L A P O R A N B U L A N A N
Pelaksana Kegiatan : Universitas Khairun - Ternate Pekerjaan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Lokasi Tahun Anggaran : 2012
PROGRESS BULANAN
NO. URAIAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA BOBOT S.D PERIODE LALU PERIODE INI
(Rp) (Rp) VOLUME BOBOT RUPIAH VOLUME BOBOT
I PEKERJAAN PERSIAPAN
Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 1.964% - 0.000% 30.00 58.915%
Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.178% - 0.000% 30.00 35.349%
Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.049%
Rp - Rp -
PEKERJAAN SEKAT DINDING LT. 1
Pek. Sekat Dinding Ruangan Gedung 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.065%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 3.806%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Pengolahan 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.044%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 3.793%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Foto Copy 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359%
- Pekerjaan Rangka Dinding Balok 5X10
Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 6.818%
: Universitas Khairun (Kampus Gambesi)
![Page 2: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/2.jpg)
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.264%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Digital 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.055%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 5.624%
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Kantin 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359%
Rp - - Pekerjaan Rangka Dinding Balok 5X10
Rp -
PEKERJAAN SEKAT DINDING LT 2 0.00 0.00 0.00 0.00 0.000%
Pek. Sekat Dinding Ruang Kepala Perpustakaan 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.076%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.303%
- Pekerjaan Pintu Kaca Satu Bukaan
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.490%
Pek. Sekat Dinding Ruangan Tata Usaha 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Kaca 8 mm
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.694%
Pek. Sekat Dinding Ruang Dapur 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.362%
- Pekerjaan Pintu Panel 1 Bukaan 570,750.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005%
Pek. Sekat Dinding Ruang Pintu Masuk 0.00 0.00 0.00 0.00 0.000%
- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.090%
- Pekerjaan Pintu Panel 2 Bukaan
- Pekerjaan Rangka Dinding Balok 5X10
Rp - 0.00 0.00 Jumlah 54,093,266.50 21.246%
PEKERJAAN SEKAT DINDING LT.3 0.00 0.00 0.00 0.00 0.000%
Pek. Sekat Pintu Masuk 0.00 0.00 0.00 0.00 0.000%
- Pekerjaan Pintu Panel 2 Bukaan
- Pas. Dinding Tripleks 3 mm
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002%
![Page 3: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/3.jpg)
Rp - 0.00 0.00 Jumlah 1,718,192.50 0.675%
PEKERJAAN SEKAT DINDING LT. 4 0.00 0.00 0.00 0.00 0.000%
### Pek. Sekat Dinding Ruang Tangga 0.000%
- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.271%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359%
Rp - - Pekerjaan Rangka Dinding Balok 5X10
Rp - 0.00 0.00 Jumlah 1,610,559.50 0.633%
PEKERJAAN PLAFON 0.00 0.00 0.00 0.00 0.000%
Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.181%
List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.065%
Rp - 0.00 0.00 Jumlah 625,880.00 0.246%
PEKERJAAN PINTU KUNCI DAN ENGSEL 0.00 0.00 0.00 0.00 0.000%
Rp 1.00 Pintu Besi ( Tangga )
Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 1.964%
Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.275%
Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.094%
Kait Angin Bh 20.00 15,000.00 300,000.00 0.118%
Rp 6.00 Engsel Pintu
Rp - 0.00 0.00 Jumlah 7,273,200.00 2.857%
PEKERJAAN PENGECETAN 0.00 0.00 0.00 0.00 0.000%
Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 0.946%
Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.679%
Plafond M2 16.00 28,005.50 448,088.00 0.176%
T O T A L 254,604,295.40 100% 0.00% 94.26%
Diperiksa : Tim Teknis Unkhair
M. Taufiq Yuda Saputra ST., MT NIP. 197507152005011002
![Page 4: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/4.jpg)
![Page 5: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/5.jpg)
L A P O R A N B U L A N A N
PERIODE I : 19 Maret - 15 April 2012 TANGGAL : 17 April 2012 PROSENTASE : 94.26%
PROGRESS BULANAN
PERIODE INI S.D. PERIODE INI SISA KONTRAK S.D PERIODE INI
RUPIAH VOLUME BOBOT RUPIAH VOLUME BOBOT RUPIAH
30.00 58.915% 70.00 -56.951%
30.00 35.349% 70.00 -34.171%
![Page 6: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/6.jpg)
![Page 7: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/7.jpg)
94.26% -91.12%
Dibuat Oleh : CV. NUR AKBAR PERKASA
Muhammad Fajrih Konsultan Pengawas
![Page 8: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/8.jpg)
![Page 9: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/9.jpg)
L A P O R A N B U L A N A N
Pelaksana Kegiatan : Universitas Khairun - Ternate Pekerjaan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Lokasi Tahun Anggaran : 2012
PROGRESS BULANAN
NO. URAIAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA BOBOT S.D PERIODE LALU PERIODE INI
(Rp) (Rp) VOLUME BOBOT RUPIAH VOLUME BOBOT
I PEKERJAAN PERSIAPAN
Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 1.964% 1.00 1.964% 5,000,000 - 0.000%
Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.178% 0.40 0.471% 1,200,000 - 0.000%
Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.049% - 0.000% - - 0.000%
Rp - Rp -
PEKERJAAN SEKAT DINDING LT. 1
Pek. Sekat Dinding Ruangan Gedung 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.065% - 0.000% - 28.57 3.072%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 3.806% - 0.000% - - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Pengolahan 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.044% - 0.000% - 27.97 3.008%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 3.793% - 0.000% - - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Foto Copy 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102% - 0.000% - - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% - 0.000% - - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10
Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 6.818% - 0.000% - 53.19 5.720%
: Universitas Khairun (Kampus Gambesi)
![Page 10: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/10.jpg)
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.264% - 0.000% - - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Digital 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.055% - 0.000% - - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 5.624% - 0.000% - - 0.000%
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow
Pek. Sekat Dinding Ruangan Kantin 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102% - 0.000% - - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% - 0.000% - - 0.000%
Rp - - Pekerjaan Rangka Dinding Balok 5X10
Rp -
PEKERJAAN SEKAT DINDING LT 2 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
Pek. Sekat Dinding Ruang Kepala Perpustakaan 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.076% 131.60 14.152% 36,031,916 - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.303% 197.40 8.606% 21,911,400 - 0.000%
- Pekerjaan Pintu Kaca Satu Bukaan - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.490% 23.20 0.980% 2,496,320 - 0.000%
Pek. Sekat Dinding Ruangan Tata Usaha 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Kaca 8 mm - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.694% 187.60 8.179% 20,823,600 - 0.000%
Pek. Sekat Dinding Ruang Dapur 0.00 0.00 0.00 0.00 0.000% 1.60 0.000% - - 0.000%
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.362% 0.60 0.007% 17,258 - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005% - 0.000% - - 0.000%
Pek. Sekat Dinding Ruang Pintu Masuk 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.090% 16.00 0.181% 460,200 - 0.000%
- Pekerjaan Pintu Panel 2 Bukaan
- Pekerjaan Rangka Dinding Balok 5X10
Rp - 0.00 0.00 Jumlah 54,093,266.50 21.246% - #VALUE! #VALUE! - #VALUE!
PEKERJAAN SEKAT DINDING LT.3 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
Pek. Sekat Pintu Masuk 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
- Pekerjaan Pintu Panel 2 Bukaan
- Pas. Dinding Tripleks 3 mm
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002% - 0.000% - - 0.000%
![Page 11: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/11.jpg)
Rp - 0.00 0.00 Jumlah 1,718,192.50 0.675% - #VALUE! #VALUE! - #VALUE!
PEKERJAAN SEKAT DINDING LT. 4 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
### Pek. Sekat Dinding Ruang Tangga 0.000% - 0.000% - - 0.000%
- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.271% 48.00 0.542% 1,380,600 - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% 3.20 0.717% 1,826,400 - 0.000%
Rp - - Pekerjaan Rangka Dinding Balok 5X10
Rp - 0.00 0.00 Jumlah 1,610,559.50 0.633% - #VALUE! #VALUE! - #VALUE!
PEKERJAAN PLAFON 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.181% - 0.000% - - 0.000%
List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.065% - 0.000% - - 0.000%
Rp - 0.00 0.00 Jumlah 625,880.00 0.246% - #VALUE! #VALUE! - #VALUE!
PEKERJAAN PINTU KUNCI DAN ENGSEL 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
Rp 1.00 Pintu Besi ( Tangga )
Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 1.964% 56.00 10.997% 28,000,000 - 0.000%
Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.275% 118.00 1.622% 4,130,000 - 0.000%
Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.094% - 0.000% - - 0.000%
Kait Angin Bh 20.00 15,000.00 300,000.00 0.118% - 0.000% - - 0.000%
Rp 6.00 Engsel Pintu
Rp - 0.00 0.00 Jumlah 7,273,200.00 2.857% - #VALUE! #VALUE! - #VALUE!
PEKERJAAN PENGECETAN 0.00 0.00 0.00 0.00 0.000% - 0.000% - - 0.000%
Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 0.946% - 0.000% - - 0.000%
Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.679% - 0.000% - - 0.000%
Plafond M2 16.00 28,005.50 448,088.00 0.176% - 0.000% - - 0.000%
T O T A L 254,604,295.40 100% #VALUE! #VALUE!
Diperiksa : Tim Teknis Unkhair
M. Taufiq Yuda Saputra ST., MT NIP. 197507152005011002
![Page 12: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/12.jpg)
![Page 13: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/13.jpg)
L A P O R A N B U L A N A N
PERIODE I : 19 Maret - 15 April 2012 TANGGAL : 17 April 2012 PROSENTASE : #VALUE!
