PAPARAN PUBLIK 2019 PT NUSA KONSTRUKSI ENJINIRING Tbk Kantor Pusat NKE, 17 Desember 2019 1

Transcript of PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux...

Page 1: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

PAPARAN PUBLIK 2019

PT NUSA KONSTRUKSI ENJINIRING Tbk

Kantor Pusat NKE, 17 Desember 2019

1

Page 2: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Visi Misi Perseroan

2

Page 3: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Nilai Perseroan

3

DIPASTIKAN NILAI-NILAI PERUSAHAAN INI DAPAT MENJADI BOOSTER UNTUK KEMAJUAN “NKE BARU”

SEHINGGA DIHARAPKAN NKE DAPAT MENJADI KEBANGGAAN INDONESIA

Page 4: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Portfolio Perseroan (Pekerjaan Gedung)

4

GRAND INDONESIA, JAKARTA APARTEMEN BOTANICA, JAKARTA SKYLINE OFFICE, SURABAYA

KALLA TOWER, MAKASSAR IBIS HOTEL TRANS STUDIO, BANDUNG AMANKILA HOTEL, BALI

Page 5: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Portfolio Perseroan (Pekerjaan Infrastruktur)

5

AMBARAWA RING ROAD

CENTRAL JAVA BRIDGE, TIMOR LESTE SERMO DAM, YOGYAKARTA

JETTY, KALIMANTAN MARTABE GOLD MINING, NORTH

SUMATERA HASANUDDIN AIRPORT, MAKASSAR

Page 6: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Strategi Diversifikasi

6

•PT Nusa Konstruksi Enjiniring Tbk Konstruksi

•PT Inti Duta Energi Energi

•PT Macmahon Mining Services Pertambangan

•PT Duta Buana Permata Real

Estate/Properti

Page 7: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Sertifikasi dan Penghargaan

7

Manajemen

Keselamatan &

Kesehatan Kerja, 2018

Environmental

Management System,

2011

Quality Management

System, 2011

Occupational Health &

Safety Management

System, 2011

Membership from green building

council Indonesia, 2011

CHESM Certificate (A Rating)

from Chevron , 2012

Free LTI Manhours from

G Resources Martabe, 2012

Page 8: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Sertifikasi dan Penghargaan

1095 Days Safe Incident Free Operartions

& Zero Accident

Chevron , 2019

Page 9: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Dewan Komisaris dan Direksi

Bambang Sulistomo Commissioner

Independent

Rony N. Hendropriyono Commissioner

Djoko Eko Soeprastowo President Director

Budi Susilo Director

Dwi Sihono R. Independent Director

Ganda Kusuma Director

Roy Edison Maningkas

Commissioner

Agoes Widjanarko President

Commissioner Independent

Page 10: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Susunan Pemegang Saham (per 30 November 2019)

10

NO SHAREHOLDERS OWNERSHIP NUMBER OF SHARES

1 PT Lintas Kebayoran Kota 34.12% 1,890,691,000

2 Hudson River Group Pte.Ltd. 11.10% 614,958,200

3 PT Rezeki Segitiga Emas 9.02% 500,000,000

4 PT Lokasindo Aditama 7.60% 420,975,500

5 PT Limex Indonesia 5.35% 296,651,000

6 Ganda Kusuma (Direktur) 0.15% 8,426,100

7 Djoko Eko Suprastowo (Direktur) 0.00% 50,000

8 Public 32.31% 1,789,976,700

9 Treasury Stock 0.35% 19,436,500

Total 100.00% 5,541,165,000

Page 11: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Tata Kelola Perusahaan

11

Manajemen Risiko

Komite Remunerasi dan Nominasi

Keterbukaan Informasi

Tanggung Jawab Sosial Perusahaan

Komite Audit

Rapat Umum Pemegang Saham

Page 12: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Tata Kelola Perusahaan

12

Code of Good

Corporate Governance

Whistleblowing System

(WBS) Code Of Conduct

Board Manual

Page 13: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

KEJADIAN PENTING DI TAHUN 2019

13

Page 14: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

14

RAPAT UMUM PEMEGANG SAHAM

TAHUNAN DAN LUAR BIASA

PERSEROAN

Pada bulan Juni 2019, Perseroan

menggelar Rapat Umum Pemegang

Saham Tahunan dan Luar Biasa

Perseroan dimana salah satu Agenda

RUPS nya adalah Perubahan Susunan

Pengurus Perseroan dimana Komisaris

Utama Perseroan yang semula

Bambang Sulistomo menjadi Agoes

Widjanarko. Selain perubahan

pengurus, NKE juga menetapkan KBLI

(Klasifikasi Baku Lapangan Usaha

Indonesia)

JUNI 2019

Page 15: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

15

PERSEROAN TELAH SELESAI MENJALANI

VONIS DAN PUTUSAN TAMBAHAN DARI

PENGADILAN TIPIKOR JULI 2019

Pada bulan Juli 2019, Perseroan

telah mendapatkan surat keterangan

dari KPK bahwasanya Perseroan

telah selesai menjalani vonis dan

putusan tambahan dari Pengadilan.

