  • 2/26/2014 KDS/PTM-1 1

    PEMINDAHAN TANAH MEKANIS (PTM)

    KULIAH 1

    OLEH : KUSUMO DRADJAD S.

    JURUSAN TEKNIK SIPIL

    POLITEKNIK NEGERI JAKARTA

  • 2/26/2014 KDS/PTM-1 2

    PEMINDAHAN TANAH MEKANIS (PTM)

    SUATU KEGIATAN DALAM PROYEK KONSTRUKSI TENTANG

    PENGATURAN , METODA KERJA, PRODUKTIVITAS DAN BIAYA

    PEKERJAAN TANAH KONSTRUKSI YANG MENGGUNAKAN PERALATAN

    BERAT (HAVY EQUITMENT)

  • 2/26/2014 KDS/PTM-1 3

    KEGUNAAN ALAT BERAT

    MEMPERCEPAT PROSES PELAKSANAAN PEKERJAAN

    MENGERJAKAN PEKERJAAN YANG SUKAR & TIDAK DPT DIKERJAKAN OLEH TENAGA MANUSIA

    APABILA MEMAKAI ALAT SEDERHANA

    KARENA ALASAN EFISIENSI, KETERBATASAN TENAGA KERJA, FAKTOR-FAKTOR EKONOMIS

    LAINNYA SEHINGGA MENUNTUT PENGGUNAAN

    ALAT BERAT

  • 2/26/2014 KDS/PTM-1 4

    PERTIMBANGAN PEMILIHAN ALAT BERAT

    SESUAI DENGAN FUNGSI ALAT BERAT TERHADAP JENIS PEKERJAANNYA

    PRODUKSI KERJA TINGGI

    ALAT BERAT YANG DIGUNAKAN HARUS LEBIH EKONOMIS

    LEBIH AMAN

    LEBIH CEPAT DAN AKURAT

    KESALAHAN PEMILIHAN ALAT BERAT BERAKIBAT

    PRODUKTIVITAS YANG DIHASILKAN LEBIH KECIL

    BIAYA OPRASIONAL BESAR

    PEKERJAAN KURANG EFISIEN

    DAPAT MEMBAHAYAKAN PEKERJAAN LAIN ATAU ALAT BERAT ITU SENDIRI

  • 2/26/2014 KDS/PTM-1 5

    PEMILIHAN ALAT BERAT

    FAKTOR-FAKTOR YANG MEMPENGARUHI PEMILIHAN ALBERT:

