PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …
Transcript of PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH …
PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI
TPA SAMPAH STUDI KASUS TPA LIKUT JAUH
DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN
TESIS
Untuk Memenuhi Sebagian Persyaratan
Guna Mencapai Gelar Magister Teknik Sipil
Diajukan oleh:
AGUS SETIAWAN
NIM :147 142 00696
PROGRAM STUDI MAGISTER TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA
2017
i
TESIS
PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI
TPA SAMPAH STUDI KASUS TPA LIKUT JAUH
DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN
Diajukan oleh:
AGUS SETIAWAN
NIM :147 142 00696
Disetujui untuk diuji
Surabaya, 27 November 2016
Pembimbing 1 : DR.Ir.H.Sajiyo,M.Kes ……………………
Pembimbing 2 : Ir.Bantot Sutriono.,M.Sc ……………………
PROGRAM STUDI MAGISTER TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS 17 AGUSTUS 1945 SURABAYA
2016
ii
TESIS
PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI
TPA SAMPAH STUDI KASUS TPA LIKUT JAUH
DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN
Diajukan oleh:
AGUS SETIAWAN
NIM :147 142 00696
Telah dipertahankan di depan Tim Penguji dan Dinyatakan lulus
Pada ujianTesis Program Studi Magister Teknik Sipil
Fakultas Teknik Universitas 17 Agustus 1945 Surabaya
PadaTanggal :16 Desember 2016
Tim Penguji
Ketua : DR.Ir.H.Sajiyo,M.Kes ……………………
Anggota : Ir.Bantot Sutriono.,M.Sc ……………………
Anggota : Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS ……………………
Mengetahui
FakultasTeknik
Universitas 17 Agustus 1945 Surabaya
Kaprodi MTS
Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS
Dekan Fakultas Teknik
DR. Ir. MuaffaqAchmad Jani, M.Eng
iii
KATA PENGANTAR
Puji Syukur kepada Tuhan Yang Maha Esa atas berkat dan rahmatnya-Nya,
sehingga penulis dapat menyelesaikan penulisan Tesis yang berjudul
“PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH
STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN”.
Penulisan Tesis ini merupakan salah satu syarat untuk memenuhi
sebagianpersyaratan guna mencapai gelar Magister Teknik Sipil pada Program
Studi Magister Teknik Sipil Fakultas Teknik Universitas 17 Agustus 1945
Surabaya.
Dalam penulisan Tesis ini, penulis memperoleh bantuan dan penjelasan
serta bimbingan dari berbagai pihak. Oleh karena itu dengan ini penulis
menyampaikan rasa terima kasih dan penghargaan kepada :
1. Yth. Ibu Prof. Dr. drg. Hj. Ida Aju Brahmasari, DiplDHE, MPA selaku
Rektor Universitas 17 Agustus 1945 Surabaya
2. Yth. Bapak DR. Ir. Muaffaq Achmad Jani, M.Eng selaku Direktur Program
Pascasarjana Universitas 17 Agustus 1945 Surabaya
3. Yth. Bapak Prof. DR.Ir. Wateno Oetomo.MM, MT, DRTS selaku Kaprodi
Magister Teknik Sipil Program Pascasarjana Universitas 17 Agustus 1945
Surabaya
4. Yth. Bapak DR.Ir.H.Sajiyo, M.Kes selaku dosen pembimbing I yang dengan
tulus dan penuh perhatian membimbing penulis sehingga penelitian dan
penulisan tesis ini dapat terselesaikan.
5. Yth. Bapak Ir.Bantot Sutriono.,M.Sc selaku dosen pembimbing II yang telah
banyak memberikan dorongan, arahan, masukan dan bimbingan selama
proses penulisan tesis ini.
6. Bapak dan Ibu Dosen serta staf Program Studi Magister Teknik Sipil Program
Pascasarjana Universitas 17 Agustus 1945 Surabaya atas bantuan, dukungan
dan kerjasamanya
iv
7. Rekan – rekan mahasiswa Magister Teknik Sipil Angkatan 24 (A+B+C)
Tahun 2015 / 2016 atas dukungan dan dorongan untuk menyelesaikan kuliah
dan penulisan penelitian ini ini.
