Perhitungan Sludge Drying Bed td (hari) 15 hl (m) 1.8 n 2 S dasar bak 0.005 d pipa drain (m) 0.2032 p (m) 15 Kedalaman media tanah dan kerikil (m) 0.45 Freeboard (m) 0.2 Jumlah Lumpur dari Unit Sedimentasi (V Ls ) V Ls =n s ×Q Ls ×td V Ls =2 × ( 17,93 m 3 15 jam × 24 jam 1 hari ) × 15 hari=537,93 m 3 Jumlah Lumpur per Bak (V Lb ) V Lb = V Ls n V Lb = 537,93 2 =268,96 m 3 Luas Permukaan Bak (A s ) A s = V Lb h L A s = 268,96 1,8 =149,42 m 2 Lebar Bed (l) media ES (mm) H (mm) pasir halus 0.4 150 pasir kasar 0.6 75 kerikil halus 5 75 kerikil sedang 20 75 kerikil kasar 40 75
-
Upload
yoanne-maretha-siswaya -
Category
Documents
-
view
175 -
download
25
Transcript of Perhitungan Sludge Drying Bed.docx
Perhitungan Sludge Drying Bed
td (hari) 15hl (m) 1.8n 2S dasar bak 0.005d pipa drain (m) 0.2032p (m) 15Kedalaman media tanah dan kerikil (m) 0.45Freeboard (m) 0.2
Jumlah Lumpur dari Unit Sedimentasi (VLs)
V Ls=ns×QLs×td
V Ls=2×( 17,93m3
15 jam× 24 jam
1hari )×15hari=537,93m3
Jumlah Lumpur per Bak (VLb)
V Lb=V Ls
n
V Lb=537,93
2=268,96m3
Luas Permukaan Bak (As)
A s=V LbhL
A s=268,96
1,8=149,42m2
Lebar Bed (l)
l=A sp
l=149,4215
=9,96m
Kapasitas Bak Sebenarnya (Vbak)
media ES (mm) H (mm)pasir halus 0.4 150pasir kasar 0.6 75kerikil halus 5 75kerikil sedang 20 75kerikil kasar 40 75
V bak=p×l×h
V bak=15×9,96×1,8=268,96m3