Performa Dpr Temp

download Performa Dpr Temp

of 16

Transcript of Performa Dpr Temp

  • 8/3/2019 Performa Dpr Temp

    1/16

    PERFORMA-BPRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)

    PACKAGE SUMMERYPackage Number:- HP-11-10 District:- Solan State:- Himachal Pradesh

    Sr.

    No

    Name of

    Block

    Name of Road Type of

    Proposal

    Proposed

    Length

    Cost of

    Pavment

    No. of

    CD

    works

    Cost of

    CD

    works

    Total Estimated Cost Average cost per Km

    Cons.

    Cost

    Maintenance

    cost

    Cons.

    Cost

    Maintenanc

    cost

    From To N/U In Km Rs: In lac Nos. Rs: in

    Lac

    Rs: in

    Lac

    Rs: in Lac Rs: in

    Lac

    Rs: in Lac

    1 2 3 4 5 6 7 8 9 10 11 12 13

    1 Nalagarh From

    Baddi

    Sai road

    at km

    18/500

    Sai N 2.25 35.36 Nil Nil 35.36 0.74 16.03 0.33

    N NEW CONNECTIVITY U UPGRADATION

    Cost Rs. 36.10 Lac only

    * Prepared by Signature Technical Scrutiny : Signature

    Name (Er. R. C. Bassi) Done By : Name

    Designation

    * Checked by Signature Coordinator : Signature

    Name (Er. A.K. Gupta) STA : Name

    Designation

    * Scrutinized by Signature

    Name (Er. D. K. Nayyar)

    Designation

  • 8/3/2019 Performa Dpr Temp

    2/16

    PERFORMA CPRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)

    Check list for P.I.U. and S.T.A

    (For Individual Road Work)

    To be filled by PIU.1. Location:- State : Himachal Pradesh Distt. Solan Block:- Nalagarh

    2. Package :- HP-11-10

    3. Name of Road:- M/T of Link road to village Sauri km 0/0 to 2/250

    4. Lingth (km) Total =2.250 In builtup area= nil In open area = 2.250

    5. Estimated Cost Rs. 37.90 lakhs Average cost per km Rs. 16.85

    6.Type of Proposal:- New Connectivity

    If the proposed road is new connectivity- Is the road a part of core network

    Yes

    - Name of the unconnected habitations to be cross checked

    with CN-6

    Sauri

    - Does the proposed road lead up to habitationsfor which it is supposed to provide connectivity(in other words are you sure that the road is notMade partially)

    Yes

    - Does the proposed road connect the un-connectedhabitations

    a) Another habitations having all weather road - Nob) Directly to an all weather road - No

    If (b) indicate the nature of road which

    the proposed road leads

    (a) (b)

    RR MDR

    SH NH

    If the proposal for up gradation No- Is road a part of the core net work Yes- Is it associated through route or not No- PCI has been done No- Age of the road given Yes

    - Is it certified that there are no other unconnectedNoeligible habitations in the District

    - Population sub served by the proposed road

    7. a) Whether the proposed road has the desired carriageway width, roadway

    width and road land width (RLW)b) Indicate the actual widths of the following for the

    proposed road(a) Carriageway

    yesIn builtuparea (m)

    In open area(m)

    -- 3.05 mtr

    -- 5/7 mtr

  • 8/3/2019 Performa Dpr Temp

    3/16

    (b) Roadway

    ( c) Road land width

    -- 5/7 mtr

    INDEX MAP (Not to scale)

    Baddi Sai

    Ramshehar road

    LAt KM 18/500

    0/0 1/00 2/00 2/250

    8. Base Year traffic Volume:- As the road is existing, hence Traffic census has been conducted for this road.

    TotalBus/Truck LCV

    /MiniBus

    Car/Vans/Jeeps

    Threewheellers

    TwoWheelers

    CycleRickshaw

    Cycles

    Bullockcart

    Motorized

    Non-Motorized

    203 494 243 - 236 - - - 1176

    9. Growth rate adopted (%) = 6 % Projected traffic:CVPD

    10. Sub grade CBR for different sections

    Chainage 0/520 1/490 2/160

    Design CBR 6.8% 5.7% 5.4%

    11. Cost DeatilA. Clearing and grubbing Cost inRs. NilB. Pavement Components

    For Black Top For Unsealed

    Item Thickness

    Cost(Rs.) Item Thickness

    Cost(Rs.)