Adapun Perseroan telah membayar

uang sejumlah Rp 85,49 Miliar

sebagai uang pengganti kepada Kas

Negara serta dinyatakan selesai

menjalani pidana tambahan yaitu

pencabutan hak untuk mengikuti

lelang/tender dari Pemerintah

terhitung sejak tanggal 10 Juli 2019.

Page 16: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

16

BULAN KAMPANYE

ANTI KORUPSI, SUAP, DAN GRATIFIKASI SEP-OKT 2019

Bentuk kegiatan Bulan Kampanye

Anti Korupsi:

1. Pemasangan atribut kampanye

di Kantor Pusat dan Proyek NKE

2. Sosialisasi kepada karyawan

Proyek

3. Lomba poster kampanye anti

korupsi yang melibatkan seluruh

karyawan Perseroan

Page 17: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

17

KUNJUNGAN KERJA DIREKSI DENGAN

SHANXI CORPORATION NOVEMBER 2019

Kunjungan kerja Direksi ke China

untuk dalam rangka untuk

menjajaki kerjasama dengan

Shanxi Construction Investment

Group (SCIG).

Dalam rencananya, Perseroan akan

melakukan Joint Operation (JO)

untuk pelaksanaan proyek dan

berpotensi dikembangkannya

kerjasama dalam bentuk Joint

Venture (JV).

Page 18: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

18

MANAGEMENT REVIEW, P2K3L, DAN

EVENT LAINNYA

Adapun event-event regular yang

diadakan Perseroan setiap

tahunnya adalah:

1. Management Review yang

diadakan setiap 6 bulan sekali

2. Rapat P2K3L

3. Public Expose Tahunan

4. Dan lain-lain

Page 19: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

19

PERESMIAN BANDARA SYAMSUDIN

NOOR, BANJARMASIN OLEH

PRESIDEN REPUBLIK INDONESIA DESEMBER 2019 Pada tanggal 18 Desember 2019

akan dilakukan peresmian bandara

Syamsudin Noor di Banjarmasin oleh

Presiden RI.

Sesuai perjanjian kerja nomor PJKP-

17001974 dan Berita Acara Serah

Terima pekerjaan, NKE telah

merampungkan pekerjaan yaitu

taxiway dan runway serta bangunan

pendukung lainnya seperti area

parkir, masjid, kargo, bangunan

kantor, dll.

Page 20: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Kejadian Penting selama Tahun 2019

20

PERKEMBANGAN MASALAH

LONGSORAN PADA PROYEK GUBENG DESEMBER 2019

Seperti yang telah disampaikan pada Public Expose sebelumnnya, perihal masalah

longsoran pada proyek Gubeng, saat ini statusnya sedang dalam proses penanganan

kasus melalui Pengadilan Negeri Surabaya dan diharapkan persidangan dapat berakhir

pada awal tahun 2020 mendatang.

Sebagaimana diterangkan oleh Pemerintah Kota Surabaya Dinas Pekerjaan Umum Bina

Marga dan Pematusan) melalui surat 004/8103/436.7.3/2019 tanggal 11 Desember

2019 bahwa disampaikan ucapan terima kasih atas selesainya pekerjaan rekondisi Jalan

Raya Gubeng yang sejak Maret 2019 telah berfungsi dengan baik untuk 4 (empat) jalur

berikut bangunan pelengkapnya dan dianggap NKE telah menyelesaikan permasalahan

longsoran tersebut.

Page 21: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

PEROLEHAN KONTRAK BARU

PER NOVEMBER 2019

21

Dalam milyar rupiah

NO NAMA PROYEK OWNER

2019

KETERANGAN Q 1 Q 2 Q 3 Q 4

Jan - Mar Apr - Jun Jul - Sep Okt - Des

1 SAP One Signature Gallery Surabaya PT. AKR Land 231,0 CSCEC - NKE,JO

(51% : 49%)

2 Apartment Gangnam District Phase 1, Bekasi PT Pollux

Properties 276,1

CNQC - NKE, JO

(60% : 40%)

