Pengukuran PH Dan Suhu Limbah

download Pengukuran PH Dan Suhu Limbah

of 2

Transcript of Pengukuran PH Dan Suhu Limbah

  • 8/17/2019 Pengukuran PH Dan Suhu Limbah

    1/2

    Air Limbah

    No. Tanggal pH Suhu (°C) No.

    1 1 nop 2013 7.8 33.1 1

    2 2 nop 2013 7.5 34.5 2

    3 3 nop 2013 off off 3

    4 4 nop 2013 7.2 34.5 4

    5 5 nop 2013 7.3 33 5

    6 6 nop 2013 7.4 34 6

    7 7 nop 2013 7.3 34.2 7

    8 8 nop 2013 7.3 33.1 8

    9 9 nop 2013 7.5 32.3 9

    10 10 nop 2013 off 0ff 10

    11 11 nop 2013 7.4 32.5 11

    12 12 nop 2013 7.3 32.5 12

    13 13 nop 2013 7.5 31.9 1314 14 nop 2013 7.4 32 14

    15 15 nop 2013 7.5 31.8 15

    16 16 nop 2013 7.4 32.1 16

    17 17 nop 2013 off off 17

    18 18 nop 2013 7.4 32.2 18

    19 19 nop 2013 7.5 32.2 19

    20 20 nop 2013 7.4 32.6 20

    21 21 nop 2013 7.4 32.2 21

    22 22 nop 2013 7.4 32.4 22

    23 23 nop 2013 7.5 32.4 23

    24 24 nop 2013 off off 24

    25 25 nop 2013 7.6 32.2 25

    26 26 nop 2013 7.4 32.1 26

    27 27 nop 2013 7.5 33.1 27

    28 28 nop 2013 7.4 32.2 28

    29 29 nop 2013 7.4 32.5 29

    30 30 nop 2013 7.3 32.1 30

    31 31

    32 3233 33

    34 34

    35 35

    36 36

    37 37

  • 8/17/2019 Pengukuran PH Dan Suhu Limbah

    2/2

    Air Bersih

    Tanggal pH Suhu (°C) Sumber  

    1 nop 2013 8 27.3 R. Bayi Perina

    2 nop 2013 8.1 27.6 R. Bayi Perina

    3 nop 2013 8.2 29.4 Musholah Lt. 2

    4 nop 2013 8.2 27.1 Musholah Lt. 2

    5 nop 2013 7.9 29.1 Musholah Lt. 2

    6 nop 2013 8 26.4 Musholah Lt. 2

    7 nop 2013 8.1 28.2 Musholah Lt. 2

    8 nop 2013 8.1 27.6 Musholah Lt. 2

    9 nop 2013 8 29.6 oilet Pria Lt. 2

    10 nop 2013 8.2 27.4 Musholah Lt. 2

    11 nop 2013 off off  

    12 nop 2013 8.2 26.8 Musholah Lt. 2

    13 nop 2013 8.1 29.2 Musholah Lt. 214 nop 2013 8 29.1 !roun" an#

    15 nop 2013 8.1 26.7 Musholah Lt.2

    16 nop 2013 7.7 31.5 $eep %ell

    17 nop 2013 8 26.6 oilet Pria Lt. 2

    18 nop 2013 off off  

    19 nop 2013 8.1 27.3 oilet Pria Lt. 2

    20 nop 2013 8 26.8 oilet Pria Lt. 1

    21 nop 2013 8.1 26.9 Musholah Lt. 2

    22 nop 2013 off off  

    23 nop 2013 8 26.4 oilet Pria Lt. 2

    24 nop 2013 8.1 27.2 Musholah Lt. 1

    25 nop 2013 off off

    26 nop 2013 8 27 Musholah Lt. 1

    27 nop 2013 8.1 26.7 oilet Pria Lt. 1

    28 nop 2013 8.1 26.4 oilet Pria Lt. 2

    29 nop 2013 8 26.5 Musholah Lt. 1

    30 nop 2013 8.2 27.1 oilet Pria Lt. 1

      26 oilet Pria Lt. 2

     8.1 26.3 oilet Pria Lt. 1