PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

18
PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK KABUPATEN BARITO SELATAN TESIS Untuk Memenuhi Sebagian Persyaratan Guna Mencapai Gelar Magister Teknik Sipil Diajukan oleh: AGUS SETIAWAN NIM :147 142 00696 PROGRAM STUDI MAGISTER TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS 17 AGUSTUS 1945 SURABAYA 2017

Transcript of PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

Page 1: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI

TPA SAMPAH STUDI KASUS TPA LIKUT JAUH

DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN

TESIS

Untuk Memenuhi Sebagian Persyaratan

Guna Mencapai Gelar Magister Teknik Sipil

Diajukan oleh:

AGUS SETIAWAN

NIM :147 142 00696

PROGRAM STUDI MAGISTER TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS 17 AGUSTUS 1945 SURABAYA

2017

Page 2: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

i

TESIS

PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI

TPA SAMPAH STUDI KASUS TPA LIKUT JAUH

DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN

Diajukan oleh:

AGUS SETIAWAN

NIM :147 142 00696

Disetujui untuk diuji

Surabaya, 27 November 2016

Pembimbing 1 : DR.Ir.H.Sajiyo,M.Kes ……………………

Pembimbing 2 : Ir.Bantot Sutriono.,M.Sc ……………………

PROGRAM STUDI MAGISTER TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS 17 AGUSTUS 1945 SURABAYA

2016

Page 3: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

ii

TESIS

PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI

TPA SAMPAH STUDI KASUS TPA LIKUT JAUH

DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN

Diajukan oleh:

AGUS SETIAWAN

NIM :147 142 00696

Telah dipertahankan di depan Tim Penguji dan Dinyatakan lulus

Pada ujianTesis Program Studi Magister Teknik Sipil

Fakultas Teknik Universitas 17 Agustus 1945 Surabaya

PadaTanggal :16 Desember 2016

Tim Penguji

Ketua : DR.Ir.H.Sajiyo,M.Kes ……………………

Anggota : Ir.Bantot Sutriono.,M.Sc ……………………

Anggota : Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS ……………………

Mengetahui

FakultasTeknik

Universitas 17 Agustus 1945 Surabaya

Kaprodi MTS

Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS

Dekan Fakultas Teknik

DR. Ir. MuaffaqAchmad Jani, M.Eng

Page 4: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

iii

KATA PENGANTAR

Puji Syukur kepada Tuhan Yang Maha Esa atas berkat dan rahmatnya-Nya,

sehingga penulis dapat menyelesaikan penulisan Tesis yang berjudul

“PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH

STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN”.

Penulisan Tesis ini merupakan salah satu syarat untuk memenuhi

sebagianpersyaratan guna mencapai gelar Magister Teknik Sipil pada Program

Studi Magister Teknik Sipil Fakultas Teknik Universitas 17 Agustus 1945

Surabaya.

Dalam penulisan Tesis ini, penulis memperoleh bantuan dan penjelasan

serta bimbingan dari berbagai pihak. Oleh karena itu dengan ini penulis

menyampaikan rasa terima kasih dan penghargaan kepada :

1. Yth. Ibu Prof. Dr. drg. Hj. Ida Aju Brahmasari, DiplDHE, MPA selaku

Rektor Universitas 17 Agustus 1945 Surabaya

2. Yth. Bapak DR. Ir. Muaffaq Achmad Jani, M.Eng selaku Direktur Program

Pascasarjana Universitas 17 Agustus 1945 Surabaya

3. Yth. Bapak Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS selaku Kaprodi

Magister Teknik Sipil Program Pascasarjana Universitas 17 Agustus 1945

Surabaya

4. Yth. Bapak DR.Ir.H.Sajiyo, M.Kes selaku dosen pembimbing I yang dengan

tulus dan penuh perhatian membimbing penulis sehingga penelitian dan

penulisan tesis ini dapat terselesaikan.

5. Yth. Bapak Ir.Bantot Sutriono.,M.Sc selaku dosen pembimbing II yang telah

banyak memberikan dorongan, arahan, masukan dan bimbingan selama

proses penulisan tesis ini.