    Earth work 150 52291.00 Earth work

    Sub Grade Preparation(GSB)

    ----- ------- Sub GradePreparation

    WBM-1 ------ ------ Wearing surface

    LinkroadtovillageSauri

  • 8/3/2019 Performa Dpr Temp

    4/16

    WBM-2 75 630288.00

    WBM-3 75 634975.00

    C. Bituminious Layers

    Prime coat 263915.00

    BM/BBM ----Tack Coat 89564.00

    MSS ----

    PMC with seal coat 1296887.00

    D. CD WorksNo. of Existing CD works 10Do they require any improvement? No

    If yes, cost of Improvement NilNo. of proposed CDNil

    Cost of proposed CD workNilE. Protection works Length: NilCost: Nil

    F. Side Drains ( If Provided) Length: 2.217Cost:

    G. Road logo, other road furniture Cost:

    H. Five year routine maintenance:

    Year Cost in Lac % cost

    1st Year 35.36 0.357

    2nd Year 35.36 0.386

    3rd Year 35.36 0.417

    4th Year 35.36 0.450

    5th Year 35.36 0.486

    12. Wheather the road has geometerics as per Rural RoadManual (RRM)

    yes

    13. Whether C.D work / Protection Work are provided

    as per Rural Road Manual (RRM)

    yes

    14. Cost estimates are as per Standard Data Analysis and SSR yes

    Certified that that information provided is true

    Prepared by:

    (Er. R. C. Bassi)

    Assitant EngineerBaddi, Sub-DivisionHP PWD. Baddi

    Checked by:

    (Er. A.K. Gupta)

    Executive EngineerNalagarh, DivisionHP PWD. Nalagarh

    Scrutinized by:

    (Er. D. K. Nayyar)

    Superintending Engineer,

    3rd circle HP PWD Solan

  • 8/3/2019 Performa Dpr Temp

    5/16

    To be filled by S.T.A

    Name of the S.T.A. NIT Hamirpur.

    20. Specified remarks, if any by STA YES/NO

    15. If the proposal is for new connectivity

    - Have you satisfied your self that the proposed road is apart of the core network

    - Is the unconnected habitations(s) part of list of un-connected habitation as perCN-6

    - Does the proposal ensure full connectivity

    YES/NO

    YES/NO

    YES/NO

    16. Are you satisfied with the following

    - Engineering surveys- Soil/ Material investigation- Traffic surveys / estimation- Hydraulic studies

    YES/NO

    YES/NO

    YES/NO

    YES/NO

    17. Is the design of the following elements as per rural roads manual?

    Alignment and geometric YES/NO

    Pavement Design YES/NOCD work and protection measures YES/NO

    Side drains YES/NO

    Drainage layer YES/NO

    18. Does the Estimation Conform to Standard Rate Analysis and SSR YES/NO

    19. Does the proposal have provision for?

    PMGSY Logo, Sign Board YES/NO

    KM/HM Stone YES/NO

    Guard Stones (where necessary) YES/NO

    Traffic sign board (as necessary) YES/NO

    5 year routine maintenance, estimated on lump-sum basis YES/NO

    Does the proposal ensure full connectivity to target habitation

    a) If no, the name of the unconnected habitation up to which it is connected

    b) if such unconnected habitation eligible under PMGSY.

  • 8/3/2019 Performa Dpr Temp

    6/16

    Certified that the Design and estimation for the proposed road work are based on the data and SSR Provided

    by PIU Engineers. The proposal may be cleared.

    Technical Scrutiny Coordinator

    Done by S.T.A

    Signature Signature.

    Name Name

  • 8/3/2019 Performa Dpr Temp

    7/16

  • 8/3/2019 Performa Dpr Temp

    8/16

    ANNEXURE-7

    FORMAT F(See Para 7

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)SUMMARY SHEET.

    Name of Block Code Total No. of

    Habitaion

    Un connected Habitations

    >1000 500-999 250-499

  • 8/3/2019 Performa Dpr Temp

    9/16

    FORMAT : F -2A

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVTY (PAVEMANT LAYERS)

    District : Solan Block: Nalagarh

    FORMAT : F -2B

    Sr.No.