8. Seluruh keluarga, rekan, sahabat dan handai taulan yang kesemuanya tak bisa
penulis sebutkan satu persatu, yang telah banyak membantu penulis dalam
penyelesaian penelitian ini.
9. Istriku tercinta dr.Folerence Felicia Sp MK., atas segala motivasi, perhatian
dan doa nya dan Anak-anakku terkasih (Dita Anggraini Putri, Gracia Asloren
Eleanora, Gabriel Asloren Edyanelta Setiawan Mering), ayah sayang Kalian.
10. Dan akhirnya kepada semua pihak yang tidak dapat di sebutkan satu persatu
yang telah membantu dalam penyusunan laporan penelitian ini.
Penulis sangat mengharapkan saran dan kritik membangun, karena pada
dasarnya penulis menyadari banyak kekurangan dan kekeliruan hingga masih jauh
dari sempurna.
Akhir kata penulis mengharapkan agar laporan penelitian ini dapat
bermanfaat khususnya bagi semua pembaca sebagai bahan pertimbangan ilmu
pengetahuan kita semua.
Surabaya, Desember 2016
Penulis,
( AGUS SETIAWAN)
v
ABSTRAKSI
Agus Setiawan, 2016
PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH
STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN
Pembimbing 1 : DR.Ir.H.Sajiyo.,M.Kes
Pembimbing 2 : Ir.Bantot Sutriono.,M.Sc
Sampah dan pengelolaannya kini menjadi masalah yang kian mendesak di
Kabupaten Barito Selatan Provinsi Kalimantan Tengah karena jumlahnya yang
terus bertambah.Kota Buntok dengan wilayah pelayanan meliputi Buntok kota,
Kel Hilir Sper, Jelapat, Pamait dan Sababilah sebesar 65 m3/hari, kemudian pada
tahun 2015 menjadi 82,045 m3/hari atau meningkat rata-rata sebesar 3,41%
pertahun yang dapat terangkut ke TPA hanya sebesar 47,59 m3/hari (58%). Jika
sampah yang tidak terangkut sebesar 42% atau setara dengan 34,46m3/hari tidak
dilakukan pengelolaan yang baik akan mengakibatkan terjadinya perubahan
keseimbangan lingkungan yang merugikan sehingga dapat mencemari lingkungan
baik terhadap tanah, air dan udara. Untuk memecahkan dan menghadapi keadaan
dan masalah tersebut maka perlu dilakukan penelitian pengelolaan persampahan
secara terperinci, baik aspek teknis, manajemen, peran serta masyarakat dan
pembiayaan.
Penelitian ini bersifat kualitatif dengan landasan berpikir filsafat positivism
dengan teori metodologi penelitian kuantitatif. Pengumpulan data dilakukan
melalui observasi dan wawancara dengan variable meliputi :(1). Manajemen
Pengangkutan; (2). Lokasi TPA; (3). Sarana Umum; (4). Fasilitas Perlindungan
Lingkungan; (5). Operasional dan Perawatan. Kemudian dilakukan (1). Analisa
model desain TPA dengan analisa lapisan dasar lahan, analisa sel dan
penimbunan, analisa air lindi dan analisa pipa gas metan; (2). Analisa umur TPA
yang meliputi analisa proyeksi penduduk, analisa timbulan sampah, analisa
kebutuhan lahan; (3). Analisa biaya dengan memperhitungkan tingkat inflansi dan
suku bunga bank.
Hasil dari penelitian menunjukan desain TPA sampah Kabupaten Barito
Selatan menggunakan sistem Sanitary Landfill dengan usia TPA diperkirakan
mencapai 10 tahun dan biaya pembangunan TPA sampah Kabupaten Barito
Selatan sampai tahun 2026 sebesar Rp.137.007.000.000,- (Terbilang : Seratus
Tiga Puluh Tujuh Milyar Tujuh Juta Rupiah).
Kata kunci :Tempat Pemrosesan Akhir, Desa Sababilah, Sanitary landfill
vi
ABSTRACT
Agus Setiawan, 2016
TECHNICAL PLANNING AND CONSTRUCTION COSTS LANDFILL
TRASHCASE STUDY TPA LIKUT JAUH SABABILAH VILLAGE
BUNTOK CITY SOUTH BARITO DISTRICT
Supervisor 1: DR.Ir.H.Sajiyo.,M.Kes
Supervisor 2: Ir.Bantot Sutriono., M.Sc
Waste and its management has become increasingly urgent problem in South
Barito regency, Central Borneo Province because their numbers are growing.