6. Bapak dan Ibu Dosen serta staf Program Studi Magister Teknik Sipil Program

Pascasarjana Universitas 17 Agustus 1945 Surabaya atas bantuan, dukungan

dan kerjasamanya

Page 5: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

iv

7. Rekan – rekan mahasiswa Magister Teknik Sipil Angkatan 24 (A+B+C)

Tahun 2015 / 2016 atas dukungan dan dorongan untuk menyelesaikan kuliah

dan penulisan penelitian ini ini.

8. Seluruh keluarga, rekan, sahabat dan handai taulan yang kesemuanya tak bisa

penulis sebutkan satu persatu, yang telah banyak membantu penulis dalam

penyelesaian penelitian ini.

9. Istriku tercinta dr.Folerence Felicia Sp MK., atas segala motivasi, perhatian

dan doa nya dan Anak-anakku terkasih (Dita Anggraini Putri, Gracia Asloren

Eleanora, Gabriel Asloren Edyanelta Setiawan Mering), ayah sayang Kalian.

10. Dan akhirnya kepada semua pihak yang tidak dapat di sebutkan satu persatu

yang telah membantu dalam penyusunan laporan penelitian ini.

Penulis sangat mengharapkan saran dan kritik membangun, karena pada

dasarnya penulis menyadari banyak kekurangan dan kekeliruan hingga masih jauh

dari sempurna.

Akhir kata penulis mengharapkan agar laporan penelitian ini dapat

bermanfaat khususnya bagi semua pembaca sebagai bahan pertimbangan ilmu

pengetahuan kita semua.

Surabaya, Desember 2016

Penulis,

( AGUS SETIAWAN)

Page 6: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

v

ABSTRAKSI

Agus Setiawan, 2016

PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH

STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN

Pembimbing 1 : DR.Ir.H.Sajiyo.,M.Kes

Pembimbing 2 : Ir.Bantot Sutriono.,M.Sc

Sampah dan pengelolaannya kini menjadi masalah yang kian mendesak di

Kabupaten Barito Selatan Provinsi Kalimantan Tengah karena jumlahnya yang

terus bertambah.Kota Buntok dengan wilayah pelayanan meliputi Buntok kota,

Kel Hilir Sper, Jelapat, Pamait dan Sababilah sebesar 65 m3/hari, kemudian pada

tahun 2015 menjadi 82,045 m3/hari atau meningkat rata-rata sebesar 3,41%

pertahun yang dapat terangkut ke TPA hanya sebesar 47,59 m3/hari (58%). Jika

sampah yang tidak terangkut sebesar 42% atau setara dengan 34,46m3/hari tidak

dilakukan pengelolaan yang baik akan mengakibatkan terjadinya perubahan

keseimbangan lingkungan yang merugikan sehingga dapat mencemari lingkungan

baik terhadap tanah, air dan udara. Untuk memecahkan dan menghadapi keadaan

dan masalah tersebut maka perlu dilakukan penelitian pengelolaan persampahan

secara terperinci, baik aspek teknis, manajemen, peran serta masyarakat dan

pembiayaan.

Penelitian ini bersifat kualitatif dengan landasan berpikir filsafat positivism

dengan teori metodologi penelitian kuantitatif. Pengumpulan data dilakukan

melalui observasi dan wawancara dengan variable meliputi :(1). Manajemen

Pengangkutan; (2). Lokasi TPA; (3). Sarana Umum; (4). Fasilitas Perlindungan

Lingkungan; (5). Operasional dan Perawatan. Kemudian dilakukan (1). Analisa

model desain TPA dengan analisa lapisan dasar lahan, analisa sel dan

penimbunan, analisa air lindi dan analisa pipa gas metan; (2). Analisa umur TPA

yang meliputi analisa proyeksi penduduk, analisa timbulan sampah, analisa

kebutuhan lahan; (3). Analisa biaya dengan memperhitungkan tingkat inflansi dan

suku bunga bank.

Hasil dari penelitian menunjukan desain TPA sampah Kabupaten Barito

Selatan menggunakan sistem Sanitary Landfill dengan usia TPA diperkirakan

mencapai 10 tahun dan biaya pembangunan TPA sampah Kabupaten Barito

Selatan sampai tahun 2026 sebesar Rp.137.007.000.000,- (Terbilang : Seratus

Tiga Puluh Tujuh Milyar Tujuh Juta Rupiah).

