Pondasi dan Struktur
Timesing Dimension Squaring
1 1 1
1 1 1
2 40 80
2 12 16.2720.6
1.131 8 5.424
0.61.13
1 10.37 9.3740.8
1.134 1.58 4.171
0.81.13
1 0.825 0.7460.8
1.131 3.075 2.780
0.81.13
1 1.5 1.3560.8
1.132 0.575 1.040
0.81.13
1 2.075 1.8760.8
1.132 1.7 3.074
0.81.13
1 3.3 2.9830.8
1.131 80 801 80 8
0.1
2 12 0.8220.685
0.051 8 0.274
0.6850.05
1 10.37 0.3550.6850.05
4 1.58 3.5720.6850.05
1 0.825 0.0280.6850.05
1 3.075 0.1050.6850.05
1 1.5 0.0510.6850.05
2 0.575 0.0390.6850.05
1 2.075 0.0710.6850.05
2 1.7 0.1160.6850.05
1 3.3 0.1130.6850.05
2 12 3.840.80.2
1 8 1.280.80.2
1 10.37 1.6590.80.2
4 1.58 4.1710.80.2
1 0.825 0.1320.80.2
1 3.075 0.4920.8
0.21 1.5 0.240
0.80.2
2 0.575 0.1840.80.2
1 2.075 0.3320.80.2
2 1.7 0.5440.80.2
1 3.3 0.5280.80.2
2 12 7.0200.60.3
0.651 8 2.340
0.60.3
0.651 10.37 3.033
0.60.3
0.654 1.58 2.465
0.60.3
0.651 0.825 0.241
0.60.3
0.651 3.075 1.199
0.60.3
0.651 1.5 0.439
0.60.3
0.652 0.575 0.448
0.60.3
0.65
1 2.075 0.6070.60.3
0.652 1.7 1.326
0.60.3
0.651 3.3 0.965
0.60.3
0.65
1 66.75 2.00250.2
0.1527 0.15 2.734
0.154.5
1 0.15 1.5020.15
66.75
970 0.536 205.26250.395
335 0.636 84.15870.395
4 66.75 237.0960.888
4 188.25 463.8480.616
2 66.75 26.70.2
108 4.5 72.90.15
2 66.75 20.0250.15
Pondasi dan Struktur
Description
Pekerjaan Persiapanpersiapan (pembersihan lapangan dan peralatan) (Ls)Pembuatan direksi kit (Ls)
Pekerjaan Tanah
Urugan sirtu dibawah lantai keramik (m³)
Urugan tanah kembali untuk peninggi lantai (m³)
Pekerjaan Pondasi
Lean Concrete, t = 5 cm (m³)
Pembuatan pagar sementara (m¹)
Galian tanah kembali untuk pondasi batu kali (m³)
Lean Concrete, t = 5 cm (m³)
Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)
Pasangan Batu Kali, t = 650 cm (m³)
Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)
Pasangan Batu Kali, t = 650 cm (m³)
Pekerjaan Beton
Sloof, 150x200 cm (m³)
Pengecoran Kolom K- (m³)
Pengecoran Ring Balok (m³)
Pekerjaan Pembesian
Besi Polos Ø 8 (kg)
Sloof Besi Polos Ø 8 (kg)
Sloof Besi Polos Ø 12 (kg)
Besi Polos Ø 12 (kg)
Pekerjaan Bekisting
Bekisting kolom (m²)
Bekisting Ring balok (m²)
Bekisting Sloof (m²)
Timesing Dimension SqueringPEKERJAAN TANAH
1/1.16
97.9821.1374.75
1/ 0.3 23.40078
1/ 0.1 7.80078
PEKERJAAN PONDASI
1/0.1
5.9800.874.75
1/0.15
8.9700.874.75
1/
0.3
20.1820.60.6
74.75PEKERJAAN BEKISTNG
1/ 0.15 22.42574.75
2/1 0.15 7.6146.345
1/ 0.15 7.0605.883
22/1 0.15 5.4004.5
4/1 0.15 12.7925.33
2/1 0.15 5.0764.23
1/ 0.15 76.200127
PEKERJAAN PENULANGAN
1/ 0.887 265.32183674.75
1/39.438
19804.5841.3474.75
1/ 0.887 417.320
1/39.438
29971.3151.24
1/ 0.887 541.470
1/ 39.438 38677.8701.24
PEKERJAAN BETON
1/0.15
2.2420.274.75
2/10.15
0.2860.156.345
1/10.15
0.2650.155.883
22/10.15
2.2280.154.5
4/10.15
0.4800.155.33
2/10.15
0.3810.154.23
1/0.15
11.4300.15127
DescriptionPEKERJAAN TANAH
Galian Pondasi Batu Kali (m³)
PEKERJAAN PONDASI
Pasir Padat t=100 mm
PEKERJAAN BEKISTNG
Bekisting Sloof (m²)
PEKERJAAN PENULANGAN
Sloof 4 D12
Sloof D8 - 200
Urugan sirtu dibawah lantai keramik (m³)
Urugan tanah kembali untuk peninggi lantai (m³)
Pasangan Batu Kosong (Anstamping), t = 20 cm (m³)
Pasangan Batu Kali, t = 600 cm (m³)
Bekisting Kolom 150x150 cm, t=6.345 m (m²)
Bekisting Kolom 150x150 cm, t=5.883 m (m²)
Bekisting Kolom 150x150 cm, t=4.5 m (m²)
Bekisting Ring Balk 150x150 cm , sisi miring 1 (m²)
Bekisting Ring Balk 150x150 cm , sisi miring 2 (m²)
Bekisting Ring Balk 150x150 cm (m²)
Kolom 4 D12
Kolom D8 - 200
Ring Balk 4 D12
Ring Balk D8 - 200
PEKERJAAN BETON
Sloof, 150x200 cm (m³)
Kolom 150x150 cm, t=4.5 m (m³)
Ring Balk 150x150 cm
Kolom 150x150 cm, t=6.345 m (m³)
Kolom 150x150 cm, t=5.883 m (m³)
Ring Balk 150x150 cm , sisi miring 1 (m³)
Ring Balk 150x150 cm , sisi miring 2 (m³)