INPUT DATA : fc' = 20 Mpa H1 = 3.5 mfy = 240 Mpa H2 = 4 mL1 = 3.2 mL2 = 3.6 m
Kedalaman tanah keras = 4 m
Tujuan bangunan = PERTOKOAN
Beban hidup yang bekerja = 250 kg/m2
Data Perencanaan struktur:
Mutu beton (fc) = 21 MPAMutu Baja Utama = 400 MPAMutu Baja sengkang = 240 MPAJenis Tanah = LunakZona Gempa = Wilayah 3
Kombinasi Pembebanan = 1.4D1.2D+1.6L1.2D+1.0L+1.0G1.2D+1.0L-1.0G
Perhitungan Plat Tangga- Arah Memanjang
MU = 1726.21 kg-m
Dimensi Plati:b = 1000 mm : Arah Xt = 150 mm : Tebal Platfc = 21 MPA : Mutu Beton
fy = 400 MPA : Mutu Bajad' = 60 mm : Tebal Selimutd = 90 mm : Tebal Efektif
Momen Negatif= 1726.21 kg-cm
maka As = 1726.210.8 x 2400 x 0.9 x 16
= 0.62 cm digunakan Φ 12 - 175 mm = 646.53
- Arah MelebarMU = 652.17 kg-m
Dimensi Plati:b = 1000 mm : Arah Xt = 150 mm : Tebal Platfc = 21 MPA : Mutu Betonfy = 400 MPA : Mutu Bajad' = 60 mm : Tebal Selimutd = 90 mm : Tebal Efektif
Momen Negatif= 652.17 kg-cm
maka As = 652.170.8 x 2400 x 0.9 x 16
= 0.24 cm digunakan Φ 10 - 200 mm = 392.86
IV PERHITUNGAN PONDASI FOOTPLATIV.1. PERHITUNGAN PONDASI FOOTPLAT UK. 2,2X2,2X0.35 mP.Max = 377783.11 kg + 4933.8 kg
= 383 ton
Pemodelan Pondasi footplat Uk 2,2x2,2x0.35 m
Momen maksimun Plat lantai Pondasi 2,2x2,2x0,35 m
Penulangan arah x (2,2m-memanjang)Lapis atas dan lapis bawah pondasi
MU = 88160.89 kg-m
Dimensi kaki pondasi:b = 1000 mm : Arah Xt = 350 mm : Tebal Plat
fc = 21 MPA : Mutu Betonfy = 400 MPA : Mutu Bajad' = 60 mm : Tebal Selimutd = 290 mm : Tebal Efektif
Momen Negatif= 881608.9 kg-cm
maka As = 881608.90.8 x 2400 x 0.9 x 16
= 318.87 mm digunakan Φ 16 - 200 mm = 1005.7
IV.2. PERHITUNGAN PONDASI FOOTPLAT UK. 4.2X2.2X0.3 mP1 = 191483.3 kg + 283051.3 kg
= 47 tonP2 = 139281.6 kg + 261806.6 kg
= 401 ton
Pemodelan Pondasi footplat Uk 4.2X2.2X0.3 m
Momen maksimun Plat lantai Pondasi 4.2X2.2X0.3 m
Penulangan arah x (4,2m-memanjang)Lapis atas dan lapis bawah pondasi
MU = 387600.5 kg-m
Dimensi kaki pondasi:b = 1000 mm : Arah Xt = 300 mm : Tebal Platfc = 21 MPA : Mutu Betonfy = 400 MPA : Mutu Bajad' = 60 mm : Tebal Selimutd = 240 mm : Tebal Efektif
Momen Negatif= 3876005 kg-cm
maka As = 38760050.8 x 2400 x 0.9 x 16
= 1401.91 mm digunakan Φ 16 - 125 mm = 1609.1
Momen maksimun Plat lantai Pondasi 4.2X2.2X0.3 m
Penulangan arah x (4,2m-memanjang)Lapis atas dan lapis bawah pondasi
MU = 292503.3 kg-m
Dimensi kaki pondasi:b = 1000 mm : Arah Xt = 300 mm : Tebal Platfc = 21 MPA : Mutu Betonfy = 400 MPA : Mutu Bajad' = 60 mm : Tebal Selimutd = 240 mm : Tebal Efektif
Momen Negatif= 2925033 kg-cm
II. PLAT LANTAI 41. Tinjauan pembebanan plat lantai 4
Pembebanan pada plat lantai 4 menurut PBI 1983 hal 11, 12, dan 17 yaitu :a. Beban mati
- Berat sendiri plat = 0.12 2400 = 288
- Berat Plafond = 20 = 20
- finishing lantai (spesi) = 21 3 cm 63
- Finishing plat lantai (5 cm) = 24 2 cm = 48 +
419
b. Beban hidup
P = 400
c. Beban Totalq = 1.2 qd + 1.6 ql= 1.2 419 + 1.6 400
= 1142.8d. ditentukan diameter tulangan = 10 mme. Tebal selimut = 20 mm
2. Tinjauan PlatTabel Markus, PBI 1971. Tabel 13.3.1.a. Tinjau Panel 1 LX