Kata kunci :Tempat Pemrosesan Akhir, Desa Sababilah, Sanitary landfill

Page 7: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

vi

ABSTRACT

Agus Setiawan, 2016

TECHNICAL PLANNING AND CONSTRUCTION COSTS LANDFILL

TRASHCASE STUDY TPA LIKUT JAUH SABABILAH VILLAGE

BUNTOK CITY SOUTH BARITO DISTRICT

Supervisor 1: DR.Ir.H.Sajiyo.,M.Kes

Supervisor 2: Ir.Bantot Sutriono., M.Sc

Waste and its management has become increasingly urgent problem in South

Barito regency, Central Borneo Province because their numbers are growing.

Buntok city with a service area covering Buntok city, villageHilirSper, Jelapat,

Pamait and Sababilah of 65 m3 / day, and then in 2015 to 82.045 m3 / day or an

average increase of 3.41% per annum which can be transported to the landfill only

amounting to 47.59 m3 / day (58%). If the waste that is not transported by 42%,

equivalent to 34.46 m3 / day did not do a good management will lead to the

occurrence of adverse changes in the environmental balance that can pollute the

environment both on land, water and air. To solve and face the situation and the

problem it is necessary to study waste management in detail, whether technical,

management, community participation and financing.

This is a qualitative study with the foundation philosophy of positivism think the

theory of quantitative research methodology. Data collected through observation

and interviews with variables include: (1). Transportation management; (2).

Landfill sites; (3). Public facilities; (4). Facility Environmental Protection; (5).

Operations and Maintenance. Then performed (1). Analysis of the landfill design

model with a base layer of land analysis, cell analysis and accumulation, analysis

of the leachate and methane gas pipeline analysis; (2). The aging of the landfill

that includes the analysis of population projections, analysis of waste, land needs

analysis; (3). Cost analysis taking into account inflansi levels and lower interest

rates.

Results from the study showed landfill design Barito Selatan using systems

Sanitary Landfill with landfill age estimated at 10 years and the cost of

construction of South Barito regency landfill until 2026 amounting to Rp

137.007.000.000, - (Amount: One Hundred And Thirty Seven Billion Seven

Million Rupiah)

Keywords: place of final processing, Sababilah Village, Sanitary landfill

Page 8: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

vii

DAFTAR ISI

Lembar Persetujuan ............................................................................................ i

Lembar Tim Penguji ........................................................................................... ii

Kata Pengantar ................................................................................................... iii

Abstraksi ............................................................................................................. v

Abstract ............................................................................................................... vi

Daftar Isi ............................................................................................................. vii

Daftar Gambar .................................................................................................... xi

Daftar Tabel ....................................................................................................... xiv

