Laporan Pembelian Gudang Gizi 2015

download Laporan Pembelian Gudang Gizi 2015

of 7

Transcript of Laporan Pembelian Gudang Gizi 2015

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    1/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    02/01/2015 01012015gz Bunga Padi 00/00/0000 2.143.000,00 0 0 0 2.143.000,00

    02/01/2015 02012015gz Bunga Padi 00/00/0000 2.118.500,00 0 0 0 2.118.500,0003/01/2015 03012015gz Bunga Padi 00/00/0000 1.232.000,00 0 0 0 1.232.000,00

    06/01/2015 04012015gz Bunga Padi 31/01/2015 1.532.500,00 0 0 0 1.532.500,00

    06/01/2015 05012015gz Bunga Padi 31/01/2015 2.149.500,00 0 0 0 2.149.500,00

    06/01/2015 06012015gz Bunga Padi 31/01/2015 1.110.500,00 0 0 0 1.110.500,00

    07/01/2015 07012015gz Bunga Padi 31/01/2015 1.676.000,00 0 0 0 1.676.000,00

    08/01/2015 08012015gz Bunga Padi 31/01/2015 2.431.000,00 0 0 0 2.431.000,00

    09/01/2015 09012015gz Bunga Padi 31/01/2015 2.520.500,00 0 0 0 2.520.500,00

    10/01/2015 10012015gz Bunga Padi 31/01/2015 2.412.500,00 0 0 0 2.412.500,00

    12/01/2015 11012015gz Bunga Padi 31/01/2015 1.479.000,00 0 0 0 1.479.000,00

    12/01/2015 12012015gz Bunga Padi 31/01/2015 1.896.500,00 0 0 0 1.896.500,0013/01/2015 13012015gz Bunga Padi 31/01/2015 1.330.500,00 0 0 0 1.330.500,00

    14/01/2015 14012015gz Bunga Padi 31/01/2015 2.589.000,00 0 0 0 2.589.000,00

    15/01/2015 15012015gz Bunga Padi 31/01/2015 1.691.000,00 0 0 0 1.691.000,00

    16/01/2015 16012015gz Bunga Padi 31/01/2015 1.559.000,00 0 0 0 1.559.000,00

    19/01/2015 18012015gz Bunga Padi 31/01/2015 1.638.000,00 0 0 0 1.638.000,00

    19/01/2015 19012015gz Bunga Padi 00/00/0000 1.957.000,00 0 0 0 1.957.000,00

    20/01/2015 17012015gz Bunga Padi 31/01/2015 2.143.000,00 0 0 0 2.143.000,00

    20/01/2015 20012015gz Bunga Padi 31/01/2015 1.260.000,00 0 0 0 1.260.000,00

    21/01/2015 21012015gz Bunga Padi 31/01/2015 2.706.000,00 0 0 0 2.706.000,00

    22/01/2015 22012015gz Bunga Padi 31/01/2015 1.462.500,00 0 0 0 1.462.500,00

    23/01/2015 23012015gz Bunga Padi 31/01/2015 1.918.500,00 0 0 0 1.918.500,00

    24/01/2015 24012015gz Bunga Padi 31/01/2015 2.091.500,00 0 0 0 2.091.500,00

    26/01/2015 26012015gz Bunga Padi 31/01/2015 1.805.000,00 0 0 0 1.805.000,00

    27/01/2015 25012015gz Bunga Padi 31/01/2015 1.608.000,00 0 0 0 1.608.000,00

    28/01/2015 27012015gz Bunga Padi 31/01/2015 1.610.000,00 0 0 0 1.610.000,00

    28/01/2015 28012015gz Bunga Padi 31/01/2015 2.941.000,00 0 0 0 2.941.000,00

    29/01/2015 29012015gz Bunga Padi 31/01/2015 1.028.400,00 0 0 0 1.028.400,00

    30/01/2015 30012015gz Bunga Padi 31/01/2015 2.206.500,00 0 0 0 2.206.500,00

    31/01/2015 31012015gz Bunga Padi 31/01/2015 1.885.000,00 0 0 0 1.885.000,00

    02/02/2015 01022015gz Bunga Padi 28/02/2015 1.606.000,00 0 0 0 1.606.000,00

    02/02/2015 02022015gz Bunga Padi 28/02/2015 2.076.000,00 0 0 0 2.076.000,0003/02/2015 03022015gz Bunga Padi 28/02/2015 1.260.500,00 0 0 0 1.260.500,00

