Perencanaan dan Penjadwalan Distribusi Batubara di...

3
73 DAFTAR PUSTAKA Bhaskar, B., Yadav, A. S., Bhadoria, R. S., 2013, Transportation System of Coal Distribution: A Fuzzy Logic Approach using MATLAB, Corona Journal of Science and Technology, Vol. 2, No. III, pp. 20-30. Bilgen, B. & Ozkarahan, I., 2007, A Mixed-Integer Linear Programming Model for Bulk Grain Blending and Shipping, International Journal of Production Economics 107, pp. 555-571. Bozarth, C. B. & Handfield, R. B., 2006, Introduction to Operations and Supply Chain Management, Prentice Hall, New Jersey. Bundesanstalt fur Geowissenschaften und Rohstoffe Federal Institute for Geosciences and Natural Resources (BGR), 2009, Reserves, Resources and Availability of Energy Resources Annual Report 2009. Central Electricity Authority Ministry of Power India (CEA), 2014, Executive Summary Power Sector 2014. Chen, W., Wu, T. H., Huang, K. I., 1995, Optimal Scheduling Plan for A Coal Shipment Problem: An Efficient Approach. Computers ind. Engineering, Vol. 29, No. 1-4,pp. 489-493. Chopra, S. & Meindl, P., 2001, Supply Chain Management: Strategy, Planning and Operation, Pearson Education, New Jersey. Dobler, D. W., 1990, Purchasing and Supply Management, McGraw-Hill, New York. El-Wakil, M. M., 1985,Powerplant Technology, McGraw-Hill Book Company, Singapore. Elliott-Shircore, T. I. & Steele, P. T., 1985, Procurement Positioning Overview: Purchasing and Supply Management. Energitoday, 2004, http://www.energitoday.com/2014/09/15/sukhyar-80-produksi- batubara-nasional-untuk-ekspor/, diakses pada tanggal 17 Oktober 2014. Johannes, J., 2010, Studi Permodelan Transportasi Laut untuk Memenuhi Kebutuhan Batubara pada PLTU 2 X 15 MW di Desa Waai Pulau Ambon, Institut Teknologi Sepuluh Nopember, Surabaya. Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga Uap PAULUS BUDI KURNIAWAN Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

Transcript of Perencanaan dan Penjadwalan Distribusi Batubara di...

Page 1: Perencanaan dan Penjadwalan Distribusi Batubara di ...etd.repository.ugm.ac.id/downloadfile/82747/potongan/S1-2015-297966-bibliography.pdf · PT. Perusahaan Listrik Negara, 2013,

73

DAFTAR PUSTAKA

Bhaskar, B., Yadav, A. S., Bhadoria, R. S., 2013, Transportation System of Coal

Distribution: A Fuzzy Logic Approach using MATLAB, Corona Journal

of Science and Technology, Vol. 2, No. III, pp. 20-30.

Bilgen, B. & Ozkarahan, I., 2007, A Mixed-Integer Linear Programming Model for

Bulk Grain Blending and Shipping, International Journal of Production

Economics 107, pp. 555-571.

Bozarth, C. B. & Handfield, R. B., 2006, Introduction to Operations and Supply

Chain Management, Prentice Hall, New Jersey.

Bundesanstalt fur Geowissenschaften und Rohstoffe – Federal Institute for

Geosciences and Natural Resources (BGR), 2009, Reserves, Resources

and Availability of Energy Resources – Annual Report 2009.

Central Electricity Authority Ministry of Power India (CEA), 2014, Executive

Summary – Power Sector 2014.

Chen, W., Wu, T. H., Huang, K. I., 1995, Optimal Scheduling Plan for A Coal

Shipment Problem: An Efficient Approach. Computers ind. Engineering,

Vol. 29, No. 1-4,pp. 489-493.

Chopra, S. & Meindl, P., 2001, Supply Chain Management: Strategy, Planning and

Operation, Pearson Education, New Jersey.

Dobler, D. W., 1990, Purchasing and Supply Management, McGraw-Hill, New

York.

El-Wakil, M. M., 1985,Powerplant Technology, McGraw-Hill Book Company,

Singapore.

Elliott-Shircore, T. I. & Steele, P. T., 1985, Procurement Positioning Overview:

Purchasing and Supply Management.

Energitoday, 2004, http://www.energitoday.com/2014/09/15/sukhyar-80-produksi-

batubara-nasional-untuk-ekspor/, diakses pada tanggal 17 Oktober 2014.