3 Civil & Structural Work Cirebon II 1x1000 MW CFPP,

Package B Hyundai E&C 304,8 NKE

4 Mock Up Holland Village Cempaka Putih PT. Trimitra Multi

S.S 2,8 NKE

5 Holland Village (Arsitektur - Mall) (Retail) PT. Trimitra Multi

S.S 70,0 NKE

6 Holland Village (Arsitektur - Mall) (Parking) PT. Trimitra Multi

S.S 18,7 NKE

7 Holland Village (Arsitektur - Apartment Tower 1) PT. Satyagraha

Dinamika Unggul 69,7 NKE

8 Holland Village (Arsitektur - Apartment Tower 2) PT. Satyagraha

Dinamika Unggul 48,3 NKE

9 Holland Village (Arsitektur - Office) PT. Satyagraha

Dinamika Unggul 27,5 NKE

10 LARONA DAM IMPROVEMENT - River Side And Road &

Kiln Road & Drainage System Improvement PT Vale Indonesia 28,9 NKE

JUMLAH PEROLEHAN PROYEK 507,1 304,8 2,8 263,2

TOTAL PEROLEHAN PROYEK Q1 s/d Q4

1.077,9

TARGET PEROLEHAN PROYEK TAHUN 2019

1.000,0

Page 22: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Proyek yang Sedang Berjalan

22

No. Nama Proyek Nilai Proyek

(Miliar Rp) Lokasi Nama Pemberi Kerja Keterangan

P R O Y E K G E D U N G

1 Nava Park 232.63 BSD City, Tangerang PT Bumi Parama Wisesa Selesai

2 Ciputra International 263,45 Puri Indah, Jakarta PT Ciputra Puri Trisula Selesai

3 Gaia Hotel Bandung 189.61 Lembang, Bandung PT Gaia Kencana Selesai (Cut Off)

4 Puri Orchard Apartment 577,00 Puri Indah, Jakarta PT Adicipta Graha Kencana Selesai (Cut Off)

5 World Capital Tower 681,89 Mega Kuningan, Jakarta PT Mega Kuningan Pinnacle

6 Embarcadero Apartemen 47,01 Bintaro, Tangerang Selatan PT. Gunung Halimun Elok Selesai (Cut Off)

7 Holland Village 272,07 Cempaka Putih, Jakarta PT Trimitra Multi Sukses

8 Gubeng Mixed Use 165,00 Gubeng, Surabaya PT. Saputra Karya Selesai (Cut Off)

9 Cinere Mixed Use 75,00 Cinere, Depok PT. Diagram Healtcare

Indonesia

Selesai (Cut Off)

P R O Y E K I N F R A S T R U K T U R

10 Universitas Mulawarman 324,11 Samarinda, Kalimantan

Timur

PT Universitas Mulawarman

Samarinda

11 Rehab Dam Batubesi 47,95 Sulawesi Selatan PT Vale Indonesia Selesai

12 Pengamanan Pantai Pandeglang 69,34 Banten Kemen PUPR Dirjen SDA Selesai

13 Ferrari Tunner 16,38 Sulawesi Selatan PT Vale Indonesia

14 Cirebon 2 CFPP Package 277,11 Cirebon, Jawa Barat Hyundai Engineering

Construction Co. Ltd

Page 23: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Proyek yang Sedang Berjalan (Proyek KSO)

23

No. Nama Proyek Nilai Proyek

(Miliar Rp) Lokasi Nama Pemberi Kerja Keterangan

P R O Y E K G E D U N G

1 Gangnam Bekasi 209,80 Bekasi PT Pollux Aditama

Kencana

JO with CNQC (Porsi

NKE 40%)

2 Sudirman 7.8 91,393 Jl. Jenderal Sudirman,

Jaksel

KSO SMKCCB SELESAI –

JO with CSCEC

(Porsi NKE 41%)

3 Chadstone 382,000 Cikarang, Pasirsari,

Bekasi, Jawa Barat

PT. Pollux Aditama

Kencana

JO with QNQC

(Porsi NKE 40%)

4 PLTU Batang 157,083 Jawa Barat Sumitomo Corporation JO with TOA Cons.

(Porsi NKE 40 %)

5 One Signature Surabaya 251 Gubeng, Surabaya PT AKR Surabaya Land

Corporindo

CUTOFF -

JO with CSCEC

(Porsi NKE 49 %)

P R O Y E K I N F R A S T R U K T U R

1 Sarana Pengaman Pantai Tiku 44,387 Padang Kementerian PUPR Dirjen

SDA

JO with PT.APL

(Porsi NKE 55 %)

2 Sarana Pengendalian Batang

Agam 55,781 Padang

Kementerian PUPR Dirjen

SDA

JO with PT.WIKA

(Porsi NKE 32.5 %)

3 Irigasi Lambunu 38,470 Palu, Sulawesi Tengah Kementerian PUPR Dirjen

SDA

JO with PT.ADHI

(Porsi NKE 30 %)

4 Lubuk Alung – Kurai Taji 76,02 Padang Kementrian PUPR Dirjen

SDA JO

Page 24: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS

PROYEK ONGOING

PER NOVEMBER 2019

Page 25: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

(Proyek World Capital

Tower)

Page 26: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

FOTO PROGRESS PROYEK

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek UNMUL - ICT)