Buntok city with a service area covering Buntok city, villageHilirSper, Jelapat,
Pamait and Sababilah of 65 m3 / day, and then in 2015 to 82.045 m3 / day or an
average increase of 3.41% per annum which can be transported to the landfill only
amounting to 47.59 m3 / day (58%). If the waste that is not transported by 42%,
equivalent to 34.46 m3 / day did not do a good management will lead to the
occurrence of adverse changes in the environmental balance that can pollute the
environment both on land, water and air. To solve and face the situation and the
problem it is necessary to study waste management in detail, whether technical,
management, community participation and financing.
This is a qualitative study with the foundation philosophy of positivism think the
theory of quantitative research methodology. Data collected through observation
and interviews with variables include: (1). Transportation management; (2).
Landfill sites; (3). Public facilities; (4). Facility Environmental Protection; (5).
Operations and Maintenance. Then performed (1). Analysis of the landfill design
model with a base layer of land analysis, cell analysis and accumulation, analysis
of the leachate and methane gas pipeline analysis; (2). The aging of the landfill
that includes the analysis of population projections, analysis of waste, land needs
analysis; (3). Cost analysis taking into account inflansi levels and lower interest
rates.
Results from the study showed landfill design Barito Selatan using systems
Sanitary Landfill with landfill age estimated at 10 years and the cost of
construction of South Barito regency landfill until 2026 amounting to Rp
137.007.000.000, - (Amount: One Hundred And Thirty Seven Billion Seven
Million Rupiah)
Keywords: place of final processing, Sababilah Village, Sanitary landfill
vii
DAFTAR ISI
Lembar Persetujuan ............................................................................................ i
Lembar Tim Penguji ........................................................................................... ii
Kata Pengantar ................................................................................................... iii
Abstraksi ............................................................................................................. v
Abstract ............................................................................................................... vi
Daftar Isi ............................................................................................................. vii
Daftar Gambar .................................................................................................... xi
Daftar Tabel ....................................................................................................... xiv
BAB I. PENDAHULUAN
1.1 Latar Belakang ............................................................................................ 1
1.2 Rumusan Masalah ....................................................................................... 4
1.3 Tujuan Penelitian ......................................................................................... 4
1.4 Manfaat penelitian ...................................................................................... 5
1.5 Batasan dan Ruang Lingkup Penelitian ...................................................... 5
1.6 Sistematika Penulisan ................................................................................. 5
BAB II. TINJAUAN PUSTAKA
2.1 Pengertian Sampah ...................................................................................... 7
2.2 Jenis-jenis Sampah ...................................................................................... 8
2.3 Pengertian TPA (Tempat Pemprosesan Akhir) ........................................... 9
2.4 Jenis-jenis TPA (Tempat Pemprosesan Akhir) ........................................... 10
2.5 Persyratan Teknis ......................................................................................... 11
2.5.1 Kapasitas Lahan Efektif ..................................................................... 12
2.5.1.1. Luas Lahan Efektif .............................................................. 13
2.5.1.2. Perkiraan Jumlah Penduduk ................................................ 14
2.5.1.3. Proyeksi Timbulan Sampah ................................................. 15
2.5.2. Pengupasan dan Pelapisan Dasar Lahan ........................................... 20
viii
2.5.3. Sel Timbunan .................................................................................... 25
