Journal and report

90
JOURNAL AND REPORT STUDENT ACTIVITY PRAKERIN STUDY SKILLS PROGRAM MACHINING ENGINEERING NAME : RUSDIANTO NIS/CLASS : 10097825/XI TP 3 ADDRESS : VILLAGE TLAJUNG Hick RT 01/12 KAB. BOGOR SMK Muhammadiyah 1 Cileungsi JL. No orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax. 82480034

Transcript of Journal and report

  • 1. NAME: RUSDIANTONIS/CLASS : 10097825/XI TP 3ADDRESS : VILLAGE TLAJUNG Hick RT 01/12 KAB. BOGORSMK Muhammadiyah 1 Cileungsi JL. No orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax. 82480034

2. I. IDENTITY Name: Rusdianto Place/Date of birth : Bogor/ October 15, 1993 Gender: Male Blood Type:B NIS/Class/Progli: 10097825/XI TP 3 Name of Parent/guardian : Tugiman Address : Rt.1/12 kp. Momonot Tlajung daughter Hillbilly Mountain District No. 18 Bogor Handphone/Telp: 087770063815 Cileungsi, December 11, 2011Signature of student COMPANY IDENTITY (DU / IN) Name of DU / IN : PT. PAMA PERSADA NUSANTARA Bid. / Type of Business : Industrial Address : Jl. Kingdom Narogong km. 23, 8 tower scenic area of industry Name of leader: Personal Mr. Santoso Name of supervisor: Mr. Suhadi Pkl start date: October 11, 2010 Pkl completion date : December 11, 2010 3. APPROVAL SHEETINDUSTRY WORKING PRACTICESSMK MUHHAMMADIYAH 1 Cileungsi "TERAKREDETASI A" CERTIFICATION SHEET BUSINESS / INDUSTRYINDUSTRY WORKING PRACTICESOn this day Monday the 11th of October 2010, Has endorsed the book industryjournal reports of work practices (prakerin) above:Name : RusdiantoNIS / Class / Progli : 10097825/XI TP Engine 3/TeknicThe name Mentioned above to implement work practices in the industry: Name of DU / IN : PT. PAMA PERSADA NUSANTARA Address: Zone Tower Permai Bogor Km 23.8 Cileungsi Start prakerin : On October 11, 2010 Done prakerin: December 11, 2010Knowing the October 11, 2010DU Leader / Supervisor DI industry 4. II. JOURNAL PRAKERINA. INTRODUCTION The purpose of the preparation of journals and reports of students activities Duringthe implementation of industry practices (prakerin) is to increase of the quality andrelevance of vocational high school Muhammadiyah 1 Cileungsi working with businessand industry That covers aspects of the development of moral character , knowledge,skills, arts and health culture. The development of these aspects leads to theimprovement and development of life skille (life skills), the which is realized throughthe achievement of the Standards of Competence. Standard and Basic competence of industry work practices (prakerin) functionalign school curriculum with business and industry, so That students can actualize anddevelop themselves to the world of business and industry. Industry practice for the students can Produce a superior personal character,Abilities and ethics to get along, adaptability, initiative skills, ability to cooperate,ability and skills to work in the company and or independent.B.LEGAL BASISImplementation of industry practices (prakerin) PSG based on: Pancasila and 1945 Constitution. Law No.20 of RI TH.2003 about the national education system GoI Peranturan Th.2005 19, of the National Education Standards. Regulation 22 TH.2006 minister of national education, about the standard ofthe ISI. 5. Regulation No.23 TH.2006 minister of national education, the Standard of Competence Graduates (SKL). Regulation of the Minister of National Education TH.2006 No.24, on the implementation of the ISI standards and SKL on elementary and secondary education units. Decision No. Education Minister. 080? U/1993 of vocational curriculum as follows,"The implementation of education Carried out through two pathways (Link and Match) of school education and special education schools.C.PURPOSEDestination industry working practices so That Learners have the followingcapabilities:1. Understanding and appreciate the business activities and industry.2. Understanding the workplace culture (mental attitude and personality).3. Understand and be Able to use equipment to business and industry.4. Understanding the production process from raw materials to finished goods.5. Understanding the administration / business and industry menegement.6. Have the skills and independence to work and Trying.7. Intertwining relationship the between the school faforable partner institutions.8. The implementation of the learning process in business and industry.9. Introduction and implementation of marketing for prospective graduate students. 6. D. INSTRUCTIONS FOR STUDENT USE1. Students are required to read the entire journal is closely2. Fill in the data / information in accordance with this question journalized3. Standard practice in competency this journal4. Prakerin always taken the time and always maintain the cleanliness of the journal and this report5. Reported after conducting prakerin6. Following the oral examination prakerinE. INSTRUCTIONS FOR USE OF SCHOOL COACH1. Read and appreciate the entire contents of this journal2. Guiding students in filling journals and this report3. Establishing good relations with industry Mentors4. Guiding the students before leaving prakerin5. Students, monitor student progress in place prakerin6. Resolving student problems together7. Responsible or the make a report after students erection prakerin 7. F. COACHS GUIDE FOR INDUSTRIAL USE 1. Working closely with school counselors and teachers in theimplementation of practice 2. Provide support to the implementation prakerin by Providing facilities andmaterial practices 3. Provide guidance and training in accordance with the needs of businessand industry 4. Provide an assessment to students prakerin tailored to the existing format 5. Together with the school signed certificate / recognition Abilities ofstudentsG. STUDENT Code PRAKERIN / PKL 1. Obeying the rules and regulations at the company / business and industry 2. Maintain and uphold the authority of, and Will not do the Things That candestroy religion, schools and parents 3. And always try, to be disciplined, creative and Responsible adultsinofative 4. Well dressed, polite and respectful to everyone 8. 