BAB I. PENDAHULUAN

1.1 Latar Belakang ............................................................................................ 1

1.2 Rumusan Masalah ....................................................................................... 4

1.3 Tujuan Penelitian ......................................................................................... 4

1.4 Manfaat penelitian ...................................................................................... 5

1.5 Batasan dan Ruang Lingkup Penelitian ...................................................... 5

1.6 Sistematika Penulisan ................................................................................. 5

BAB II. TINJAUAN PUSTAKA

2.1 Pengertian Sampah ...................................................................................... 7

2.2 Jenis-jenis Sampah ...................................................................................... 8

2.3 Pengertian TPA (Tempat Pemprosesan Akhir) ........................................... 9

2.4 Jenis-jenis TPA (Tempat Pemprosesan Akhir) ........................................... 10

2.5 Persyratan Teknis ......................................................................................... 11

2.5.1 Kapasitas Lahan Efektif ..................................................................... 12

2.5.1.1. Luas Lahan Efektif .............................................................. 13

2.5.1.2. Perkiraan Jumlah Penduduk ................................................ 14

2.5.1.3. Proyeksi Timbulan Sampah ................................................. 15

2.5.2. Pengupasan dan Pelapisan Dasar Lahan ........................................... 20

Page 9: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

viii

2.5.3. Sel Timbunan .................................................................................... 25

2.5.4. Penataan Sistem Pengumpul Lindi ................................................... 26

2.5.5. Tanah Penutup .................................................................................. 31

2.5.6. Jalan Akses ....................................................................................... 35

2.5.7. Jalan Operasional .............................................................................. 36

2.5.8. Drainase Air Hujan ........................................................................... 36

2.5.9. Teori Pengolahan Lindi .................................................................... 44

2.5.10. Drainase Air Lindi ......................................................................... 55

2.5.11. Bangunan Pengolahan Lindi .......................................................... 56

2.5.12. Sistem Penanganan Gas TPA dan Pengelolaan Biogas .................. 57

2.5.13. Perencanaan Sarana Penunjang ...................................................... 64

2.6 Konsep Penerapan Sistem Landfilling ........................................................ 65

2.7 Studi Ekonomi Biaya ................................................................................... 65

2.8 Penelitian Terdahulu ................................................................................... 67

BAB III. METODE PENELITIAN

3.1 Jenis Penelitian ............................................................................................ 68

3.1.1 Kerangka Alur Pikir ........................................................................... 69

3.2 Lokasi dan Waktu Penelitian ...................................................................... 70

3.3 Instrumen / Alat Bantu Penelitian ............................................................... 71

3.4 Metode Pengumpulan Data ......................................................................... 72

3.5 Sampel Penelitian ........................................................................................ 74

3.6 Variabel Penelitian ...................................................................................... 75

3.7 Metode dan Teknik Analisis Data ............................................................... 79

3.7.1 Metode Analisis Desain TPA ............................................................. 79

3.7.2 Metode Analisis Umur TPA ............................................................... 82

3.7.3 Metode Analisis Biaya Pembangunan TPA ....................................... 84

3.8 Flow Chart ................................................................................................... 85

Page 10: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

ix

BAB IV. ANALISA DATA DAN PEMBAHASAN

4.1 Profil TPA Sampah Buntok ......................................................................... 86

4.1.1 Lokasi TPA Sampah Buntok .............................................................. 86

4.1.2 Komposisi Sampah ............................................................................. 89

4.1.3 Route Pengangkutan Sampah ............................................................. 91

4.1.4 Kuantitas Sampah Yang Terangkut .................................................... 95

4.1.5 Manajemen Persampahan Eksisting ................................................... 98

4.1.6 Sarana & Prasarana Persampahan Eksisting ...................................... 100

4.1.7 Restribusi dan Pelayanan Kebersihan & Persampahan ...................... 104

4.1.8 Kendala Pengelolaan .......................................................................... 109

4.2 Rencana Desain TPA Buntok ..................................................................... 109

4.2.1 Lapis Dasar Lahan TPA .................................................................... 109

4.2.2 Sel TPA dan Penimbunan .................................................................. 120

4.2.3 Pengolahan Leachate .......................................................................... 128

4.2.4 Rancangan Pipa Gas ........................................................................... 138

4.2.5 Pipa Pengumpul Leachate .................................................................. 141

4.3 Analisis Umur TPA ...................................................................................... 149

4.3.1 Analisis Proyeksi Jumlah Penduduk ................................................. 149

4.3.2 Analisis Kepadatan Penduduk ........................................................... 153

4.3.3 Analisis Laju Pertumbuhan Penduduk .............................................. 153

4.3.4 Analisis Proyeksi Timbulan Sampah ................................................. 153

4.3.5 Analisis Kebutuhan Lahan TPA ........................................................ 162

4.3.6 Analisis Minimalisasi Sampah dengan Kegitan 3R .......................... 171

4.4 Rencana Biaya Konstruksi & Biaya Operasional TPA Buntok .................. 174

4.4.1 Rencana Biaya Konstruksi TPA Buntok ........................................... 174

4.4.2 Rencana Biaya Operasinal TPA Buntok ........................................... 177

Page 11: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

x

BAB V. KESIMPULAN DAN SARAN

5.1 Kesimpulan ................................................................................................. 180

5.2 Saran ........................................................................................................... 182

Daftar Pustaka .................................................................................................... 184

Lampiran ............................................................................................................. 186

Lampiran Gambar ............................................................................................... 193

Page 12: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

xi

DAFTAR GAMBAR

Gambar 1.1. Menumpuknya sampah dipinggir jalan ...................................... 2

Gambar 1.2. Pembuangan Sampah ke sungai ................................................. 3

Gambar 2.1. Ilustrasi Pembuangan dan Penataan Sel Timbulan

Sampah di TPA .......................................................................... 26

Gambar 2.2. Pengaturan Kemiringan Dasar Ke Salah Satu Sisi ..................... 27

