    Ver.1 pmu Jan’16

    D O K U M E N S T A N D A R P E L E L A N G A NPelelangan Elektronik 

     ADB LOAN NO. 2928-INO

    UNTUK 

    PENGADAAN PERALATAN LAB KONTROL DAN OTOMASI (2)

    Panitia Pengadaan Barang

     ADB LOAN NO. 2928-INO : Polytechnic Education Development Project 

    PROJECT IMPLEMENTATION UNIT POLITEKNIK CALTEX RIAU

    POLITEKNIK CALTEX RIAU

    MEI 2016

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    2/183

    Ver.1 pmu Jan’16

    S T A N D A R D B I D D I N G D O C U M E N Te-procurement 

     ADB LOAN NO. 2928-INO

    FOR

    PROCUREMENT THE EQUIPMENT OF CONTROL AND AUTOMATION LABORATORY (2)POLITEKNIK CALTEX RIAU 

    Procurement Committee for Goods

     ADB LOAN NO. 2928-INO : Polytechnic Education Development Project 

    PROJECT IMPLEMENTATION UNIT POLITEKNIK CALTEX RIAU

    POLITEKNIK CALTEX RIAU

    MAY 2016

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    3/183

    Ver.1 pmu Jan’16

    D O K U M E N S T A N D A R P E L E L A N G A N /

    S T A N D A R D B I D D I N G D O C U M E N T

    e-procurement 

    No : 01/Goods/NCB/PCR/PHK PMPP 1/2016Tanggal / Date : MEI 2016

    UNTUK / FOR

    PENGADAAN PERALATAN LAB KONTROL DAN OTOMASI (2)

    PROCUREMENT THE EQUIPMENT OF CONTROL AND AUTOMATION LABORATORY (2)

    POLITKNIK CALTEX RIAU 

    Panitia Pengadaan Barang / Procurement Committee for Goods

    PIU - Polytechnic Education Development Project 

    Politeknik CALTEX RIAU

    Tahun Anggaran / Fiscal Year: 2016

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    4/183

    Ver.1 pmu Jan’16

    DOKUMEN STANDAR PELELANGAN / STANDARD BIDDING DOCUMENT

    PENGADAAN PERALATAN LAB KONTROL DAN OTOMASI (2)

    PROCUREMENT THE EQUIPMENT OF CONTROL AND AUTOMATION LABORATORY (2)

    No : 01/Goods/NCB/PCR/PHK PMPP 1/2016Tanggal / Date : Mei 2016

    Mengetahui/Witness :

    Pejabat Pembuat Komitmen (PPK)/

    Commitment Officer

    Polytechnic Education Development Project 

    PROJECT IMPLEMENTATION UNIT 

    POLITEKNIK CALTEX RIAU 

    Edy Santoso

    NIP. 196012311984031010

    ULP / Panitia Pengadaan /

    Procurement Committee

    Polytechnic Education Development Project 

    PROJECT IMPLEMENTATION UNIT 

    POLITEKNIK CALTEX RIAU 

    Tobi Arfan

    NIP. 058404

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    5/183

    Ver.1 pmu Jan’16

    DAFTAR ISI LIST OF CONTENT

    BAB I. UMUM 1 SECTION I. GENERAL 1

    BAB II. PENGUMUMAN PELELANGAN 5 SECTION II. INVITATION OF BID 5

    BAB III. INSTRUKSI KEPADA PESERTA 8 SECTION III. INSTRUCTION TO BIDDER 8

     A. UMUM 9 1 GENERAL 9

    1. LINGKUP PEKERJAAN 9 2 SCOPE OF WORKS 9

    2. SUMBER DANA 9 3 SOURCE OF FUND 9

    3. PESERTA PELELANGAN 9 8 ELIGIBLE BIDDER 9

    4. PRAKTEK KORUPSI 11 4 CORRUPT PRACTICES 11

    5. LARANGAN PERTENTANGAN

    KEPENTINGAN

    13 5 CONFLICT OF INTEREST 13

    6. KELAYAKAN BARANG DAN JASATERKAIT

    14 6 ELIGIBLE GOODS AND RELATEDSERVICES

    14

    7. SATU PENAWARAN TIAP PESERTA 15 7 ONE BIDS OF EACH BIDDER 15

    B. DOKUMEN PENGADAAN 15 B. BIDDING DOCUMENT 15

    8. ISI DOKUMEN PENGADAAN 15 8. CONTENTS OF BIDDING

    DOCUMENT

    15

    9. BAHASA DOKUMEN PENGADAAN 16 9. LANGUAGE OF BIDDING

    DOCUMENT

    16

    10 PEMBERIAN PENJELASAN 16 10. CLARIFICATION 15

    11. PERUBAHAN DOKUMEN

    PENGADAAN

    17 11. AMENDMENT OF BIDDING

    DOCUMENT

    17

    12. TAMBAHAN WAKTU PEMASUKAN

    DOKUMEN PENAWARAN

    18 12. ADDITIONAL BID-SUBMISSION

    TIME

    18

    C. PENYIAPAN DOKUMEN

    PENAWARAN DAN KUALIFIKASI

    18 C. PREPARATION OF BID

    DOCUMENT AND QUALIFICATION

    18

    13. BIAYA PENYIAPAN PENAWARAN

    DAN KUALIFIKASI

    18 13. COST OF PREPARATION OF BID

    AND QUALIFICATION

    18

    14. BAHASA PENAWARAN 18 14. LANGUAGE OF BID 18

    15. DOKUMEN PENAWARAN 18 15. BID DOCUMENTS 18

    16. HARGA PENAWARAN 19 16. BID PRICE 19

    17. MATA UANG PENAWARAN DAN

    CARA PEMBAYARAN

    20 17. BID CURRENCY AND TERM OF

    PAYMENT

    20

    18. MASA BERLAKU PENAWARAN

    DAN JANGKA WAKTU

    PELAKSANAAN

    20 18. BID VALIDITY AND DURATION OF

    WORK IMPLEMENTATION

    20

    19. PENGISIAN DATA KUALIFIKASI 20 19. QUALIFICATION DOCUMENT

    FORM

    20

    20. PAKTA INTEGRITAS 20 20. INTEGRITY PACT 20

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    6/183

    Ver.1 pmu Jan’16

    21. SURAT JAMINAN PENAWARAN 21 21. BID SECURITY 21

    D. PEMASUKAN DOKUMEN

    PENAWARAN

    23 D. BID SUBMISSION 23

    22. PENYAMPULAN DAN PENANDAAN

    SAMPUL PENAWARAN

    23 22 SEALING AND MARKING OF BID 23

    23. PEMASUKAN / PENYAMPAIAN

    DOKUMEN PENAWARAN

    23 23. SUBMISSION OF BID / DELIVERY

    OF BID

    23

    24. BATAS AKHIR WAKTU

    PEMASUKAN PENAWARAN

    24 24. DEADLINE FOR BID SUBMISSION 24

    25. PENAWARAN TERLAMBAT 24 25. LATE BID 24

    E. PEMBUKAAN DAN EVALUASI

    PENAWARAN

    25 E. BID OPENING AND EVALUATION 25

    26. PEMBUKAAN PEAWARAN 25 26. BID OPENING 25

    27. EVALUASI DOKUMENPENAWARAN

    26 27. BID EVALUATION 26

    28. EVALUASI KUALIFIKASI 37 28. QUALIFICATION EVALUATION 37

    29. PEMBUKTIAN HASIL KUALIFIKASI 39 29. VERIFICATION OF

    QUALIFICATION

    39

    30. BERITA ACARA HASIL

    PELELANGAN

    40 30. MINUTES OF BIDDING PROCESS 40

    F. PENETAPAN PEMENANG LELANG 40 F. AWARD OF THE WINNER 40

    31. PENETAPAN PEMENANG 40 31. AWARD OF BIDDING 40

    32. PENGUMUMAN PEMENANG 41 32. WINNER ANNOUNCEMENT 41

    33. SANGGAHAN 41 33. OBJECTION 41

    G. PENUNJUKAN PEMENANG 43 G. APPOINTMENT OF THE WINNER 43

    34. PENUNJUKAN PENYEDIA

    BARANG/ JASA

    43 34. APPOINTMENT AS SUPPLIER OF

    GOODS / SERVICES

    43

    35. BAHP, BERITA ACARA LAINNYA

    DAN KERAHASIAAN PROSES

    45 35. MINUTES OF BID EVALUATION

    AND PROCESS CONFIDENTIALY

    45

    H. PELELANGAN GAGAL 45 H. FAILED BID 45

    36. PELELANGAN GAGAL 46 36. FAILED BID 46I. JAMINAN PELAKSANAAN 49 I. PERFORMANCE SECURITY 49

    37. JAMINAN PELAKSANAAN 49 37. PERFORMANCE SECURITY 49

    J. PENANDATANGANAN KONTRAK 50 J. CONTRACT SIGNING 50

    38. PENANDATANGANAN KONTRAK 50 38. CONTRACT SIGNING 50

    BAB IV. LEMBAR DATA PEMILIHAN

    (LDP)

    54 SECTION IV. BID DATA SHEET (BDS) 54

    1. LINGKUP PEKERJAAN 55 1. SCOPE OF WORK 55

    2. SUMBER DANA 55 2. SOURCE OF FUND 55

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    7/183

    Ver.1 pmu Jan’16

    15. Dokumen Penawaran 55 15. Bid Document 55

    16. Harga Penawaran 56 16. Harga Penawaran 56

    17. Mata Uang Penawaran dan Tata

    Cara Pembayaran

    56 17. Currency of Bid and Term of  

    Payment 

    56

    18. Masa Berlaku Penawaran 57 18. Bid Validity Period 57

    21. Jaminan Penawaran 57 21. Bid Security 57

    22. Penyampulan & Penyampaian

    Penawaran

    57 22. Sealing and Submission of Bids 57

    24. Jadwal Penawaran 57 24. Schedule of Bids 57

    27. Evaluasi Dokumen Penawaran

    Teknis dan Harga

    57 27. Evaluation of Technical and Price

    Bids

    57

    28. Evaluasi Kualifikasi 58 28. Qualification Evaluation 58

    29. Peninjauan Lokasi untuk 

    Pembuktian Kualifikasi

    58 29. Site Visit to Verification

    Qualification

    58

    33. SANGGAHAN 58 33. OBJECTION 58

    BAB V. LEMBAR DATA KUALIFIKASI

    (LDK)

    60 SECTION V. QUALIFICATION DATA

    SHEET

    60

    BAB VI. BENTUK DOKUMEN

    PENAWARAN

    63 SECTION VI. FORMAT OF BID

    DOCUMENT

    63

    A. BENTUK SURAT PENAWARAN

    UNTUK PESERTA BADAN USAHA /

    KEMITRAAN (KSO) UNTUK 1

    (SATU) FILE

    64 A. BIDDING FORM FOR BUSINESS

    ENTITY / PARTNERSHIPS ONE (1)

    FILE

    64

    B. BENTUK SURAT PENAWARAN

    PESERTA PERORANGAN [UNTUK 1

    (SATU) FILE]

    66 B. FORMAT OF LETTER OF BID FOR

    INDIVIDUAL (ONE FILE SYSTEM)

    66

    C. BENTUK PERJANJIAN KEMITRAAN

    / KERJA SAMA OPERASI (KSO)