PROGRESS BULANAN
PERIODE INI S.D. PERIODE INI SISA KONTRAK S.D PERIODE INI
RUPIAH VOLUME BOBOT RUPIAH VOLUME BOBOT RUPIAH
- 1.00 1.964% 5,000,000 99.00 0.000% -
- 0.40 0.471% 1,200,000 99.60 0.707% 1,800,000
- - 0.000% - 100.00 1.049% 2,670,000
- - 0.000% - 0.00 0.000% -
7,822,430 28.57 3.072% 7,822,430 27.83 2.993% 7,619,819
- - 0.000% - 87.30 3.806% 9,690,300
- - 0.000% - 1.80 0.404% 1,027,350
- - 0.000% - 0.00 0.000% -
7,658,151 27.97 3.008% 7,658,151 28.23 3.036% 7,729,339
- - 0.000% - 87.00 3.793% 9,657,000
- - 0.000% - 1.80 0.404% 1,027,350
- - 0.000% - 0.00 0.000% -
- - 0.000% - 9.00 0.102% 258,863
- - 0.000% - 1.60 0.359% 913,200
- - 0.000% - 0.00 0.000% -
14,563,356 53.19 5.720% 14,563,356 10.21 1.098% 2,795,485
![Page 14: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/14.jpg)
- - 0.000% - 97.80 4.264% 10,855,800
- - 0.000% - 1.80 0.404% 1,027,350
- - 0.000% - 0.00 0.000% -
- - 0.000% - 84.20 9.055% 23,053,855
- - 0.000% - 129.00 5.624% 14,319,000
- - 0.000% - 1.80 0.404% 1,027,350
- - 0.000% - 0.00 0.000% -
- - 0.000% - 9.00 0.102% 258,863
- - 0.000% - 1.60 0.359% 913,200
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
- 131.60 14.152% 36,031,916 -65.80 -7.076% (18,015,958)
- 197.40 8.606% 21,911,400 -98.70 -4.303% (10,955,700)
-
- 23.20 0.980% 2,496,320 -11.60 -0.490% (1,248,160)
- - 0.000% - 0.00 0.000% -
-
- 187.60 8.179% 20,823,600 -125.80 -5.485% (13,963,800)
- 1.60 0.000% - -1.60 0.000% -
- 0.60 0.007% 17,258 31.40 0.355% 903,143
-
- - 0.000% - 0.24 0.005% 12,102
- - 0.000% - 0.00 0.000% -
- 16.00 0.181% 460,200 -8.00 -0.090% (230,100)
-
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.10 0.002% 5,043
![Page 15: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/15.jpg)
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
- 48.00 0.542% 1,380,600 -24.00 -0.271% (690,300)
- 3.20 0.717% 1,826,400 -1.60 -0.359% (913,200)
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 16.00 0.181% 460,200
- - 0.000% - 16.00 0.065% 165,680
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- 56.00 10.997% 28,000,000 -46.00 -9.034% (23,000,000)
- 118.00 1.622% 4,130,000 -98.00 -1.347% (3,430,000)
- - 0.000% - 15.00 0.094% 240,000
- - 0.000% - 20.00 0.118% 300,000
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 86.00 0.946% 2,408,473
- - 0.000% - 117.16 2.679% 6,821,934
- - 0.000% - 16.00 0.176% 448,088
#VALUE! - #VALUE! 254,604,295
Dibuat Oleh : CV. NUR AKBAR PERKASA
Muhammad Fajrih Konsultan Pengawas
![Page 16: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/16.jpg)
![Page 17: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/17.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% 28.57 28.57 - 0.03 0.03
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% 27.97 27.97 - 0.03 0.03
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% 53.19 53.19 - 0.06 0.06
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 18: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/18.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital -
- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha -
- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur -
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 -
PEKERJAAN SEKAT DINDING LT.311 Pek. Sekat Pintu Masuk
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 -
PEKERJAAN SEKAT DINDING LT. 4
![Page 19: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/19.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27% -
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35%
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19% -
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44% -
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14% -
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48% -
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13% -
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30% -
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - 0.129 0.129
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 20: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/20.jpg)
![Page 21: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/21.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 22: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/22.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 23: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/23.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 24: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/24.jpg)
![Page 25: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/25.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 26: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/26.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 27: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/27.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 28: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/28.jpg)
![Page 29: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/29.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 30: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/30.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 31: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/31.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 32: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/32.jpg)
![Page 33: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/33.jpg)
L A P O R A N B U L A N A N
Pelaksana Kegiatan : Universitas Khairun - Ternate Pekerjaan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Lokasi Tahun Anggaran : 2012
PROGRESS BULANAN
NO. URAIAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA BOBOT S.D PERIODE LALU PERIODE INI
(Rp) (Rp) VOLUME BOBOT RUPIAH VOLUME BOBOT
I PEKERJAAN PERSIAPAN
Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 1.964% 0.80 1.571% 0.20 0.393%
Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.178% 0.20 0.236% 0.20 0.236%
Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.049% - 0.000% - 0.000%
Rp - Rp - - 0.000% 0.000%
PEKERJAAN SEKAT DINDING LT. 1 - 0.000% 0.000%
Pek. Sekat Dinding Ruangan Gedung 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.065% - 0.000% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 3.806% - 0.000% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow - 0.000% 0.000%
Pek. Sekat Dinding Ruangan Pengolahan 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.044% - 0.000% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 3.793% - 0.000% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow - 0.000% 0.000%
Pek. Sekat Dinding Ruangan Foto Copy 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102% - 0.000% - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% - 0.000% - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 - 0.000% 0.000%
Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 6.818% - 0.000% - 0.000%
: Universitas Khairun (Kampus Gambesi)
![Page 34: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/34.jpg)
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.264% - 0.000% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow - 0.000% 0.000%
Pek. Sekat Dinding Ruangan Digital 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.055% - 0.000% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 5.624% - 0.000% - 0.000%
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.404% - 0.000% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow - 0.000% 0.000%
Pek. Sekat Dinding Ruangan Kantin 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.102% - 0.000% - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% - 0.000% - 0.000%
Rp - - Pekerjaan Rangka Dinding Balok 5X10 - 0.000% 0.000%
Rp - - 0.000% 0.000%
PEKERJAAN SEKAT DINDING LT 2 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
Pek. Sekat Dinding Ruang Kepala Perpustakaan 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.076% 65.80 7.076% 65.80 7.076%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.303% 98.70 4.303% 98.70 4.303%
- Pekerjaan Pintu Kaca Satu Bukaan - 0.000% 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.490% 11.60 0.490% 11.60 0.490%
Pek. Sekat Dinding Ruangan Tata Usaha 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Kaca 8 mm - 0.000% 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.694% 93.80 4.089% 93.80 4.089%
Pek. Sekat Dinding Ruang Dapur 0.00 0.00 0.00 0.00 0.000% - 0.000% 1.60 0.000%
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.362% 0.30 0.003% 0.30 0.003%
- Pekerjaan Pintu Panel 1 Bukaan 570,750.00 - 0.000% 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005% - 0.000% - 0.000%
Pek. Sekat Dinding Ruang Pintu Masuk 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.090% 8.00 0.090% 8.00 0.090%
- Pekerjaan Pintu Panel 2 Bukaan 2.80 0.000% 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 0.09 0.000% 0.000%
Rp - 0.00 0.00 Jumlah 54,093,266.50 21.246% - #VALUE! - #VALUE!
PEKERJAAN SEKAT DINDING LT.3 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
Pek. Sekat Pintu Masuk 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
- Pekerjaan Pintu Panel 2 Bukaan - 0.000% 0.000%
- Pas. Dinding Tripleks 3 mm - 0.000% 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002% - 0.000% - 0.000%
![Page 35: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/35.jpg)
Rp - 0.00 0.00 Jumlah 1,718,192.50 0.675% - #VALUE! - #VALUE!
PEKERJAAN SEKAT DINDING LT. 4 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
### Pek. Sekat Dinding Ruang Tangga 0.000% - 0.000% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.271% 24.00 0.271% 24.00 0.271%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.359% 1.60 0.359% 1.60 0.359%
Rp - - Pekerjaan Rangka Dinding Balok 5X10 - 0.000% 0.000%
Rp - 0.00 0.00 Jumlah 1,610,559.50 0.633% - #VALUE! - #VALUE!
PEKERJAAN PLAFON 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.181% - 0.000% - 0.000%
List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.065% - 0.000% - 0.000%
Rp - 0.00 0.00 Jumlah 625,880.00 0.246% - #VALUE! - #VALUE!
PEKERJAAN PINTU KUNCI DAN ENGSEL 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
Rp 1.00 Pintu Besi ( Tangga ) - 0.000% 0.000%
Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 1.964% 28.00 5.499% 28.00 5.499%
Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.275% 59.00 0.811% 59.00 0.811%
Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.094% - 0.000% - 0.000%
Kait Angin Bh 20.00 15,000.00 300,000.00 0.118% - 0.000% - 0.000%
Rp 6.00 Engsel Pintu - 0.000% 0.000%
Rp - 0.00 0.00 Jumlah 7,273,200.00 2.857% - #VALUE! - #VALUE!