Gambar 2.3. Pengaturan Kemiringan Dasar Ketengah Sel .............................. 27

Gambar 2.4. Dasar Sel Dengan Pengaturan Kemiringan ................................ 28

Gambar 2.5. Pengaturan Kemiringan Pada Sel Yang Luas ............................ 28

Gambar 2.6. Pola Saluran Pengumpul Lindi .................................................. 29

Gambar 2.7. Penampang Saluran Pengumpul Lindi ....................................... 29

Gambar 2.8. Pipa Pengumpul Lindi ................................................................. 30

Gambar 2.9. Ilusrasi Perataan Tanah Penutup ................................................ 31

Gambar 2.10. Penampang Melintang Lapisan .................................................. 35

Gambar 2.11 Air Limpasan di TPA ................................................................. 36

Gambar 2.12. Drainase Penangkap Limpasan Dari Luar .................................. 39

Gambar 2.13. Pembuangan Air Dari Alur Alam Di Bagian Hulu .................... 39

Gambar 2.14. Penangkapan Aliran Air Tanah .................................................. 40

Gambar 2.15. Prinsip Koagulasi - Flokulasi ..................................................... 54

Gambar 2.16. Ventilasi Gas Area Individual .................................................... 59

Gambar 2.17. Ventilasi Gas Slope Individual ................................................... 60

Gambar 2.18. Perpipaan Vertikal ...................................................................... 60

Gambar 2.19. Perpipaan Horizontal .................................................................. 61

Gambar 3.1. Peta Kecamatan Dusun Selatan .................................................. 70

Gambar 4.1. Lokasi TPA Buntok .................................................................... 86

Gambar 4.2. Jalan Masuk TPA Buntok ........................................................... 87

Gambar 4.3. Lahan TPA Buntok Eksisting Luas = 4.424 Ha .......................... 87

Gambar 4.4. Peta Lokasi TPA Buntok Kabupaten Barito Selatan .................. 88

Page 13: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

xii

Gambar 4.5. Presentase Komposisi Sampah Permukiman .............................. 89

Gambar 4.6. Presentase Komposisi Sampah Hotel .......................................... 89

Gambar 4.7. Presentase Komposisi Sampah RSUD Buntok ........................... 90

Gambar 4.8. Presentase Komposisi Sampah Pasar Beringin ........................... 90

Gambar 4.9. Presentase Komposisi Sampah Kantor Bupati ............................ 90

Gambar 4.10. Presentase Komposisi Sampah SMP 2 Buntok ........................... 91

Gambar 4.11. Presentase Komposisi Sampah TPA Buntok .............................. 91

Gambar 4.12. Tempat Penampungan Sampah/TPS ........................................... 93

Gambar 4.13. Kendaraan Dump Truck Pengangkut Sampah ............................ 93

Gambar 4.14. Lokasi TPS dan Jalur Angkut Sampah Eksisting ........................ 94

Gambar 4.15. Grafik Volume Sampah Terangkut Ke TPA (M³/Hari) ............. 95

Gambar 4.16. Grafik Frekuensi Pembuangan Sampah ke TPA Likut Jauh

Buntok Bulan Februari – April 2016 .......................................... 97

Gambar 4.17. Grafik Volume Sampah Yang Dibuang ke TPA Likut Jauh

Buntok Bulan Februari – April 2016 .......................................... 97

Gambar 4.18. Container ..................................................................................... 99

Gambar 4.19. Garasi Sementara Alat Buldozer ................................................. 99

Gambar 4.20 Bangunan Pos Jasa ...................................................................... 100

Gambar 4.21 Bangunan Komposting ................................................................ 101

Gambar 4.22 Garasi Alat Berat Sementara ....................................................... 101

Gambar 4.23 Genangan Leachate & Pembuangan Sampah Open Dumping ... 101

Gambar 4.24 Pembuangan Sampah ke Sungai ................................................. 102

Gambar 4.25 Rencana Penambahan Lahan TPA 6 Ha ..................................... 102

Gambar 4.26 Proses Pemisahan Sampah Oleh Pemulung DI TPA .................. 103

Gambar 4.27 Peralatan Mesin Sampah Hibah Dari Dinas LH ....................... 103

