Lampiran III RAB

3
HIMPUNAN MAHASISWA JURUSAN TEKNIK KIMIA KELUARGA MAHASISWA POLITEKNIK NEGERI BANDUNG Sekretariat: Student Center Politeknik Negeri Bandung Jalan Gegerkalong Hilir Ciwaruga PO. BOX 1234 Bandung Barat 40012 Lampiran III Sub- aktivitas Komponen dan Sub- Komponen Biaya Satuan Volume Harga Total Biaya Sumber Dana Swadaya POL BAN Sponsor Persiapa n Belanja Bahan Habis Kertas A4 Rim 1 30,000 30,000 30,000 - - Stempel Buah 1 90,000 90,000 90,000 - - Pamflet A4 Exp 30 5,000 150,000 150,000 - - Pipa Paralon (d=3,5 inch) Meter 3 20,000 60,000 60,000 - - Bibit Pohon Polybag 35 50,000 1,750,000 - - 1,750,000 Pupuk Karung 1 10,000 10,000 10,000 - - Gula Merah Kg 1 10,000 10,000 10,000 - - Em4 Botol 1 20,000 20,000 20,000 - - Tepung Kanji Kg 1 10,000 10,000 10,000 - -

description

rancangan anggaran biaya

Transcript of Lampiran III RAB

Page 1: Lampiran III RAB

HIMPUNAN MAHASISWA JURUSAN TEKNIK KIMIAKELUARGA MAHASISWA POLITEKNIK NEGERI BANDUNG

Sekretariat: Student Center Politeknik Negeri BandungJalan Gegerkalong Hilir Ciwaruga PO. BOX 1234 Bandung Barat 40012

Lampiran III

Sub-aktivitasKomponen dan Sub-

Komponen BiayaSatuan Volume Harga Total Biaya

Sumber Dana

Swadaya POL BAN Sponsor

Persiapan Belanja Bahan Habis

Kertas A4 Rim 1 30,000 30,000 30,000 - -

Stempel Buah 1 90,000 90,000 90,000 - -

Pamflet A4 Exp 30 5,000 150,000 150,000 - -

Pipa Paralon (d=3,5 inch) Meter 3 20,000 60,000 60,000 - -

Bibit Pohon Polybag 35 50,000 1,750,000 - - 1,750,000

Pupuk Karung 1 10,000 10,000 10,000 - -

Gula Merah Kg 1 10,000 10,000 10,000 - -

Em4 Botol 1 20,000 20,000 20,000 - -

Tepung Kanji Kg 1 10,000 10,000 10,000 - -

Jumlah Bahan Habis 380,000 - 1,750,000

Biaya Transportasi dan Akomodasi

Page 2: Lampiran III RAB

HIMPUNAN MAHASISWA JURUSAN TEKNIK KIMIAKELUARGA MAHASISWA POLITEKNIK NEGERI BANDUNG

Sekretariat: Student Center Politeknik Negeri BandungJalan Gegerkalong Hilir Ciwaruga PO. BOX 1234 Bandung Barat 40012

Transportasi Barang Unit 1 250,000 250,000 250,000 - -

Jumlah Transportasi dan Akomodasi 250,000 - -

Pelaksanaan

Belanja Bahan Habis

Air Minum Dus 5 20,000 100,000 100,000 - -

Snack Dus 250 5,000 1,250,000 1,250,000 - -

Stiker Buah 250 2,000 500,000 500,000 - -

Jumlah Bahan Habis 1,850,000 - -

Evaluasi dan Laporan

Belanja Bahan Habis

Penggandaan Laporan Buah 2 10,000 20,000 20,000 - -

Jumlah Bahan Habis 20,000 - -

Jumlah Keseluruhan Biaya Bahan Habis 2,250,000 - 1,750,000

Jumlah Keseluruhan Biaya Transportasi dan Akomodasi 250,000 - -

Total 2,500,000 - 1,750,000

Total Anggaran Biaya Rp4,250,000.00