PEKERJAAN PENGECETAN 0.00 0.00 0.00 0.00 0.000% - 0.000% - 0.000%
Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 0.946% - 0.000% - 0.000%
Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.679% - 0.000% - 0.000%
Plafond M2 16.00 28,005.50 448,088.00 0.176% - 0.000% - 0.000%
T O T A L 254,604,295.40 100% #VALUE! #VALUE!
Diperiksa : Tim Teknis Unkhair
M. Taufiq Yuda Saputra ST., MT NIP. 197507152005011002
![Page 36: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/36.jpg)
![Page 37: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/37.jpg)
L A P O R A N B U L A N A N
BULAN : PERTAMA TANGGAL : 20 September s/d 19 Oktober PROSENTASE : #VALUE!
PROGRESS BULANAN
PERIODE INI S.D. PERIODE INI SISA KONTRAK S.D PERIODE INI
RUPIAH VOLUME BOBOT RUPIAH VOLUME BOBOT RUPIAH
1,000,000 1.00 1.964% 5,000,000 99.00 0.000% -
600,000 0.40 0.471% 1,200,000 99.60 0.707% 1,800,000
- - 0.000% - 100.00 1.049% 2,670,000
0.000%
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 56.40 6.065% 15,442,250
- - 0.000% - 87.30 3.806% 9,690,300
- - 0.000% - 1.80 0.404% 1,027,350
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 56.20 6.044% 15,387,490
- - 0.000% - 87.00 3.793% 9,657,000
- - 0.000% - 1.80 0.404% 1,027,350
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 9.00 0.102% 258,863
- - 0.000% - 1.60 0.359% 913,200
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 63.40 6.818% 17,358,841
![Page 38: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/38.jpg)
- - 0.000% - 97.80 4.264% 10,855,800
- - 0.000% - 1.80 0.404% 1,027,350
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 84.20 9.055% 23,053,855
- - 0.000% - 129.00 5.624% 14,319,000
- - 0.000% - 1.80 0.404% 1,027,350
0.000% -
- - 0.000% - 0.00 0.000% -
- - 0.000% - 9.00 0.102% 258,863
- - 0.000% - 1.60 0.359% 913,200
0.000%
0.000%
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
18,015,958 131.60 14.152% 36,031,916 -65.80 -7.076% (18,015,958)
10,955,700 197.40 8.606% 21,911,400 -98.70 -4.303% (10,955,700)
0.000%
1,248,160 23.20 0.980% 2,496,320 -11.60 -0.490% (1,248,160)
- - 0.000% - 0.00 0.000% -
0.000%
10,411,800 187.60 8.179% 20,823,600 -125.80 -5.485% (13,963,800)
- 1.60 0.000% - -1.60 0.000% -
8,629 0.60 0.007% 17,258 31.40 0.355% 903,143
0.000% -
- - 0.000% - 0.24 0.005% 12,102
- - 0.000% - 0.00 0.000% -
230,100 16.00 0.181% 460,200 -8.00 -0.090% (230,100)
0.000%
0.000%
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
0.000%
0.000%
- - 0.000% - 0.10 0.002% 5,043
![Page 39: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/39.jpg)
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 0.00 0.000% -
690,300 48.00 0.542% 1,380,600 -24.00 -0.271% (690,300)
913,200 3.20 0.717% 1,826,400 -1.60 -0.359% (913,200)
0.000%
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 16.00 0.181% 460,200
- - 0.000% - 16.00 0.065% 165,680
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
0.000%
14,000,000 56.00 10.997% 28,000,000 -46.00 -9.034% (23,000,000)
2,065,000 118.00 1.622% 4,130,000 -98.00 -1.347% (3,430,000)
- - 0.000% - 15.00 0.094% 240,000
- - 0.000% - 20.00 0.118% 300,000
0.000%
#VALUE! - #VALUE! #VALUE! 0.00 #VALUE! #VALUE!
- - 0.000% - 0.00 0.000% -
- - 0.000% - 86.00 0.946% 2,408,473
- - 0.000% - 117.16 2.679% 6,821,934
- - 0.000% - 16.00 0.176% 448,088
#VALUE! #VALUE! #VALUE! #VALUE!
Dibuat Oleh : CV. NUR AKBAR PERKASA
Muhammad Fajrih. ST Konsultan Pengawas
![Page 40: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/40.jpg)
![Page 41: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/41.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 42: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/42.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 43: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/43.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 44: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/44.jpg)
![Page 45: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/45.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 46: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/46.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 47: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/47.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 48: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/48.jpg)
![Page 49: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/49.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% 0.80 - 0.80 0.00 - 0.00
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% 0.20 - 0.20 0.00 - 0.00
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% 0.00 - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% 0.00 - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% 0.00 - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
![Page 50: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/50.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% 0.00 - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% 0.00 - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% 0.00 -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% 65.80 - 65.80 0.08 - 0.08
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% 98.70 - 98.70 0.05 - 0.05
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% 0.00 -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% 11.60 - 11.60 0.01 - 0.01
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% 0.00 -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% 93.80 - 93.80 0.04 - 0.04
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% 0.30 - 0.30 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% 0.00 - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% 8.00 - 8.00 0.00 - 0.00
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 2.80 - 2.80 0.01 - 0.01
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% 0.09 - 0.09 0.00 - 0.00
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 0.00 -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% 0.00 -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% 0.00 - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 51: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/51.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% 24.00 - 24.00 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 1.60 - 1.60 0.00 - 0.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% 0.00 -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% 0.00 - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% 0.00 - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% 28.00 - 28.00 0.06 - 0.06
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% 59.00 - 59.00 0.01 - 0.01
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% 0.00 - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% 0.00 - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% 0.00 -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% 15.00 - 15.00 0.00 - 0.00
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% 0.00 - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% 0.00 - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19% 0.00
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44% 0.00
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14% 0.00
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48% 0.00
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13% 0.00
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30% 0.00
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% 0.26 - 0.260
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 52: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/52.jpg)
![Page 53: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/53.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% 0.80 - 0.80 0.00 - 0.00
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% 0.20 - 0.20 0.00 - 0.00
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% 0.00 - - - - -
Jumlah 10,670,000.00 II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% 0.00 - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% 0.00 - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% 0.00 - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
![Page 54: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/54.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% 0.00 - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% 0.00 - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% 0.00 - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% 0.00 - -
6 Pek. Sekat Dinding Ruangan Kantin 0.00
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% 0.00 - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% 0.00 -
Jumlah 124,722,447.75 PEKERJAAN SEKAT DINDING LT 2
7 Pek. Sekat Dinding Ruang Kepala Perpustakaan- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% 65.80 - 65.80 0.08 - 0.08
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% 98.70 - 98.70 0.05 - 0.05
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% 0.00 -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% 11.60 - 11.60 0.01 - 0.01
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% 0.00 -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% 93.80 - 93.80 0.04 - 0.04
Pek. Sekat Dinding Ruang Dapur 0.00
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% 0.30 - 0.30 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 0.00 -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% 0.00 - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% 8.00 - 8.00 0.00 - 0.00
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 2.80 - 2.80 0.01 - 0.01
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% 0.09 - 0.09 0.00 - 0.00