    04/02/2015 04022015gz Bunga Padi 28/02/2015 2.115.500,00 0 0 0 2.115.500,00

    05/02/2015 05022015gz Bunga Padi 28/02/2015 2.568.000,00 0 0 0 2.568.000,00

    06/02/2015 06082015gz Bunga Padi 28/02/2015 1.421.000,00 0 0 0 1.421.000,00

    07/02/2015 07022015gz Bunga Padi 28/02/2015 1.650.500,00 0 0 0 1.650.500,00

    09/02/2015 08022015gz Bunga Padi 00/00/0000 1.457.500,00 0 0 0 1.457.500,00

    09/02/2015 09022015gz Bunga Padi 28/02/2015 2.646.000,00 0 0 0 2.646.000,00

    10/02/2015 10022015gz Bunga Padi 28/02/2015 1.583.000,00 0 0 0 1.583.000,00

    11/02/2015 11022015gz Bunga Padi 28/02/2015 2.237.500,00 0 0 0 2.237.500,00

    12/02/2015 12022015gz Bunga Padi 28/02/2015 1.222.000,00 0 0 0 1.222.000,00

    13/02/2015 13022015gz Bunga Padi 28/02/2015 1.970.000,00 0 0 0 1.970.000,00

    14/02/2015 14022015gz Bunga Padi 28/02/2015 2.842.500,00 0 0 0 2.842.500,00

    16/02/2015 15022015gz Bunga Padi 28/02/2015 2.422.000,00 0 0 0 2.422.000,00

    16/02/2015 16022017gz Bunga Padi 28/02/2015 1.163.500,00 0 0 0 1.163.500,00

    17/02/2015 17022015gz Bunga Padi 28/02/2015 1.593.000,00 0 0 0 1.593.000,00

    18/02/2015 18022015gz Bunga Padi 28/02/2015 1.782.000,00 0 0 0 1.782.000,00

    21/02/2015 19022015gz Bunga Padi 28/02/2015 989.001,00 0 0 0 989.001,00

    RS PKU Muhammadiyah Sruweng

    INFORMASI PEMBELIAN Gudang Gizi

    PERIODE: 01 Januari 2015 s . d 07 Desember 2015

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    2/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    21/02/2015 20022015gz Bunga Padi 28/02/2015 2.200.500,00 0 0 0 2.200.500,00

    21/02/2015 21022015gz Bunga Padi 28/02/2015 3.191.500,00 0 0 0 3.191.500,00

    23/02/2015 22022015gz Bunga Padi 28/02/2015 1.572.500,00 0 0 0 1.572.500,00

    23/02/2015 23022015gz Bunga Padi 28/02/2015 1.603.500,00 0 0 0 1.603.500,00

    24/02/2015 24022015gz Bunga Padi 28/02/2015 1.352.500,00 0 0 0 1.352.500,00

    25/02/2015 25022015gz Bunga Padi 28/02/2015 2.276.500,00 0 0 0 2.276.500,0026/02/2015 26022015gz Bunga Padi 28/02/2015 1.362.500,00 0 0 0 1.362.500,00

    27/02/2015 27022015gz Bunga Padi 28/02/2015 1.354.000,00 0 0 0 1.354.000,00

    03/03/2015 28022015gz Bunga Padi 28/02/2015 2.811.000,00 0 0 0 2.811.000,00

    03/03/2015 01032015gz Bunga Padi 31/03/2015 1.617.501,00 0 0 0 1.617.501,00

    03/03/2015 02032015gz Bunga Padi 31/03/2015 1.937.500,00 0 0 0 1.937.500,00

    04/03/2015 03032015gz Bunga Padi 31/03/2015 1.622.000,00 0 0 0 1.622.000,00

    04/03/2015 04032015gz Bunga Padi 31/03/2015 2.530.000,00 0 0 0 2.530.000,00

    04/03/2015 05032015gz Bunga Padi 31/03/2015 1.163.000,00 0 0 0 1.163.000,00

    07/03/2015 06032015gz Bunga Padi 31/03/2015 1.213.000,00 0 0 0 1.213.000,00

    07/03/2015 07032015gz Bunga Padi 31/03/2015 3.183.500,00 0 0 0 3.183.500,00

    09/03/2015 08032015gz Bunga Padi 31/03/2015 1.531.500,00 0 0 0 1.531.500,00

    09/03/2015 09032015gz Bunga Padi 31/03/2015 1.626.000,00 0 0 0 1.626.000,00

    11/03/2015 10032015gz Bunga Padi 31/03/2015 2.043.000,00 0 0 0 2.043.000,00

    11/03/2015 11032015gz Bunga Padi 31/03/2015 1.399.000,00 0 0 0 1.399.000,00

    12/03/2015 12032015gz Bunga Padi 31/03/2015 1.372.500,00 0 0 0 1.372.500,00

    13/03/2015 13032015gz Bunga Padi 31/03/2015 1.053.500,00 0 0 0 1.053.500,00

    16/03/2015 14032015gz Bunga Padi 31/03/2015 3.184.000,00 0 0 0 3.184.000,00

    16/03/2015 15032015gz Bunga Padi 31/03/2015 1.397.500,00 0 0 0 1.397.500,00

    16/03/2015 16032015gz Bunga Padi 31/03/2015 1.117.000,00 0 0 0 1.117.000,00

    17/03/2015 17032015gz Bunga Padi 31/03/2015 1.949.500,00 0 0 0 1.949.500,00

    18/03/2015 18032015gz Bunga Padi 31/03/2015 1.726.500,00 0 0 0 1.726.500,0019/03/2015 19032015gz Bunga Padi 31/03/2015 1.086.000,00 0 0 0 1.086.000,00