2.5.4. Penataan Sistem Pengumpul Lindi ................................................... 26
2.5.5. Tanah Penutup .................................................................................. 31
2.5.6. Jalan Akses ....................................................................................... 35
2.5.7. Jalan Operasional .............................................................................. 36
2.5.8. Drainase Air Hujan ........................................................................... 36
2.5.9. Teori Pengolahan Lindi .................................................................... 44
2.5.10. Drainase Air Lindi ......................................................................... 55
2.5.11. Bangunan Pengolahan Lindi .......................................................... 56
2.5.12. Sistem Penanganan Gas TPA dan Pengelolaan Biogas .................. 57
2.5.13. Perencanaan Sarana Penunjang ...................................................... 64
2.6 Konsep Penerapan Sistem Landfilling ........................................................ 65
2.7 Studi Ekonomi Biaya ................................................................................... 65
2.8 Penelitian Terdahulu ................................................................................... 67
BAB III. METODE PENELITIAN
3.1 Jenis Penelitian ............................................................................................ 68
3.1.1 Kerangka Alur Pikir ........................................................................... 69
3.2 Lokasi dan Waktu Penelitian ...................................................................... 70
3.3 Instrumen / Alat Bantu Penelitian ............................................................... 71
3.4 Metode Pengumpulan Data ......................................................................... 72
3.5 Sampel Penelitian ........................................................................................ 74
3.6 Variabel Penelitian ...................................................................................... 75
3.7 Metode dan Teknik Analisis Data ............................................................... 79
3.7.1 Metode Analisis Desain TPA ............................................................. 79
3.7.2 Metode Analisis Umur TPA ............................................................... 82
3.7.3 Metode Analisis Biaya Pembangunan TPA ....................................... 84
3.8 Flow Chart ................................................................................................... 85
ix
BAB IV. ANALISA DATA DAN PEMBAHASAN
4.1 Profil TPA Sampah Buntok ......................................................................... 86
4.1.1 Lokasi TPA Sampah Buntok .............................................................. 86
4.1.2 Komposisi Sampah ............................................................................. 89
4.1.3 Route Pengangkutan Sampah ............................................................. 91
4.1.4 Kuantitas Sampah Yang Terangkut .................................................... 95
4.1.5 Manajemen Persampahan Eksisting ................................................... 98
4.1.6 Sarana & Prasarana Persampahan Eksisting ...................................... 100
4.1.7 Restribusi dan Pelayanan Kebersihan & Persampahan ...................... 104
4.1.8 Kendala Pengelolaan .......................................................................... 109
4.2 Rencana Desain TPA Buntok ..................................................................... 109
4.2.1 Lapis Dasar Lahan TPA .................................................................... 109
4.2.2 Sel TPA dan Penimbunan .................................................................. 120
4.2.3 Pengolahan Leachate .......................................................................... 128
4.2.4 Rancangan Pipa Gas ........................................................................... 138
4.2.5 Pipa Pengumpul Leachate .................................................................. 141
4.3 Analisis Umur TPA ...................................................................................... 149
4.3.1 Analisis Proyeksi Jumlah Penduduk ................................................. 149
4.3.2 Analisis Kepadatan Penduduk ........................................................... 153
4.3.3 Analisis Laju Pertumbuhan Penduduk .............................................. 153
4.3.4 Analisis Proyeksi Timbulan Sampah ................................................. 153