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 0.00 -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% 0.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% 0.00 - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 55: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/55.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% 24.00 - 24.00 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 1.60 - 1.60 0.00 - 0.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% 0.00 -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% 0.00 - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% 0.00 - - - - -
Jumlah 625,880.00 0.27% 0.00 -
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% 0.00 -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% 28.00 - 28.00 0.06 - 0.06
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% 59.00 - 59.00 0.01 - 0.01
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% 0.00 - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% 0.00 - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% 0.00 -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% 15.00 - 15.00 0.00 - 0.00
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% 0.00 - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% 0.00 - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19% 0.00 -
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44% 0.00 -
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14% 0.00 -
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48% 0.00 -
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13% 0.00 -
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30% 0.00 -
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% 0.26 - 0.260
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 56: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/56.jpg)
![Page 57: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/57.jpg)
L A P O R A N B U L A N A N
Pelaksana Kegiatan : Universitas Khairun - Ternate Pekerjaan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Lokasi Tahun Anggaran : 2012
PROGRESS BULANAN
NO. URAIAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA BOBOT S.D PERIODE LALU PERIODE INI
(Rp) (Rp) VOLUME BOBOT RUPIAH VOLUME BOBOT
I PEKERJAAN PERSIAPAN
1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.147% 0.000% - 0.80 1.717%
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.288% 0.000% - 0.20 0.258%
3 Dokumentasi dan Pelaporan 100.00 2,670,000.00 2,670,000.00 1.146% 0.000% - - 0.000%
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 1 - 0.000%
1 Pek. Sekat Dinding Ruangan Gedung - 0.000%
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.629% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.160% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% - 0.000%
2 Pek. Sekat Dinding Ruangan Pengolahan -
- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.606% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.146% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% - 0.000%
3 Pek. Sekat Dinding Ruangan Foto Copy
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002% - 0.000%
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat -
- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.452% - 0.000%
: Universitas Khairun (Kampus Gambesi)
![Page 58: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/58.jpg)
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.660% - 0.000%
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% - 0.000%
5 Pek. Sekat Dinding Ruangan Digital
- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.897% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.147% - 0.000%
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% - 0.000%
6 Pek. Sekat Dinding Ruangan Kantin
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - 0.000%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002% - 0.000%
0 Jumlah 124,722,447.75
PEKERJAAN SEKAT DINDING LT 2
7 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.734% 65.80 7.734%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.703% 98.70 4.703%
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.882% - 0.000%
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.536% 11.60 0.536%
8 Pek. Sekat Dinding Ruangan Tata Usaha
- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.843% - 0.000%
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.945% 93.80 4.470%
9 Pek. Sekat Dinding Ruang Dapur 0.00 0.00 0.00 0.00 0.000% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.395% 0.30 0.004%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005% - 0.000%
10 Pek. Sekat Dinding Ruang Pintu Masuk
- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.099% 8.00 0.099%
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% 2.80 0.686%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.002% 0.09 0.002%
Jumlah 54,093,266.50 -
PEKERJAAN SEKAT DINDING LT.3 -
11 Pek. Sekat Pintu Masuk - 0.000%
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% - 0.000%
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.049% - 0.000%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002% - 0.000%
![Page 59: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/59.jpg)
Jumlah 1,718,192.50
PEKERJAAN SEKAT DINDING LT. 4
12 Pek. Sekat Dinding Ruang Tangga
- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.296% 24.00 0.296%
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% 1.60 0.392%
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.003% - 0.000%
Jumlah 1,610,559.50
III PEKERJAAN PLAFON -
1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.198% - 0.000%
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.071% - 0.000%
Jumlah 625,880.00
IV PEKERJAAN PINTU KUNCI DAN ENGSEL
1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.092% - 0.000%
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.147% 28.00 6.010%
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.301% 59.00 0.887%
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.103% - 0.000%
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.129% - 0.000%
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.351% - 0.000%
Jumlah 7,273,200.00
V PEKERJAAN PENGECETAN
1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.034% 15.00 0.180%
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.929% - 0.000%
3 Plafond M2 16.00 28,005.50 448,088.00 0.192% - 0.000%
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.192% - 0.000%
Jumlah 10,126,582.90 -
VI PEKERJAAN SANITASI -
1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.435% - 0.000%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.142% - 0.000%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.476% - 0.000%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.132% - 0.000%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.299% - 0.000%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% 0.00% 27.97%
Diperiksa : Tim Teknis Unkhair
M. Taufiq Yuda Saputra ST., MT NIP. 197507152005011002
![Page 60: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/60.jpg)
![Page 61: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/61.jpg)
L A P O R A N B U L A N A N
BULAN : PERTAMA TANGGAL : 20 September s/d 19 Oktober PROSENTASE : 27.97%
PROGRESS BULANAN
PERIODE INI S.D. PERIODE INI SISA KONTRAK S.D PERIODE INI
RUPIAH VOLUME BOBOT RUPIAH VOLUME BOBOT RUPIAH
4,000,000 0.80 1.717% 4,000,000 99.20 0.429% 1,000,000
600,000 0.20 0.258% 600,000 99.80 1.030% 2,400,000
- - 0.000% - 100.00 1.146% 2,670,000
0.000%
0.000% - 0.00 0.000% -
- - 0.000% - 56.40 6.629% 15,442,250
- - 0.000% - 87.30 4.160% 9,690,300
- - 0.000% - 1.80 0.441% 1,027,350
0.000% - 5.80 0.268% 624,080
- - 0.000% - 56.20 6.606% 15,387,490
- - 0.000% - 87.00 4.146% 9,657,000
- - 0.000% - 1.80 0.441% 1,027,350
0.000% - 5.80 0.268% 624,080
- - 0.000% - 9.00 0.111% 258,863
- - 0.000% - 1.60 0.392% 913,200
0.000% - 0.08 0.002% 4,034
- - 0.000% - 63.40 7.452% 17,358,841
![Page 62: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/62.jpg)
- - 0.000% - 97.80 4.660% 10,855,800
- - 0.000% - 1.80 0.441% 1,027,350
0.000% - 5.80 0.268% 624,080
- - 0.000% - 84.20 9.897% 23,053,855
- - 0.000% - 129.00 6.147% 14,319,000
- - 0.000% - 1.80 0.441% 1,027,350
0.000% -
- - 0.000% - 9.00 0.111% 258,863
- - 0.000% - 1.60 0.392% 913,200
0.000% 0.08 0.002% 4,034
18,015,958 65.80 7.734% 18,015,958 0.00 0.000% -
10,955,700 98.70 4.703% 10,955,700 0.00 0.000% -
- - 0.000% - 3.60 0.882% 2,054,700
1,248,160 11.60 0.536% 1,248,160 0.00 0.000% -
- 0.000% 4.843% 11,280,509
10,411,800 93.80 4.470% 10,411,800 -32.00 -1.525% (3,552,000)
- - 0.000% - 0.00 0.000% -
8,629 0.30 0.004% 8,629 31.70 0.391% 911,771
0.000% -
- - 0.000% - 0.24 0.005% 12,102
230,100 8.00 0.099% 230,100 0.00 0.000% -
1,598,100 2.80 0.686% 1,598,100 0.00 0.000% -
4,538 0.09 0.002% 4,538 0.00 0.000% -
-
- - 0.000% - 0.00 0.000% -
- - 0.000% - 2.80 0.686% 1,598,100
- - 0.000% - 4.00 0.049% 115,050
- - 0.000% - 0.10 0.002% 5,043
![Page 63: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/63.jpg)
690,300 24.00 0.296% 690,300 0.00 0.000% -
913,200 1.60 0.392% 913,200 0.00 0.000% -
- - 0.000% - 0.14 0.003% 7,060
- - 0.000% - 16.00 0.198% 460,200
- - 0.000% - 16.00 0.071% 165,680
- - 0.000% - 2.00 0.092% 215,200
14,000,000 28.00 6.010% 14,000,000 -18.00 -3.864% (9,000,000)
2,065,000 59.00 0.887% 2,065,000 -39.00 -0.586% (1,365,000)
- - 0.000% - 15.00 0.103% 240,000
- - 0.000% - 20.00 0.129% 300,000
- - 0.000% - 20.00 0.351% 818,000
-
15.00 0.180% 420,083 71.00 0.854% 1,988,391
- 0.000% - 117.16 2.929% 6,821,934
- 0.000% - 16.00 0.192% 448,088
- 0.000% - 16.00 0.192% 448,088
- - 0.000% - 152.00 3.435% 8,002,344
- - 0.000% - 10.00 0.142% 330,000
- - 0.000% - 32.00 2.476% 5,766,848
- - 0.000% - 1.60 0.132% 308,240
- - 0.000% - 32.00 3.299% 7,684,835
27.97% 65,161,567 65.32% 152,143,626
Dibuat Oleh : CV. NUR AKBAR PERKASA
Muhammad Fajrih. ST Konsultan Pengawas