    68 C. FORM of PARTNERSHIP / JOINT

    OPERATION (JO) AGREEMENT

    68

    D. BENTUK DOKUMEN PENAWARAN

    TEKNIS

    72 D. TECHNICAL BIDDING FORM 72

    E. BENTUK JAMINAN PENAWARAN

    DARI BANK

    73 E. FORM OF BID SECURITY FROM

    BANK

    73

    F. BENTUK PAKTA INTEGRITAS 77 F. FORM OF INTEGRITY PACT 77

    G. DATA ISIAN KUALIFIKASI 80 G. FORM OF QUALIFICATION DATA 80

    BAB VII. PETUNJUK PENGISIAN DATA

    KUALIFIKASI

    89 SECTION VII. INSTRUCTION FOR

    FILLING QUALIFICATION DATA

    89

    BAB VIII. TATA CARA EVALUASI

    KUALIFIKASI

    94 SECTION VIII. TERM OF QUALIFICATION

    EVALUATION

    94

    BAB IX. BENTUK DOKUMEN KONTRAK 98 SECTION IX FORM OF CONTRACT

    DOCUMENT

    98

    BENTUK SURAT PERJANJIAN 99 FORM OF LETTER OF

     AGREEMENT

    99

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    8/183

    Ver.1 pmu Jan’16

    BAB X. SYARAT-SYARAT UMUM

    KONTRAK (SSUK)

    103 SECTION X. GENERAL CONDOTION OF

    CONTRACT (GCC)

    103

     A. KETENTUAN UMUM 104 A. GENERAL CONDITION 104

    1. DEFINISI 104 1. DEFINITION 104

    2. PENERAPAN 107 2. APPLICATION 107

    3. BAHASA DAN HUKUM 107 3. LANGUAGE AND LAW 107

    4. KEBIJAKAN ANTIKORUPSI 107 4. ANTICORRUPTION POLICY 107

    5. ASAL BARANG 109 5. ORIGIN OF THE GOODS 109

    6. KORESPONDENSI 110 6. CORRESPONDENCE 110

    7. REPRESENTASI PARA PIHAK 110 7. REPRESENTATIVE OF PARTIES 110

    8. PEMBUKUAN 111 8. BOOKKEEPING 111

    9. PERPAJAKAN 111 9. TAXATION 111

    10. PENGALIHAN DAN/ATAU

    SUBKONTRAK

    111 10. TRANSFERING AND/OR

    SUBCONTRACT

    111

    11. KEMITRAAN / KSO 111 11. PARTNERSHIP / JOINT VENTURE 111

    B. PELAKSANAAN, PENYELESAIAN,

     ADDENDUM & PEMUTUSAN

    KONTRAK 

    112 B. IMPLEMENTATION, HANDOVER,

     AMENDMENT & TERMINATION

    112

    12. JADWAL PELAKSANAAN

    PEKERJAAN

    112 12. DELIVERY & COMPLETION

    SCHEDULE

    112

    B.1. PELAKSANAAN PEKERJAAN 112 B.1. PROCUREMENT

    IMPLEMENTATION

    112

    13. SURAT PESANAN 112 13. LETTER OF ORDER 112

    14. RAPAT PERSIAPAN PELAKSANAAN

    KONTRAK

    112 14. PREPARATORY MEETING OF THE

    CONTRACT IMPLEMENTATION

    112

    15. LINGKUP PEKERJAAN 113 15. SCOPE OF SUPPLY 113

    16. SPESIFIKASI DAN STANDAR 113 16. SPECIFICATION AND STANDARD 113

    17. PENGAWASAN PELAKSANAAN

    PEKERJAAN

    114 17. SUPERVISION OF WORK

    IMPLEMENTATION

    114

    18. INSPEKSI PABRIKASI 115 18. FABRICATION INSPECTION 115

    19. PENGEPAKAN 115 19. PACKAGING 115

    20. PENGIRIMAN 115 20. DELIVERY 115

    21. ASURANSI 116 21. INSURANCE 116

    22. TRANSPORTASI 116 22. TRANSPORTATION 116

    23. PEMERIKSAAN DAN PENGUJIAN 116 23. CHECKING AND TESTING 116

    24. WAKTU PENYELESAIAN

    PEKERJAAN

    119 24. COMPLETION OF WORKS TIME 119

    25. PERPANJANGAN WAKTU 119 25. EXTENSION TIME 119

    26. INCOTERM 120 26. INCOTERM 120

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    9/183

    Ver.1 pmu Jan’16

    B.2. PENYELESAIAN KONTRAK 120 B.2. CONTRACT COMPLETION 120

    27. SERAH TERIMA BARANG 120 27. HAND OVER OF GOODS 120

    28. JAMINAN BEBAS CACAT MUTU /

    GARANSI

    122 28. WARRANTY FOR FREE OF

    QUALITY DEFECT / GUARANTEE

    OF GOODS

    122

    29. PEDOMAN PENGOPERASIAN DAN

    PERAWATAN

    123 29. MANUAL BOOK OF OPERATION

    AND MAINTENANCE

    123

    30. LAYANAN TAMBAHAN 124 30. ADDITIONAL SERVICES 124

    B.3. ADDENDUM 124 B.3. ADDENDUM 124

    31. PERUBAHAN NILAI KONTRAK 124 31. CHANGE ORDER 124

    B.4. KEADAAN KAHAR 125 B.4. FORCE MAJEURE 125

    32. PENGERTIAN 125 32. DEFINITION 125

    33. BUKAN CEDERA JANJI 126 33. NOT A BREACH OF CONTRACT 126

    34. PERPANJANGAN WAKTU 127 34. TIME EXTENSION 127

    35. PEMBAYARAN 127 35. PAYMENT 127

    B.5. PENGHENTIAN DAN PEMUTUSAN

    KONTRAK 

    127 B.5. TERMINATION OF CONTRACT 127

    36. PENGHENTIAN KONTRAK 127 36. TERMINATION OF CONTRACT 127

    C. HAK & KEWAJIBAN PENYEDIA 130 C. RIGHT & OBLIGATIONS OF

    SUPPLIERS

    130

    37. HAK DAN KEWAJIBAN PENYEDIA 130 37. RIGHTS AND OBLIGATIONS OF

    SUPPLIERS

    130

    38. TANGGUNGJAWAB PENYEDIA 131 38. RESPONSIBILITY OF SUPPLIER 131

    39. PENGGUNAAN DOKUMEN

    KONTRAK DAN INFORMASI

    131 39. THE USE OF CONTRACT

    DOCUMENT AND INFORMATION

    131

    40. GANTI RUGI HAK ATAS KEKAYAAN

    INTELEKTUAL

    131 40. PATENT INDEMNITY PROPERTY

    RIGHTS

    131

    41. PEMBAYARAN DENDA 132 41. LEQUIDATED DAMAGE 132

    42. JAMINAN PELAKSANAAN 132 42. PERFORMANCE SECURITY 132

    D. PEMBAYARAN KEPADA

    PENYEDIA

    134 D. PAYMENT TO THE SUPPLIER 134

    43. HARGA KONTRAK 134 43. CONTRACT PRICE 134

    44. KETENTUAN PEMBAYARAN 134 44. TERM OF PAYMENT 134

    E. PENGAWASAN MUTU 135 E. QUALITY SUPERVISION 135

    45. PENGAWASAN DAN PEMERIKSAAN 135 45. SUPERVISION AND EXAMINATION 135

    F. PENYELESAIAN PERSELISIHAN 135 F. SETTLEMENT OF DISPUTE 135

    46. PENYELESAIAN PERSELISIHAN 135 46. SETTLEMENT OF DISPUTE 135

    47. ITIKAD BAIK 136 47. GOODWILL 136

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    10/183

    Ver.1 pmu Jan’16

    BAB XI. SYARAT-SYARAT KHUSUS

    KONTRAK (SSKK)

    137 SECTION XI SPECIAL OF CONTRACT

    (SCC)

    137

    BAB XII. SKEDUL PENGADAAN

    (SPESIFIKASI TEKNIS DAN

    JADWAL

    143 SECTION XII SCHEDULE OF SUPPLY 

    (TECHNICAL

    SPECIFICATION AND

    DELIVERY SCHEDULE)

    143

    BAB XIII. DAFTAR KUANTITAS DAN

    HARGA

    161 SECTION XIII LIST OF QUNTITY AND

    PRICE SCHEDULE

    161

    BAB XIV. BENTUK DOKUMEN LAIN 166 SECTION XIV FORM OF OTHER

    DOCUMENT

    166

    A. SURAT PENUNJUKAN PENYEDIA

    BARANG / JASA

    167 A. LETTER OF APPOINTMENT OF

    GOODS/ SERVICES SUPPLIER

    (SPPBJ)

    167

    B. SURAT PESANAN (SP) 168 B. NOTICE TO PROCEED (SP) 168

    C. JAMINAN PELAKSANAAN DARIBANK

    170 C. PERFORMANCE SECURITY FROMBANK

    170

    D. JAMINAN UANG MUKA DARI BANK 172 D. ADVANCE PAYMENT SECURITY

    FROM BANK

    172

    BAB XV. NEGARA LAYAK 174 SECTION XV ELIGIBLE COUNTRIES 174

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    11/183

    BAB-I SECTION-I

    UMUM GENERAL

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    12/183

    BAB I. UMUM

    A. Dokumen Pengadaan ini disusun

    berdasarkan Peraturan Presiden

    Republik Indonesia Nomor 54 Tahun

    2010 tentang Pengadaan Barang/JasaPemerintah dan perubahannya, y.i.perubahan pertama, perubahan

    kedua, perubahan ketiga, dan

    perubahan ke empat, PERPRES No.4

    Tahun 2015, dan Berita Acara HasilNegosiasi “Polytechnic Education

    Development Project” pada tanggal 10September 2012 antara wakil pemerintah

    Republik Indonesia dan Bank Pembangunan Asia (ADB).

    B. Dalam dokumen ini dipergunakan

    pengertian, istilah dan singkatan sebagai

    berikut:

    - ADB: Asian Development Bank adalah

    Bank pemberi pinjaman untuk membiayai proyek yang namanya

    tercantum dalam Lembar DataPemilihan (LDP)

    - Barang: setiap benda baik berwujudmaupun tidak berwujud, bergerak 

    maupun tidak bergerak, yang dapat diperdagangkan, dipakai,dipergunakan atau dimanfaatkan oleh

    Pengguna Barang.- HPS: Harga Perkiraan Sendiri;- HEA: Harga Evaluasi Akhir;- Kemitraan/KSO :kerjasama usaha

    antar para penyedia yang masing-masing pihak mempunyai hak,

    kewajiban dan tanggung jawab yangjelas berdasarkan perjanjian tertulis;

    - LDP: Lembar Data Pemilihan;- LDK  : Lembar Data Kualifikasi;

    - PA/KPA: pejabat/instansi yang ber-tanggung jawab atas anggaran yang

    akan digunakan untuk membiayaipekerjaan;

    - Panitia Pengadaan/Pokja ULP:

    Kelompok Kerja Unit LayananPengadaan yang berfungsi untuk 

    melaksanakan PengadaanBarang/Jasa;

    - PPK : Pejabat Pembuat Komitmenadalah pejabat yang bertanggung

    jawab atas pelaksanaan pekerjaan;

    SECTION I. GENERAL

    A. This Bidding Document is prepared

    according to the Decree of the President of 

    the Republic of Indonesia Number 54 Year

    2010, regarding Procurement of Goods/Services for the Government andits amendment i.e. first amendment,

    second amendment, third amendment 

    and current fourth amendment,

    Presidential Decree No. 4 Year 2015

    and the minutes of negotiation of 

    Polytechnic Education Development Project dated September 10, 2012

    between representatives of theGovernment of Republic of Indonesia and

    Asian Development Bank.

    B. Terms, names and abbreviations used in

    this document are as follows:

    -  ADB: Asian Development Bank is the

    Lender that preparing the fund for theproject specified in the Bid Data Sheet 

    - Goods : each item either tangible orintangible, moving or not moving,

    which can be traded, worn, used orexploited by Users Goods.