    20/03/2015 20032015gz Bunga Padi 31/03/2015 3.854.500,00 0 0 0 3.854.500,00

    23/03/2015 23032015gz Bunga Padi 31/03/2015 1.349.500,00 0 0 0 1.349.500,00

    26/03/2015 21032015gz Bunga Padi 31/03/2015 1.631.500,00 0 0 0 1.631.500,00

    26/03/2015 22032015gz Bunga Padi 31/03/2015 1.457.000,00 0 0 0 1.457.000,00

    26/03/2015 24032015gz Bunga Padi 31/03/2015 1.242.000,00 0 0 0 1.242.000,00

    26/03/2015 25032015gz Bunga Padi 31/03/2015 1.337.500,00 0 0 0 1.337.500,00

    26/03/2015 26032015gz Bunga Padi 31/03/2015 1.537.000,00 0 0 0 1.537.000,00

    27/03/2015 27032015gz Bunga Padi 31/03/2015 1.692.000,00 0 0 0 1.692.000,00

    31/03/2015 28032015gz Bunga Padi 31/03/2015 1.420.500,00 0 0 0 1.420.500,00

    31/03/2015 29032015gz Bunga Padi 31/03/2015 1.536.500,00 0 0 0 1.536.500,00

    31/03/2015 30032015gz Bunga Padi 31/03/2015 2.565.000,00 0 0 0 2.565.000,00

    31/03/2015 31032015gz Bunga Padi 31/03/2015 1.205.000,00 0 0 0 1.205.000,00

    02/04/2015 01042015gz Bunga Padi 30/04/2015 1.093.000,00 0 0 0 1.093.000,00

    03/04/2015 02042015gz Bunga Padi 30/04/2015 1.494.000,00 0 0 0 1.494.000,00

    07/04/2015 05042015gz Bunga Padi 30/04/2015 1.543.000,00 0 0 0 1.543.000,00

    07/04/2015 06042015gz Bunga Padi 30/04/2015 1.284.000,00 0 0 0 1.284.000,00

    07/04/2015 03042015gz Bunga Padi 30/04/2015 957.500,00 0 0 0 957.500,00

    08/04/2015 07042015gz Bunga Padi 30/04/2015 1.806.000,00 0 0 0 1.806.000,00

    09/04/2015 04042015gz Bunga Padi 30/04/2015 3.286.500,00 0 0 0 3.286.500,00

    09/04/2015 08042015gz Bunga Padi 30/04/2015 1.092.500,00 0 0 0 1.092.500,0009/04/2015 9042015 Bunga Padi 30/04/2015 1.758.500,00 0 0 0 1.758.500,00

    10/04/2015 10042015gz Bunga Padi 30/04/2015 1.382.500,00 0 0 0 1.382.500,00

    13/04/2015 11042015gz Bunga Padi 30/04/2015 1.577.000,00 0 0 0 1.577.000,00

    14/04/2015 13042015gz Bunga Padi 30/04/2015 1.974.000,00 0 0 0 1.974.000,00

    14/04/2015 14042015gz Bunga Padi 30/04/2015 1.212.500,00 0 0 0 1.212.500,00

    15/04/2015 12042015gz Bunga Padi 30/04/2015 1.589.000,00 0 0 0 1.589.000,00

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    3/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    16/04/2015 16042015gz Bunga Padi 30/04/2015 895.500,00 0 0 0 895.500,00

    20/04/2015 17042015gz Bunga Padi 30/04/2015 1.905.500,00 0 0 0 1.905.500,00

    20/04/2015 18042015gz Bunga Padi 30/04/2015 826.500,00 0 0 0 826.500,00

    22/04/2015 19042015gz Bunga Padi 30/04/2015 1.801.000,00 0 0 0 1.801.000,00

    23/04/2015 20042015gz Bunga Padi 30/04/2015 2.380.500,00 0 0 0 2.380.500,00

    23/04/2015 21042015gz Bunga Padi 30/04/2015 1.203.000,00 0 0 0 1.203.000,0023/04/2015 22042015gz Bunga Padi 30/04/2015 1.362.500,00 0 0 0 1.362.500,00