![Page 64: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/64.jpg)
![Page 65: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/65.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% 0.80 - 0.80 0.00 - 0.00
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% 0.20 - 0.20 0.00 - 0.00
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - - -
Jumlah 10,670,000.00 - -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
3 Pek. Sekat Dinding Ruangan Foto Copy - -
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - - -
![Page 66: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/66.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
Jumlah 124,722,447.75 - -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - 65.80 65.80 - 0.08 0.08
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% 98.70 - 98.70 0.05 - 0.05
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - 11.60 11.60 - 0.01 0.01
Pek. Sekat Dinding Ruangan Tata Usaha - -
- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% - 41.20
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% 61.80 32.00 93.80 0.03 0.02 0.04
Pek. Sekat Dinding Ruang Dapur - 1.60
- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% 0.30 - 0.30 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% 8.00 - 8.00 0.00 - 0.00
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 2.80 - 2.80 0.01 - 0.01
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% 0.09 - 0.09 0.00 - 0.00
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 67: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/67.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% 24.00 - 24.00 0.00 - 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 1.60 - 1.60 0.00 - 0.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% - -
Jumlah 1,610,559.50 - -
III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - - -
Jumlah 625,880.00 0.27% - -
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% - -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% 3.00 25.00 28.00 0.01 0.05 0.06
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% 4.00 55.00 59.00 0.00 0.01 0.01
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% - -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% 15.00 - 15.00 0.00 - 0.00
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19% - -
Jumlah 10,126,582.90 - -
VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44% - -
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14% - -
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48% - -
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13% - -
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30% - -
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% 0.10 0.160 0.260
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 68: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/68.jpg)
![Page 69: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/69.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% 0.80 0.80 - 0.00 0.00
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% 0.20 0.20 - 0.00 0.00
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 70: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/70.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin -
- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% 98.70 98.70 - 0.05 0.05
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% 61.80 61.80 - 0.03 0.03
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% 0.30 0.30 - 0.00 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% 8.00 8.00 - 0.00 0.00
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% 2.80 2.80 - 0.01 0.01
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% 0.09 0.09 - 0.00 0.00
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 -
PEKERJAAN SEKAT DINDING LT. 4
![Page 71: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/71.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% 24.00 24.00 - 0.00 0.00
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% 1.60 1.60 - 0.00 0.00
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% 0.27
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27% -
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% 2.00
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% 3.00 3.00 - 0.01 0.01
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% 4.00 4.00 - 0.00 0.00
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% 10.00
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% 15.00 15.00 - 0.00 0.00
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19% -
Jumlah 10,126,582.90 -
VI PEKERJAAN SANITASI -
1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44% -
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14% -
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48% -
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13% -
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30% -
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - 0.100 0.100
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 72: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/72.jpg)
![Page 73: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/73.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 5 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
7 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.15% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.29% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.15% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.63% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.16% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.61% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.15% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.45% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.66% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
![Page 74: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/74.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.90% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.15% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.44% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.27% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.11% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.00% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.73% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.70% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.88% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.54% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.84% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.94% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.40% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.01% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.10% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.00% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.69% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.05% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.00% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 75: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/75.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.30% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.39% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.00% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.20% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.07% - - - - -
Jumlah 625,880.00 0.27%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.09% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.15% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.30% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.10% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.13% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.35% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.03% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.93% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.19% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.19%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.44%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.14%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.48%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.13%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.30%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 76: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/76.jpg)
![Page 77: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/77.jpg)
LAPORAN MINGGUAN
Pelaksana Kegiatan : Universitas Khairun - Ternate Periode : Kegiatan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Minggu : I ( Pertama )Lokasi : Universitas Khairun (Kampus Gambesi) Tanggal : Tahun Anggaran : 2012
No Uraian Pekerjaan Sat.HARGA JUMLAH PELAKSANAAN VOLUME KEMAJUAN PEKERJAAN ( % )
Volume SATUAN HARGA Bobot s/d Minggu Minggu s/d Minggu s/d Minggu Minggu s/d Minggu( Rp ) ( Rp ) % Lalu Ini Ini Lalu Ini Ini
1 2 3 4 500.000% 6 7 8=6+7 9=6/4*5 10=7/4*5 11=9+10
700.000% 8 9 10=8+9 11=8/4*7 12=9/4*7 13=11+12I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.147% - - - - -
2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.288% - - - - -
3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.146% - - - - -
Jumlah 10,670,000.00 -
II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.629% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.160% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% -
2 Pek. Sekat Dinding Ruangan Pengolahan- Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.606% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.146% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% -
3 Pek. Sekat Dinding Ruangan Foto Copy- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002% - -
