Tahapan perencanaan
terminal agribisnis
Sumber:
Wholesale markets, Planning and design manual
by J. D. Tracey-White
FAO 1991
(diolah)
Kawi Boedisetio
[email protected] Irawati Kodri
Pengantar
• Dokumen ini berisi diagram proses untuk
melakukan perancangan dan perencanaan
pembangunan Pasar Sayur atau “Sub-Terminal
Agribisnis”
Untuk memudahkan pembacaan, 9 slide berikut
perlu di-print dan hasilnya disambung-sambung,
sesuai dengan “connector” yang ada.
A1
A2
A3
A4
B1
B2
B3
B4
Management
and Operations
Location and
Planning
Construction
and Implemen-
tation
STAGE I
Project Ident-
ification and
pre-feasibility
STAGE II
Detailed
Design
Development
STAGE III
Project
formulation
and feasibility
STAGE IV
Project
Implementa-
tion FUNCTIONSACTIVITIES
National
Policy &
Goals, Ins-
titutional
Structure
Context,
review of
Facilities &
Site Selection
Plan options
& Land Use -
Traffic
Master Plan
Building
options,
Structure,
Materials &
Costs
Plan
Evaluation &
Financial
Analysis
Operation
Plan &
Management
Procedures
Staffing,
Training,
and Initiate
Operations
Tender
Documents,
Construction
&
Procurement
Administrators
and
Policy Maker
Planners
and
Economists
Engineers
And
Architects
Figure 4 – A Design Methodology
Data
CollectionSurveys
Data
Processing
Data
AnalysisSynthesis
National
Agricultural Policy
Regional Planning
Studies
Existing Sector
Programme
Existing Marketing
Studies
Existing Market
Records
Agricultural
Production Data
National
Consumption Data
Demographic Data
Legislation &
Ordinance
Preliminary
Physical Survey of
Market
Reconnaissance
Survey of Market
Operations
Tabulate Relevant
Development
Policies
Tabulate Existing
Market Facilities
Define Market
Functionaries
Define Marketing
Channels
Tabulate Catch-
ment Production
Tabulate
Population Data
Extract Relevant
Laws
Appraisal of Market
Facilities
Analysis of Existing
Marketing System
Estimate Market
Turnover
Estimate Design
Population
Definition of Project
Goals
Identify Existing
Shortcomings
Review Suitability
of Site Size &
Location
Definition of Project
Risks
Project Future
Needs
Identify Project
Beneficiaries
Identify Manage-
ment Options
A1
Data
CollectionSurveys
Data
Processing
Data
AnalysisSynthesis
Stage 1 definition
of Project Goals
Stage 1 Context
data & Studies:
• Existing
Marketing Studies
• Existing Market
records
• Agricultural
Production
• National
Consumption
• Demography
• Management
Proposals
Stage 2 Final
Master Plan
Stage 2 Civil Works
Budget
Detailed Survey of
Market Operations
Detailed Field
Suirvey of Traders
& Turnover
Review Develop-
ment Policies
Review Design
Population
Review Market
Functionaries
Review Marketing
Channels
Review Catchment
Production
Manual/Computer
Spreadsheet
Define End-of
Project Status
Quantify Project
Beneficiaries
Analysis of Existing
Marketing System
Project Market
Turnover
Define Project’s
Immediate
Objectives &
Outputs
Define Project’s
Inputs
Formulate Market
Procedures &
Agree Staffing
Establishment
Estimate Utilization
of Market Facilities
Phasing of Design
Options
Agree Equipment
Needs
A2
Appraisal of
Operations &
Management
Options
Data
CollectionSurveys
Data
Processing
Data
AnalysisSynthesis
Stage 1 Review
Proposals/Issues
Construction
Materials Studies
Official Rates &
Cost data
Construction
Materials
Availability
Local Construction
Cost Review
Manual / Computer
Spreadsheets
Tabulate existing
market facilities
Base Map
Preparation
Tabulate suitable
materials
Collate cost Data
Check Stage 1
Findings on
Existing
Shortcomings,
Project Risks,
Issues &
Beneficiaries
Revise estimate of
Demand & Trade
Volumes
Constraints &
Opportunities
Mapping
Prepare Unit Rates
Revision of Project
Goals
Refine Stage 1
Estimate of Phisical
needs
Define
Accomodation Brief
Review Site
Planning Options
Review Building
Design Options:
• Modules
• Facilities
• Overall Form
• Climatic Design
Review Stage 1
Draft Budget
A3
Further analysis of
existing market
facilities
Local Planning
Studies
Maps and Aerial
Photographs
Climatic / Hydro-
geology Studies
Existing Geo-
technical Studies
Planning / Building
Regulations
Stage 1 Draft
Project Budget
Survey of Traders
& Turnover
Engineering
Survey of Markets:
• Historic
• Topographic
• Geodetic
• Site Features
• Services
• Soils
Survey of Traffic
Modes & Volumes
Data
CollectionSurveys
Data
Processing
Data
AnalysisSynthesis
List of Monitoring &
Evaluation
Indicators
Detailed Stage 3 &
Stage 2 Civil Works
Budgets
Stage 2 Final
Master Plan &
Development Brief
Establishment of
Market
management
Board &
Appointment of
Core Management
& Operations Staff
Selection and
Appointment of
Design &
Supervision
Consultants
Agreed M & E
Programme
Agreed Scope of
Training
Programme
Finalize Staffing
Establishment
Agreed Phasing of
Development
Agreed Design
Drawing
Programme
A4
Review Work Plan
& Phasing
Programme
Stage 3
Management
Structure &
Institutions Report
Technical
Assistance Needs
Stage 3 Project
Work Plan
Stage 2 Phasing
Programme
Stage 2 Building
Design Drawings
Studies/Survey:
• Training
• MIS System
• Regulations
• Facilities
Detailed Enginee-
ring Surveys:
• Geotechnic
• Geodetic
• Materials
Survey Sub-
Contractors reports
Review M & E
Requirements
Review training
proposals
Review issues to
be resolved
Review budget
allocations
Review Design
Changes
Confirm Availability
of Finance
Outline Detailed Final
Output
Form
Output
User
Consultation
Procedure
Preliminary Es-
timate of Phisical
requirements
Adjustment of
Development
Programme,
Budget Estimate &
Preliminary
Financial Analysis
Define Issues to be
resolved
Draft Budget
Requirements
Land Acquisition
Requirements
Further Survey
Requirements
Project Iden-
tification & Pre-
Feasibility report
Budget Request
Form
Land Purchase
Form
Draft management
Structure &
Institutions Report
Client Policy
Making Body &
Donors
Finance Ministry &
Donors
Lands / Survey
Ministry
Public Works Dept.