4.3.5 Analisis Kebutuhan Lahan TPA ........................................................ 162
4.3.6 Analisis Minimalisasi Sampah dengan Kegitan 3R .......................... 171
4.4 Rencana Biaya Konstruksi & Biaya Operasional TPA Buntok .................. 174
4.4.1 Rencana Biaya Konstruksi TPA Buntok ........................................... 174
4.4.2 Rencana Biaya Operasinal TPA Buntok ........................................... 177
x
BAB V. KESIMPULAN DAN SARAN
5.1 Kesimpulan ................................................................................................. 180
5.2 Saran ........................................................................................................... 182
Daftar Pustaka .................................................................................................... 184
Lampiran ............................................................................................................. 186
Lampiran Gambar ............................................................................................... 193
xi
DAFTAR GAMBAR
Gambar 1.1. Menumpuknya sampah dipinggir jalan ...................................... 2
Gambar 1.2. Pembuangan Sampah ke sungai ................................................. 3
Gambar 2.1. Ilustrasi Pembuangan dan Penataan Sel Timbulan
Sampah di TPA .......................................................................... 26
Gambar 2.2. Pengaturan Kemiringan Dasar Ke Salah Satu Sisi ..................... 27
Gambar 2.3. Pengaturan Kemiringan Dasar Ketengah Sel .............................. 27
Gambar 2.4. Dasar Sel Dengan Pengaturan Kemiringan ................................ 28
Gambar 2.5. Pengaturan Kemiringan Pada Sel Yang Luas ............................ 28
Gambar 2.6. Pola Saluran Pengumpul Lindi .................................................. 29
Gambar 2.7. Penampang Saluran Pengumpul Lindi ....................................... 29
Gambar 2.8. Pipa Pengumpul Lindi ................................................................. 30
Gambar 2.9. Ilusrasi Perataan Tanah Penutup ................................................ 31
Gambar 2.10. Penampang Melintang Lapisan .................................................. 35
Gambar 2.11 Air Limpasan di TPA ................................................................. 36
Gambar 2.12. Drainase Penangkap Limpasan Dari Luar .................................. 39
Gambar 2.13. Pembuangan Air Dari Alur Alam Di Bagian Hulu .................... 39
Gambar 2.14. Penangkapan Aliran Air Tanah .................................................. 40
Gambar 2.15. Prinsip Koagulasi - Flokulasi ..................................................... 54
Gambar 2.16. Ventilasi Gas Area Individual .................................................... 59
Gambar 2.17. Ventilasi Gas Slope Individual ................................................... 60
Gambar 2.18. Perpipaan Vertikal ...................................................................... 60
Gambar 2.19. Perpipaan Horizontal .................................................................. 61
Gambar 3.1. Peta Kecamatan Dusun Selatan .................................................. 70
Gambar 4.1. Lokasi TPA Buntok .................................................................... 86
Gambar 4.2. Jalan Masuk TPA Buntok ........................................................... 87
Gambar 4.3. Lahan TPA Buntok Eksisting Luas = 4.424 Ha .......................... 87
Gambar 4.4. Peta Lokasi TPA Buntok Kabupaten Barito Selatan .................. 88
xii
Gambar 4.5. Presentase Komposisi Sampah Permukiman .............................. 89
Gambar 4.6. Presentase Komposisi Sampah Hotel .......................................... 89
Gambar 4.7. Presentase Komposisi Sampah RSUD Buntok ........................... 90
Gambar 4.8. Presentase Komposisi Sampah Pasar Beringin ........................... 90
Gambar 4.9. Presentase Komposisi Sampah Kantor Bupati ............................ 90
Gambar 4.10. Presentase Komposisi Sampah SMP 2 Buntok ........................... 91
Gambar 4.11. Presentase Komposisi Sampah TPA Buntok .............................. 91
Gambar 4.12. Tempat Penampungan Sampah/TPS ........................................... 93
Gambar 4.13. Kendaraan Dump Truck Pengangkut Sampah ............................ 93
Gambar 4.14. Lokasi TPS dan Jalur Angkut Sampah Eksisting ........................ 94
Gambar 4.15. Grafik Volume Sampah Terangkut Ke TPA (M³/Hari) ............. 95