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat- Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.452% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.660% - - - - -
- Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - - - -
![Page 78: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/78.jpg)
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% -
5 Pek. Sekat Dinding Ruangan Digital- Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.897% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.147% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - - - -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% - -
6 Pek. Sekat Dinding Ruangan Kantin- Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002% -
Jumlah 124,722,447.75 -
PEKERJAAN SEKAT DINDING LT 27 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.734% - - - - -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.703% - - - - -
- Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.882% -
- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.536% - - - - -
Pek. Sekat Dinding Ruangan Tata Usaha- Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.843% -
- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.945% - - - - -
Pek. Sekat Dinding Ruang Dapur- Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.395% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005% - - - - -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.099% - - - - -
- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.002% - - - - -
Jumlah 54,093,266.50 PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk- Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% -
- Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.049% -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002% - - - - -
Jumlah 1,718,192.50 PEKERJAAN SEKAT DINDING LT. 4
![Page 79: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/79.jpg)
12 Pek. Sekat Dinding Ruang Tangga- Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.296% - - - - -
- Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - - - -
- Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.003% -
Jumlah 1,610,559.50 III PEKERJAAN PLAFON1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.198% - - - - -
2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.071% - - - - -
Jumlah 625,880.00 0.269%
IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.092% -
2 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.147% - - - - -
3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.301% - - - - -
4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.103% - - - - -
5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.129% - - - - -
6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.351% -
Jumlah 7,273,200.00 V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.034% - - - - -
2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.929% - - - - -
3 Plafond M2 16.00 28,005.50 448,088.00 0.192% - - - - -
4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.192%
Jumlah 10,126,582.90 VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.435%
2 Kran Air Bh 10.00 33,000.00 330,000.00 0.142%
3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.476%
4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.132%
5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.299%
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% - - -
Diperiksa : Dibuat Oleh :Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST NIP. 197507152005011002 Konsultan Pengawas
![Page 80: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/80.jpg)
![Page 81: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/81.jpg)
DAFTAR KUANTITASKementerian Negara / Lembaga : KEMENTERIAN PENDIDIKAN NASIONAL
Unit Esalon : DIREKTORAT PENDIDIKAN TINGGI
Program : PENDIDIKAN TINGGI
Hasil : TERBAYARNYA REHABILITASI GEDUNG PERPUSTAKAAN
Unit Esalon II : UNIVERSITAS KHAIRUN
Kegiatan : PROGRAM PENDIDIKAN TINGGI
Indikator ; REHABILITASI GEDUNG PERPUSTAKAAN
Satuan Ukur : M2
Volume : 950
No URAIAN PEKERJAAN
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembongkaran 100 Ls 5,000,000.00 2 Pembersihan 100 Ls 3,000,000.00 3 Dokumentasi dan Pelaporan 100 Ls 2,670,000.00
Jumlah II PEKERJAAN SEKAT DINDING LT. 1
1 Pek. Sekat Dinding Ruangan Gedung
- Pas. Dinding Kaca 8 mm 56.40 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 87.30 M1 111,000.00 - Pekerjaan Pintu Satu Bukaan 1.80 M2 570,750.00 - Pekerjaan Rangka Pintu Alumunium Hollow 5.80 M1 107,600.00
2 Pek. Sekat Dinding Ruangan Pengolahan
- Pas. Dinding Kaca 8 mm 56.20 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 87.00 M1 111,000.00 - Pekerjaan Pintu Satu Bukaan 1.80 M2 570,750.00 - Pekerjaan Rangka Pintu Alumunium Hollow 5.80 M1 107,600.00
3 Pek. Sekat Dinding Ruangan Foto Copy
- Pas. Dinding Tripleks 3 mm 9.00 M2 28,762.50 - Pekerjaan Pintu Panel 1 Bukaan 1.60 M2 570,750.00 - Pekerjaan Rangka Dinding Balok 5X10 0.08 M3 50,425.00
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat
- Pas. Dinding Kaca 8 mm 63.40 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 97.80 M1 111,000.00 - Pekerjaan Pintu Satu Bukaan 1.80 M2 570,750.00 - Pekerjaan Rangka Pintu Alumunium Hollow 5.80 M1 107,600.00
5 Pek. Sekat Dinding Ruangan Digital
- Pas. Dinding Kaca 8 mm 84.20 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 129.00 M1 111,000.00 - Pekerjaan Pintu Kaca Satu Bukaan 1.80 M2 570,750.00 - Pekerjaan Rangka Pintu Alumunium Hollow 5.80 M1 107,600.00
6 Pek. Sekat Dinding Ruangan Kantin
- Pas. Dinding Tripleks 3 mm 9.00 M2 28,762.50 - Pekerjaan Pintu Panel 1 Bukaan 1.60 M2 570,750.00 - Pekerjaan Rangka Dinding Balok 5X10 0.08 M3 50,425.00
Jumlah PEKERJAAN SEKAT DINDING LT 2
7 Pek. Sekat Dinding Ruang Kepala Perpustakaan
- Pas. Dinding Kaca 8 mm 65.80 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 98.70 M1 111,000.00 - Pekerjaan Pintu Kaca Satu Bukaan 3.60 M2 570,750.00 - Pekerjaan Rangka Pintu Alumunium Hollow 11.60 M1 107,600.00
8 Pek. Sekat Dinding Ruangan Tata Usaha
- Pas. Dinding Kaca 8 mm 41.20 M2 273,798.75 - Pekerjaan Rangka Dinding Alumunium Hollow 61.80 M1 111,000.00
9 Pek. Sekat Dinding Ruang Dapur
- Pas. Dinding Tripleks 3 mm 32.00 M2 28,762.50 - Pekerjaan Pintu Panel 1 Bukaan 1.60 M2 570,750.00 - Pekerjaan Rangka Dinding Balok 5X10 0.24 M3 50,425.00
SATUAN
![Page 82: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/82.jpg)
10 Pek. Sekat Dinding Ruang Pintu Masuk
- Pas. Dinding Tripleks 3 mm 8.00 M2 28,762.50 - Pekerjaan Pintu Panel 2 Bukaan 2.80 M2 570,750.00 - Pekerjaan Rangka Dinding Balok 5X10 0.09 M3 50,425.00
Jumlah PEKERJAAN SEKAT DINDING LT.3
11 Pek. Sekat Pintu Masuk
- Pekerjaan Pintu Panel 2 Bukaan 2.80 M2 570,750.00 - Pas. Dinding Tripleks 3 mm 4.00 M2 28,762.50 - Pekerjaan Rangka Dinding Balok 5X10 0.10 M3 50,425.00
Jumlah PEKERJAAN SEKAT DINDING LT. 4
12 Pek. Sekat Dinding Ruang Tangga
- Pas. Dinding Tripleks 3 mm 24.00 M2 28,762.50 - Pekerjaan Pintu Panel 1 Bukaan 1.60 M2 570,750.00 - Pekerjaan Rangka Dinding Balok 5X10 0.14 M3 50,425.00
Jumlah III PEKERJAAN PLAFON
1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) 16.00 M2 28,762.50 2 List Profil Plafond ( Kmr. Mandi Lt.1 ) 16.00 M' 10,355.00
Jumlah IV PEKERJAAN PINTU KUNCI DAN ENGSEL
1 Pintu Besi ( Tangga ) 2.00 M2 107,600.00 2 Kunci Pintu + Bak Kunci 10.00 Bh 500,000.00 3 Grendel Pintu 20.00 Bh 35,000.00 4 Grendel Jendela 15.00 Bh 16,000.00 5 Kait Angin 20.00 Bh 15,000.00 6 Engsel Pintu 20.00 Bh 40,900.00
Jumlah V PEKERJAAN PENGECETAN
1 Cat Dinding Luar Dalam 2 Kali Lapis 86.00 M2 28,005.50 2 Koseng Pintu Jendela 117.16 M2 58,227.50 3 Plafond 16.00 M2 28,005.50 4 List Profil Plafond 16.00 M' 28,005.50
Jumlah VI PEKERJAAN SANITASI
1 Pipa Paralon PVC Diameter 3 Inchi 152.00 M' 52,647.00 2 Kran Air 10.00 Bh 33,000.00 3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) 32.00 M2 180,214.00 4 Urungan Pasir Dibawah Lantai 1.60 M3 192,650.00 5 Waterproof 32.00 M2 240,151.10
Jumlah
![Page 83: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/83.jpg)
DAFTAR KUANTITAS: KEMENTERIAN PENDIDIKAN NASIONAL
: DIREKTORAT PENDIDIKAN TINGGI
: PENDIDIKAN TINGGI
: TERBAYARNYA REHABILITASI GEDUNG PERPUSTAKAAN
: UNIVERSITAS KHAIRUN
: PROGRAM PENDIDIKAN TINGGI
; REHABILITASI GEDUNG PERPUSTAKAAN
: M2
: 950
6
5,000,000.00 3,000,000.00 2,670,000.00 10,670,000.00
15,442,249.50 9,690,300.00 1,027,350.00 624,080.00
15,387,489.75 9,657,000.00 1,027,350.00 624,080.00
258,862.50 913,200.00 4,034.00
17,358,840.75 10,855,800.00 1,027,350.00 624,080.00
23,053,854.75 14,319,000.00 1,027,350.00 624,080.00
258,862.50 913,200.00 4,034.00 124,722,447.75
18,015,957.75 10,955,700.00 2,054,700.00 1,248,160.00
11,280,508.50 6,859,800.00
920,400.00 913,200.00 12,102.00
![Page 84: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/84.jpg)
230,100.00 1,598,100.00 4,538.25 54,093,266.50
1,598,100.00 115,050.00 5,042.50 1,718,192.50
690,300.00 913,200.00 7,059.50 1,610,559.50
460,200.00 165,680.00 625,880.00
215,200.00 5,000,000.00 700,000.00 240,000.00 300,000.00 818,000.00 7,273,200.00
2,408,473.00 6,821,933.90 448,088.00 448,088.00 10,126,582.90
8,002,344.00 330,000.00 5,766,848.00 308,240.00 7,684,835.20
22,092,267.20
![Page 85: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/85.jpg)
REKAPITULASI RINCIAN ANGGARAN BIAYA (RAB)
Kementerian Negara / Lembaga : KEMENTERIAN PENDIDIKAN NASIONAL
Unit Esalon : DIREKTORAT PENDIDIKAN TINGGI
Program : PENDIDIKAN TINGGI
Hasil : TERBAYARNYA REHABILITASI GEDUNG PERPUSTAKAAN
Unit Esalon II : UNIVERSITAS KHAIRUN
Kegiatan : PROGRAM PENDIDIKAN TINGGI
Indikator ; REHABILITASI GEDUNG PERPUSTAKAAN
Satuan Ukur : M2
Volume : 950
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)1 2 3
I PEKERJAAN PERSIAPAN 10,670,000.00
II PEKERJAAN SEKAT DINDING LANTAI. 1 124,722,447.75
