KELKA KA S5 DAN S6 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 310
50
100
150
200
250
300
160 150
202
148
113
220
173160
206
160 155183
143
205
136165
198
115
159176
195 192
284
139158 165
78
120
231
165 153
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 015
RATA-RATA KELKA : S5 = 167 MENIT DAN S6 = 0,48 MENIT
S5 S6
TGL 31/03 : KA S6 LAMBAT 15MENIT KARENA TUNGGU PENGATURAN PENUMPANG NAIK. KARENA PENUMPANG PADAT.
KELKA KA S3 DAN S4 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 280
50
100
150
200
250
52
107
210
172
103
150
88
116
143157
145
83
130
64
95 95
150
98
124 120140
105 11095 98
122 120
170
0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RATA-RATA KELKA : S3 = 120 MENIT DAN S4 = 0,3 MENIT
S3 S4 S5
TGL 08/2 KA S4 LAMBAT 10MENIT KARENA K1 NO 06618 BLOWER PATAH DAN KONDENSOR TERBAKAR
SOP KA 2723-2724 DI STASIUN LUBUK LINGGAU
KEGIATAN SOP KETERANGAN
1. LANGSIRAN LOKO UNTUK MENDORONG
20 MENIT
PERSIAPAN BONGKAR 5 MEINT
2. BONGKAR : 360MENIT
- BONGKARAN KE 1 = 15 kkw = 300 MENIT- BONGKAR KE 2 = 3 KKW = 60 MENIT - CEK LOKO 3. PERSIAPAN BERANGKAT : - LANGSIRAN AMBIL RANGKAIAN- PERIKSA SCOWING- PERCOBAAN REM- ADMINISTRASI
45 MENIT
Pemeriksaan Loko = bersamaan dengan waktu bongkaran
TOTAL = 430 MENIT
KELKA KA 2723 DAN 2724 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014TGL DAT
2723KELKA BER
2724KELKA SOP(menit) 430 menit
01 23.25 1043 05.34 1039
02 15.37 575 20.17 482
03 13.35 453 18.02 347
04 13.15 453 20.00 465
05 16.56 654 21.50 575
06 16.20 618 22.35 620
07 16.20 598 22.10 595
KELKA KA 2723 DAN 2724 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014TGL DAT
2723KELKA BER
2724KELKA SOP(menit) 430 menit
08 15.57 595 22.10 595
09 12.28 386 18.25 370
10 12.47 405 19.10 415
11 13.29 457 19.02 407
12 12.27 335 18.15 360
13 20.37 875 02.05 830
14 18.27 745 00.35 740
KELKA KA 2723 DAN 2724 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014TGL DAT
2723KELKA BER
2724KELKA SOP(menit) 430 menit
15 11.59 357 16.28 253
16 12.18 376 19.30 435
17 15.35 573 21.36 561
18 13.40 20.20 605
19 20.32 870 03.05 890
20 16.27 625 22.10 595
21 00.52 1130 10.10
KELKA KA 2723 DAN 2724 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014TGL DAT
2723KELKA BER
2724KELKA SOP(menit) 430 menit
22 12.02 360 17.30 315
23 15.08 546 22.17 602
24 10.53 291 17.10 295
25 15.32 570 19.22 427
26 13.22 440 19.32
27 22.03 961 02.26 851
28 17.57 710 22.25 610
KELKA KA 2723 DAN 2724 DI STASIUN LUBUK LINGGAU (LLG)
BULAN MARET 2014TGL DAT
2723KELKA BER
2724KELKA SOP(menit) 430 menit
29 13.27 445 19.42 447
30 18.35 753 00.25 720
31 13.32 450 19.27 432
LLG KPT
8. WPI = MENIT
4. WPK = MENIT
5. PERSIAPAN ISI= MENIT
2. BONGKAR = 360MENIT ( 300’ UNTUK RANGK
15KKW)
3. PERSIAPAN BERANGKA KOSONG= 45 MENIT
7. PERSIAPAN BERANGKAT ISI =
MENIT
6. MUAT BATUBARA = MENIT
1. LANGSIRAN MENDORONG =
20 MENIT, PERSIAPAN
BONGKAR : 5’
SOP KA 2723-2724KERTAPATI – LUBUK LINGGAU
PROGRAM SOP
353’
430’
SELESAI
REALISASI RATA-RATA TIME TOTAL = 352 MENIT DIBAWAH SOP 430MENIT