    - OE : Owner Estimate;- FBE : Final Bid Evaluation;- Partnership/JV : business cooperation

    between suppliers of that each partyhas the rights, obligations and

    responsibilities which are clearly basedon a written agreement;

    -BDS : Bid Data Sheet 

    - QDS : Qualification Data Sheet;

    - PA/KPA : Official of the institution whoresponsible for the budget that will be

    used to finance the goods/services

    - Procurement Committee: The

    Committee/ Working Group of theProcurement Service Unit who

    implement the Procurement of Goods /Services;

    - PPK : Commitment Officer is the officialperson who responsible for the

    implementation of the works;

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    13/183

    - SPPBJ: Surat Penunjukan PenyediaBarang/Jasa;

    - Kontrak  : Surat Perjanjian

    - SP: Surat Pesanan- TKDN: Tingkat Komponen Dalam

    Negeri.- LPSE : Layanan Pengadaan Secara

    Elektronik adalah unit kerja K/L/D/I

    yang dibentuk untuk menyelenggarakan sistem pelayanan

    Pengadaan Barang/Jasa secaraelektronik.

    - Aplikasi SPSE :Aplikasi perangkat lunak Sistem Pengadaan Secara

    Elektronik (SPSE) berbasis webyangterpasang di server LPSE yang dapat 

    diakses melalui website LPSE.

    Dikembangkan oleh LKPP,- Form Isian Elektronik : Tampilan/

    antarmuka pemakai berbentuk grafis

    berisi komponen isian yang dapat 

    diisikan oleh pengguna aplikasi- Form Isian Elektronik Data

    Kualifikasi:Form isian elektronik pada aplikasi SPSE yang digunakan

    penyedia barang/jasa untuk menginputkan dan mengirimkan data

    kualifikasi- E-Lelang: Proses pelelangan

    umum/ sederhana/ terbatas/pemilihan langsung dengan tahapansesuai Perpres 54/2010 dan

    perubahannya serta petunjuk 

    teknisnya yang disesuaikan dengan

    teknis operasional pengadaan secaraelektronik sebagaimana diatur dalam

    Perka 18/2012. Semua istilah“pelelangan” pada dokumen ini

    merujuk pada pengertian “e-lelang”- K/L/D/I:

    Kementrian/Lembaga/Satuan KerjaPerangkat Daerah /Institusi lainnya

    yang menggunakan APBN dan/atauAPBD

    C. Pelelangan Sederhana dengan

    pascakualifikasi ini dibiayai dari sumber

    pendanaan yang tercantum dalam LDP.

    D. Pelelangan Sederhana denganpascakualifikasi ini terbuka dan dapat 

    diikuti oleh semua peserta yangberbentuk badan usaha atau

    Kemitraan/KSO serta perorangan.

    - SPPBJ : Letter for Appointment of Goods/ Services Providers;

    - Contract : Letter of Agreement - SP : Purchase Order.- TKDN : Level of Domestic Component.

    - LPSE : Electronic Procurement Service

    is a service unit of K/L/D/I, which was

    formed to organize the procurement of Goods/Services electronically.

    - SPSE Application: Web basedElectronic Procurement System (SPSE)

    Application software installed in LPSEserver which can be accessed through

    the LPSE website. Developed by LKPP.

    - Electronic Form: display / userinterface graphical form fields containcomponents that can be filled out by the

    user of application- Electronic Field Data Qualifications

    Form: Electronic form in the SPSE usedby suppliers of goods/services to input 

    and transmit the data of qualification.

    -E-Procurement: The process of competitive/ simple/ limited/ direct selection bidding in accordance with

    the Presidential Decree No. 54/2010and its amendments as well as the

    technical instructions tailored to thetechnical operation of electronic

    procurement as stipulated in Perka18/2012. All the term "bidding" in this

    document refers to the term "e-

    procurement"- K/L/D/I: Government Institutions that 

    implement government budget.

    C. This Simple Bidding with post  

    qualification is funded from source of funding specified in the Bid Data Sheet.

    D. The Post qualification of SimpleBidding is

    open and can be bid by all bidders of a

    business entity or a partnershipandindividuals.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    14/183

    E. Panitia Pengadaan mengumumkanpelaksanaan pelelangan sederhana

    dengan pascakualifikasi melalui website

    Politeknik Caltex Riau, dan Portal

    Pengadaan Nasional melalui LPSE.

    E. Procurement Committee announce theimplementation of public bidding with

    post qualification through the website of 

    Politeknik Caltex Riau, and Portal of 

    National Procurement through LPSE.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    15/183

    5

    BAB-II   SECTION-II

    PENGUMUMAN

    PELELANGAN

    INVITATION FOR

    BID

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    16/183

    6

    BAB-II PENGUMUMAN PELELANGAN

    PENGUMUMAN PELELANGAN SEDERHANA DENGAN PASCAKUALIFIKASINomor: 099/PMPP/PCR/2016

    PIU - Polytechnic Education Development Project (PEDP) Politeknik Caltex Riau, akan

    melaksanakan pengadaan barang/jasa dengan pascakualifikasi sistem 1 (satu) file secara

    elektronik untuk paket pekerjaan pengadaan barang sebagai berikut:

    1. Paket Pekerjaan

    Nama paket pekerjaan : Pengadaan Peralatan Lab Kontrol dan Otomasi (2)

    Kualifikasi : Kecil

    Nilai total HPS : Rp.2.272.416.000 (Dua Milyar Dua Ratus Tujuh Puluh Dua Juta

    Empat Ratus Enam Belas Ribu Rupiah), tidak termasuk PPN

    Sumber pendanaan : ADB Loan No. 2928-INO melalui DIPA Politeknik Caltex Riau

    Tahun Anggaran 2016.

    2. Persyaratan Peserta

    Paket pengadaan ini terbuka untuk penyedia barang sub bidang pengadaan Mesin, Elektronik,

    Komputer dan sejenis yang teregistrasi pada Layanan Pengadaan Secara Elektronik (LPSE)

    dan memenuhi persyaratan sebagaimana disebutkan dalam dokumen lelang

    3. Pelaksanaan Pengadaan

    Pengadaan ini dilaksanakan secara elektronik dengan mengakses Sistem Pengadaan Secara

    Elektronik (SPSE) pada alamatwebsite Layanan Pengadaan Secara Elektronik (LPSE)

    Politeknik Caltex Riau: http//www.lpse.riau.go.id

    4. Jadwal Pelaksanaan PengadaanDapat dilihat pada website LPSE: http//www.lpse.riau.go.id

    Pendaftaran dan pengunduhan (download ) dokumen pengadaan

    Alamat : http//www.lpse.riau.go.id

    Waktu : Mei 2016

    Demikian pengumuman ini untuk dapat dimaklumi bagi para peminat, dan atas perhatiannya

    kami ucapkan terima kasih.

    Panitia Pengadaan Barang/Jasa

    PIU- Polytechnic Education Development Project 

    Politeknik Caltex Riau

    Tahun Anggaran 2016

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    17/183

    7

    SECTION-II INVITATION FOR BID

    INVITATION FOR NATIONAL COMPETITIVE BIDDING (NCB) WITH POST

    QUALIFICATION

    No: 099/PMPP/PCR/2016

    PIU - Polytechnic Education Development Project (PEDP) Politeknik Caltex Riau, will conduct a

    National Competitive Bidding (NCB) with one file system Post Qualification Electronically for

    Supply of Goods and Related Service Packages as follows:

    1. Procurement Package

    Name of Package : Procurement The Equipment of Control and Automation

    Laboratory (2)

    Qualification : Small

    Owner Estimate Price : IDR 2.272.416.000,- (Two Billion Two Hundred Seventy Two

    Million Four Hundred and Sixteen Thousand Rupiah), excluded

    VAT

    Source of Fund : ADB Loan No. 2928-INO through DIPA Politeknik Caltex Riau

    Fiscal Year 2016

    2. Bidder Requirements

    The Procurement is open to providers listed for Procurement of Machine, Electrical, Computer

    and others and registered on Electrinic Procurement Service (LPSE), and meet the

    requirement as specified in the bidding documents

    3. Procurement Implementation

    This Procurement is conducted electronically by accessing the application of ElectronicProcurement System (SPSE) in LPSE website address of Politeknik Caltex Riau:

    http//www.lpse.riau.go.id

    4. Procurement Schedule

    May be viewed on the LPSE website: http//www.lpse.riau.go.id

    5. Registration and retrieval of Procurement Documents can be conducted as the following:

    Address : http//www.lpse.riau.go.id

    Time : May 2016

    This was stated to be concern of the interested participants.

    Procurement Committee of Goods and Services

    PIU- Polytechnic Education Development Project 

    Politeknik Caltex Riau

    Fiscal Year 2016

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    18/183

    BAB-III SECTION-III

    INSTRUKSI KEPADA

    PESERTA (IKP)

    INSTRUCTION TO

    BIDDERS (ITB)

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    19/183

    BAB III

    INSTRUKSI KEPADA PESERTA (IKP)

    SECTION III

    INSTRUCTION TO BIDDERS (ITB)

     A. UMUM A. GENERAL

    1. Lingkup Pekerjaan 1.  Scope of Work 

    1.1 Pokja ULP mengumumkan kepada

    para peserta untuk menyampaikan

    penawaran atas paket pengadaanbarang sebagaimana tercantum

    dalam LDP.

    1.1 Procurement Committee advertise

    and invites the bidders to submit bid

    for procurement package of Goodspecified in the BDS.

    1.2 Nama paket dan lingkup pekerjaan

    sebagaimana tercantum dalam LDP.

    1.2 Name of Package and scope of wor

    specified in the Bid Data Sheet.

    1.3 Penyedia yang ditunjuk berkewajiban untuk menyelesaikan pekerjaandalam jangka waktu yang telah

    ditentukan dalam LDP, berdasarkan

    syarat umum dan syarat khususkontrak dengan kualitas sesuai

    spesifikasi teknis dan biaya sesuaikontrak.

    1.3 Appointed provider/supplier has thobligation to finish the work in thperiod specified in the BDS, based o

    the General Conditions of Contract an

    Specific Conditions of Contract iaccordance with thegoods an

    services quality specified in the in thcontract.

    2.  Sumber Dana 2.  Source of Funding

    Pengadaan ini dibiayai dari sumber

    pendanaan yang tercantum dalam LDP.

    This procurement is funded from source o

    funding specified in the BDS.

    3. Peserta Pelelangan 3. Eligible Bidders

    3.1 Pelelangan Umum pengadaan barang

    ini terbuka dan dapat diikuti oleh

    semua peserta pengadaan yangberbentuk badan usaha,

    Kemitraan/KSO atau peserta

    perorangan yang memenuhikualifikasi.

    3.1 This bidding is open and can b

    followed by all qualified bidders o

    business entities, partnership/joinventure (JV) of business entities, o

    individual participant who meet th

    qualification.

    3.2 Dalam hal peserta melakukan

    Kemitraan/ KSO

    3.2 In the case of Joint Venture

    a. Semua mitra KSO harusbertanggung jawab renteng, dan

    a. all partners to the JV shall be jointland severally liable; and

    b. KSO harus menunjuk wakil yang

    berwenang untuk melakukan

    semua bisnis untuk dan atas namasetiap dan semua mitra KSO

    selama proses lelang, dan padasaat kontrak, serta selama

    pelaksanaan kontrak.

    b. A JV shall nominate a representativ

    who shall have the authority t

    conduct all business for and obehalf of any and all the partners o

    the JV during the bidding procesand in the event the JV is awarde

    the Contract, during contracexecution.

    3.3 Dalam hal peserta akan atau sedangmelakukan Kemitraan/KSO, baik  3.3 In the case that a participant will or idoing Partnership/Joint Venture, wit

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    20/183

    dengan perusahaan nasionalmaupun asing maka peserta harus

    memiliki Perjanjian Kemitraan

    /Kerja Sama Operasi yang memuat 

    persentase Kemitraan/KSO dan

    perusahaan yang ditunjuk untuk mewakili Kemitraan/KSO tersebut.

    a national or foreign company, thethe bidders should have a Partnershi

    Agreement / Joint Venture Agreemen

    which explain the percentage o

    funding partnership, and th

    appointed companies that representhe Partnership.

    3.4 Peserta Kemitraan/KSO dilarang

    untuk mengubah perjanjianKemitraan/Kerja Sama Operasi.