Gambar 4.16. Grafik Frekuensi Pembuangan Sampah ke TPA Likut Jauh
Buntok Bulan Februari – April 2016 .......................................... 97
Gambar 4.17. Grafik Volume Sampah Yang Dibuang ke TPA Likut Jauh
Buntok Bulan Februari – April 2016 .......................................... 97
Gambar 4.18. Container ..................................................................................... 99
Gambar 4.19. Garasi Sementara Alat Buldozer ................................................. 99
Gambar 4.20 Bangunan Pos Jasa ...................................................................... 100
Gambar 4.21 Bangunan Komposting ................................................................ 101
Gambar 4.22 Garasi Alat Berat Sementara ....................................................... 101
Gambar 4.23 Genangan Leachate & Pembuangan Sampah Open Dumping ... 101
Gambar 4.24 Pembuangan Sampah ke Sungai ................................................. 102
Gambar 4.25 Rencana Penambahan Lahan TPA 6 Ha ..................................... 102
Gambar 4.26 Proses Pemisahan Sampah Oleh Pemulung DI TPA .................. 103
Gambar 4.27 Peralatan Mesin Sampah Hibah Dari Dinas LH ....................... 103
Gambar 4.28 Grafik Operasional Dan Pemeliharaan Sampah Eksiting ........... 108
Gambar 4.29 Support Layer – Existing Ground Suitable ................................. 116
Gambar 4.30 Support Layer – Existing Ground Not Suitable .......................... 116
Gambar 4.31 Support Layer – Existing Ground Not Suitable .......................... 117
xiii
Gambar 4.32 Alternatif I ................................................................................... 118
Gambar 4.33 Alternatif II.................................................................................. 119
Gambar 4.34 Siteplan ........................................................................................ 125
Gambar 4.35 Potongan ...................................................................................... 128
Gambar 4.36 Proses Pengolahan Lindi ............................................................. 134
Gambar 4.37 Denah Kolam Lindi ..................................................................... 138
Gambar 4.38 Pertemuan Pipa Lindi Dan Pipa Gas ........................................... 141
Gambar 4.39 Rencana Jaringan Pipa Leachate TPA Buntok Kabupaten
Barito Selatan .............................................................................. 146
Gambar 4.40 Proyeksi Penduduk Kota Buntok Tahun 2015-2026 ................... 151
Gambar 4.41 Grafik Cakupan Pelayanan Sampah Kota Buntok
Tahun 2015-2026 ........................................................................ 161
Gambar 4.42 Grafik Pelayanan Sampah Kota Buntok
Tahun 2015-2026 ........................................................................ 161
Gambar 4.43 Kebutuhan Lahan TPA Kota Buntok dan Sekitarnya ................. 162
Gambar 4.44 Skenario Penerapan 3R Kota Buntok 2015-2026 ....................... 162
xiv
DAFTAR TABEL
Tabel 2.1. Timbulan Sampah Kota ........................................................... 17
Tabel 2.2. Karakteristik Fisik Tanah sebagai Bahan Lapisan Kedap ........ 21
Tabel 2.3. Koefisien Pengaliran .................................................................. 43
Tabel 2.4. Karakteristik lindi di beberapa kota di Indonesia ...................... 45
Tabel 2.5. Kriteria Teknis Pengolahan Lindi (Alternatif 1) ....................... 47
Tabel 2.6. Kriteria Teknis Pengolahan Lindi (Alternatif 2) ....................... 48
Tabel 2.7. Kriteria Teknis Pengolahan Lindi (Alternatif 3) ....................... 49
Tabel 2.8. Kriteria Teknis Pengolahan Lindi (Alternatif 4) ....................... 50
Tabel 2.9. Kriteria Teknis Pengolahan Lindi (Alternatif 5) ....................... 51
Tabel 2.10. PenelitianTerdahulu ................................................................... 67
Tabel 3.1. Jadwal Penelitian ....................................................................... 71
Tabel 3.2. Sampel Responden .................................................................... 75
Tabel 3.3. Variabel Penelitian ................................................................... 76
Tabel 4.1. Komposisi Sampah Permukiman............................................... 89
Tabel 4.2. Komposisi Sampah Hotel .......................................................... 89
Tabel 4.3. Komposisi Sampah RSUD Buntok ........................................... 90
Tabel 4.4. Komposisi Sampah Pasar Beringin ........................................... 90