Gambar 4.28 Grafik Operasional Dan Pemeliharaan Sampah Eksiting ........... 108

Gambar 4.29 Support Layer – Existing Ground Suitable ................................. 116

Gambar 4.30 Support Layer – Existing Ground Not Suitable .......................... 116

Gambar 4.31 Support Layer – Existing Ground Not Suitable .......................... 117

Page 14: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

xiii

Gambar 4.32 Alternatif I ................................................................................... 118

Gambar 4.33 Alternatif II.................................................................................. 119

Gambar 4.34 Siteplan ........................................................................................ 125

Gambar 4.35 Potongan ...................................................................................... 128

Gambar 4.36 Proses Pengolahan Lindi ............................................................. 134

Gambar 4.37 Denah Kolam Lindi ..................................................................... 138

Gambar 4.38 Pertemuan Pipa Lindi Dan Pipa Gas ........................................... 141

Gambar 4.39 Rencana Jaringan Pipa Leachate TPA Buntok Kabupaten

Barito Selatan .............................................................................. 146

Gambar 4.40 Proyeksi Penduduk Kota Buntok Tahun 2015-2026 ................... 151

Gambar 4.41 Grafik Cakupan Pelayanan Sampah Kota Buntok

Tahun 2015-2026 ........................................................................ 161

Gambar 4.42 Grafik Pelayanan Sampah Kota Buntok

Tahun 2015-2026 ........................................................................ 161

Gambar 4.43 Kebutuhan Lahan TPA Kota Buntok dan Sekitarnya ................. 162

Gambar 4.44 Skenario Penerapan 3R Kota Buntok 2015-2026 ....................... 162

Page 15: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

xiv

DAFTAR TABEL

Tabel 2.1. Timbulan Sampah Kota ........................................................... 17

Tabel 2.2. Karakteristik Fisik Tanah sebagai Bahan Lapisan Kedap ........ 21

Tabel 2.3. Koefisien Pengaliran .................................................................. 43

Tabel 2.4. Karakteristik lindi di beberapa kota di Indonesia ...................... 45

Tabel 2.5. Kriteria Teknis Pengolahan Lindi (Alternatif 1) ....................... 47

Tabel 2.6. Kriteria Teknis Pengolahan Lindi (Alternatif 2) ....................... 48

Tabel 2.7. Kriteria Teknis Pengolahan Lindi (Alternatif 3) ....................... 49

Tabel 2.8. Kriteria Teknis Pengolahan Lindi (Alternatif 4) ....................... 50

Tabel 2.9. Kriteria Teknis Pengolahan Lindi (Alternatif 5) ....................... 51

Tabel 2.10. PenelitianTerdahulu ................................................................... 67

Tabel 3.1. Jadwal Penelitian ....................................................................... 71

Tabel 3.2. Sampel Responden .................................................................... 75

Tabel 3.3. Variabel Penelitian ................................................................... 76

Tabel 4.1. Komposisi Sampah Permukiman............................................... 89

Tabel 4.2. Komposisi Sampah Hotel .......................................................... 89

Tabel 4.3. Komposisi Sampah RSUD Buntok ........................................... 90

Tabel 4.4. Komposisi Sampah Pasar Beringin ........................................... 90

Tabel 4.5. Komposisi Sampah Kantor Bupati ............................................ 90

Tabel 4.6. Komposisi Sampah SMP 2 Buntok ........................................... 91

Tabel 4.7. Komposisi Sampah TPA Buntok ............................................... 91

Tabel 4.8. Data Kuantitas Sampah Terangkut Ke TPA

Dari Tahun 2013– 2015 ............................................................. 95

Tabel 4.9. Rekapitulasi Volume Sampah Yang Masuk ke TPA

Likut Jauh Buntok Februari – April 2016 ................................. 96

Tabel 4.10. Retribusi Kebersihan ................................................................. 105

Tabel 4.11. Anggaran Pelaksanaan Pengelolaan Persampahan

Eksisting .................................................................................... 108

Page 16: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

xv

Tabel 4.12. Perbandingan System Penggunaan Tanah Liat

dan SLT HDPE .......................................................................... 119

Tabel 4.13. Panjang Sel TPA Buntok Kabupaten Barito Selatan ................. 123

Tabel 4.14. Kebutuhan Tanah Penutup Harian ............................................. 127