    3.4 Bidders of Partnership/ Joint Ventur

    forbidden to amend thPartnership/Joint Venture.

    3.5 Penawar, dan semua pihak yangmerupakan Peserta Lelang, harus

    memiliki kewarganegaraan darinegara yang layak, sesuai dengan

    Bagian XV, Negara Yang Layak).Peserta Lelang dianggap memiliki

    kewarganegaraan dari suatu negarajika Peserta Lelang adalah warganegara atau dibentuk, atau

    dimasukkan, dan beroperasi sesuaidengan ketentuan hukum negara

    tersebut. Kriteria ini berlaku jugauntuk penentuan kewarganegaraan

    dari subkontraktor yang diusulkanatau Penyedia, untuk setiap bagian

    dari Kontrak termasuk jasa terkait.

    3.5 A Bidder, and all parties constitutinthe Bidder, shall have the nationality o

    an eligible country, in accordance witSection XV, Eligible Countries).

    Bidder shall be deemed to have thnationality of a country if the Bidder

    a citizen or is constituted, oincorporated, and operates iconformity with the provisions of th

    laws of that country. This criterioshall also apply to the determination o

    the nationality of proposesubcontractors or suppliers for an

    part of the Contract including relateservices.

    3.6 Sebuah perusahaan tidak layak 

    untuk berpartisipasi dalam setiapkegiatan pengadaan yang dibiayai

    ADB atau bantuan ADB apabilaperusahaan tersebut masih dalamsanksi ADB berdasarkan Kebijakan

    Anti Korupsi (lihat ITB 3), apakahsanksi tersebut langsung diberlaku

    kan oleh ADB, atau diberlakukan olehADB sesuai dengan Perjanjian

    Keputusan Penetapan daftar hitam.Penawaran dari perusahaan yang

    memperoleh sanksi atau   cross-

    debarred akan ditolak.

    3.6 A firm shall not be eligible t

    participate in any procuremenactivities under an ADB-financed o

    ADB-supported project while undesanction by ADB pursuant to itAnticorruption Policy (see ITB 3

    whether such sanction was directlimposed by ADB, or imposed by AD

    pursuant to the Agreement for MutuaEnforcement of Debarment Decision

    A bid from a sanctioned or crossdebarred firm will be rejected.

    3.7 Perusahaan milik pemerintahdinyatakan memenuhi syarat hanya

    jika mereka dapat membuktikan

    bahwa mereka (i) secara hukum dan

    finansial otonom, (ii) beroperasi dibawah prinsip-prinsip hukumkomersial, dan (iii) bukan agen dari

    dari Pembeli.

    3.7 Government-owned enterprises in thPurchaser’s country shall be eligibl

    only if they can establish that they (

    are legally and financiall

    autonomous, (ii) operate under thprinciples of commercial law, and (iiare not dependent agencies of th

    Purchaser..

    3.8 Peserta Lelang harus memberikan

    bukti kelayakan mereka dalam terus

    3.8 Bidders shall provide such evidence o

    their continued eligibility satisfactor

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    21/183

    menjaga kepuasan Pembeli, apabiladiminta oleh Pembeli.

    to the Purchaser, as the Purchaseshall reasonably request.

    3.9 Perusahaan harus dikecualikan jikaterdapat peraturan sesuai dengan

    keputusan Dewan Keamanan PBB

    berdasarkan Bab VII Piagam PBB,negara Peminjam melarang imporbarang atau kontrak karya atau jasa

    dari negara atau pembayaran kepadaorang atau badan di negara itu.

    3.9 Firms shall be excluded if by an act ocompliance with a decision of th

    United Nations Security Council take

    under Chapter VII of the Charter of thUnited Nations, the Borrowercountry prohibits any import of good

    or contracting of works or servicefrom that country or any payments t

    persons or entities in that country.

    4. Praktik Korupsi  4. Corrupt Practices

    4.1 Kebijakan Antikorupsi ADBmengharuskan peminjam (termasuk 

    penerima manfaat dari kegiatan yang

    dibiayai ADB), penawar, Penyedia,dan kontraktor di bawah kontrak 

    yang dibiayai ADB, untuk mematuhistandar etika tertinggi selama

    pengadaan dan pelaksanaan kontrak tersebut. Sejalan dengan kebijakan

    tersebut, ADB

    4.1 ADB’s Anticorruption Policy requireborrowers (including beneficiaries o

    ADB-financed activity), as well a

    bidders, suppliers, and contractorunder ADB-financed contract

    observe the highest standard of ethicduring the procurement and executio

    of such contracts. In pursuance of thipolicy, the ADB

    a. mendefinisikan, untuk tujuan

    ketentuan ini, istilah yangditetapkan di bawah sebagai

    berikut:

    a. defines, for the purposes of th

    provision, the terms set forth belowas follows:

    (i) Praktek Korupsi berartimenawarkan, memberi,

    menerima, atau meminta,

    langsung atau tidak langsung,sesuatu yang berharga untuk mempengaruhi tindakan

    pihak lain secara tidak benar;

    (i) Corrupt Practice means thoffering, giving, receiving, o

    soliciting, directly or indirectly

    anything of value to influencimproperly the actions oanother party;

    (ii) Praktek Penipuan berarti

    setiap tindakan atau

    kelalaian, termasuk 

    kekeliruan yang menyesatkan

    baik sengaja atau karenakecerobohan, atau upaya

    untuk menyesatkan suatu

    pihak untuk mendapat keuntungan finansial atau

    lainnya atau untuk 

    menghindari kewajiban;

    (ii) Fraudulent Practice mean

    any act or omission, including

    misrepresentation, tha

    knowingly or recklessl

    misleads, or attempts tmislead, a party to obtain

    financial or other benefit or t

    avoid an obligation;

    (iii) Praktek Pemaksaan berartimerusak atau merugikan,

    atau mengancam untuk 

    merusak atau merugikan,

    secara langsung atau tidak langsung, salah satu pihak 

    (iii) Coercive Practice meanimpairing or harming, o

    threatening to impair or harm

    directly or indirectly, any part

    or the property of the party t

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    22/183

    atau milik salah satu pihak untuk mempengaruhi salah

    satu pihak secara tidak benar;

    influence improperly thactions of a party;

    (iv) Praktek Kolusi berarti

    pengaturan antara dua pihak atau lebih yang dirancanguntuk mencapai tujuan

    tertentu yang tidak benar,termasuk mempengaruhi

    pihak lain secara tidak benar.

    (iv) Collusive Practice means a

    arrangement between two omore parties designed tachieve an improper purpos

    including influencinimproperly the actions o

    another party.

    b. akan menolak usulan untuk jadi

    pemenang lelang jika penawartersebut direkomendasikan

    menjadi pemenang lelang, bagipenawar yang memiliki, kaitan

    secara langsung atau melalui pihak lain, yang terlibat dalam praktik korupsi, penipuan, kolusi, atau

    pemaksaan dalam bersaing untuk mendapatkan Kontrak; dan

    b. will reject a proposal for award if

    determines that the bidderecommended for award ha

    directly or through an agenengaged in corrupt, fraudulen

    collusive, or coercive practices icompeting for the Contract; and

    c. akan membatalkan bagian daripembiayaan yang dialokasikan

    dalam kontrak setiap saat,jikaterbukti bahwa wakil-wakil dari

    peminjam atau penerima manfaat dari ADB terlibat dalam praktek 

    korupsi, penipuan, kolusi, ataupemaksaan, pada saat pengadaan

    atau pelaksanaan kontrak, apabilapeminjam tidak mengambiltindakanperbaikan situasi pada

    waktu yang tepat dan memuaskanADB;

    c. will cancel the portion of thfinancing allocated to a contract if

    determines at any time tharepresentatives of the borrower o

    of a beneficiary of ADB-financinengaged in corrupt, fraudulen

    collusive, or coercive practiceduring the procurement or th

    execution of that contract, withouthe borrower having taken timeland appropriate action satisfactor

    to ADB to remedy the situation;

    d. akan memberikan sanksi, setiapsaat, kepada perusahaan atau

    individu, sesuai dengan KebijakanAntikorupsi dan Prinsip Integritas,

    serta PedomanADB (sesuaiperubahannya dari waktu ke

    waktu), termasuk menyatakantidak memenuhi syarat, baik 

    selamanya atau dalam jangka

    waktu tertentu, untuk 

    berpartisipasi dalam kegiatanyang dibiayai ADB, atau kegiatanyang dikelola ADB atau untuk 

    mendapatkan keuntungan darikegiatan yang dibiayai ADB atau

    kontrak yang secara finansialdibiayai ADB atau sebaliknya, jika

    pada saat tertentu perusahaan

    d. will sanction a firm or an individuaat any time, in accordance wit

    ADB’s Anticorruption Policy anIntegrity Principles and Guideline

    (both as amended from time ttime), including declaring ineligibl

    either indefinitely or for a stateperiod of time, to participate i

    ADB-financed or ADB-administere

    activities or to benefit from an ADB

    financed or ADB-administerecontract, financially or otherwise, it at any time determines that th

    firm or individual has, directly othrough an agent, engaged i

    corrupt, fraudulent, collusive, ocoercive or other prohibite

    practices.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    23/183

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    24/183

    posisi untuk memiliki akses keinformasi atau dapat 

    mempengaruhi Penawaran

    Peserta Lelang lain,

    ataumempengaruhi keputusan

    Pembeli mengenai prosespenawaran ini, atau

    or influence on the Bid of anotheBidder, or influence the decisions o

    the Purchaser regarding thi

    bidding process; or

    e. Peserta Lelang berpar-tisipasi

    dalam lebih dari satu penawarandalam proses penawaran ini.

    Partisipasi Peserta Lelang di lebihdari satu penawaran akan

    mengaki-batkan diskualifikasi darisemua Penawarannya di mana ia

    terlibat. Namun, hal ini tidak membatasi masuknyasubkontraktor yang sama, tidak 

    sebaliknya berpartisipasi sebagai

    Peserta Lelang, lebihdari satu

    penawaran; atau

    e. a Bidder participates in more tha

    one bid in this bidding procesParticipation by a Bidder in mor

    than one Bid will result in thdisqualification of all Bids in whic

    it is involved. However, this doenot limit the inclusion of the sam

    subcontractor, not otherwisparticipating as a Bidder, in morthan one bid; or

    f. Peserta Lelang atau afiliasinya

    berpartisipasi sebagai konsultandalam penyusunan desain atau

    spesifikasi teknis dari barang danjasa yang merupakan subjek dari

    tawaran.

    f. a Bidder or any of its affiliate

    participated as a consultant inthpreparation of the design o

    technical specifications of thegoodand services that are the subject o

    the bid.

    6. Kelayakan Barang dan Jasa Terkait  6. Eligible Goods and Related Services

    6.1 Semua barang dan jasa terkait yangharus dipasok berdasarkan Kontrak 

    dan dibiayai oleh ADB, wajib berasal

    dari negara asal yang memenuhisyarat sebagai negara anggota ADB

    (lihat Bab XV, Negara Layak ).

    6.1 All goods and related services to bsupplied under the contract an

    financed by ADB, shall have the

    country of origin the eligrble countrof the ADB (see Section XV, Eligibl

    Countries).

    6.2 Untuk tujuan Pasal ini, istilah

    "barang" meliputi komoditas, bahanbaku, mesin, peralatan, dan pabrik,

    dan "jasa terkait" meliputi layanan

    seperti asuransi, instalasi,

    transportasi, komisioning, pelatihan,dan perawatan awal.

    6.2 For the purposes of this Clause, th

    term “goods” includes commoditieraw material, machinery, equipmen

    and industrial plants; and “relate

    services” includes services such a

    insurance, transportation, installationcommissioning, training, and initia

    maintenance.

    6.3 "Negara asal" berarti negara dimana

    barang telah ditambang, tumbuh,

    dibudidayakan, diproduksi, dibuat,

    atau diproses, atau melaluipembuatan, pengolahan, atauperakitan barang-barang komersial

    yang diimpor,yang secara

    substansial karakteristiknya telah

    berubah dari karakteristik dasarkomponen awalnya.