    23/04/2015 23042015gz Bunga Padi 30/04/2015 1.251.000,00 0 0 0 1.251.000,00

    27/04/2015 24042015gz Bunga Padi 30/04/2015 1.010.500,00 0 0 0 1.010.500,00

    27/04/2015 25042015gz Bunga Padi 30/04/2015 2.037.000,00 0 0 0 2.037.000,00

    27/04/2015 26042015gz Bunga Padi 30/04/2015 2.494.000,00 0 0 0 2.494.000,00

    27/04/2015 27042015gz Bunga Padi 30/04/2015 2.324.000,00 0 0 0 2.324.000,00

    02/05/2015 28042015 Bunga Padi 30/04/2015 1.511.000,00 0 0 0 1.511.000,00

    02/05/2015 29042015gz Bunga Padi 30/04/2015 1.595.500,00 0 0 0 1.595.500,00

    02/05/2015 30042015gz Bunga Padi 30/04/2015 886.500,00 0 0 0 886.500,00

    02/05/2015 01052015gz Bunga Padi 31/05/2015 1.752.000,00 0 0 0 1.752.000,00

    02/05/2015 02052015gz Bunga Padi 31/05/2015 1.332.000,00 0 0 0 1.332.000,00

    05/05/2015 03052015gz Bunga Padi 31/05/2015 1.554.000,00 0 0 0 1.554.000,00

    05/05/2015 04052015gz Bunga Padi 31/05/2015 2.354.000,00 0 0 0 2.354.000,00

    05/05/2015 05052015gz Bunga Padi 31/05/2015 2.032.000,00 0 0 0 2.032.000,00

    06/05/2015 06052015gz Bunga Padi 31/05/2015 1.104.000,00 0 0 0 1.104.000,00

    08/05/2015 07052015gz Bunga Padi 31/05/2015 1.743.500,00 0 0 0 1.743.500,00

    08/05/2015 08052015gz Bunga Padi 31/05/2015 1.388.000,00 0 0 0 1.388.000,00

    11/05/2015 09052015gz Bunga Padi 31/05/2015 1.380.500,00 0 0 0 1.380.500,00

    11/05/2015 10052015gz Bunga Padi 31/05/2015 1.657.000,00 0 0 0 1.657.000,00

    11/05/2015 11052015gz Bunga Padi 31/05/2015 2.913.000,00 0 0 0 2.913.000,00

    14/05/2015 12052015gz Bunga Padi 31/05/2015 1.279.000,00 0 0 0 1.279.000,0014/05/2015 13052015gz Bunga Padi 31/05/2015 1.684.500,00 0 0 0 1.684.500,00

    18/05/2015 14052015gz Bunga Padi 31/05/2015 1.460.000,00 0 0 0 1.460.000,00

    18/05/2015 15052015gz Bunga Padi 31/05/2015 2.832.000,00 0 0 0 2.832.000,00

    18/05/2015 16052015gz Bunga Padi 31/05/2015 1.068.500,00 0 0 0 1.068.500,00

    19/05/2015 17052015gz Bunga Padi 31/05/2015 1.529.500,00 0 0 0 1.529.500,00

    19/05/2015 18052015gz Bunga Padi 31/05/2015 1.968.000,00 0 0 0 1.968.000,00

    20/05/2015 19052015gz Bunga Padi 31/05/2015 1.842.000,00 0 0 0 1.842.000,00

    22/05/2015 20052015gz Bunga Padi 31/05/2015 1.935.500,00 0 0 0 1.935.500,00

    22/05/2015 21052015gz Bunga Padi 31/05/2015 1.360.000,00 0 0 0 1.360.000,00

    23/05/2015 22052015gz Bunga Padi 31/05/2015 1.324.000,00 0 0 0 1.324.000,00

    23/05/2015 23052015gz Bunga Padi 31/05/2015 1.281.500,00 0 0 0 1.281.500,00

    25/05/2015 24052015gz Bunga Padi 31/05/2015 1.786.500,00 0 0 0 1.786.500,00

    25/05/2015 25052015gz Bunga Padi 31/05/2015 2.127.500,00 0 0 0 2.127.500,00

    26/05/2015 26052015gz Bunga Padi 31/05/2015 1.818.000,00 0 0 0 1.818.000,00

    28/05/2015 27052015gz Bunga Padi 31/05/2015 1.529.000,00 0 0 0 1.529.000,00

    28/05/2015 28052015gz Bunga Padi 31/05/2015 1.445.500,00 0 0 0 1.445.500,00

    30/05/2015 29052015gz Bunga Padi 31/05/2015 1.518.000,00 0 0 0 1.518.000,00

    30/05/2015 30052015gz Bunga Padi 31/05/2015 1.694.500,00 0 0 0 1.694.500,00

    01/06/2015 31052015gz Bunga Padi 31/05/2015 1.678.000,00 0 0 0 1.678.000,00

    01/06/2015 01062015gz Bunga Padi 30/06/2015 3.174.000,00 0 0 0 3.174.000,00

    03/06/2015 02062015gz Bunga Padi 30/06/2015 1.378.500,00 0 0 0 1.378.500,0003/06/2015 03062015gz Bunga Padi 30/06/2015 1.033.500,00 0 0 0 1.033.500,00

    04/06/2015 04062015gz Bunga Padi 30/06/2015 1.689.500,00 0 0 0 1.689.500,00

    08/06/2015 05062015gz Bunga Padi 30/06/2015 1.726.000,00 0 0 0 1.726.000,00

    08/06/2015 06062015gz Bunga Padi 30/06/2015 1.035.500,00 0 0 0 1.035.500,00

    08/06/2015 07062015gz Bunga Padi 30/06/2015 1.387.000,00 0 0 0 1.387.000,00

    08/06/2015 08062015gz Bunga Padi 30/06/2015 2.574.500,00 0 0 0 2.574.500,00

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    4/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    09/06/2015 09062016gz Bunga Padi 30/06/2015 1.143.500,00 0 0 0 1.143.500,00

    10/06/2015 10062016gz Bunga Padi 30/06/2015 1.634.500,00 0 0 0 1.634.500,00

    11/06/2015 11062015gz Bunga Padi 30/06/2015 1.860.001,00 0 0 0 1.860.001,00

    12/06/2015 12062015 Bunga Padi 30/06/2015 1.037.500,00 0 0 0 1.037.500,00

    13/06/2015 13062015gz Bunga Padi 30/06/2015 1.720.500,00 0 0 0 1.720.500,00

    15/06/2015 14062015gz Bunga Padi 30/06/2015 1.509.000,00 0 0 0 1.509.000,0015/06/2015 15062015gz Bunga Padi 30/06/2015 2.354.500,00 0 0 0 2.354.500,00