PEKERJAAN SEKAT DINDING LANTAI. 2 54,093,266.50
PEKERJAAN SEKAT DINDING LANTAI. 3 1,718,192.50
PEKERJAAN SEKAT DINDING LANTAI. 4 1,610,559.50
III PEKERJAAN PLAFOND 625,880.00
IV PEKERJAAN PINTU, KUNCI DAN ENGSEL 7,273,200.00
V PEKERJAAN PENGECETAN 10,126,582.90
VI PEKERJAAN SANITASI 22,092,267.20
JUMLAH 232,932,396.35
PPN 10 % 23,293,239.64
JUMLAH TOTAL 256,225,635.98
DIBULATKAN 256,224,999.99
Terbilan : Dua ratus lima puluh enam juta dua ratus dua puluh lima ribu rupiah,-
Ternate : 03 September 2012
CV. LINDA UTAMATTD
Ir. SAMSUL BAYAN
Direktur
![Page 86: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/86.jpg)
L A P O R A N H A R I A N
Pelaksana Kegiatan : Universitas Khairun - Ternate Pekerjaan : Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan Lokasi : Universitas Khairun (Kampus Gambesi) Tahun Anggaran : 2012 Konsultan Pengawas : CV. Nur Akbar Perkasa
Hari/Tgl : Tenaga Material Datang Material Terpakai Alat
Keahlian Jumlah periode ini periode ini Jenis Jumlah
Direksi Tanah Pengawas Sirtu Site Manager Semen Pelaksana Lap Kerikil Kons Pengawas Batu Mekanik Pasir Sopir Kayu Mandor Papan Tukang Kayu Tukang Batu Tukang Besi Pekerja
Waktu Kerja : s/d Jenis Pekerjaan Sat Vol Keterangan
: : : : : : : : : :
Sketsa Pekerjaan Terlaksana :
Kondisi Cuaca : Hujan / Tidak Hujan dari jam ………………….... s/d ………………….... Kendala Lapangan :
Diperiksa Oleh : Dibuat Oleh : Tim Teknis Unkhair CV. NUR AKBAR PERKASA
M. Taufiq Yuda Saputra ST., MT Muhammad Fajrih. ST
NIP. 197507152005011002 Konsultan Pengawas
Jenis Material s/d periode
lalu s/d periode
ini s/d periode
lalu s/d periode
ini
![Page 87: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/87.jpg)
RENCANA DAN REALISASI PELAKSANAAN PEKERJAAN
0 SPMK : Tgl 20 Sep s/d 18 Des 2012 000
No Uraian Pekerjaan Sat.HARGA JUMLAH WAKTU DAN REALISASI PEKERJAAN
Volume SATUAN HARGA Bobot BULAN I BULAN II ( Rp ) ( Rp ) % 1 2 3 4 TOTAL 5
1 2 3 4 5 20 s/d 26 27 s/d 02 03 s/d 10 11 s/d 17 VOLUME 18 s/d 24 7
I PEKERJAAN PERSIAPAN1 Pembongkaran Ls 100.00 5,000,000.00 5,000,000.00 2.147% 0.80 0.80 2 Pembersihan Ls 100.00 3,000,000.00 3,000,000.00 1.288% 0.20 0.20 3 Dokumentasi dan Pelaporan Ls 100.00 2,670,000.00 2,670,000.00 1.146% -
Jumlah 10,670,000.00II PEKERJAAN SEKAT DINDING LT. 11 Pek. Sekat Dinding Ruangan Gedung -
- Pas. Dinding Kaca 8 mm M2 56.40 273,798.75 15,442,249.50 6.629% - - Pekerjaan Rangka Dinding Alumunium Hollow M1 87.30 111,000.00 9,690,300.00 4.160% - - Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268%
2 Pek. Sekat Dinding Ruangan Pengolahan - - Pas. Dinding Kaca 8 mm M2 56.20 273,798.75 15,387,489.75 6.606% - - Pekerjaan Rangka Dinding Alumunium Hollow M1 87.00 111,000.00 9,657,000.00 4.146% - - Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268%
3 Pek. Sekat Dinding Ruangan Foto Copy - - Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - - Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002%
4 Pek. Sekat Dinding Ruang Koleksi Pinjam Singkat - - Pas. Dinding Kaca 8 mm M2 63.40 273,798.75 17,358,840.75 7.452% - - Pekerjaan Rangka Dinding Alumunium Hollow M1 97.80 111,000.00 10,855,800.00 4.660% - - Pekerjaan Pintu Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268%
5 Pek. Sekat Dinding Ruangan Digital - - Pas. Dinding Kaca 8 mm M2 84.20 273,798.75 23,053,854.75 9.897% - - Pekerjaan Rangka Dinding Alumunium Hollow M1 129.00 111,000.00 14,319,000.00 6.147% - - Pekerjaan Pintu Kaca Satu Bukaan M2 1.80 570,750.00 1,027,350.00 0.441% - - Pekerjaan Rangka Pintu Alumunium Hollow M1 5.80 107,600.00 624,080.00 0.268% -
6 Pek. Sekat Dinding Ruangan Kantin - - Pas. Dinding Tripleks 3 mm M2 9.00 28,762.50 258,862.50 0.111% - - Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - Pekerjaan Rangka Dinding Balok 5X10 M3 0.08 50,425.00 4,034.00 0.002%
Jumlah 124,722,447.75PEKERJAAN SEKAT DINDING LT 2
7 Pek. Sekat Dinding Ruang Kepala Perpustakaan - - Pas. Dinding Kaca 8 mm M2 65.80 273,798.75 18,015,957.75 7.734% 65.80 65.80 - Pekerjaan Rangka Dinding Alumunium Hollow M1 98.70 111,000.00 10,955,700.00 4.703% 98.70 98.70 - Pekerjaan Pintu Kaca Satu Bukaan M2 3.60 570,750.00 2,054,700.00 0.882%- Pekerjaan Rangka Pintu Alumunium Hollow M1 11.60 107,600.00 1,248,160.00 0.536% 11.60 11.60
8 Pek. Sekat Dinding Ruangan Tata Usaha - - Pas. Dinding Kaca 8 mm M2 41.20 273,798.75 11,280,508.50 4.843% 41.20- Pekerjaan Rangka Dinding Alumunium Hollow M1 61.80 111,000.00 6,859,800.00 2.945% 61.80 32.00 93.80
9 Pek. Sekat Dinding Ruang Dapur 0.00 0.00 0.00 0.00 0.000% 1.60 1.60 - Pas. Dinding Tripleks 3 mm M2 32.00 28,762.50 920,400.00 0.395% 0.30 0.30 - Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% - - Pekerjaan Rangka Dinding Balok 5X10 M3 0.24 50,425.00 12,102.00 0.005% -
10 Pek. Sekat Dinding Ruang Pintu Masuk- Pas. Dinding Tripleks 3 mm M2 8.00 28,762.50 230,100.00 0.099% 8.00 8.00 - Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% 2.80 - Pekerjaan Rangka Dinding Balok 5X10 M3 0.09 50,425.00 4,538.25 0.002% 0.09
Jumlah 54,093,266.50PEKERJAAN SEKAT DINDING LT.3 -
11 Pek. Sekat Pintu Masuk - - Pekerjaan Pintu Panel 2 Bukaan M2 2.80 570,750.00 1,598,100.00 0.686% - - Pas. Dinding Tripleks 3 mm M2 4.00 28,762.50 115,050.00 0.049% - - Pekerjaan Rangka Dinding Balok 5X10 M3 0.10 50,425.00 5,042.50 0.002% -
Jumlah 1,718,192.50 - PEKERJAAN SEKAT DINDING LT. 4 -
12 Pek. Sekat Dinding Ruang Tangga - - Pas. Dinding Tripleks 3 mm M2 24.00 28,762.50 690,300.00 0.296% 24.00 24.00 - Pekerjaan Pintu Panel 1 Bukaan M2 1.60 570,750.00 913,200.00 0.392% 1.60 1.60 - Pekerjaan Rangka Dinding Balok 5X10 M3 0.14 50,425.00 7,059.50 0.003% 0.270 0.27
Jumlah 1,610,559.50III PEKERJAAN PLAFON - 1 Plafond Tripleks 3 mm (Kmr Mandi Lt. 1 ) M2 16.00 28,762.50 460,200.00 0.198% - 2 List Profil Plafond ( Kmr. Mandi Lt.1 ) M' 16.00 10,355.00 165,680.00 0.071% -
Jumlah 625,880.00 0.269%IV PEKERJAAN PINTU KUNCI DAN ENGSEL1 Pintu Besi ( Tangga ) M2 2.00 107,600.00 215,200.00 0.092% 2.002 Kunci Pintu + Bak Kunci Bh 10.00 500,000.00 5,000,000.00 2.147% 3.00 25.00 28.00 3 Grendel Pintu Bh 20.00 35,000.00 700,000.00 0.301% 4.00 55.00 59.00 4 Grendel Jendela Bh 15.00 16,000.00 240,000.00 0.103% - 5 Kait Angin Bh 20.00 15,000.00 300,000.00 0.129% - 6 Engsel Pintu Bh 20.00 40,900.00 818,000.00 0.351% 10.00
Jumlah 7,273,200.00V PEKERJAAN PENGECETAN1 Cat Dinding Luar Dalam 2 Kali Lapis M2 86.00 28,005.50 2,408,473.00 1.034% 15.00 15.00 2 Koseng Pintu Jendela M2 117.16 58,227.50 6,821,933.90 2.929%3 Plafond M2 16.00 28,005.50 448,088.00 0.192%4 List Profil Plafond M' 16.00 28,005.50 448,088.00 0.192%
Jumlah 10,126,582.90VI PEKERJAAN SANITASI1 Pipa Paralon PVC Diameter 3 Inchi M' 152.00 52,647.00 8,002,344.00 3.435% - 2 Kran Air Bh 10.00 33,000.00 330,000.00 0.142% - 3 Kramik Kamar Mandi Lantai 1 dan 2 ( 30 X 30 ) M2 32.00 180,214.00 5,766,848.00 2.476% - 4 Urungan Pasir Dibawah Lantai M3 1.60 192,650.00 308,240.00 0.132% - 5 Waterproof M2 32.00 240,151.10 7,684,835.20 3.299% -
Jumlah 22,092,267.20
T O T A L 232,932,396.35 100% 0 - 233 232 409 0
![Page 88: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/88.jpg)
![Page 89: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/89.jpg)
Bobot Rencana Bobot Kumulatif Rencana Bobot Realisasi Bobot Kumulatif Realisasi Deviasi
![Page 90: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/90.jpg)
RENCANA DAN REALISASI PELAKSANAAN PEKERJAAN
91
WAKTU DAN REALISASI PEKERJAAN BULAN II BULAN III BULAN IV
6 7 8 TOTAL 9 10 11 12 TOTAL 13 14 15 16 25 s/d 01 02 s/d 08 09 s/d 15 VOLUME 16 s/d 22 23 s/d 29 30 s/d 06 07 s/d 13 VOLUME 14 s/d 20
0.20 0.20 - 1.00 0.80 0.80 - 1.00
- - -
- - - - 28.57 28.57 28.57 - - - - - -
- - - - - 27.97 27.97 27.97 - - - - - -
- - - - - - - - - -
- - - - - 53.19 53.19 53.19 - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - 65.80 - - 98.70
- - - 11.60 - - -
- - - 93.80 - - 1.60 - - 0.30 - - - - - -
- - - - 8.00
-
- - - - - - - - - - - - - - -
- - - - - 24.00 - - 1.60 - - 0.27
- - - - - - - - -
- - 28.00 - - 59.00 - - - - - -
15.00 - - -
- - - - - - - - - - - - - - - - - -
- 0 1 0 1 0 0 0 110 0 519.40
![Page 91: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/91.jpg)
![Page 92: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/92.jpg)
![Page 93: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/93.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Tempat ParkirLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Pondasi II-1 Galian Tanah Pondasi 0.35 x 0.35 x 0.20 = 0.024 m3Jumlah Pondasi = 18 bh 0.4410 m3
II-2 Urugan Tanah Kembali ( 1/4 dari Galian) 0.1102 m3
II-3 Urugan Tanah Kembali ( 1/4 dari Galian) 0.35 x 0.35 x 0.05 = 0.006 m3Jumlah Pondasi = 18 bh 0.1102 m3
III-1 Beton K-225 0.35 x 0.35 x 0.40 = 0.049 m3Jumlah Pondasi = 18 bh 0.8820 m3
5 Kolom praktis 0.20 x 0.25 - 0.1 x 0.15 = 0.035 m2 tinggi kolom = 0.6 banyak kolom = 18 0.38 m3
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 94: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/94.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Tempat ParkirLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Atap 1 Kuda-Kuda 5/10 panjang a = 4.00 = 4.000
b = 2.44 x 2 = 4.880c = 0.91 x 2 = 1.820d = 1.21 = 1.210
11.910 m'Jumlah kuda-kuda = 9Dimensi balok = 0.005 m2 0.5360 m3
2 Gording Panjang Gording = 22.490 m' Dimensi balok = 0.005 Jumlah Gording = 11 1.2370 m3
3 Atap Seng BJLS 0,2 Panjang b = 2.44 x 2 = 4.880 m' Panjang Gording = 22.490 m' 109.75 m2
4 Nok Seng Panjang Nok Bubungan = 22.490 m' 22.49 m'
5 Lisplank Papan Panjang = 22.49 44.98 m' dua sisi
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 95: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/95.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Tempat ParkirLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Atap 6 Pengecatan Bidang Atap Panjang b = 2.44 x 2 = 4.880 m' Panjang Gording = 22.490 m' 109.75 m2