    6.3 The term “country of origin” means th

    country where the goods have bee

    mined, grown, cultivated, produced

    manufactured, or processed; othrough manufacture, processing, oassembly, another commerciall

    recognized article results that differ

    substantially in its bas

    characteristics from its importecomponents.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    25/183

    6.4 Asal barang bukan ditentukan olehNegara asal perusahaan yang

    memproduksi,merakit,mendistribusi, atau menjual barang-

    barang tersebut.

    6.4 The nationality of the firm thaproduces, assembles, distributes, o

    sells the goods shall not determintheir origin.

    7.  Satu Penawaran Tiap Peserta 7. One Bid from Each Bidder 

    Setiap peserta, baik atas nama sendirimaupun sebagai anggota kemitraan/KSO

    hanya boleh memasukkan satu penawaran

    untuk satu paket pekerjaan.

    Any bidder, either on his own behalf or as member of a partnership may only submit on

    bid for one package.

    B. DOKUMEN PENGADAAN B. BIDDING DOCUMENT

    8. Isi Dokumen Pengadaan 8. Content of Bidding Document 

    8.1 Dokumen Pengadaan terdiri atasDokumen Pemilihan dan Dokumen

    Kualifikasi

    8.1 Bidding Document consist of SelectioDocument and Qualification Documen

    8.2 Dokumen Pemilihan meliputi: 8.2 Bidding Document consist of:

    a. Umum

    b. Pengumumanc. Instruksi Kepada Peserta (IKP)

    d. Lembar Data Pemilihan (LDP)

    e. Syarat-Syarat Umum Kontrak 

    f. Syarat-Syarat Khusus Kontrak g. Bentuk Surat Perjanjian

    h. Spesifikasi Teknis dan Gambar

    i. Tata Cara Evaluasi Penawara

    j. Daftar Kuantitas dan Harga

    k. Bentuk Dokumen Penawaran:

    a. General Explanation

    b. Advertisement c. Instruction To Bedders (ITB)

    d. Bid Data Sheet (BDS)

    e. General Conditions of Contract 

    f. Special Conditions of Contract g. Form of Contract 

    h. Technical Specification and

    Drawing

    i. Evaluation Criteria andProcedures

    j. List of Quantity and Price

    k. Form of Bidding Proposal, consist

    of:1) Surat Penawaran, untuk 

    lelang elektronik (e-lelang) 1

    file

    2) Dokumen Penawaran Teknis

    3) Surat PerjanjianKemitraan/Kerja Sama

    Operasi (apabila peserta

    berbentuk Kemitraan/KSO)4) Jaminan Penawaran

    1) Bid Submission Letter for EProc. 1 file procedure

    2) Technical Proposal Document

    3) Joint Venture Agreement (if thbidder is a partnership/J

    business entity)

    4)5) Bid Security

    l. Bentuk Dokumen Lain l. Form of Other Bidding Document

    1) SPPBJ2) SP

    3) Jaminan Sanggahan Banding4) Jaminan Pelaksanaan

    5) Jaminan Uang Muka

    1) SPPBJ2) SP

    3) Objection Apeal Security4) Performance Security

    5) Advance Payment Security

    8.3 Dokumen Kualifikasi meliputi:

    a. Lembar Data Kualifikasi

    b. Pakta Integritasc. Isian Data Kualifikasi

    8.3 Qualification Document consisit of:

    a. Qualification Data Sheet 

    b. Integrity Pact c. Qualification Data to be filled

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    26/183

    d. Petunjuk Pengisian DataKualifikasi dan Tata Cara Evaluasi

    Kualifikasi

    d. Instruction to fill the QualificationSheet and Evaluation Procedure

    8.4 Peserta berkewajiban memeriksa

    keseluruhan isi Dokumen Pengadaan

    ini. Kelalaian menyampaikanDokumen Penawaran yang tidak memenuhi persyaratan yang ditetap

    kan dalam Dokumen Pengadaan inisepenuhnya menjadi risiko peserta.

    8.4 Bidders are obliged to examine th

    entire contents of this procuremen

    document. Negligence convey BiDocuments that do not meet threquirements set out in th

    Procurement Document is entirely risk of bidders

    9. Bahasa Dokumen Pengadaan 9. Language of Bidding Document 

    Dokumen Pengadaan beserta seluruh

    korespondensi tertulis dalam prosesPengadaan menggunakan Bahasa Indonesia.

    The Bidding Document as well a

    correspondence and documents relating tthe bid exchanged by the Bidder and th

    Purchaser shall be written in Bahas

    Indonesia.

    10. Pemberian Penjelasan 10. Clarification

    10.1 Pemberian penjelasan dilakukansecara online melalui aplikasi SPSE

    sesuai jadwal dalam aplikasi SPSE.

    10.1 An explanation (pre-bid meeting) wibe given on-line through SPS

    application at the specified time.

    10.2 Ketidakhadiran peserta pada saat 

    Pemberian Penjelasan tidak dapat 

    dijadikan dasar untuk menolak/

    menggugurkan penawaran.

    10.2 The absence ofbidderat the tim

    ofexplanation by the Committe

    cannot beused as areason t

    reject/disqualify abid.

    10.3 Apabila diperlukan Pokja ULP dapat 

    memberikan informasi yangdianggap penting terkait dengan

    dokumen pengadaan.

    10.3 If necessary, the Procuremen

    Committee can provide informatiothat is considered important i

    relation to the procuremen

    documents.

    10.4 Apabila dipandang perlu, Pokja ULPmelalui tim atau tenaga ahli pemberi

    penjelasan teknis yang ditunjuk 

    dapat memberikan penjelasanlanjutan dengan cara melakukan

    peninjauan lapangan. Biaya

    peninjauan lapangan ditanggung

    oleh peserta

    10.4 If deemed necessary, ProcuremenCommittee assisted by the appointe

    experts are able to give a technica

    explanations to provide furtheexplanation by visiting the site/th

    field. Costs of the site/field visit to b

    borned by the bidders

    Apabila dipandang perlu, Pokja ULP

    dapat memberikan penjelasan(ulang).

    If deemed necessary, the Procuremen

    Committee may provide a reexplanation.

    10.5 Kumpulan tanya jawab pada saat pemberian penjelasan dalam aplikasi

    SPSE merupakan Berita AcaraPemberian Penjelasan (BAPP).

    10.5 Set of questions and answers at thtime of the pre-bid meeting in a

    SPSE’s application to be recorded as Minutes of Explanation (BAPP).

    10.6 Jika dilaksanakan peninjauanlapangan dapat dibuat Berita Acara

    Pemberian Penjelasan Lanjutan dandiunggah melalui aplikasi SPSE.

    10.6 Site/field visit conducted during thbidding process have to be recorded a

    a Minutes of Additional Explanatio

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    27/183

    and to be uploaded into the SPSapplication.

    11. Perubahan Dokumen Pengadaan 11.  Amendment of Bidding Document 

    11.1 Apabila pada saat pemberianpenjelasan terdapat hal-

    hal/ketentuan baru atau perubahanpenting yang perlu ditampung, maka

    Pokja ULP menuangkan ke dalam

    Adendum Dokumen Pengada-an

    yang menjadi bagian tidak terpisahkan dari Dokumen

    Pengadaan.

    11.1 If the explanation (pre-bid meetingcontained a new provision or change

    that need to be accommodated, thethe Procurement Committee has t

    make an Addendum of Biddin

    Document as an integral part of th

    Bidding Documents.

    11.2 Perubahan rancangan kontrak,

    spesifikasi teknis, gambar dan/atau

    nilai total HPS, harus mendapatkanpersetujuan PPK sebelum

    dituangkan dalam AdendumDokumen Pengadaan.

    11.2 Changes in contract design, technica

    specifications, dra-wings and/or th

    total value of OE, the ProcuremenCommittee must obtain prior approva

    from PPK before recorded in thAddendum of Bidding Document.

    11.3 Apabila ketentuan baru atauperubahan penting tersebut tidak 

    dituangkan dalam Adendum

    Dokumen Pengadaan, maka

    ketentuan baru atau perubahantersebut dianggap tidak ada dan

    ketentuan yang berlaku adalah

    Dokumen Pengadaan yang awal.

    11.3 If the new provision or changes are norecorded in the Addendum of Biddin

    Document, it has to be considered tha

    there are no new provision or change

    and the document to be used is thoriginal Bidding Document.

    11.4 Setelah Pemberian Penje-lasan dansebelum batas akhir waktu

    pemasukan penawaran, Pokja ULPdapat menetapkan AdendumDokumen Pengadaan berdasarkan

    informasi baru yang mempengaruhi

    substansi Dokumen Pengadaan.

    11.4 After carrying out the explanation anbefore the deadline of submission o

    bids, the Procurement Committeeable to made an Addendum of BiddinDocument based on the new

    information that affects the substanti

    content of the Bidding Documents.

    11.5 Setiap Adendum yang ditetapkanmerupakan bagian yang tidak 

    terpisahkan dari Dokumen

    Pengadaan.

    11.5 Every Addendum recorded is aintegral part of the Biddin

    Documents.

    11.6 Pokja ULP dapat mengu-mumkanAdendum Doku-men Pengadaan

    dengan cara mengunggah (upload ) file adendum Dokumen Pengadaan

    melalui aplikasiSPSE paling lambat 2

    (dua) hari sebelum batas akhir

    pemasukan penawaran. ApabilaPokja ULP akan mengunggah(upload )   file Adendum Dokumen

    Penga-daan kurang dari 2 (dua) hari

    sebelum batas akhir pemasukanpenawaran, maka Pokja ULP wajib

    11.6 Procurement Committee maannounce the Addendum of Biddin

    Document by uploading the filethrough an SPSE’s application not late

    than 2 (two) days before the deadlin

    of bid submission. If Procuremen

    Committee will upload the files oAddendum of Bidding Document lesthan 2 (two) days prior to the deadlin

    of submission of Bids, th

    Procurement Committee ha

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    28/183

    mengundurkan batas akhirpemasukan penawaran.

    compulsory to postpone the deadlinof submission of Bids.

    11.7 Peserta dapat mengunduh(download ) Adendum Dokumen

    Pengadaan yang diunggah (upload )

    Pokja ULP pada aplikasi SPSE(apabila ada).

    11.7 Bidders may download the Addendumof Bidding Documents uploaded by th

    Procurement Committee from th

    SPSE’s application (if any).

    12. Tambahan Waktu Pemasukan Dokumen

    Penawaran

    12.  Additional Bid Submission Time

    Apabila adendum dokumen pengadaan

    mengakibatkan kebutuhan penambahanwaktu penyiapan dokumen penawaran

    maka Pokja ULP memperpanjang batasakhir pemasukan penawaran.

    If the Addendum of Bidding Document affect

    the need of extra time for preparing the bidocuments, the Procurement Committee ma

    extend the deadline of bid submission.

    C. PENYIAPAN DOKUMEN PENAWARAN C. PREPARATION OF BID DOCUMENT

    13. Biaya dalam Penyiapan Penawaran 13. Cost of Bid Preparation

    13.1 Peserta menanggung semua biaya

    dalam penyiapan dan penyampaianpenawaran;

    13.1 The Bidder shall bear all cost

    associated with the preparation ansubmission of its Bid;

    13.2 Pokja ULP tidak bertanggungjawab

    atas kerugian apapun yang

    ditanggung oleh peserta.

    13.2 The Procurement Committee is no

    responsible for any losses incurred b

    bidders.

    14. Bahasa Penawaran 14. Languaage of Bid 

    14.1 Semua Dokumen Penawar-an harus

    menggunakan Bahasa Indonesia.

    14.1 All Bid Document must use Bahas

    Indonesia.14.2 Dokumen penunjang yang terkait 

    dengan Dokumen Penawaran dapat 

    menggunakan Bahasa Indonesia ataubahasa asing.

