.6850.05

1 10.37 0.3550.6850.05

4 1.58 3.5720.6850.05

1 0.825 0.0280.6850.05

1 3.075 0.1050.6850.05

1 1.5 0.0510.6850.05

2 0.575 0.0390.6850.05

1 2.075 0.0710.6850.05

2 1.7 0.1160.6850.05

1 3.3 0.1130.6850.05

2 12 3.840.80.2

1 8 1.280.80.2

1 10.37 1.6590.80.2

4 1.58 4.1710.80.2

1 0.825 0.1320.80.2

1 3.075 0.4920.8

Page 3: pondasi

0.21 1.5 0.240

0.80.2

2 0.575 0.1840.80.2

1 2.075 0.3320.80.2

2 1.7 0.5440.80.2

1 3.3 0.5280.80.2

2 12 7.0200.60.3

0.651 8 2.340

0.60.3

0.651 10.37 3.033

0.60.3

0.654 1.58 2.465

0.60.3

0.651 0.825 0.241

0.60.3

0.651 3.075 1.199

0.60.3

0.651 1.5 0.439

0.60.3

0.652 0.575 0.448

0.60.3

0.65

Page 4: pondasi

1 2.075 0.6070.60.3

0.652 1.7 1.326

0.60.3

0.651 3.3 0.965

0.60.3

0.65

1 66.75 2.00250.2

0.1527 0.15 2.734

0.154.5

1 0.15 1.5020.15

66.75

970 0.536 205.26250.395

335 0.636 84.15870.395

4 66.75 237.0960.888

4 188.25 463.8480.616

2 66.75 26.70.2

108 4.5 72.90.15

2 66.75 20.0250.15

Page 5: pondasi

Pondasi dan Struktur

Description

Pekerjaan Persiapanpersiapan (pembersihan lapangan dan peralatan) (Ls)Pembuatan direksi kit (Ls)

Pekerjaan Tanah

Urugan sirtu dibawah lantai keramik (m³)

Urugan tanah kembali untuk peninggi lantai (m³)

Pekerjaan Pondasi

Lean Concrete, t = 5 cm (m³)

Pembuatan pagar sementara (m¹)

Galian tanah kembali untuk pondasi batu kali (m³)

Page 6: pondasi

Lean Concrete, t = 5 cm (m³)

Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)

Page 7: pondasi

Pasangan Batu Kali, t = 650 cm (m³)

Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)

Page 8: pondasi

Pasangan Batu Kali, t = 650 cm (m³)

Pekerjaan Beton

Sloof, 150x200 cm (m³)

Pengecoran Kolom K- (m³)

Pengecoran Ring Balok (m³)

Pekerjaan Pembesian

Besi Polos Ø 8 (kg)

Sloof Besi Polos Ø 8 (kg)

Sloof Besi Polos Ø 12 (kg)

Besi Polos Ø 12 (kg)

Pekerjaan Bekisting

Bekisting kolom (m²)

Bekisting Ring balok (m²)

Bekisting Sloof (m²)

Page 9: pondasi

Timesing Dimension SqueringPEKERJAAN TANAH

1/1.16

97.9821.1374.75

1/ 0.3 23.40078

1/ 0.1 7.80078

PEKERJAAN PONDASI

1/0.1

5.9800.874.75

1/0.15

8.9700.874.75

1/

0.3

20.1820.60.6

74.75PEKERJAAN BEKISTNG

1/ 0.15 22.42574.75

2/1 0.15 7.6146.345

1/ 0.15 7.0605.883

22/1 0.15 5.4004.5

4/1 0.15 12.7925.33

2/1 0.15 5.0764.23

1/ 0.15 76.200127

PEKERJAAN PENULANGAN

1/ 0.887 265.32183674.75

1/39.438

19804.5841.3474.75

Page 10: pondasi

1/ 0.887 417.320

1/39.438

29971.3151.24

1/ 0.887 541.470

1/ 39.438 38677.8701.24

PEKERJAAN BETON

1/0.15

2.2420.274.75

2/10.15

0.2860.156.345

1/10.15

0.2650.155.883

22/10.15

2.2280.154.5

4/10.15

0.4800.155.33

2/10.15

0.3810.154.23

1/0.15

11.4300.15127

Page 11: pondasi

DescriptionPEKERJAAN TANAH

Galian Pondasi Batu Kali (m³)

PEKERJAAN PONDASI

Pasir Padat t=100 mm

PEKERJAAN BEKISTNG

Bekisting Sloof (m²)

PEKERJAAN PENULANGAN

Sloof 4 D12

Sloof D8 - 200

Urugan sirtu dibawah lantai keramik (m³)

Urugan tanah kembali untuk peninggi lantai (m³)

Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)

Pasangan Batu Kali, t = 600 cm (m³)

Bekisting Kolom 150x150 cm, t=6.345 m (m²)

Bekisting Kolom 150x150 cm, t=5.883 m (m²)

Bekisting Kolom 150x150 cm, t=4.5 m (m²)

Bekisting Ring Balk 150x150 cm , sisi miring 1 (m²)

Bekisting Ring Balk 150x150 cm , sisi miring 2 (m²)

Bekisting Ring Balk 150x150 cm (m²)

Page 12: pondasi

Kolom 4 D12

Kolom D8 - 200

Ring Balk 4 D12

Ring Balk D8 - 200

PEKERJAAN BETON

Sloof, 150x200 cm (m³)

Kolom 150x150 cm, t=4.5 m (m³)

Ring Balk 150x150 cm

Kolom 150x150 cm, t=6.345 m (m³)

Kolom 150x150 cm, t=5.883 m (m³)

Ring Balk 150x150 cm , sisi miring 1 (m³)

Ring Balk 150x150 cm , sisi miring 2 (m³)

Page 13: pondasi
Page 14: pondasi