    18/06/2015 16062015gz Bunga Padi 30/06/2015 1.909.000,00 0 0 0 1.909.000,00

    18/06/2015 17062015gz Bunga Padi 30/06/2015 2.868.500,00 0 0 0 2.868.500,00

    18/06/2015 18062015gz Bunga Padi 30/06/2015 885.000,00 0 0 0 885.000,00

    19/06/2015 19062015gz Bunga Padi 30/06/2015 1.045.001,00 0 0 0 1.045.001,00

    20/06/2015 20062015gz Bunga Padi 30/06/2015 1.605.500,00 0 0 0 1.605.500,00

    22/06/2015 21062015gz Bunga Padi 30/06/2015 1.357.500,00 0 0 0 1.357.500,00

    22/06/2015 22062015gz Bunga Padi 30/06/2015 1.368.500,00 0 0 0 1.368.500,00

    23/06/2015 23062015gz Bunga Padi 30/06/2015 1.137.500,00 0 0 0 1.137.500,00

    25/06/2015 24062015gz Bunga Padi 30/06/2015 2.665.000,00 0 0 0 2.665.000,00

    25/06/2015 25062015gz Bunga Padi 30/06/2015 1.366.500,00 0 0 0 1.366.500,00

    26/06/2015 26062015gz Bunga Padi 30/06/2015 1.168.500,00 0 0 0 1.168.500,00

    29/06/2015 27062015gz Bunga Padi 30/06/2015 1.798.500,00 0 0 0 1.798.500,00

    29/06/2015 28062015gz Bunga Padi 30/06/2015 1.273.000,00 0 0 0 1.273.000,00

    29/06/2015 29062015gz Bunga Padi 30/06/2015 2.372.000,00 0 0 0 2.372.000,00

    30/06/2015 30062015gz Bunga Padi 30/06/2015 886.500,00 0 0 0 886.500,00

    01/07/2015 01072015gz Bunga Padi 31/07/2015 984.000,00 0 0 0 984.000,00

    03/07/2015 02072015gz Bunga Padi 31/07/2015 1.236.000,00 0 0 0 1.236.000,00

    03/07/2015 03072015gz Bunga Padi 31/07/2015 2.238.000,00 0 0 0 2.238.000,00

    04/07/2015 04072015gz Bunga Padi 31/07/2015 1.147.500,00 0 0 0 1.147.500,00

    06/07/2015 05072015gz Bunga Padi 31/07/2015 904.000,00 0 0 0 904.000,0006/07/2015 06072015gz Bunga Padi 31/07/2015 2.221.000,00 0 0 0 2.221.000,00

    07/07/2015 07072015gz Bunga Padi 31/07/2015 1.100.500,00 0 0 0 1.100.500,00

    09/07/2015 08072015gz Bunga Padi 31/07/2015 5.013.000,00 0 0 0 5.013.000,00

    10/07/2015 09072015gz Bunga Padi 31/07/2015 747.000,00 0 0 0 747.000,00

    10/07/2015 10072015gz Bunga Padi 31/07/2015 1.509.500,00 0 0 0 1.509.500,00

    13/07/2015 11072015gz Bunga Padi 31/07/2015 1.556.000,00 0 0 0 1.556.000,00

    13/07/2015 12072015gz Bunga Padi 31/07/2015 1.395.500,00 0 0 0 1.395.500,00

    13/07/2015 13072015gz Bunga Padi 31/07/2015 1.079.000,00 0 0 0 1.079.000,00

    14/07/2015 14072015gz Bunga Padi 31/07/2015 1.575.500,00 0 0 0 1.575.500,00

    16/07/2015 15072015gz Bunga Padi 31/07/2015 2.127.500,00 0 0 0 2.127.500,00

    16/07/2015 16072015gz Bunga Padi 31/07/2015 2.969.500,00 0 0 0 2.969.500,00

    21/07/2015 20072015gz Bunga Padi 31/07/2015 694.500,00 0 0 0 694.500,00

    21/07/2015 21072015 Bunga Padi 31/07/2015 898.000,00 0 0 0 898.000,00

    23/07/2015 22072015gz Bunga Padi 31/07/2015 970.500,00 0 0 0 970.500,00

    23/07/2015 23072015gz Bunga Padi 31/07/2015 1.379.500,00 0 0 0 1.379.500,00

    24/07/2015 24072015gz Bunga Padi 31/07/2015 1.157.000,00 0 0 0 1.157.000,00

    25/07/2015 25072015gz Bunga Padi 31/07/2015 2.622.000,00 0 0 0 2.622.000,00

    27/07/2015 26072015gz Bunga Padi 31/07/2015 1.584.500,00 0 0 0 1.584.500,00

    27/07/2015 27072015gz Bunga Padi 31/07/2015 835.500,00 0 0 0 835.500,00

    28/07/2015 28072015gz Bunga Padi 31/07/2015 2.156.000,00 0 0 0 2.156.000,00

    29/07/2015 29072015gz Bunga Padi 31/07/2015 1.498.000,00 0 0 0 1.498.000,0005/08/2015 30072015gz Bunga Padi 31/07/2015 1.367.500,00 0 0 0 1.367.500,00