    14.2 Supporting documents related to BiDocuments can use Bahasa Indonesi

    or English Language.

    14.3 Dokumen penunjang yang berbahasa asing perlu disertai penjelasan dalam Bahasa Indonesia. Dalam

    hal terjadi perbedaan penafsiran,

    maka yang berlaku adalah penjelasan

    dalam Bahasa Indonesia.

    14.3 Supporting documents using foreiglanguage require to be accompanieby an explanation in Bahasa Indonesi

    Incase of difference of interpretatio

    thenone will be used is the Bahas

    Indonesia.

    15. Dokumen Penawaran 15. Bid Document 

    15.1 Metode penyampaian penawaran 1file (sampul). Dokumen Penawaran

    meliputi:

    15.1 The 1 file bidding procedure/deliverThe Bid shall comprise the following:

    a. Surat Penawaran yang

    didalamnya mencantumkan:

    a. Letter of Bid contained th

    following informations:1) Tanggal

    2) Masa Berlaku Penawaran3) Total Harga Penawaran

    1) Date of Signed

    2) Bid Validity Period3) Total Bid Price

    b. Softcopy hasil pemindaian (scan)

    Jaminan Penawaran asli

    b. Softcopy of the scanned origina

    Bid Security

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    29/183

    c. Daftar Kuantitas dan Harga, c. List of Quantity and Price

    d. Surat Perjanjian Kemitraan/Kerja

    Sama Operasi (jika pesertaberbentuk Kemitraan/ KSO)

    d. Joint Venture Agreement (if th

    bidder is a Joint Venture businesentity)

    e. Penawaran Teknis terdiri dari: e. Technical Proposal consist of:1) jadwal dan jangka waktu

    pelaksanaan pekerjaan s.d

    serah terima pekerjaan

    1) Implementation Schedule an

    duration of works/services u

    to the handing over

    2) spesifikasi teknis barang yang

    ditawarkan dengan contoh,

    brosur dan gambar-gambar

    2) Technical specification of th

    goods to be offere

    accompanied with thbrochures or drawings

    3) jadwal waktu penyerahan/pengiriman barang;

    3) Schedule of delivery

    4) identitas (jenis, tipe danmerek) yang ditawarkantercantum dengan lengkap &

    jelas;

    4) Goods identity (classificatiotype, and brand) to be offereshould be stated clearly an

    completely

    5) layanan purnajual 5) After sales services

    6) Surat dukungan dariagen/pabrikan untuk barang

    sebagaimana yangdinyatakan dalam lembar

    data pemilihan (LDP)

    6) Leeter of Attorney fromAgent/Factory for the items a

    spesicifed in Bid Data Shee(BDS)

    7) tenaga teknis 7) List of technicians

    8) bagian pekerjaan yang akandisubkontrakkan (jika ada)

    8) Part of the services/work to bsubcontracted (if required)

    f. Data Kualifikasi f. Qualification Data

    16. Harga Penawaran 16. Bid Price

    16.1 Harga penawaran ditulis denganjelas dalam angka dan huruf.

    16.1 Bid Price Shall be quoted clearly inumber and word.

    16.2 Untuk kontrak harga satuanpeserta

    harus mencantumkan harga satuandan harga total tiap mata

    pembayaran/pekerjaan dalamDaftar Kuantitas dan Harga. Jika

    harga satuan ditulis nol /tidak dicantumkan maka pekerjaan dalam

    mata pembayaran itu dianggap telahtermasuk dalam harga satuan

    pekerjaan lain & pekerjaan itu tetap

    harus dilaksanakan.

    16.2 Forcontracts unit price, the bidder

    have to write unit price include totaprice for each currency of payment

    work/services in the list of quantitand price. If the unit price written

    zero or not specified then thwork/services in mentioned unit pric

    shall be deemed to have been includein the unit price of the othe

    work/services and it remains to b

    done.

    16.3 Biaya overhead, keuntungan, pajak,bea, retribusi, pungutan lain& biaya

    asuransi yang harus dibayar oleh

    penyedia untuk pelaksanaanpengadaan barang & jasa ini

    16.3 Overhead ostsandbenefitsandalltaxeduties, levies, and other fees an

    insurance fees to be paid by bidder

    for the implementation of this packagare included inthe total bid price.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    30/183

    diperhitungkan dalam total hargapenawaran.

    16.4 Untuk Kontrak yang masapelaksanaannya lebih 12 (dua belas)

    bulan, “Penyesuaian harga dapat 

    dilakukan sebagaimana diatur dalamSyarat-Syarat Umum/KhususKontrak”.

    16.4 For the contract implemen-tatioperiod more than 12 (twelve) month

    "price adjustment may be enforced a

    provided in the General / SpeciaConditions of Contracts".

    17. Mata Uang Penawaran & Cara

    Pembayaran

    17. Currencies of Bid & Term of Payment 

    17.1 Semua harga dalam penawaranharus dalam bentuk mata uang

    sebagaimana tercantum dalam LDP.

    17.1 All prices in the Bid must use thcurrency specified in the BDS.

    17.2 Pembayaran atas pelaksanaan

    pengadaan barang ini dilakukan

    sesuai dengan sebagaimanatercantum dalam LDP dan diuraikan

    dalam Syarat-Syarat Umum/KhususKontrak.

    17.2 Payment for the implementation of th

    procurement in accordance with th

    clause stated in the BDS and scheduleas described in the Genera

    Conditions/Special Condition oContract.

    18. Masa Berlaku Penawaran & Jangka

    Waktu Pelaksanaan

    18. Bid Validity Period & Duration of 

    Implementation

    18.1 Masa berlaku penawaran sesuai

    dengan ketentuan dalam LDP.

    18.1 Bid validity period in accordance wit

    the clause specified in the BDS.

    18.2 Jangka waktu pelaksanaan pekerjaan

    yang ditawarkan tidak melebihi

    jangka waktu sebagaimanatercantum dalam LDP.

    18.2 The duration of work implementatio

    proposed does not exceed th

    durations pecified in the BDS.

    19. Pengisian Data Kualifikasi  19. Qualification Data Form

    19.1 Peserta berkewajiban untuk 

    menyetujui Pakta Integritas danmengisi form isian elektronik datakualifikasi dalam aplikasi SPSE.

    19.1 Bidders were required to approve th

    Integrity Pact and fill out a form oqualification data in the SPSapplication electronically.

    19.2 Pakta Integritas dan Data Kualifikasidianggap telah disetujui dan

    ditandatangani oleh peserta

    pengadaan, kecuali untuk penyediabarang/jasa yang melakukanKemitraan/Kerja Sama Operasi

    (KSO), Pakta Integritas dan DataKualifikasi ditandatangani oleh

    pejabat yang menurut perjanjianKemitraan/Kerja Sama Operasi

    berhak mewakili Kemitraan/KSO.

    19.2 Integrity Pact and qualifications datdeemed approved and signed by th

    bidders of the bidding, except for th

    supplier of goods / services that dPartnership / Joint Venture (JVQualification Data and Integrity Pac

    are signed by an officer under thterms of the Partnership/Join

    Venture's right to represent thPartnership/Joint Venture.

    20. Pakta Integritas 20. Integrity Pact 

    20.1 Pakta Integritas berisi ikrar untuk 

    mencegah dan tidak melakukan dan

    akan melaporkan terjadinya kolusi,korupsi, dan nepotisme (KKN).

    20.1 The Integrity Pact consists o

    commitment to prevent, reject i

    doing, and report any collusioncorruption and nepotism (KKN).

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    31/183

    20.2 Dengan mendaftar sebagai pesertalelang pada suatu paket pekerjaan

    melalui aplikasi SPSE, maka pesertatelah menandatangani Pakta

    Integritas, kecuali penyedia

    barang/jasa yang melakukanKemitraan/Kerja Sama Operasi(KSO), badan usaha yang ditunjuk 

    mewakili Kemitraan/Kerja Sama

    Operasi (KSO) wajib menyampaikan

    pakta integritas melalui fasilitasunggahan lainnya pada form isian

    elektronik data kualifikasi di aplikasi

    SPSE.

    20.2 By registering as a bidder on a packagof goods through the application o

    SPSE, the bidders considered alreadsigned the Integrity Pact, except th

    supplier of goods / services that d

    Partnership / Joint Venture (KSO), thdesignated business entitrepresenting the Partnership / Join

    Venture (JV) must submit an Integrit

    Pact through the other upload facilit

    in a form of electronic qualificatiodata to the SPSE application.

    21.  Surat Jaminan Penawaran 21. Bid Security 

    21.1 Apabila jaminan penawaran disyarat 

    kan sebagaimana tercantum di LDP,maka   softcopy  hasil pemindaian

    (scan) jaminan penawaran diserta

    kan dalam dokumen penawaran.

    21.1 If the Bid Security required, a

    specified in the BDS, it shall bdelivered in the form of softcopy of th

    scanned bid security that included i

    the bidding documents.

    21.2 Jaminan penawaran asli disampaikan

    kepada Pokja ULP pada saat pembuktian kualifikasi.

    21.2 The original bid security have to b

    submitted to the ProcuremenCommitteeat the time of qualificatio

    proofing.

    21.3 Jika calon pemenang tidak  

    memberikan jaminan penawaran asli

    atau jaminan penawaran tidak dapat dicairkan makaakun SPSEpenyediabarang/jasa tersebut di nonaktifkan

    dan dimasukkan dalam daftar hitam.

    21.3 If a potential winner does not provid

    original Bid Security or Bid Securit

    cannot be liquidated then the accounof SPSE’s supplier of goods/ serviceare switched off and the company sha

    be registered and published in thblacklist.

    21.4 Peserta menyerahkan Jaminan

    Penawaran dalam mata uang

    penawaran dengan nilai nominal

    tidak kurang dari seperti tercantumdalam LDP.

    21.4 Bidders shall submit Bid Security i

    the currency of the Bid proposal an

    its nominal value is not less than th

    value as stated in the BDS.

    21.5 Surat Jaminan Penawaran harus

    memenuhi ketentuan,yaitu:

    21.5 Bid Security shall be met the followin

    requirements:

    a. diterbitkan oleh Bank Umumbereputasi baik;

    a. published by reputabCommercial Bank;

    b. Jaminan Penawaran mulai sejak 

    tanggal terakhir pemasukan

    penawaran dan masa berlakunyatidak kurang dari sebagaimana

    tercantum dalam LDP;

    b. Validity of the Bid Security begin a

    the last date of submission and it

    expiration is not less than thduration as specified in the BDS;

    c. nama peserta sama dengan namayang tercantum dalam Jaminan

    Penawaran

    c. the name stated in the Bid Securitshould be the same name as th

    name of participant;

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    32/183

    d. besaran nilai Jaminan Penawarantidak kurang dari nilai nominal

    seperti tercantum dalam LDP;

    d. value of the Bid Security is not lesthan the nominal value as stated i

    the BDS;

    e. besaran nilai Jaminan Penawaran

    dicantumkan dalam angka dan

    huruf;

    e. value of the Bid Security written i

    the numbers and words;

    f. nama Pokja ULP yang menerimaJaminan Penawaran sama dengan

    nama Pokja ULP yang

    mengadakan pelelangan;

    f. The guarantee in the bid securitshould be the name of th

    procurement committe tha

    conducted the bid;

    g. paket pekerjaan yang dijamin

    sama dengan paket pekerjaan

    yang dilelangkan;

    g. work packages guaranteed is th

    same as work packages bidded;

    h. Jaminan Penawaran harus dapat 

    dicairkan tanpa syarat sebesar

    nilai Jaminan dalam waktu palinglambat 14 (empat belas) hari

    kerja, setelah surat pernyataan

    wanprestasi dari Pokja ULP

    diterima oleh Penerbit Jaminan;

    h. Bid Security shall be withdraw

    unconditionally in the amount o

    value stated in the security nolater than 14 (fourteen) days afte

    the default statement letterissue

    by the Procurement Committe

    received by the Bid Security Issue

    i. Jaminan Penawaran atas nama

    perusahaan Kemitraan (KerjaSama Operasi/KSO) harus ditulis

    atas nama perusahaankemitraan/KSO.

    i. Bid Security on behalf of th

    Partnership Company (JoinVenture) must be written on beha

    of the partnership/JV.