Tabel 4.5. Komposisi Sampah Kantor Bupati ............................................ 90
Tabel 4.6. Komposisi Sampah SMP 2 Buntok ........................................... 91
Tabel 4.7. Komposisi Sampah TPA Buntok ............................................... 91
Tabel 4.8. Data Kuantitas Sampah Terangkut Ke TPA
Dari Tahun 2013– 2015 ............................................................. 95
Tabel 4.9. Rekapitulasi Volume Sampah Yang Masuk ke TPA
Likut Jauh Buntok Februari – April 2016 ................................. 96
Tabel 4.10. Retribusi Kebersihan ................................................................. 105
Tabel 4.11. Anggaran Pelaksanaan Pengelolaan Persampahan
Eksisting .................................................................................... 108
xv
Tabel 4.12. Perbandingan System Penggunaan Tanah Liat
dan SLT HDPE .......................................................................... 119
Tabel 4.13. Panjang Sel TPA Buntok Kabupaten Barito Selatan ................. 123
Tabel 4.14. Kebutuhan Tanah Penutup Harian ............................................. 127
Tabel 4.15. Karakteristik Utama Leachate ................................................... 129
Tabel 4.16. Perbandingan Biaya Proses Pengolahan Air Lindi .................... 132
Tabel 4.17. Perbandingan Unit Proses Pengolahan Leachate ....................... 133
Tabel 4.18. Perhitungan Dimensi Pipa Manifold dan Pipa Lateral .............. 147
Tabel 4.19. Proyeksi Penduduk Kota Buntok dan Sekitarnya dari
Tahun 2015-2026 ...................................................................... 152
Tabel 4.20. Proyeksi Volume Timbulan Sampah dan Rencana Pelayanan
Kota Buntok dan Sekitarnya Dari Tahun 2015-2026 ................ 155
Tabel 4.21. Skenario Penerapan Kegiatan 3R di Desa/Kelurahan ............... 163
Tabel 4.22. Rekapitulasi Skenario Pelayanan Sampah
Tahun 2015 s/d 2026 ................................................................. 169
Tabel 4.23. Kebutuhan Lahan TPA Kota Buntok dan Sekitarnya Dari
Tahun 2015 s/d 2026 ................................................................. 169
Tabel 4.24. Usia Tempat Pemprosesan Akhir .............................................. 170
Tabel 4.25. Biaya Konstruksi TPA Kota Buntok di Kabupaten
Barito Selatan ............................................................................ 176
Tabel 4.26. Biaya Operasional TPA Sampah Kota Buntok di Kabupaten
Barito Selatan ............................................................................179
SURAT PERNYATAAN
Saya yang bertanda tangan dibawah ini :
Nama : AGUS SETIAWAN
NIM : 147.142.0.0696
Alamat : JalanMorist Ismail III N0 07 Palangka Raya
Telepon / HP : 08125151256
Menyatakan bahwa ‘Tesis’ yang saya buat untuk memenuhi persyaratan
kelulusan Magister Teknik Sipil – Program Pasca Sarjana – Universitas 17
Agustus 1945 Surabaya dengan judul :
“ PERENCANAAN TEKNIS DAN BIAYA KONSTRUKSI TPA SAMPAH
STUDI KASUS TPA LIKUT JAUH DESA SABABILAH KOTA BUNTOK
KABUPATEN BARITO SELATAN ”
Adalah hasil karya saya sendiri, dan bukan’Duplikasi’ dari karya orang lain.
Selanjutnya apabila dikemudian hari ada klaim dari pihak lain bukan tanggung
jawab Pembimbing dan atau Pengelola Program tetapi menjadi tanggung jawab
saya sendiri.
Atas hal tersebut saya bersedia menerima sanksi, sesuai dengan hukum atau
aturan yang berlaku di Indonesia.
Demikian pernyataan ini saya buat dengan sebenarnya tanpa paksaan dari
siapa pun.
Surabaya, Januari 2017
Hormat saya,
AGUS SETIAWAN
RIWAYAT HIDUP
Agus Setiawan, dilahirkan di Palangkaraya, Propinsi Kalimantan Tengah
Pada Tanggal 20 agustus 1975. Anak ke tiga dari enam bersaudara, pasangan dari
bapak Eduard Songkay Mering dan ibu Yance Frans Ikat. Sekolah dasar (SD)
telah diselesaikan di Palangkaraya tamat tahun 1987, sekolah lanjutan tingkat
pertama (SLTP) di Palangkaraya, tamat tahun 1990, sekolah lanjutan tingkat atas
(SLTA) di Palangkaraya, tamat tahun 1994.
Pendidikan di perguruan tinggi ditempuh di Fakultas Teknik, Jurusan
Teknik Arsitektur, Universitas Kristen Petra Surabaya dan selesai pada tahun
2000. Dengan tugas akhir dengan judul: Museum Sejarah dan Kebudayaan Dayak
Ngaju di Palangkaraya.
Karier pada tahun 2001 s.d 2009 sebagai wiraswasta. Pada tahun 2010
sampai sekarang sebagai PNS di Dinas Pekerjaan Umum dan Perumahan Rakyat,
Bidang Cipta Karya Provinsi Kalimantan Tengah.
Menikah pada tahun 2008 dengan Florence Felicia dan telah dikaruniai
anak 2 orang anak masing-masing : Gracia Asloren Eleanora (perempuan) 7
Tahun dan Gabriel Asloren Edyanelta Setiawan Mering (laki – laki) 1 Tahun.