    05/08/2015 31072015gz Bunga Padi 31/07/2015 1.325.000,00 0 0 0 1.325.000,00

    05/08/2015 01082015gz Bunga Padi 31/08/2015 2.801.500,00 0 0 0 2.801.500,00

    05/08/2015 02082015gz Bunga Padi 31/08/2015 1.401.000,00 0 0 0 1.401.000,00

    05/08/2015 03082015gz Bunga Padi 31/08/2015 988.000,00 0 0 0 988.000,00

    05/08/2015 04082015gz Bunga Padi 31/08/2015 1.745.000,00 0 0 0 1.745.000,00

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    5/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    06/08/2015 05082015gz Bunga Padi 31/08/2015 1.441.000,00 0 0 0 1.441.000,00

    06/08/2015 06082015gza Bunga Padi 31/08/2015 1.389.500,00 0 0 0 1.389.500,00

    07/08/2015 07082015gz Bunga Padi 31/08/2015 1.424.500,00 0 0 0 1.424.500,00

    10/08/2015 08082015gz Bunga Padi 31/08/2015 1.854.500,00 0 0 0 1.854.500,00

    10/08/2015 09082015gz Bunga Padi 31/08/2015 2.483.500,00 0 0 0 2.483.500,00

    10/08/2015 10082015gz Bunga Padi 31/08/2015 1.429.000,00 0 0 0 1.429.000,0011/08/2015 11082015gz Bunga Padi 31/08/2015 1.494.500,00 0 0 0 1.494.500,00

    12/08/2015 12082015gz Bunga Padi 31/08/2015 1.326.500,00 0 0 0 1.326.500,00

    13/08/2015 13082015gz Bunga Padi 31/08/2015 927.500,00 0 0 0 927.500,00

    14/08/2015 14082015gz Bunga Padi 31/08/2015 1.100.500,00 0 0 0 1.100.500,00

    18/08/2015 15082015gz Bunga Padi 31/08/2015 1.343.500,00 0 0 0 1.343.500,00

    18/08/2015 16082015gz Bunga Padi 31/08/2015 2.174.500,00 0 0 0 2.174.500,00

    20/08/2015 18082015gz Bunga Padi 31/08/2015 1.925.500,00 0 0 0 1.925.500,00

    20/08/2015 19082015gz Bunga Padi 31/08/2015 1.155.000,00 0 0 0 1.155.000,00

    24/08/2015 17082015gz Bunga Padi 31/08/2015 570.000,00 0 0 0 570.000,00

    24/08/2015 20082015gz Bunga Padi 31/08/2015 859.000,00 0 0 0 859.000,00

    24/08/2015 21082015gz Bunga Padi 31/08/2015 1.830.000,00 0 0 0 1.830.000,00

    24/08/2015 22082015gz Bunga Padi 31/08/2015 1.682.000,00 0 0 0 1.682.000,00

    24/08/2015 23082015gz Bunga Padi 31/08/2015 1.234.500,00 0 0 0 1.234.500,00

    25/08/2015 24082015gz Bunga Padi 31/08/2015 2.845.000,00 0 0 0 2.845.000,00

    25/08/2015 25082015gz Bunga Padi 31/08/2015 2.569.500,00 0 0 0 2.569.500,00

    26/08/2015 26082015gz Bunga Padi 31/08/2015 1.460.000,00 0 0 0 1.460.000,00

    27/08/2015 27082015gz Bunga Padi 31/08/2015 771.500,00 0 0 0 771.500,00

    31/08/2015 28082015gz Bunga Padi 31/08/2015 1.953.000,00 0 0 0 1.953.000,00

    31/08/2015 29082015gz Bunga Padi 31/08/2015 1.599.500,00 0 0 0 1.599.500,00

    31/08/2015 30082015gz Bunga Padi 31/08/2015 1.196.500,00 0 0 0 1.196.500,00

    31/08/2015 31082015gz Bunga Padi 31/08/2015 2.013.000,00 0 0 0 2.013.000,0001/09/2015 01092015gz Bunga Padi 30/09/2015 1.294.000,00 0 0 0 1.294.000,00