Lx = 3 mLy = 3 m
Bentang Panjang=
Ly=
3= 1
Bentang Pendek Lx 3
Mlx = 0.001 q CMlx = 0.001 1143 9 53.5 = 549.7439 kgm
Mly = 0.001 q CMly = 0.001 1143 9 37.7 = 387.2378 kgm
Mtx = -0.001 q CMtx = -0.001 1143 9 105.9 = -1089.2 kgm
Mty = -0.001 q Cmty = -0.001 1143 9 105.9 = -1089.2 kgm
Tulangan Arah xd = 120 - 20 + 5= 120 - 25 dy = 8.5 cm= 95 mm = 9.5 cm dx= 9.5 cm
Tulangan Arah yd = 120 - 20 + 10 + 5= 120 - 35= 85 mm = 8.5 cm
a. Mlx = 549.7439 kgm = 54974.39 kgcm ( Lapangan )
- fy d As +Mu
= 01.7 f'c b
4000 2- 4000 9.5 As +
54974.39= 0
kg/m2
kg/m2
kg/m1
kg/m2
kg/m2
kg/m2
kg/m2
Lx2
Lx2
Lx2
Lx2
fy2
As2
As2
88
20
1.7 210 100- 4000 9.5 As +
1= 0
448.1792717087 - 38000 As + 54974.39 = 0
Dengan rumus ABC di peroleh :
As =38000 38000 2 - 4 448.179272 54974.39 0.5
896.3585434174
As =38000 36680.328
= 1.4723896.3585434174
As2
As2
Pada lebar jalur kolom 100 cm atau 1.4723 per m' jalur kolom
= 10 - 15 = 5.233333Kontrol :
=1.4
=1.4
= 0.0035fy 400
=As
=5.23333333
= 0.005509b d 100 9.5
= 0.75 0.850.85 f'c 600
fy 600 + fy
= 0.75 0.850.85 210 600
400 600 + 400
= 0.170691
< < ……….. Okey
b. Mtx = -1089.2 kgm = -108920 kgcm (Tumpuan )
- fy d As +Mu
= 01.7 f'c b
4000 2- 4000 9.5 As +
108920= 0
1.7 210 100 1
448.1792717087 - 38000 As + 108920 = 0
Dengan rumus ABC di peroleh :
As = 38000 38000 2 - 4 448.179272 108920.27 0.5896.3585434174
As = 38000 35337.4698 = 2.9704896.3585434174
Pada lebar jalur kolom 100 cm atau 2.9704 per m' jalur kolom
= 10 - 15 = 5.233333Kontrol :
=1.4
=1.4
= 0.0035fy 400
=As
=5.23333333
= 0.005509b d 100 9.5
= 0.75 0.850.85 f'c 600
fy 600 + fy
= 0.75 0.850.85 210 600
400 600 + 400
= 0.170691
cm2
Dipilih tulangan arah L1 cm2
min
ada
maks
min
ada
maks
fy2
As2
As2
As2
cm2
Dipilih tulangan arah L1 cm2
min
ada
maks
< < ……….. Okey
Tulangan Arah y
a. Mly = 387.2378 kgm = 38723.78 kgcm ( Lapangan )
- fy d As +Mu
= 01.7 f'c b
4000 2- 4000 8.5 As +
38723.78= 0
1.7 210 100 1
448.1792717087 - 34000 As + 38723.78 = 0
Dengan rumus ABC di peroleh :
As =34000 34000 2 - 4 448.179272 38723.78 0.5
896.3585434174
As =34000 32963.3011
= 1.1566896.3585434174
Pada lebar jalur kolom 100 cm atau 1.1566 per m' jalur kolom
= 10 - 15 = 5.233333Kontrol :
=1.4
=1.4
= 0.0035fy 400
=As
=5.23333333
= 0.006157b d 100 8.5
= 0.75 0.850.85 f'c 600
fy 600 + fy
= 0.75 0.850.85 210 600
400 600 + 400
= 0.170691
< < ……….. Okey
b. Mty = -1089.2 kgm = -108920 kgcm (Tumpuan )
- fy d As +Mu
= 01.7 f'c b
4000 2- 4000 8.5 As +
108920= 0
1.7 210 100 1
448.1792717087 - 34000 As + 108920 = 0
Dengan rumus ABC di peroleh :
As = 34000 34000 2 - 4 448.179272 108920.27 0.5
min
ada
maks
fy2
As2
As2
As2
cm2
Dipilih tulangan arah L2 cm2
min
ada
maks
min
ada
maks
fy2
As2
As2
As2
As =896.3585434174
As = 34000 30995.7541 = 3.3516896.3585434174
Pada lebar jalur kolom 100 cm atau 3.3516 per m' jalur kolom
= 10 - 15 = 5.233333Kontrol :
=1.4
=1.4
= 0.0035fy 400
=As
=5.23333333
= 0.006157b d 100 8.5
= 0.75 0.850.85 f'c 600
fy 600 + fy
= 0.75 0.850.85 30 600
400 600 + 400
= 0.024384
< < ……….. Okey
cm2
Dipilih tulangan arah L2 cm2
min
ada
maks
min
ada
maks