    1

    Block

    NameofHabitationconnected

    Benifited

    Newconstruction/u

    pgradation

    (N)/Assosiatedthroughroute

    (A)/Upgradation(U)

    FacilitiesaccessedusedA/B/C/D

    RoadlengthinKm

    Existingsurfacetype

    Roadfurniture

    Detail

    ClearingGrubbing

    EarthWork

    SubgradepreparationGSB

    -1

    SubbaseGSBG

    -I

    WBMG-II

    WBMG-III

    BOEEdging

    KC.Drain/CutstonePCCdra

    in

    Primer/Tackco

    at Surface dressing

    OGPC

    Sealcoat

    From

    To N A U

    1 2 3 4 5 5A 5B 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    1

    Nalagarh

    BaddiSairoada

    tkm1

    8/500

    Sauri

    N

    - - -

    2.2

    5

    Thicknessinmm -- 150

    mm

    75

    mm

    75

    mm

    - 20

    mm

    CostRsinlac

    -- 0.52 -- 6.30 6.35 3.53

  • 8/3/2019 Performa Dpr Temp

    10/16

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)ROAD PROPOSED IN PMGSY FOR RURAL CONNECTIVTY (PAVEMANT LAYERS)

    District : Solan Package No.

    Sr.No.

    NameofBlock

    CodeofBlock

    Nameofroad

    Habitation

    connected/benefited

    Population

    Roadlengthinkm Existing C.D. Structure by type

    of

    Details of proposed C.D.

    Structure by type.

    TotalcostofpavementfromForma

    F-

    5

    HumePipe

    Culvert. B

    ox/Arch/RC

    Culverts M

    inorBridge

    HumepipeCulverts

    Box/Arch/RC

    Culverts M

    inorBridge

    TotalcostofproposedC.D.

    strct.

    No. Dia No. Length No. Dia No. Dia. No. Length No length

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2

    1

    NALAGARH

    LinkroadtovillageSauri

    1No

    236souls

    2.250km 8 900

    mm

    1 4.00Cost Rs.

    2 1 3.00Cost Rs.

    3Cost Rs.

    4Cost Rs.

    5Cost Rs.

    6Cost Rs.

    7Cost Rs.

    8Cost Rs.

    9Cost Rs.

    10Cost Rs.

    TotalCost Rs.

  • 8/3/2019 Performa Dpr Temp

    11/16

    Addl. Assistant Engineer Assistant Engineer Executive Engineer

    FORMAT : F -

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)Detail Of Existing Roads (For Upgradation)

    District : Solan Package No. HP-11-10

    Block: Nalagarh Length = 2.25 km

    Sr.

    No.

    Name of

    Road

    Road

    Length

    Road

    connecting to

    Facilities

    accessed

    A/B/C/D

    Traffic per day Existing road details

    Trucks /

    Buses

    Tractors Land

    width

    (mt)

    Road

    width

    (mt)

    Embankment WBM Layer Bitumen layer

    Ht Width Width Thickness Type Width Thickness

    (mm)

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    1 Link

    road to

    village

    Sauri

    2.25 km BSR road

    MDR

    29 Nos 34 Nos 5/7 mt 5/7 mt Nil Nil 3.05 300 PC 3.05 20 mm

    *Road connecting to NH/SH/MDR/ODR/VR** Use A= market, B= Education Facilities, C = Health Centres, D = Combination of previous

    *** Where actual figure is not available, Estimated figure may be included**** Type BM/MMS/DMC

  • 8/3/2019 Performa Dpr Temp

    12/16

    FORMAT : F -4A

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)Association of routes

    District : Solan Package No. HP-11-10

    Package No Primary Network AssociatedThrough

    route(ATR)

    PCI Age Whether proposed for

    Upgradation(U) or Renewal

    (R)

    Otherconformance

    subsidiary tothe ATR

    Whetherincludes in

    package Y/N

    Habitationserved wit

    population

    No. Habitation

    Served (withpopulation)

    HP-11-10 1 236

  • 8/3/2019 Performa Dpr Temp

    13/16

    FORMAT : F -

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)COST ESTIMATE FOR ROAD CONSTRUCTION

    Package No. HP-11-10

    District : SolanRoad from.

    Block: Nalagarh Length = 2.25 km

    Sl.No.

    Description of Items No. L(m)

    B(m)

    D/H(m)

    Quantity Unit Rate Amoun(Rs.)

  • 8/3/2019 Performa Dpr Temp

    14/16

    FORMAT : F -

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY) COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

    Package No. HP-11-10

    District : SolanRoad from.

    Block: Nalagarh Length = 2.25 km

    Sl.No.

    Description of Items No. L(m)

    B(m)

    D/H(m)

    Quantity Unit Rate Amoun(Rs.)

  • 8/3/2019 Performa Dpr Temp

    15/16

    FORMAT : F -

    PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY) RATE ANALYSIS

    State: H.P. District: Solan Package No. HP-11-10

  • 8/3/2019 Performa Dpr Temp

    16/16