Johannes, J., 2010, Studi Permodelan Transportasi Laut untuk Memenuhi

Kebutuhan Batubara pada PLTU 2 X 15 MW di Desa Waai Pulau Ambon,

Institut Teknologi Sepuluh Nopember, Surabaya.

Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

Page 2: Perencanaan dan Penjadwalan Distribusi Batubara di ...etd.repository.ugm.ac.id/downloadfile/82747/potongan/S1-2015-297966-bibliography.pdf · PT. Perusahaan Listrik Negara, 2013,

74

Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2005, Anatomi

Sumber Daya Batubara serta Asumsi Pemanfaatan untuk PLTU di

Indonesia.

Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2011, Tata

Cara Penetapan Besaran Biaya Penyesuaian Harga Patokan Batubara.

Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2014, Harga

Batubara Acuan & Harga Patokan Batubara Bulan Maret 2014.

Kementerian Perhubungan Republik Indonesia, 2008, Peta Sebaran Pelabuhan

Indonesia.

Kompas, 2008, Membenahi Perusahaan Listrik Negara,

http://lipsus.kompas.com/grammyawards/read/2008/01/10/19315174/Me

mbenahi.Perusahaan.Listrik.Negara, diakses pada tanggal 12 Agustus

2014.

Kumar, S. A. & Suresh, M., 2008, Production and Operations Management, New

Age International Publishers, New Delhi.

Lieberman, G. J. & Hillier, F. S., 1967, Introduction to Operations Research,

McGraw-Hill, New York.

Petromindo, 2005, Indonesian Coal Book 2004-2005.

PT. Adaro Indonesia, 2013, Investor Presentation 2013.

PT. Bukit Asam, 2013, Annual Report 2013.

PT. Harum Energy, 2013, Annual Report 2013.

PT. Indo Tambangraya Megah, 2013, Annual Report 2013.

PT. Kaltim Prima Coal, 2012, Sustainability Report 2012.

PT. Pembangkitan Jawa-Bali, 2014, Batubara, System Unloading & Gangguan

Pembongkarannya.

PT. Perusahaan Listrik Negara, 2013, Rencana Usaha Penyediaan Tenaga Listrik

2013-2022.

PT. Perusahaan Listrik Negara, 2014, Statistik PLN 2013.

Quayle, M., 2006, Purchasing and Supply Chain Management: Strategies and

Realities, IRM Press, London.

Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/

Page 3: Perencanaan dan Penjadwalan Distribusi Batubara di ...etd.repository.ugm.ac.id/downloadfile/82747/potongan/S1-2015-297966-bibliography.pdf · PT. Perusahaan Listrik Negara, 2013,

75

Shih, L.-H., 1997, Planning of Fuel Coal Imports Using a Mixed Integer

Programming Model, International Journal of Production Economics 51,

pp. 243-249.

Shih, L.-H. & Huarng, F.-H., 1994, Integer Programming Model for Scheduling

Coal Shipment: A Case Study, Journal of Chinese Institute of Industrial

Engineering 11(2), 61.

Slack, N., Chambers, S., Johnston, R., 2013, Operations Management 7th Edition,

Pearson Education, Harlow.

Tempo, 2007, PLN Kekurangan Pasokan Batubara,

http://tempo.co.id/hg/ekbis/2007/03/09/brk,20070309-95168,id.html,

diakses pada tanggal 12 Agustus 2014.

U.S. Energy Information Administration, 2013, International Energy Statistics

2012,http://www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm?tid=1&pid=

7&aid=1, diakses pada tanggal 12 Agustus 2014.

Winston, W. L., 1994, Introduction to Operation Research: Applications and

Algorithms, Duxbury Press, USA.

Wu, T.-H., Huang, K-I., Chen, W., 1995, Optimal Scheduling Plan for A Coal

Shipment Problem: An Efficient Approach, Computers ind. Engineering

Vol. 2, No. 1-4, pp. 489-493.

Yucekaya, A., 2013, Managing Fuel Coal Supply Chains with Multiple Objectives

and Multimode Transportation,Engineering Management Journal, Vol.

25, No. 1, pp. 58-70.

Yucekaya, A., 2013, Cost Minimizing Coal Logistics for Power Plants Considering

Transportation Constraints. Journal of Traffic and Logistics Engineering,

Vol. 1, No. 2,pp. 22-127.

Perencanaan dan Penjadwalan Distribusi Batubara di Pembangkit Listrik Tenaga UapPAULUS BUDI KURNIAWANUniversitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/