storage Fresh Feed T-01
diket
tipe
temperatur (o C)
p (atm)
fow rate mass (kg/h)
densitas (kg/m3)
corrosion actor
fow voumetrik (m3/h)
untuk 30 hr (m3)
voume !0" voume storage m3
#3
# (m)
$ (m)
tinggi i%uid daam she (t)
tinggi i%uid daam she (m)
(stress) psia
e&esiensi pengeasan
densit' (/t3)
tea adan storage (in)
tea adan storage ditamah corrosion 0th
dimensi tutup storage (t)
ahan tangki
-
8/16/2019 Perhitungan tangki baru
2/13
siinder
-*0
1
0*1+,0*.
!,!++*3.3
0,13 in per 'ear
3!*,0.3.3!
diagi menadi 10 tangki1+*!13,.131.
1301+,*301++ 13331,3+*3
+.+11**,30!1+. t
1!*,0*+03+33 +0,3.0+!!!!
.,+3.0!13 !,100.
v siinder
m3
1*!,.+..+*
+0,!01.3*
13.0
0,!utt weded
0,3+03!+
0,0+*.++3 0,0+!1!1!*.
,+*.++3 +,1!1!1!*.
0,+11+.*0.
caron stee 2-01 grade
-
8/16/2019 Perhitungan tangki baru
3/13
m3 t3
1+*!13,.131. **.!*
di appendi4 5 rowne m
+0 1!!,*.+
0 .+,
13000
13*01,+
cm
cm
-
8/16/2019 Perhitungan tangki baru
4/13
storage 6roduk atas #-1
diket
tipe pherica
temperatur -103,..3*1
p (psia) 0.,+
fow rate mass kg/hr +0*,0!
densitas kg/m3 3.,3!!*. daam /t3
corrosion actor 0,13 per 'ear
(stress) psia 13.0
e&esiensi pengeasan 0,!
densit' /t3 0,!0!
fow voumetrik (m3/h) ++,111.*1 diagi menadi tangki
untuk 30 hr (m3) .+00,.+*033
voume !0" voume storage m3 1!.,033 *3+0,!*1030+
#3 33,003+1!
# meter 1,*03+3 diuatkan menadi
7 meter .,+*+01!1. diuatkan menadi
6h 0,11.++.
6design (6si) 0.,.1.+ diuah ke psig
ts (inch) .,3.!.0!.31*
ts (cm) 1!,.1*01.*
-
8/16/2019 Perhitungan tangki baru
5/13
0,!0!
m3 t3
11*00,1*! 01,.1*
1+ diuah ke Ft ,*! #iuah ke 8nch +*,*13+
! diuah ke Ft +,+ #iuah ke 8nch 31,*+!
*3,01.+
-
8/16/2019 Perhitungan tangki baru
6/13
storage 6roduk awah #-
diket
tipe siinder
temperatur (o C) 10,****.1
p (atm) 3,
fow rate mass (kg/h) +!*,01.**.
densitas (kg/m3) 31,0!0+*01
corrosion actor 0,13
fow voumetrik (m3/h) ,01.!.*
untuk 30 hr (m3) 1,!0.3
voume !0" voume storage m3 1!1*,100*1
#3 .*3,3!31
# (m) 1.,*+01+0
$ (m) .,1!00
tinggi i%uid daam she (t) 1!,1!.+.*
tinggi i%uid daam she (m) ,301+3
(stress) psia 13.0
e&esiensi pengeasan 0,!
densit' (/t3) 1,*3++.!
tea adan storage (in) 0,00*.+1
tea adan storage ditamah corrosion 0th ,0*.+1
dimensi tutup storage (t) 0,+11+.*1
ahan tangki caron stee
-
8/16/2019 Perhitungan tangki baru
7/13
in per 'ear
diagi menadi 1 tangki
m3 t3
1,!0.+103 13*,*03*
111,+3100+
t di appendi4 5 rowne m
!,*3!1!3 +0 1!,!!
3,+*3+1*3 .,31
v siinder 1+*0*
m3 +!!,3+1*1
utt weded
0,03+01 cm
+,3.3+01 cm
-01 grade
-
8/16/2019 Perhitungan tangki baru
8/13
-
8/16/2019 Perhitungan tangki baru
9/13
storage 6roduk atas #-3
diket
tipe pherica
temperatur ( c ) -.,000+.3!1
p (psia) 0.,+
fow rate mass kg/hr 10..,00!*
densitas kg/m3 ..,!!.+1++1++ #aam 9/Ft3
corrosion actor 0,13 per 'ear
(stress) psia 13.0 caron stee 2-01 grade
e&esiensi pengeasan 0,! utt :eded
fow voumetrik (m3/h) 131!,*133* diuat . tangki
untuk 30 hr (m3) **+1.,+.
voume !0" voume storage m3 1+*.,.*1 10++.3,!+!!*1
#3 003,!3
# meter 3,3111.3 diuatkan menadi
7 meter 1.,1.10.!. diuatkan menadi
Tekanan $idrostatik (6h) 1,!*3+*.
6design (psi) 0*,*3+*. diuah ke psig
ts (inch) 1,**011!3*+
ts (cm) 3*,+1*00.
-
8/16/2019 Perhitungan tangki baru
10/13
,!+
m3 t3
13+*,++33 .*0.!0
3 diuah ke Ft 111,. #iuah ke 8nch 133!,++
1. diuah ke Ft ,..3+ #iuah ke 8nch ++*,!3
*,.*3+*.
-
8/16/2019 Perhitungan tangki baru
11/13
kode aat ungsi aat entuk entuk tutup
T-01 pen'impanan resh eed etana siinder
T-0 ;en'impan produk atas destiasi 1 spherica
T-03 ;en'impan produk awah destiasi iinder
T-0 ;en'impan 6roduk akhir (etien) spherica
-
8/16/2019 Perhitungan tangki baru
12/13
voume (m3) diameter (m) tinggi (m) tea (cm)
-
8/16/2019 Perhitungan tangki baru
13/13
ahan konstruksi
caron stee 2-01 grade
caron stee 2-01 grade
caron stee 2-01 grade
caron stee 2-01 grade