    21.6Jaminan Penawaran dicairkan dandisetorkan ke Kas Negara/Daerah

    seperti tercantum dalam LDP jika:

    21.6Bid Security will be cashed andeposited into the State/ Distric

    Treasury Office as stated in the BDS i

    a. peserta terlibat KKN; a. bidders engaged in the corruptio

    practice;

    b. calon pemenang, calon pemenangcadangan 1 atau 2 tidak bersedia

    menambah nilai jaminanpelaksanaan dalam hal harga

    penawarannya dibawah 80%HPS;

    b. potential winner, first and seconcandidate of potential winner ar

    not able to submit an additionavalue of Bid Security, in terms o

    the bid price proposal below 80%of Owner’s Estimate;

    c. calon pemenang, calon pemenangcadangan 1 atau 2 tidak hadir

    dalam klarifikasi dan/atau

    verifikasi kualifikasi dengan

    alasan yang tidak dapat diterima;

    c. potential winner, first and seconcandidate of potential winner ar

    not present in the clarificatio

    and/or verification of qualificatio

    without any reasons that can baccepted;

    d. calon pemenang, calon pemeangcadangan 1 atau 2 pada saat 

    pembuktian kualifikasi terbukti

    melakukan pemalsuan data; atau

    d. potential winner, first and seconcandidate of potential winner at th

    time of qualifying proven wa

    convicted of falsifying data; or

    e. calon pemenang, calon pemenangcadangan 1 atau 2 mengundurkan

    e. potential winner, first and seconcandidate of potential winne

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    33/183

    diri dengan alasan yang tidak dapat diterima atau gagal tanda

    tangan kontrak 

    resigned withoutany reasons thacan be accepted, or they are faile

    to bind the contract.

    D. PEMASUKAN DOKUMEN PENAWARAN D. SUBMISSION OF BID DOCUMENT

    22. Penyampulan dan Penandaan Sampul 

    Penawaran

    22.  Sealing and Marking Envelope of Bid 

    22.1 Penyampulan dan penyampaian

    Dokumen Penawaran mengikutimetoda sebagaimana ditentukan

    dalam Lembar Data Pemilihan.

    22.1 Sealing and submission of Bid i

    accordance with the methomentioned in the Bid Data Sheet.

    22.2   Untuk metoda 1 (satu) file. 22.2 For 1 (One) File Method Procuremen

    22.2

    (A)File penawaran yang disampaikanoleh peserta terdiri dari 1 (satu) file

    penawaran yang telah disandikan/

    dienkripsi yang terdiri dari:

    22.2

    (A)The Bid Proposal’s file to be submitteby the Bidder consist of 1 (one

    decoded/encrypted file as follows:

    a. Penawaran Administrasi;

    b. Penawaran Teknis;c. Penawaran Harga.

    a. Administrative Proposal;

    b. Technical Proposal;c. Price Proposal.

    22.2

    (B)File penawaran disandikan/

    dienkripsi dengan Aplikasi

    Pengaman Dokumen (APENDO).

    22.2

    (B)Bid proposal’s file have t

    bedecoded/encrypted usingth

    security application softwar(APENDO).

    22.2

    (C)Peserta mengirimkan file penawaranyang telah disandikan/dienkripsi

    melalui aplikasi SPSE.

    22.2

    (C)Bidders submit bidproposal files thahave been decoded/encrypte

    through the SPSE application.

    22.2

    (D)Data kualifikasi diisikan dan dikirim

    melalui form isian elektronik datakualifikasi pada SPSE.

    22.2

    (D)Qualification data is filled out and sen

    through electronic qualification datform in SPSE application.

    23. Pemasukan / Penyampaian Penawaran 23.  Submission /Delivery of Bid 

    23.1 Peserta menyampaikan DokumenPenawaran kepada Pokja ULP

    dengan ketentuan:

    23.1 Bidders submit the Bid Proposal to thProcurement Committee with th

    following provisions:

    a. Pertama, mengirimkan Data

    Kualifikasi melalui form isianelektronik data kualifikasi pada

    aplikasi SPSE;

    a. First, send the data through a form

    of qualification data in thSPSEapplication electronically;

    b. Dilanjutkan dengan mengunggah

     file penawaran terenkripsi (*.rhs)

    hanya melalui aplikasi SPSE

    sesuai jadwal yang ditetapkan;

    b. Followed by uploading files of bi

    prposal encrypted (*. rhs) onl

    through the SPSE application i

    accordance with thpredetermined schedule;

    c. Peserta dapat mengirimkan datakualifikasi secara berulang

    sebelum batas akhir waktupemasukan Dokumen

    c. Bidders can submit qualificatiodata repeatedly before the deadlin

    for submission of the BiDocument. The data being sent las

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    34/183

    Penawaran. Data kualifikasi yangdikirmkan terakhir akan

    menggantikan data kualifikasi

    yang telah terkirim sebelumnya.

    qualification will replace the datthat has been sent previousl

    qualified.

    23.1

    (A)

    Untuk metode 1 (satu) file: 23.1

    (A)

    For 1 (one) file method o

    procurement:

    1) Setelah   File penawaranadministrasi, teknis dan harga

    dienkripsi menggunakan Apendo;

    1) After administrative, technical anprice proposal files have bee

    encrypted using Apendo;

    2) Peserta mengunggah (upload ) file

    penawaran administrasi, teknisdan harga yang telah terenkripsi

    (*.rhs) melalui aplikasi SPSEsesuai jadwal yang ditetapkan;

    2) Bidders have to upload th

    encrypted (*. rhs) files oadministrative, technical, an

    prices proposal through the SPSapplication in accordance wit

    predetermined schedule;

    3) Peserta dapat mengunggah   filepenawaran secara berulang

    sebelum batas akhir waktupemasukan Dokumen

    Penawaran.   File penawaranterakhir akan menggantikan   file

    penawaran yang telah terkirimsebelumnya.

    3) Bidders are allowed to upload thbid proposal repeatedly before th

    deadline for submission of the BiDocument. The latest file uploade

    will replace the file uploadepreviously.

    24. Batas Akhir Waktu Pemasukan

    Penawaran

    24. Deadline for Bid Submission

    24.1 Penawaran harus disampaikansecara elektronik melalui aplikasi

    SPSE kepada Pokja ULP paling

    lambat pada waktu yang ditentukan

    oleh Pokja ULP.

    24.1 Bid proposal must be submitteelectronically through the SPS

    application to the Procuremen

    Committee not later than the tim

    specified by the ProcuremenCommittee.

    24.2 Tidak dibolehkan mengubah waktu

    batas akhir pemasukan penawarankecuali keadaan kahar atau terjadi

    gangguan teknis. Apabila terpaksa

    dilakukan perubahan batas akhir

    pemasukan penawaran maka PokjaULP harus menginput alasan yang

    sebenarnya dan dapat 

    dipertanggungjawabkan pada

    aplikasi SPSE.

    24.2 It is not allowed to change the time o

    the deadline for submission of Bidexcept for the condition force majeur

    or there are technical problems. Whe

    the deadline for bid submission dat

    forced to be changed, the ProcuremenCommittee has to explain thereal an

    accountable reason to the SPS

    application.

    25. Dokumen Penawaran Terlambat  25. Late Bid 

    Aplikasi SPSE menolak setiap   file

    penawaran yang dikirimkan setelah batas

    akhir waktu pemasukan penawaran.’

    Application SPSE has to right to reject any bifile submitted after the deadline fo

    submission of Bids.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    35/183

    E. PEMBUKAAN DAN EVALUASI

    PENAWARAN

    E. BID OPENING AND EVALUATION

    26. Pembukaan Penawaran 26. Bid Opening

    26.1 Pada tahap pembukaan penawaran,

    Pokja ULP mengunduh (download )dan melakukan dekripsi   file

    penawaran dengan menggunakan

    Apendo sesuai waktu yang telah

    ditetapkan.

    26.1 At the stage of bid opening

    Procurement Committee downloadand decrypts files using Apendo at th

    time as stated in the predetermine

    time.

    26.2 Terhadap file penawaran yang tidak 

    dapat dibuka (didekripsi), Pokja ULPmenyampaikan   file penawaran

    tersebut kepada LPSE untuk mendapat keterangan bahwa   file

    yang bersangkutan tidak dapat 

    dibuka dan bila dianggap perlu LPSEdapat menyampaikan file penawaran

    tersebut kepada LKPP.

    26.2 For the bid proposal’s file that canno

    be opened (decrypted), thProcurement Committee will subm

    that file to the LPSE to get a noticconcerning the condition of file tha

    cannot be opened and if necessar

    LPSE will submit the bid proposal’s filto the LKPP.

    26.3 Berdasarkan keterangan dari LPSE

    atau LKPP, apabila   file penawaran

    tidak dapat dibuka/didekripsi maka

    Pokja ULP dapat menetapkan bahwa file penawaran tersebut tidak 

    memenuhi syarat sebagai penawarandan penyedia barang/jasa yang

    mengirimkan   file penawaran

    tersebut dianggap tidak memasukkan penawaran. Apabiladapat dibuka, maka Pokja ULP akan

    melanjutkan proses atas penawaranyang bersangkutan.

    26.3 Based on the information from LPSE o

    LKPP, if the bid proposal’s file canno

    be opened / decrypted then th

    Procurement Committee will decidthat bid proposal is not qualified an

    the Bidder that propose the biproposal’s file is considered do no

    submit a bid. If it can be opened, the

    the Procurement Committee wicontinue the process of concernebidding.

    26.4   File yang dianggap sebagai

    penawaran adalah dokumenpenawaran yang berhasil dibuka dan

    dapat dievaluasi sekurang-kurangnya memuat:

    26.4 The file is considered as a Bid proposa

    document when it can be opened anevaluated successfullly. This fil

    consist of at least:

    a. satu file: harga penawaran, daftarkuantitas & harga untuk kontrak 

    harga satuan, jangka waktupenawaran, & deskripsi/

    spesifikasi barang/jasa yangditawarkan.

    a. one file: bid price, list of quantitand price for the unit pric

    contract, bid validity, andescription/ specification o

    goods/services will be offered.

    26.5 Apabila penawaran yang masuk kurang dari 3 (tiga) peserta maka,

    panitia pengadaan melanjutkanproses lelang dengan melakukan

    negosiasi teknis dan harga.

    26.5 If the bids are less than 3 (threeparticipants then, procuremen

    committee to continue the biddinprocess with the technical and pric

    negotiations.

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    36/183

    26.6 Panitia pengadaan/Pokja ULP tidak boleh menggugurkan penawaran

    pada waktu pembukaan penawarankecuali untuk file penawaran yang

    sudah dipastikan tidak dapat dibuka

    berdasarkan keterangan LPSE.

    26.6 Procurement Committee should nodisqualify the bid at the time of bi

    opening except the bid that its filcannot be opened based on th

    information from LPSE.