    1. BERDASARKAN JENIS PEKERJAAN

    2. BERDASARKAN KARAKTERISTIK TANAH

    3. BERDASARKAN JARAK ANGKUT

    4. BERDASARKAN KEKERASAN MATERIAL

    5. BERDASARKAN KEADAAN CUACA DAN MEDAN KERJA

    6. PEMILIHAN ALAT KARENA JANGKA WAKTU PELAKSANAAN PROYEK

    7. FAKTOR-FAKTOR TIDAK LANGSUNG YANG MEMPENGARUHI

    PEMILIHAN ALAT

  • 2/26/2014 KDS/PTM-1 6

    PERALATAN BAKU ALAT BERAT

    1. DIPRODUKSI SECARA MASAL

    2. SUKU CADANG SELALU TERSEDIA

    3. PENGADAAN LEBIH CEPAT

    4. HARGA STANDAR TIDAK TERLALU MAHAL

    5. PERBAIKAN DAN PERAWATAN CUKUP MUDAH

  • 2/26/2014 KDS/PTM-1 7

    PERALATAN KHUSUS ALAT BERAT

    1. DIDESAIN TERLEBIH DAHULU

    2. SUKU CADANG DIBUAT KHUSUS

    3. WAKTU PENGADAAN LEBIH LAMA

    4. PERALATAN HANYA COCOK U/ PEKERJAAN YANG SESUAI

    5. PENGADAAN ALAT DISESUAIKAN DENGAN HASIL DARI SUATU PROYEK

    6. PRODUKSI ALAT SANGAT BESAR

    7. PERLU OPERATOR KHUSUS

    8. UMUMNYA PERAWATAN AGAK SULIT

  • 2/26/2014 KDS/PTM-1 8

    PENGGUNAAN ALAT BERAT PADA PEKERJAAN KONSTRUKSI

    ALAT BERAT

    PROYEK KONSTRUKSI

    PEMILIHAN ALAT BERAT

    &

    METODE KERJA

    MANAJEMEN ALAT BERAT

    PRODUKTIVITAS M3/JAM

    BIAYA PEMILIKAN & OPRASIONAL Rp/JAM

    HARGA SATUAN PEKERJAAN Rp/M3

    MOBILISASI

  • 2/26/2014 KDS/PTM-1 9

    PEMILIHAN ALAT BERAT UNTUK PEKERJAAN TANAH

    PEKERJAAN LAND CLEARING & GRUBBING

    PENEBASAN ALANG-ALANG & GULMA

    MOTOR GRADER BULLDOZER KECIL

    PENEBASAN SEMAK PEPOHONAN & PENGGUSURAN BONGKANHAN BATUAN

    BULLDOZER ROCK DRILL COMPRESSOR

  • 2/26/2014 KDS/PTM-1 10

    PEMILIHAN ALAT BERAT UNTUK PEKERJAAN TANAH

    PEKERJAAN PENGUPASAN TANAH

    PENGUPASAN TANAH LUNAK

    MOTOR GRADER BULLDOZER SCRAPER

    PENGUPASAN TANAH KERAS DAN BATUAN

    BULLDOZER ROCK DRILL COMPRESSOR

    LANJUTAN

  • 2/26/2014 KDS/PTM-1 11

    PEMILIHAN ALAT BERAT UNTUK PEKERJAAN TANAH

    PEKERJAAN PENGGALIAN DAN PEMUATAN & PENIMBUNAN TANAH

    SECARA UMUM

    BULLDOZER SCRAPER DOZER SHOVEL WHEEL LOADER HYDRAULIC EXCAVATOR CLAMSHELL DRAGLINE

    UNTUK PONDASI BANGUNAN

    BULLDOZER DOZER SHOVEL HYDRAULIC EXCAVATOR CLAMSHELL DRAGLINE

    PEMBUATAN SALURAN

    MOTOR GRADER BULLDOZER HYDRAULIC EXCAVATOR CLAMSHELL DRAGLINE

    PENGANGKUTAN

    BULLDOZER SCRAPER DUMP TRUCK WHEEL LOADER

    LANJUTAN

  • 2/26/2014 KDS/PTM-1 12

    PEMILIHAN ALAT BERAT UNTUK PEKERJAAN TANAH

    PEKERJAAN PEMADATAN TANAH

    PEMADATAN TIMBUNAN TANAH UNTUK JALAN, TANGGUL SUNGAI, BENDUNGAN

    TIRE ROLLER TAMPING ROLLER

    PEMADATAN PERMUKAAN MIRING TIMBUNAN

    TAMPER TOWED VIBRATING ROLLER HYDRAULIC EXCAVATOR DENGAN SLOPE FACE BUCKET SPEC

    PEMADATAN PONDASI JEMBATAN, PENUTUPAN GORONG-GORONG,

    PEMADATAN DASAR SALURAN

    TAMPER TOWED VIBRATING ROLLER RAMER

    PEMADATAN PERMUKAAN ASPAL

    ROAD ROLLER TIRE ROLLER VIBRATING ROLLER

    LANJUTAN

  • 2/26/2014 KDS/PTM-1 13

    PEMILIHAN ALAT BERAT UNTUK PEKERJAAN TANAH

    PEKERJAAN PEMBENTUKAN PENAMPANG

    PENAMPANG JALAN

    MOTOR GRADER

    PENAMPANG SALURAN

    MOTOR GRADER HYDRAULIC EXCAVATOR

    LANJUTAN

  • 2/26/2014 KDS/PTM-1 14

    MANAJEMEN PERALATAN

    PERENCANAAN PERALATAN :

    JENIS, KAPASITAS, WAKTU PEMAKAIAN, MEDAN KERJA

    ORGANISASI BAGIAN PERALATAN:

    PERAWATAN BERENCANA & TIDAK , PENYEDIAAN SUKU CADANG

    PELAKSANAAN :

    MEMBUAT BAGAN PENGGUNAAN, MENCATAT PRODUKTIVITAS,

    WAKTU PEMAKAIAN, ALAT LAIN YANG ADA

    PENGAWASAN DAN EVALUASI:

    LAPORAN WAKTU, PRODUKSI, PERAWATAN

    KEMAMPUAN OPERATOR