Tabel 4.15. Karakteristik Utama Leachate ................................................... 129

Tabel 4.16. Perbandingan Biaya Proses Pengolahan Air Lindi .................... 132

Tabel 4.17. Perbandingan Unit Proses Pengolahan Leachate ....................... 133

Tabel 4.18. Perhitungan Dimensi Pipa Manifold dan Pipa Lateral .............. 147

Tabel 4.19. Proyeksi Penduduk Kota Buntok dan Sekitarnya dari

Tahun 2015-2026 ...................................................................... 152

Tabel 4.20. Proyeksi Volume Timbulan Sampah dan Rencana Pelayanan

Kota Buntok dan Sekitarnya Dari Tahun 2015-2026 ................ 155

Tabel 4.21. Skenario Penerapan Kegiatan 3R di Desa/Kelurahan ............... 163

Tabel 4.22. Rekapitulasi Skenario Pelayanan Sampah

Tahun 2015 s/d 2026 ................................................................. 169

Tabel 4.23. Kebutuhan Lahan TPA Kota Buntok dan Sekitarnya Dari

Tahun 2015 s/d 2026 ................................................................. 169

Tabel 4.24. Usia Tempat Pemprosesan Akhir .............................................. 170

Tabel 4.25. Biaya Konstruksi TPA Kota Buntok di Kabupaten

Barito Selatan ............................................................................ 176

Tabel 4.26. Biaya Operasional TPA Sampah Kota Buntok di Kabupaten

Barito Selatan ............................................................................179

Page 17: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

SURAT PERNYATAAN

Saya yang bertanda tangan dibawah ini :

Nama : AGUS SETIAWAN

NIM : 147.142.0.0696

Alamat : JalanMorist Ismail III N0 07 Palangka Raya

Telepon / HP : 08125151256

Menyatakan bahwa ‘Tesis’ yang saya buat untuk memenuhi persyaratan

kelulusan Magister Teknik Sipil – Program Pasca Sarjana – Universitas 17

Agustus 1945 Surabaya dengan judul :

“ PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH

STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK

KABUPATEN BARITO SELATAN ”

Adalah hasil karya saya sendiri, dan bukan’Duplikasi’ dari karya orang lain.

Selanjutnya apabila dikemudian hari ada klaim dari pihak lain bukan tanggung

jawab Pembimbing dan atau Pengelola Program tetapi menjadi tanggung jawab

saya sendiri.

Atas hal tersebut saya bersedia menerima sanksi, sesuai dengan hukum atau

aturan yang berlaku di Indonesia.

Demikian pernyataan ini saya buat dengan sebenarnya tanpa paksaan dari

siapa pun.

Surabaya, Januari 2017

Hormat saya,

AGUS SETIAWAN

Page 18: PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …

RIWAYAT HIDUP

Agus Setiawan, dilahirkan di Palangkaraya, Propinsi Kalimantan Tengah

Pada Tanggal 20 agustus 1975. Anak ke tiga dari enam bersaudara, pasangan dari

bapak Eduard Songkay Mering dan ibu Yance Frans Ikat. Sekolah dasar (SD)

telah diselesaikan di Palangkaraya tamat tahun 1987, sekolah lanjutan tingkat

pertama (SLTP) di Palangkaraya, tamat tahun 1990, sekolah lanjutan tingkat atas

(SLTA) di Palangkaraya, tamat tahun 1994.

Pendidikan di perguruan tinggi ditempuh di Fakultas Teknik, Jurusan

Teknik Arsitektur, Universitas Kristen Petra Surabaya dan selesai pada tahun

2000. Dengan tugas akhir dengan judul: Museum Sejarah dan Kebudayaan Dayak

Ngaju di Palangkaraya.

Karier pada tahun 2001 s.d 2009 sebagai wiraswasta. Pada tahun 2010

sampai sekarang sebagai PNS di Dinas Pekerjaan Umum dan Perumahan Rakyat,

Bidang Cipta Karya Provinsi Kalimantan Tengah.

Menikah pada tahun 2008 dengan Florence Felicia dan telah dikaruniai

anak 2 orang anak masing-masing : Gracia Asloren Eleanora (perempuan) 7

Tahun dan Gabriel Asloren Edyanelta Setiawan Mering (laki – laki) 1 Tahun.