    27. Evaluasi Dokumen Penawaran 27. Bid Evaluation

    27.1 Dalam hal dokumen penawaran

    dengan 1 (satu) filesistem gugur:

    27.1 In the case of bidding procedure is

    (one) file pass and fail systems:

    27.1

    (A)Sebelum evaluasi penawaran,

    dilakukan koreksi aritmatik denganketentuan :

    27.1

    (A)Prior to the evaluation of bid, th

    arithmetic correction to be conducteunder the following provisions:

    a. untuk kontrak Harga Satuan: a. for a contract of Unit Price:

    1) volume dan/atau jenis

    pekerjaan yang tercantumdalam daftar kuantitas danharga disesuaikan dengan

    yang tercantum dalam

    Dokumen Pengadaan;

    1) the volume and / or type o

    work listed in the list oquantity and price to badjusted to the list mentione

    in the Bidding Document;

    2) apabila terjadi kesalahanperkalian antara volume dan

    harga satuan pekerjaan, makadilakukan pembetulan,

    dengan ketentuan hargasatuan pekerjaan yang

    ditawarkan tidak bolehdiubah;

    2) if an error occurs in thmultiplication between th

    volume and the unit price ogoods/works, then th

    corrections have to be made othe result of multiplicatio

    without change the unit price;

    3) jenis pekerjaan yang tidak 

    diberi harga satuan dianggap

    sudah termasuk dalam hargasatuan pekerjaan yang laindan harga satuan pada daftar

    kuantitas dan harga tetapdibiarkan kosong;

    3) the type of goods/works that

    not proposed the unit price

    considered to be included ithe unit price for anothegoods/works, and the list o

    quantity and price be leblank;

    4) Jenis pekerjaan yang tidak tercantum dalam daftar

    kuantitas & hargadisesuaikandengan jenis pekerjaan yang

    tercantum dalam Dokumen

    Pengadaan & harga satuan

    pekerjaan dianggap nol; dan

    4) the type of goods/works arnot listed in the list of quantit

    and price to be adjusted to thtype of goods/works specifie

    in the Bidding Documents an

    the unit price of tha

    goods/works are considerezero, and

    5) Hasil koreksi aritmatik padabagian harga satuan dapat 

    mengubah nilai total harga

    penawaran sehingga urutanperingkat dapat lebih tinggi

    5) The correction of arithmetic othe unit price can change th

    value of the total bid price s

    that the rank order may bhigher or lower than th

    original rank order;

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    37/183

    atau lebih rendah dari urutanperingkat semula;

    27.1

    (B)Penawar yang total hargapenawarannya setelah koreksi

    aritmatik melebihi nilai total HPS

    tetap diikut sertakan dalam evaluasiselanjutnya.

    27.1

    (B)The Bidders who their total bid pricafter arithmetical corrections exceed

    the total value of OE, is remain to b

    evaluated in the next step.

    27.1

    (C)Apabila semua harga penawaran

    setelah koreksi aritmatik melebihinilai total HPS, maka pelelangan

    dinyatakan gagal setelah POKJA ULPmemperoleh persetujuan ADB.

    27.1

    (C)If the total price after arithmeti

    correction of all bids exceed the totavalue of OE, then the bid is declared fa

    after the Procurement Committeobtains the ADB’s approval.

    27.1

    (D)Berdasarkan hasil koreksi aritmatik Pokja ULP menyusun urutan dari

    penawaran terendah.

    27.1

    (D)Based on the results of arithmetcorrection, Procurement Committe

    prepares the sort order list based o

    the lowest bid price.

    27.1

    (E)Pelaksanaan evaluasi sistem gugur,

    dilakukan oleh Pokja ULP untuk mendapatkan 3 (tiga) penawaran

    yang memenuhi syarat yang dimulaidengan penawaran terendah setelah

    koreksi aritmatik.

    27.1

    (E)TheProcurement Committee conduc

    the pass and failevaluation to obtain(three) qualified/eligible bidder

    sorted ascending from the lowest bito the highest bid after arithmetica

    correction.

    27.1

    (F)Apabila setelah koreksi aritmatik 

    terdapat kurang dari 3 (tiga)

    penawar yang menawar kurang dari

    nilai total HPS maka proses tetap

    dilanjutkan dengan evaluasipenawaran.

    27.1

    (F)If after arithmetical corrections ar

    less than 3 (three) bidders whose bi

    price is less than the total value of th

    HPS then the bidding proces

    continued for the evaluation of bids.

    27.1

    (G)Pokja ULP melakukan evaluasi

    penawaran yang meliputi :

    27.1

    (G)Procurement Committee conduct th

    evaluation of the bid proposal include

    a. Evaluasi Administrasi;b. Evaluasi Teknis;

    c. Evaluasi Harga, dan

    d. Evaluasi Kualifikasi.

    a. Administration Evaluation;b. Technical Evaluation;

    c. Price Evaluation, and

    d. Qualification Evaluation.

    27.3 Ketentuan umum dalammelakukan

    evaluasisebagai berikut:

    27.3 General provisions in conducting th

    evaluation as follows:

    a. Pokja ULP dilarang menambah,mengurangi,mengganti, dan/atau

    mengubah kriteria danpersyaratan yang telah

    ditetapkan dalam DokumenPengadaan;

    a. Procurement Committeeforbidden to add, subtract, chang

    and / or change the criteria anrequirements set out in th

    Procurement Documents;

    b. Pokja ULP dan/ataupesertadilarang menambah,

    mengurangi,mengganti, dan/ataumengubah isi DokumenPenawaran;

    b. Procurement Committee and /obidders is prohibited to add

    subtract, change and/or change thcontents of Bidding Document 

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    38/183

    c. penawaran yang memenuhisyarat adalah penawaran yang

    sesuai dengan ketentuan, syarat-syarat, dan spesifikasi teknis yang

    ditetapkan dalam Dokumen

    Pengadaan, tanpa adapenyimpangan yang bersifat penting/pokok atau penawaran

    bersyarat.

    c. qualified bids are bid proposal thameet the requirement i

    accordance with the termconditions, and technica

    specifications set out in the Biddin

    Documents, without any deviationthat are important/ essential oconditional bid.

    d. penyimpangan penting/pokok 

    atau penawaran bersyarat yaitu:

    d. deviations that are important

    essential or conditional offers are

    1) penyimpangan dari Dokumen

    Pengadaanyang

    mempengaruhi lingkup,

    kualitas & hasil/kinerjapekerjaan; dan/atau

    1) deviations from the Biddin

    Documents that affect th

    scope, quality and results

    performance of work, and / or

    2) penawaran peserta dengan

    persyaratan tambahan yangakan menimbulkan

    persaingan tidak sehat 

    dan/atau tidak adil diantara

    peserta yang memenuhisyarat.

    2) bid proposal from the bidder

    with an additionarequirements that would lea

    to unfair competition and /o

    unfair among the eligibl

    bidders.

    e. Pokja ULP dilarangmenggugurkan penawaran

    dengan alasan:

    e. Procurement Committeeforbidden to abort the bid unde

    the following reasons:

    1) ketidakikutsertaan dalampemberian penjelasandan/atau pembukaan

    penawaran; dan/atau;

    1) did not attending the session oexplanations (pre-bid meetingand / or bid opening, and / or

    2) kesalahan yang tidak 

    substansial, misal kesalahan

    pengetikan, penyebutansebagian nama atau

    keterangan, surat penawarantidak berkop perusahaan.

    2) errors are not substantial, suc

    as a typing error, mention par

    of the name or description, thbid proposal are not written i

    the company letter head.

    f. para pihak dilarangmempengaruhi atau melakukan

    intervensi kepada Pokja ULPselama proses evaluasi;

    f. the parties are prohibited frominfluencing or intervening to W

    ULP during the evaluation proces

    g. apabila dalam evaluasi

    ditemukan bukti adanya

    persaingan usaha yang tidak sehat dan/atau terjadi

    pengaturan bersama

    (kolusi/persekongkolan) antarapeserta, ULP dan/atau PPK,

    dengan tujuan untuk 

    g. when the evaluation foun

    evidence of unhealthy competitio

    and / or regulation occur togethe(collusion / conspiracy) amon

    bidders, Procurement Committe

    and / or PPK, in order to win one othe bidders, then:

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    39/183

    memenangkan salah satu peserta,maka:

    1) peserta yang ditunjuk sebagaicalon pemenang dan peserta

    lain yang terlibat dimasukkan

    ke dalam Daftar Hitam;

    1) bidders who are designated apotential winners and othe

    bidders involved are put int

    the Black List;

    2) proses evaluasi tetapdilanjutkan dengan

    menetapkan peserta lainnyayang tidak terlibat; dan

    2) the evaluation procescontinues to set anothe

    bidders who were not involveand

    3) apabila tidak ada peserta lainsebagaimana dimaksud pada

    angka 2), maka pelelangandinyatakan gagal setelah

    mendapat persetujuan ADB.

    3) if there is no other participanreferred to point 2), then th

    bid is declared fail after thProcurement Committe

    obtains ADB’s approval.

    27.4 Evaluasi Administrasi 27.4 Administration Evaluation

    a. evaluasi terhadap data

    administrasi hanya dilakukanterhadap hal-hal yang tidak 

    dinilai pada saat penilaiankualifikasi;

    a. evaluation of administrative data

    only done to things that are noassessed at the time of assessmen

    of qualifications;

    b. penawaran dinyatakan

    memenuhi persyaratan

    administrasi, apabila:

    b. bids comply with administrativ

    requirements, if:

    1) syarat-syarat substan-sial

    yang diminta berdasarkanDokumen Pengadaan ini

    dipenuhi/dilengkapi;

    1) substantial data requirement

    requested by the ProcuremenDocuments are met;

    2) surat penawaran memenuhi

    ketentuan sebagai berikut:

    2) the bid proposal meet th

    following requirements:

    a) jangka waktu berlakunyasurat penawaran tidak 

    kurang dari waktu

    sebagaimana tercantum

    dalam LDP;dan

    a) The validity period of thbid is not less than the tim

    as specified in the BDS, an

    b) Bertanggal b) Dated3) Surat Jaminan Penawaran

    memenuhi ketentuan:3) Bid Security meet th

    following requirements:

    a) diterbitkan oleh Bank Umum yang bereputasi

    baik;

    a) issued by a reputablcommercial bank;

    b) Jaminan Penawaran

    dimulai sejak tanggal

    terakhir pemasukan

    penawaran dan masaberlakunya tidak kurang

    b) Bid Security validity begi

    since last date o

    submission of Bids and th

    expiration is not less thathe time as specified in thBDS;

  • 8/17/2019 Lab Kontrol Dan Otomasi(2)

    40/183

    dari waktu sebagaimanatercantum dalam LDP;

    c) nama peserta samadengan nama yang

    tercantum dalam Jaminan

    Penawaran;

    c) the name of bidders are thsame as the names listed i

    the Bid Security;

    d) besaran nilai JaminanPenawaran tidak kurang

    dari nilai jaminansebagaimana tercantum

    dalam LDP;

    d) the amount of the value othe Bid Security of not les

    than the value of collateraas specified in the BDS;

    e) besaran nilai Jaminan

    Penawaran dicantumkandalam angka dan huruf;

    e) the amount of the value o

    the Bid Security is writtein numbers and words;

    f) nama Pokja ULP yang

    menerima JaminanPenawaran sama dengan

    nama Pokja ULP yangmengadakan pelelangan;

    dan

    f) the name of Procuremen

    Committee who receive thBid Security is the sam

    Procurement Committethat conducted the biddin

    process, and

    g) paket pekerjaan yang

    dijamin sama denganpaket pekerjaan yang

    dilelangkan;

    g) package of goods which

    guaranteed in the bisecurity is the same nam

    as in the bid package;

    h) Jaminan Penawaran

    harus dapat dicairkan

    tanpa syarat sebesar nilai

    Jaminan dalam waktupaling lambat 14 (empat 

    belas) hari kerja, setelah

    surat pernyataanwanprestasi dari Pokja

    ULP diterima olehPenerbit Jaminan;

    h) Bid Security shall b

    withdrawn unconditionall

    in amount of the guarante

    not later than 14 (fourteendays after the defau

    statement from th

    Procurement Committereceived by the Issue

    Security;

    i) Jaminan Penawaran atasnama perusahaan

    kemitraan/KSO harus

    ditulis atas namaperusahaan Kemitraan/KSO, dan

    i) Bid Security of thpartnership company mus

    be written on behalf of th

    partnership, and

    j) substansi & keabsahan/keaslian Jaminan

    Penawaran dari penerbit jaminan telah dikonfir

    masi dan diklarifikasisecara tertulis oleh PokjaULP kepada penerbit 

    jaminanapabila kurang