    02/09/2015 02092015gz Bunga Padi 30/09/2015 1.532.000,00 0 0 0 1.532.000,00

    03/09/2015 03092015gz Bunga Padi 30/09/2015 1.006.500,00 0 0 0 1.006.500,00

    04/09/2015 04092015gz Bunga Padi 30/09/2015 1.089.000,00 0 0 0 1.089.000,00

    07/09/2015 05092015gz Bunga Padi 30/09/2015 2.161.500,00 0 0 0 2.161.500,00

    09/09/2015 06092015gz Bunga Padi 30/09/2015 1.021.500,00 0 0 0 1.021.500,00

    09/09/2015 07092015gz Bunga Padi 30/09/2015 1.962.500,00 0 0 0 1.962.500,00

    09/09/2015 08092015gz Bunga Padi 30/09/2015 1.736.000,00 0 0 0 1.736.000,00

    09/09/2015 09092015gz Bunga Padi 30/09/2015 1.168.000,00 0 0 0 1.168.000,00

    11/09/2015 10092015gz Bunga Padi 30/09/2015 1.135.500,00 0 0 0 1.135.500,00

    11/09/2015 11092015gz Bunga Padi 30/09/2015 1.554.000,00 0 0 0 1.554.000,00

    14/09/2015 12092015gz Bunga Padi 30/09/2015 2.071.000,00 0 0 0 2.071.000,00

    15/09/2015 13092015gz Bunga Padi 30/09/2015 1.276.500,00 0 0 0 1.276.500,00

    15/09/2015 14092015gz Bunga Padi 30/09/2015 1.218.500,00 0 0 0 1.218.500,00

    15/09/2015 15092015gz Bunga Padi 30/09/2015 1.711.500,00 0 0 0 1.711.500,00

    16/09/2015 16092015 Bunga Padi 30/09/2015 973.000,00 0 0 0 973.000,00

    17/09/2015 17092015gz Bunga Padi 30/09/2015 1.876.500,00 0 0 0 1.876.500,00

    19/09/2015 18092015gz Bunga Padi 30/09/2015 1.961.000,00 0 0 0 1.961.000,00

    19/09/2015 19092015gz Bunga Padi 30/09/2015 1.335.500,00 0 0 0 1.335.500,00

    21/09/2015 20092015gz Bunga Padi 30/09/2015 1.286.500,00 0 0 0 1.286.500,00

    21/09/2015 21092015gz Bunga Padi 30/09/2015 781.500,00 0 0 0 781.500,0025/09/2015 22092015gz Bunga Padi 30/09/2015 1.239.500,00 0 0 0 1.239.500,00

    25/09/2015 23092015gz Bunga Padi 30/09/2015 2.795.500,00 0 0 0 2.795.500,00

    25/09/2015 24092015gz Bunga Padi 30/09/2015 584.500,00 0 0 0 584.500,00

    25/09/2015 25092015gz Bunga Padi 30/09/2015 2.340.000,00 0 0 0 2.340.000,00

    26/09/2015 26092015gz Bunga Padi 30/09/2015 813.000,00 0 0 0 813.000,00

    28/09/2015 27092015gz Bunga Padi 30/09/2015 1.109.500,00 0 0 0 1.109.500,00

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    6/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    28/09/2015 28092015gz Bunga Padi 30/09/2015 1.339.000,00 0 0 0 1.339.000,00

    30/09/2015 29092015gz Bunga Padi 30/09/2015 1.361.500,00 0 0 0 1.361.500,00

    30/09/2015 30092015gz Bunga Padi 30/09/2015 894.000,00 0 0 0 894.000,00

    03/10/2015 01102015gz Bunga Padi 31/10/2015 1.192.500,00 0 0 0 1.192.500,00

    03/10/2015 02102015gz Bunga Padi 31/10/2015 915.000,00 0 0 0 915.000,00

    05/10/2015 03102015gz Bunga Padi 31/10/2015 2.333.500,00 0 0 0 2.333.500,0005/10/2015 04102015gz Bunga Padi 31/10/2015 1.321.500,00 0 0 0 1.321.500,00

    05/10/2015 05102015gz Bunga Padi 31/10/2015 1.560.000,00 0 0 0 1.560.000,00

    09/10/2015 06102015gz Bunga Padi 31/10/2015 1.327.000,00 0 0 0 1.327.000,00

    09/10/2015 07102015gz Bunga Padi 31/10/2015 878.000,00 0 0 0 878.000,00

    09/10/2015 08102015gz Bunga Padi 31/10/2015 566.000,00 0 0 0 566.000,00

    09/10/2015 09102015gz Bunga Padi 31/10/2015 732.000,00 0 0 0 732.000,00

    12/10/2015 10102015gz Bunga Padi 31/10/2015 820.500,00 0 0 0 820.500,00

    13/10/2015 11102015gz Bunga Padi 31/10/2015 994.500,00 0 0 0 994.500,00

    13/10/2015 12102015gz Bunga Padi 31/10/2015 1.391.500,00 0 0 0 1.391.500,00

    13/10/2015 13102015gz Bunga Padi 31/10/2015 2.540.000,00 0 0 0 2.540.000,00

    15/10/2015 14102015gz Bunga Padi 31/10/2015 1.042.500,00 0 0 0 1.042.500,00

    15/10/2015 15102015gz Bunga Padi 31/10/2015 940.500,00 0 0 0 940.500,00

    16/10/2015 16102015gz Bunga Padi 31/10/2015 951.500,00 0 0 0 951.500,00

    17/10/2015 17102015gz Bunga Padi 31/10/2015 1.251.000,00 0 0 0 1.251.000,00

    19/10/2015 18102015gz Bunga Padi 31/10/2015 1.140.500,00 0 0 0 1.140.500,00

    19/10/2015 19102015gz Bunga Padi 31/10/2015 794.500,00 0 0 0 794.500,00

    21/10/2015 20102015gz Bunga Padi 31/10/2015 2.164.500,00 0 0 0 2.164.500,00

    21/10/2015 21102015gz Bunga Padi 31/10/2015 969.000,00 0 0 0 969.000,00

    22/10/2015 22102015gz Bunga Padi 31/10/2015 2.176.000,00 0 0 0 2.176.000,00

    24/10/2015 23102015gz Bunga Padi 31/10/2015 1.365.500,00 0 0 0 1.365.500,00

    24/10/2015 24102015gz Bunga Padi 31/10/2015 2.014.000,00 0 0 0 2.014.000,0027/10/2015 25102015gz Bunga Padi 31/10/2015 1.302.000,00 0 0 0 1.302.000,00