FOTO PROGRESS PROYEK

(Proyek UNMUL - SLC)

FOTO PROGRESS PROYEK

(Proyek UNMUL - OLS)

FOTO PROGRESS PROYEK

(Proyek UNMUL - Pharmasi)

Page 27: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

FOTO PROGRESS PROYEK

(Proyek Nava Park)

Page 28: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek GAIA Bandung)

Page 29: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek Ciputra Internasional)

Page 30: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek The Element)

FOTO PROGRESS PROYEK

(Proyek Sudirman 7.8)

FOTO PROGRESS PROYEK

(Proyek Chadstone)

FOTO PROGRESS PROYEK

(Proyek PLTU Batang)

Page 31: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

FOTO PROGRESS PROYEK

(Proyek The Element) (Proyek Sudirman 7.8)

Page 32: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Casa Domain Apartemen, Jakarta

Page 33: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

(Y 354 BANDARA BANJARMASIN)

Page 34: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

(Y 354 BANDARA BANJARMASIN)

Page 35: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 356 Rehab DAM Batubesi VALE) (Y 356 Rehab DAM Batubesi VALE)

(Y 356 Rehab DAM Batubesi VALE) (Y 356 Rehab DAM Batubesi VALE)

Page 36: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 477 Pengaman Pantai Pandeglang) (Y 477 Pengaman Pantai Pandeglang)

(Y 477 Pengaman Pantai Pandeglang) (Y 477 Pengaman Pantai Pandeglang)

Page 37: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 350 FERRARI TUNNEL) (Y 350 FERRARI TUNNEL)

(Y 350 FERRARI TUNNEL) (Y 350 FERRARI TUNNEL)

Page 38: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 777 Sarana Pengendalian Batang Agam) (Y 777 Sarana Pengendalian Batang Agam)

(Y 777 Sarana Pengendalian Batang Agam) (Y 777 Sarana Pengendalian Batang Agam)

Page 39: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 778 Irigasi Lambunu) (Y 778 Irigasi Lambunu)

(Y 778 Irigasi Lambunu) (Y 778 Irigasi Lambunu)

Page 40: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

RESUME KINERJA PER JANUARI 2017

(Y 779 LUBUK ALUNG- KURAI TAJI) (Y 779 LUBUK ALUNG- KURAI TAJI)

(Y 779 LUBUK ALUNG- KURAI TAJI) (Y 779 LUBUK ALUNG- KURAI TAJI)

Page 41: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Laporan Keuangan (Q3 2019 – FY 2019 – RKAP 2020)

41

(dalam miliar R upiah)

Q3 2019 FY 2019 (PROYEKSI) RKAP 2020

Penghasilan Usaha 749.19 909.53 950.00

Beban Kontrak (695.24) (843.93) (840.75)

Laba Kotor 53.95 65.60 109.25

Laba KSO 0.21 6.00 20.00

Laba Kotor setelah KSO 54.16 71.60 129.25

Beban Umum Administrasi dan Pajak (89.15) (114.81) (90.25)

Beban Pajak (21.70) (26.59) (28.50)

Laba Usaha (56.69) (69.80) 10.50

Pendapatan/(Beban) Lain-lain 48.90 72.34 19.00

Bagian Laba (Rugi) Bersih Entitas Asosiasi - - -

Laba sebelum Pajak Penghasilan (7.79) 2.54 29.50

Beban Pajak Penghasilan - Non Final (2.39) (1.20) (4.75)

Laba Bersih (10.18) 1.34 24.75

Pendapatan Komprehensif Lainnya - - -

Laba Bersih (10.18) 1.34 24.75

Laporan Laba Rugi

Page 42: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

42

Laporan Keuangan (Q3 2019 – FY 2019 – RKAP 2020)

(dalam miliar R upiah)

Q3 2019 FY 2019 (PROYEKSI) RKAP 2020

Aset Lancar 998.88 1,062.84 1,077.45

Aset Tidak lancar 626.35 643.44 672.06

Total Aset 1,625.23 1,706.28 1,749.51

Liabilitas Jangka Pendek 857.16 921.64 964.93

Liabilitas Jangka Panjang 113.83 118.93 114.34

Total Liabilitas 970.99 1,040.57 1,079.27

Total Ekuitas 654.24 665.74 670.27

Neraca

Page 43: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

Rencana Tahun 2020

43

1.000 2.000 25

Perolehan

Kontrak Baru

2020

Target

Penghasilan

Usaha Tahun

2020

Laba Bersih

Tahun 2020

Seluruh Angka dalam Satuan Miliar Rupiah

Page 44: PAPARAN PUBLIK 2019 · 2019. 12. 18. · 2 Apartment Gangnam District Phase 1, Bekasi PT Pollux Properties 276,1 CNQC - NKE, JO (60% : 40%) 3 Civil & Structural Work Cirebon II 1x1000

44