/ Engineering
Consultans
Marketing Dept. or
Authority
Law Ministry /
Client Body
B1R e c o m m e n d a t I o n s
Institutional
Proposals
Terms of reference
for Initial Surveys:
•Engineering
•Social
•Marketing
Outline Detailed Final
Output
Form
Output
User
Consultation &
Agree Parameters
to be used in
Analysis
Review of Design
Options & Project
Risks
Overall Project
Design, Financial &
Economic Analysis,
including Sensitivity
testing
Justification of
Project Benefits &
Risks
Final Institutional
Strategy
Further Issues to
be Resolved
Agreed Co-
ordination
Arrangements
Project Feasibility
Report
Final Management
Structure &
Institutions Report
Project Work Plan /
Bar Chart
Detailed Budget
Form
Client Policy
Making Body &
Donors
Finance Ministry &
Donors
Management /
Engineering
Consultant
Marketing Dept. or
Authority
Law Ministry
B2R e c o m m e n d a t I o n s
Further Survey
RequirementsTerms of reference
for further Studies /
Surveys:
•Training
•MIS System
•Market
Regulations
•Facilities
•EIA
Figure 6 Stage II - detailed design development
Estimate recurrent
Costs:
•Salaries
•Qverheads
•Depreciation
•Repairs &
Maintenance
Estimate Annual
Revenues:
•Levies
•Rents
•Parking Fees
Estimate Capital
Costs:
•Land Purchase
•Surveys
•Civil Works
•Equipment
Prepare Cash
Flows for Basic
Options
Technical
Assistance
Requirements
Final Budget
Requirements
List of Monitoring &
Evaluation
Indicators
Outline Detailed Final
Output
Form
Output
User
Consultation
Procedure: staffing,
costs, demand,
phasing & Facilities
Draft Master Plan
Detailed Site
Planning and
Engineering
Studies:
•Earthworks
•Reclamation
•Conservation
•Land Drainage
•Roads/Parking
•Site Services
•Urban Design
•Landscaping
Further Issues to
be Resolved
Final Land Use &
Traffic Master Plan
Phasing
Programme
Defined Off Site
Infrastructure
Requirements
Building Design
Drawings
Client Policy
Making Body &
Donors
Finance Ministry &
Donors
Public Works Dept.
/ Engineering
Consultants
Marketing Dept. or
Authority
Local Planning
Authority
B3R e c o m m e n d a t I o n s
Further Survey
Requirements
Terms of reference
for Detailed
Surveys:
•Geotechnic
•Geodetic
•Materials
Sketch Design of
Buildings &
FacilitiesDetailed Building
Design:
•Circulation
•Space Needs
•Services
•Expansion
•Evaluation of
Structure &
Materials
Final Building
Designs
Outline
Specification Notes
& Final Cost
Estimate
Adjustments from
Consultation &
Stage 3 Feasibility
Study
Project Master Plan
report
&
Detailed
Development Brief
Final Civil Works
Budget
Survey
Subcontractors
Lands/Survey
Ministry
Construction
Consultants
Outline Detailed Final
Output
Form
Output
User
Preparation of
Overall Training
programme
Define Salary
Scales
Initiate Staff
Recruitment
Finalize M & E
System
Staff Training
Initiated
Agreed Rents,
Tolls, Levies &
Parking Fees
Selection of
Applicants/
Stallholders
Procurement
Scedules
Client Policy
Making Body &
Donors
Finance Ministry &
Donors
Management
Consultants
Private Sector
Investors/Traders
Marketing
Authority/Board
B4R e c o m m e n d a t I o n s
Finalize Market
Procedures
Contract
Documents:
•Drawings/Spec.
•Signed Contract
•Materials Testing
Programme
Define Context:
•Cost Plan
•Materials Supply
•Contract Types
•Phasing Targets
•Pre-qualification
Selection of
Contractors &
Contract Start
Finalize Working
Details
Prepare Training
Material & Pilot
Test Training
Programme
Management
Manual:
•Procedures
•Training
•Accounts
Appointed
Contractors
Design & Super-
vision Consultants
Materials/Equip-
ment Suppliers
Define Training
Recipients
Preparation of
Working Drawings,
Specifications &
Bills of Quantities
for Civil Works
Review Equipment
Needs
Trader/Public
Participation
Design Accounting
System
Agreed Financial
Management
System
Tendering
Procedure:
•Analysis
•Award
Final Equipment
List/Specification
Equipment
Procurement
M & E Guidelines
Trained Staff
Schedule of Tolls &
Levies
Register of
Traders/Leases
Training Body TA
Consultants