7 Pengecatan Lisplank Papan Panjang lisplank = 22.49 m Lebar Lisplank = 0.400 m 17.9920 m2 dua sisi
8 Pengecatan Nok Seng Panjang Nok = 22.490 m' Lebar Nok = 0.300 m 13.4940 m2
9 Pengecatan Rangka Kap Panjang Kuda-Kuda = 11.910 m' Jumlah Kuda-Kuda = 9.00 bh Lintasan Kayu = 0.30 m' 32.16 m2
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 96: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/96.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Tempat ParkirLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Tiang Parkir 1 Volume Tiang Parkir panjang = 3.00 balok gapit = 6.00 m jumlah tiang = 18 bhDimensi balok = 0.005 m2
Volume 0.5400 m3
2 Pengecatan Tiang Parkir tinggi = 2.40 m lintasan kayu = 0.40 m jumlah tiang = 18 bh
Volume 17.2800 m2
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 97: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/97.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : TamanLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KET
Pekerjaan Galian Pondasi Pekerjaan Pasangan Pondasi I-1 Galian Tanah 0.33 x 0.10 x 30.75 = 1.0148 m3
1.0148 m3
I-2 Pas. Pondasi Batu Kali 0.30 x 0.10 x 25.67 = 0.7701 m3
0.7701 m3
IV-1 Pasangan Bataa. 0.40 x 44.39 = 17.756 m2
Pekerjaan Pasangan Bata
b. 0.36 + 0.9 x 1.74 = 1.096 m22 18.8522 m2
a
b
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 98: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/98.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KET
Pekerjaan Pasangan Bata / Tempat Sampah IV-1 Pekerjaan Pasangan Dinding
a. 1.1 + 0.8 X 1.14 = 1.71 m2
2
b. 0.8 0.6 = 0.48 m2
c. 1.1 X 1.4 = 1.54 m23.73 m2
VII-1 Pas Lantai Keramika. 0.80 x 3.22 = 2.576 m2b. 1.20 x 2.82 = 3.384 m2
c. 0.40 x 5.27 = 2.108 m2 8.0680 m2
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 99: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/99.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KET
Pekerjaan Con Blok IV-1 Pasangan Conblock panjang = 26.00 m lebar = 3.00 m
= 78.0 m2
panjang = 4.20 m lebar = 3.40 m
= 14.3 m2 92.28 m2
Beton Rabat panjang = 3.10 m lebar = 3.50 m
= 10.9 m2
tebal = 0.10 m 1.09 m3
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 100: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/100.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KET
Pekerjaan Con Blok 1 Pasangan Batu 1:4 Potongan A-A
L = 0.3 + 0.35 x 0.82.00
= 0.26
Potongan B-B
L = 0.3 + 0.35 x 0.922.00
= 0.299
Luas = 0.28 Panjang = 9.2 2.57 m3
2 Pasangan Bataa Panjang = 3 m
Tinggi = 0.8 m Luas = 2.4 m2
b Panjang = 0.55 m Tinggi = 0.6 m Luas = 0.33 x 2 = 0.66 3.06 m2
Diperiksa oleh, Dibuat oleh,Tim Teknis CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra, ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 101: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/101.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KETPekerjaan Plafond
1 Pekerjaan Plafond
L = 13.13 x 3.2 x 2= 84.03
L = 1.85 x 2.3= 4.255
L = 3.21 x 1.19 x 2= 7.6398
L = 4.11 x 0.83= 3.4113
99.34 m2
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 102: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/102.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BiroLokasi Bangunan : Fakultas Perikanan
SKETSA KODE URAIAN VOLUME KET
Pekerjaan Plafond1 Pekerjaan Plafond
L = 2.4 x 1.25= 3
L = 1.4 x 2.4= 3.36
L = 2 x 0.3= 0.6
L = 1.82 x 0.8= 1.46
L = 13.13 x 0.96= 12.605
21.02 m2
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 103: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/103.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
Nama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan dan Pertanian
SKETSA KODE URAIAN VOLUME KETPekerjaan Lantai Keramik 40 x 40
1 Pekerjaan Lantai Keramik 40 x 40 L = 4 x 0.8 L = 3.6 x 1.6
= 3.20 = 5.76
L = 2.4 x 0.8 L = 1.4 x 2.8= 1.92 = 3.92
L = 4.8 x 2.4= 11.52
26.32 m2
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 104: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/104.jpg)
CV. MANDAONG PUTRARehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Perikanan dan Pertanian
SKETSA KODE URAIAN VOLUME KETPekerjaan Pas Lantai Keramik 40 x 40
1 Pekerjaan Keramik
L = 2.4 x 4.4 L = 1.2 x 3.2= 10.56 = 3.84
L = 1.6 x 2.8 L = 4.8 x 1.2= 4.48 = 5.76
L = 3.6 x 0.8= 2.88 27.52 m2
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 105: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/105.jpg)
Tahun Anggaran 2012Rehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Kusen Pintu dan Jendela 1 Kosen pintu panjang a = 2.70 x 2 = 5.400 lebar b = 1.25 x 2 = 2.500
=7.900 m'
Jumlah Kosen = 5Dimensi balok = 0.1 m2 3.7920 m3
2 Jendela panjang a = 1.80 x 3 = 5.400 lebar b = 0.7 x 3 = 2.100
=7.500 m'
Jumlah Kosen = 8Dimensi balok = 0.1 m2 5.7600 m3
9.55
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 106: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/106.jpg)
Rehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIRehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M E
Nama Bangunan : Ruang BelajarLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Pekerjaan Daun Pintu dan Jendela 1 Daun pintu = 2.10 x 1.15 = 2.415 m2
Jumlah Kosen = 5 12.0750 m2
2 Jendela panjang a = 1.50 x 2 = 0.300 lebar b = 0.55 x 2 = 0.110
=0.410 m' m2
Jumlah Kosen = 8Dimensi balok = 0.1 m 0.3280 m2
12.40
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 107: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/107.jpg)
Rehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIRehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang Belajar dan Ruang DosenLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.Sekat Dinding Tripleks
1 Sekat dinding Tripleks Ruang Belajar
L = 2.8 x 2.8= 7.84
7.84 m2
Sekat dinding Tripleks Ruang Dosen
L = 3 x 0.8 x 2
= 4.8
L = 2 x 0.8 x 2= 3.2
L = 5 x 0.8 x 2= 8
16.00 m2
23.84 m2
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 108: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/108.jpg)
Tahun Anggaran 2012Rehabilitasi dan Pemeliharaan Gedung Kantor - Paket IIIUniversitas Khairun TernateTahun Anggaran 2012
P E R H I T U N G A N V O L U M ENama Bangunan : Ruang Dosen & Ruang BelajarLokasi Bangunan : Fakultas Pertanian
SKETSA KODE URAIAN VOLUME KET.
Sekat Dinding Tripleks Rangka Sekat Dinding 5/10
a. b. a. Panjang a = 15.550 = 15.550 Dimensi b = 0.05 x 0.1 = 0.005 x
0.078 m3 0.078 m3
b. Panjang a = 4.100 = 4.100c. Dimensi b = 0.05 x 0.1 = 0.005 x
2 x 0.021 m3 0.04 m3
c. Panjang a = 8.100 = 8.100 Dimensi b = 0.05 x 0.1 = 0.005 x
2 x 0.041 m3 0.08 m3
d.
d. Panjang a = 13.5 = 13.500 Dimensi b = 0.05 x 0.1 = 0.005 x
2 x 0.068 m3 0.14 m3
0.335 m3
Diperiksa Oleh Dibuat oleh,Tim Tekniks CV. MANDAONG PUTRAUniversitas Khairun
M. Taufiq Yuda Saputra. ST., MT M. Arif HusinNIP. 197507152005011002 Direktur
![Page 109: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/109.jpg)
IDENTITAS PEKERJAAN
PEMILIK : UNIVERSITAS KHAIRUN
KONTRAKTOR PELAKSANA : CV. MAJU MUNDUR
NOMOR KONTRAK :
KEGIATAN : Pemeliharaan Gedung Kantor
PEKERJAAN : Rehabilitasi dan Pemeliharaan Gedung Kantor - Paket I
LOKASI : Kampus Akehuda
Kampus Jati
Kampus Gambesi
TAHUN ANGGARAN : 2012 NILAI PEKERJAAN :
KEMAJUAN PEKERJAAN S/D : PERIODE LALU
KEMAJUAN PEKERJAAN : PERIODE INI
KEMAJUAN PEKERJAAN S/D : PERIODE INI
TERNATE, …………………. 2012 CV. MAJU MUNDUR
MAKARONDA Direktur
![Page 110: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/110.jpg)
ADDENDUM VOLUME PEKERJAAN
Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -
No Uraian Pekerjaan Sat.HARGA JUMLAH PEKERJAAN TAMBAH KURANG SATUAN HARGA Bobot PEKERJAAN TAMBAH
( Rp ) ( Rp ) % VOLUME 1 2 3 4 5 6 7 8
7I PEKERJAAN KONSTRUKSI
#DIV/0!#DIV/0!
T O T A L - #DIV/0!
Disetujui : Pejabat Pelaksana Kegiatan
DR. Nahu Daud, SE., M.Si M. Taufiq Yuda Saputra ST., MT NIP. 197101102001121003 NIP. 197507152005011002
Volume Kontrak
![Page 111: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/111.jpg)
ADDENDUM VOLUME PEKERJAAN
PEKERJAAN TAMBAH KURANG PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME AKHIR
BOBOT RUPIAH VOLUME BOBOT RUPIAH VOLUME 9 10 11 12 13 14
Diperiksa : Dibuat Oleh : Tim Teknis #REF!
M. Taufiq Yuda Saputra ST., MT #REF! NIP. 197507152005011002 Direktur
![Page 112: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/112.jpg)
ADDENDUM VOLUME PEKERJAAN
PEKERJAAN TAMBAH KURANG VOLUME AKHIR
BOBOT RUPIAH 15 16
Dibuat Oleh : #REF!
#REF! Direktur
![Page 113: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/113.jpg)
DOKUMENTASI PEKERJAAN
Universitas Khairun - Ternate
![Page 114: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/114.jpg)
Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan
![Page 115: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/115.jpg)
DOKUMENTASI PEKERJAAN
Universitas Khairun - Ternate
![Page 116: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/116.jpg)
Rehabilitasi dan Pemeliharaan Gedung Kantor - Perpustakaan
![Page 117: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/117.jpg)
LANTAI II RANGKA SEKAT TRIPLEKS LT 2
KACA NO P. BTG B.BTG
R Kpala R TT Usaha 1 0.63 32.992 2.56 2 3.20 57.656 6.93 2.31 3 3 3.305 4
0.7482 1.38 0.69 2 4 2 40.8084 1.722 5 1 7
1.924 2.9904 0.7476 4 6 1.6 32.068 7.476 1.869 4 7
2.385 3.0576 0.7644 46.27 7.644 1.911 4
24.8516 33.7600 RANGKA ALUMUNIUM LT 2
NO P. BTG B.BTG
1 0.94 62 0.87 33 1.14 64 0.81 45 0.94 96 3.1 137
![Page 118: PERPUSTAKAAN UNKHAIR.xlsx](https://reader034.fdokumen.com/reader034/viewer/2022050906/557213e7497959fc0b934dc9/html5/thumbnails/118.jpg)
RANGKA SEKAT TRIPLEKS LT 2
DIMENSI TOTAL TOT VOL KUBIKASI KET
0.005
1.89
51.721 0.258605
1613.22
8 Rangka Sekat
7 Tripleks Lt 2
4.80.811
DIMENSI TOTAL TOT VOL KUBIKASI KET
0.005
5.64
93 0.465
2.616.843.24 Rangka Sekat
8.46 Tripleks Lt 2
40.325.91