    27/10/2015 26102015gz Bunga Padi 31/10/2015 2.498.500,00 0 0 0 2.498.500,00

    27/10/2015 27102015gz Bunga Padi 31/10/2015 1.334.500,00 0 0 0 1.334.500,00

    28/10/2015 28102015gz Bunga Padi 31/10/2015 2.306.000,00 0 0 0 2.306.000,00

    29/10/2015 29102015gz Bunga Padi 31/10/2015 720.000,00 0 0 0 720.000,00

    30/10/2015 30102015gz Bunga Padi 31/10/2015 1.497.500,00 0 0 0 1.497.500,00

    31/10/2015 31102015gz Bunga Padi 31/10/2015 1.724.500,00 0 0 0 1.724.500,00

    02/11/2015 1112015gz Bunga Padi 30/11/2015 1.424.500,00 0 0 0 1.424.500,00

    02/11/2015 02112015gz Bunga Padi 30/11/2015 911.000,00 0 0 0 911.000,00

    03/11/2015 03112015gz Bunga Padi 30/11/2015 1.634.500,00 0 0 0 1.634.500,00

    04/11/2015 04112015gz Bunga Padi 30/11/2015 1.654.500,00 0 0 0 1.654.500,00

    07/11/2015 05112015gz Bunga Padi 30/11/2015 2.730.500,00 0 0 0 2.730.500,00

    07/11/2015 06112015gz Bunga Padi 30/11/2015 1.754.000,00 0 0 0 1.754.000,00

    07/11/2015 07112015gz Bunga Padi 30/11/2015 1.781.500,00 0 0 0 1.781.500,00

    09/11/2015 08112015gz Bunga Padi 30/11/2015 1.473.000,00 0 0 0 1.473.000,00

    09/11/2015 09112015gz Bunga Padi 30/11/2015 1.232.000,00 0 0 0 1.232.000,00

    10/11/2015 10112015gz Bunga Padi 30/11/2015 1.365.500,00 0 0 0 1.365.500,00

    12/11/2015 11112015gz Bunga Padi 30/11/2015 1.654.001,00 0 0 0 1.654.001,00

    13/11/2015 12112015gz Bunga Padi 30/11/2015 2.245.000,00 0 0 0 2.245.000,00

    13/11/2015 13112015gz Bunga Padi 30/11/2015 1.264.000,00 0 0 0 1.264.000,00

    14/11/2015 14112015gz Bunga Padi 30/11/2015 1.276.000,00 0 0 0 1.276.000,0017/11/2015 15112015gz Bunga Padi 30/11/2015 1.492.000,00 0 0 0 1.492.000,00

    18/11/2015 16112015gz Bunga Padi 30/11/2015 2.355.000,00 0 0 0 2.355.000,00

    18/11/2015 17112015gz Bunga Padi 30/11/2015 1.559.500,00 0 0 0 1.559.500,00

    18/11/2015 18112015gz Bunga Padi 30/11/2015 773.000,00 0 0 0 773.000,00

    19/11/2015 19112015gz Bunga Padi 30/11/2015 2.535.000,00 0 0 0 2.535.000,00

    21/11/2015 20112015gz Bunga Padi 30/11/2015 1.243.000,00 0 0 0 1.243.000,00

  • 7/24/2019 Laporan Pembelian Gudang Gizi 2015

    7/7

    Tanggal

    FakturNo. Surat Suplier

    Tgl. Jatuh

    TempoHarga PPN (%)

    Materai

    (Rp.)

    Diskon

    (Rp.)jumlah (Rp.)

    21/11/2015 21112015gz Bunga Padi 30/11/2015 992.000,00 0 0 0 992.000,00

    23/11/2015 22112015gz Bunga Padi 30/11/2015 1.154.500,00 0 0 0 1.154.500,00

    23/11/2015 23112015gz Bunga Padi 30/11/2015 1.692.500,00 0 0 0 1.692.500,00

    25/11/2015 24112015gz Bunga Padi 30/11/2015 1.285.000,00 0 0 0 1.285.000,00

    25/11/2015 25112015gz Bunga Padi 30/11/2015 1.244.000,00 0 0 0 1.244.000,00

    26/11/2015 26112015gz Bunga Padi 30/11/2015 671.500,00 0 0 0 671.500,0030/11/2015 27112015gz Bunga Padi 30/11/2015 1.907.000,00 0 0 0 1.907.000,00

    30/11/2015 28112015gz Bunga Padi 30/11/2015 1.852.500,00 0 0 0 1.852.500,00

    30/11/2015 29112015gz Bunga Padi 30/11/2015 1.357.500,00 0 0 0 1.357.500,00

    30/11/2015 30112015gz Bunga Padi 30/11/2015 822.000,00 0 0 0 822.000,00

    02/12/2015 01122015gz Bunga Padi 31/12/2015 2.032.500,00 0 0 0 2.032.500,00

    02/12/2015 02122015gz Bunga Padi 31/12/2015 1.828.500,00 0 0 0 1.828.500,00

    03/12/2015 03122015gz Bunga Padi 31/12/2015 812.000,00 0 0 0 812.000,00

    04/12/2015 04122015gz Bunga Padi 31/12/2015 1.860.500,00 0 0 0 1.860.500,00

    05/12/2015 05122015gz Bunga Padi 31/12/2015 3.250.500,00 0 0 0 3.250.500,00

    544.704.905,00

    0

    0

    0

    Total PPN

    Total Diskon

    Total Pembelian

    Total Materai