Perhitungan Gempa

40
PERHITUNGAN DETAILING TULANGAN GESER BALOK DAN KOLOM PADA GEDUNG 8 LANTAI ADDY RUSTONO ALFIAN AMIN S FUAD NAJI TKG-LANJUTAN

description

Teknik Sipil

Transcript of Perhitungan Gempa

PERHITUNGAN DETAILING TULANGAN GESER BALOK DAN KOLOM PADA GEDUNG 8 LANTAI

PERHITUNGAN DETAILING TULANGAN GESER BALOK DAN KOLOM PADA GEDUNG 8 LANTAIADDY RUSTONOALFIAN AMIN SFUAD NAJITKG-LANJUTANDETAIL BANGUNAN

DETAIL BANGUNAN

STRUKTUR YANG DITINJAU

BALOK B22 STORY 2 GRID 1(D-E)

KOLOM C17 STORY (2-3) GRID 1EDESAIN TULANGAN GESER BALOK B22DATA BANGUNANtinggi kolom=4mFc=30MpaFy=300MpaFs=500MpaD tul Utama=16mmD Sengkang=10mmdekking=40mmd'=58mmd=342mm1=0,85

Berat dinding= 875Kg/m'Berat beton= 2400Kg/m2Berat keramik= 24Kg/m2Berat spesi= 21Kg/m2

Dimensi Balokb=300mmh=500mmLn=4,6m

TULANGAN LONGITUDINALTulangan tumpuan atasAs=378mmAs D13=132,7322896mmjml tulangan=2,847837562 3 buahTulangan tumpuan bawahAs=187mmAs D13=132,7322896mmjml tulangan=1,408850857 2 buah

TULANGAN LONGITUDINALTulangan lapangan atasAs=93 mmAs D13=132,7322896mmjml tulangan=0,700658448 2 buah (syarat minimum)

Tulangan lapangan bawahAs=239mmAs D13=132,7322896mmjml tulangan=1,800616871 2 buah

TULANGAN LONGITUDINAL TERPASANGTumpuan kiri atas= 3D 13; As =398,1968688mmTumpuan kiri bawah= 2D 13; As =265,4645792mm Tumpuan kanan atas= 3D 13; As =398,1968688 mm Tumpuan kanan bawah= 2D 13; As =265,4645792mm Lapangan atas= 2D 13; As =265,4645792mm Lapangan bawah= 2D 13; As =265,4645792mm

CEK SYARAT PENAMPANGDimensi minimal lebar balokb 250 mmb= 300 mm .... OK

Rasio b terhadap hb/h 0,3b/h= 0,6 .... OK

Panjang balok efektif (Ln)Ln 4d = 1,734 mLn= 4,6 m ..... OKCEK SYARAT PENAMPANGmin =0,00466667

CEK SYARAT PENAMPANGCEK SYARAT PENAMPANGCEK SYARAT PENAMPANG14CEK SYARAT PENAMPANGCek Momen Positif di muka kolom

a. Tumpuan kiriAs M-=606,9mm2As M+=606,9mm2... OKb. Tumpuan kananAs M-=606,9mm2As M+=606,9mm2... OKc. LapanganAs M-=606,9mm2As M+=606,9mm2... OK

M+ M-CEK SYARAT PENAMPANGCek kuat momen terpasang terhadap kuat momen maksimumAs Mmax=606,9mm1/4 As Mmax=151,725mma. Tumpuan kiriAs M-=606,9mm........OKAs M+=606,9mm........OKb. Tumpuan kananAs M-=606,9mm........OKAs M+=606,9mm........OKc. LapanganAs M-=606,9mm........OKAs M+=606,9mm........OK

M + atau 1/4 M terbesarPERHITUNGAN TULANGAN GESERPEMBEBANAN

Keramik=24Kg/mplesteran (1,5 cm)=31,5Kg/mMEP=25Kg/mplafon=18Kg/mpelat lantai=360Kg/mqDL=458,5Kg/mq ekuivalen= 1/3 x q x Lx= 703,0333333kg/m'berat sendiri balok= 0,3 x 0,5 x 2400= 360kg/m'berat dinding= 875kg/m'W DL=1938,033333kg/m'

qLL=250Kg/mW LL=1/3 x qLL x Lx=383,3333333kg/m'Wu=1,2 DL + 1,0 LL=2708,973333kg/m'=27,090KN/m

Gaya Geser RencanaGaya Geser RencanaGaya Geser RencanaJarak Tulangan GeserJarak Tulangan GeserJarak Tulangan GeserJarak Tulangan GeserDESAIN TULANGAN GESER KOLOM C17DATA BANGUNANtinggi kolom=4mFc=30MpaFy=300MpaFs=500MpaD tul Utama=16mmD Sengkang=10mmdekking=40mmd'=58mmd=342mm1=0,85

Berat dinding = 875Kg/m'Berat beton = 2400Kg/m2Berat keramik = 24Kg/m2Berat spesi =21Kg/m2

kolomb= 400mmh= 400mmhn (Ln)= 3,5mhc= 350mmAg= 160000mmAc= 122500mmBalokb= 300mmh= 500mmDaerah Tumpuan Tarik= 3 D 13 Tekan= 2 D 13 Sengkang= 2 D 10 - 100mmDaerah Lapangan Tarik= 2 D 13 Tekan= 2 D 13 Sengkang= 2 D 10 -100mmMpr 1=95,27382kNmMpr 2=95,27382kNm

DATA BANGUNANTULANGAN LONGITUDINALTulangan Longitudinal terpasangAs=1600As D13=201,0619298jml tulangan=7,957747155 8 buah

Jumlah tulangan terpasang 8 D 13; As = 1608,495 mmCEK SYARAT PENAMPANGCEK SYARAT PENAMPANGPERHITUNGAN TULANGAN GESERJarak tulangan GeserDaerah tumpuan sepanjang Sengkang tertutup (Sepanjang dari muka HBK) = h=400mm = Ln/6=583,3333mm=500mmGunakan =584mmS = h/4=100mmS = 6 D=96mmS = =100-150mmdipakai jarak sengkang =96mm 90 mmJarak tulangan GeserJarak tulangan GeserJarak tulangan GeserJarak tulangan GeserKESIMPULAN1. Penulangan yang digunakan pada balok B22 yaitu :a. Daerah TumpuanTulangan Utama - Tarik= 3 D13 - Tekan= 2 D13Sengkang= 2 D 10 - 100mmSelimut= 50mmb. Daerah LapanganTulangan Utama -Tarik= 2 D13 -Tekan= 2 D13Sengkang= 2 D10 -100mmSelimut= 50mm

KESIMPULAN2. Penulangan yang digunakan pada kolom C17 yaitu:a. Daerah Tumpuan (Sepanjang o)Tulangan Utama= 8 D 16Sengkang= 4 D 10 -90mmo= 584 mmb. Daerah Lapangan (Diluar o)Tulangan Utama= 8 D 16Sengkang= 2 D 10 - 150mm

TERIMA KASIH