5. Giving Them know (permissions) to the coach industry, if Unable to attend (sick)6. Complete and sign with Their parents sign a statementH. HOPE AFTER PRAKERIN1. Have a noble character and Devotion to the Almighty GOD (Students can Enhance the personality of the which include: accuracy, dexterity, discipline, independence and responsibility)2. Having insight into the world of industry and mental readiness to work independently3. Students can Improve Their standard of competence (life skill to have) a better life skills4. Studentscan Enhance creativity and initiative in learning, work and community 9. STUDENT COUNTER 10. III. Noted the companys organizational structure (owners & responsible person) 11. CHAPTER IINTRODUCTIONA. Company BackgroundPT. PAMA PERSADA NUSANTARA is a company engaged in the field ofnon-oil mining contractor in IndonesiaThat are used Sciences include:1. Basic sciences include: Mathematics engineering, engineering physics, computer programming language, materials engineering structural mechanics, control and automation2. Applied science include: CAD, welding equipment metal industry, machine maintenance, safetyThe problems faced byStudents explore the material in the company of heavy equipment manitenanceand engineering / modification unit. Will the unit be used continuously Damaged ifwithout treatment, so That a unit in the industry requires regular maintenance to bedone periodically to the unit is Damaged and Will not be an obstacle in theproduction process within a company. 12. Purpose and objectives1. The purpose of this report is students writes: a. That the Various Study Often problems occur in the PT. Pama Persada Nusantara, problems. That Often Happen to find a solution based on science That have been studied are: engine maintenance b. Apply the theoretical knowledge obtained paraktek That has been into a real school. c. Helping to find and solve technical and non technical issues in the use and maintenance of heavy equipment in a corporate environment.2. The purpose of this company is students writes: a. Gain experience on the care units of heavy equipment in the companys real, so students get a clearer picture about the Various Things about the world of work is applicable. b. Get a real picture and clearer understanding of the components inside the unit That Is used with care. 13. B. Methods of practical work The method is a way of working systematically to facilitate the implementation of an activity in order to Achieve the specified goals. The method used is: 1) Guidance In this case, the method used to Convey materials mentor That growing niche or learning materials to be oral and written and Mentors to the praktikan work practice field. 2) Observation "The method of observation is an observational research method (review) field Carried out carefully before practice. 3) Interview "This method is a method of research interviews conducted by a researcher to the speaker. 4) Practice "Method of practice is a method of research conducted by a real implementation on the ground. 14. C. SystematicsIn this report, contains about treatments and how to repair, engineering andmodification on the job in general track in PT. PAMA PERSADANUSANTARA.CHAPTER IICOMPANY OVERVIEWA. History of company PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA derivedfrom heavy equipment rental division to its parent company PT United Tractor Tbkis specialized heavy equipment sales and distributors. For many, many famousbrands Such as Komatsu and Nisan. Major shareholder of PT. Astra InternationalTbk, one of the companies in Indonesia. PAMA is one herald mining contractor inIndonesia, where Indonesia has a wealth not inferior to other nations. Against thebackdrop of a solid and constant desire to Improve Their professional and generatecustomer satisfaction, PAMA has grown in Indonesias mining industry, andprovides all the capabilities and services to clients and partners. PAMA is thelargest mining contractor in Indonesia, has done 40% of coal mining spread in partsof Indonesia in 2003. 15. PAMA today operate with many mining regions in Kalimantan andSumatra, the scope of the projects handled include coal mining. Goldmining, construction and removal of soil. Coal mining into business with themajority of 140.68 million cubic meters of bada areas in the mine and Transportedin 2003. In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets includes1028 units of heavy equipment and the number of employees 4316 people, in theconduct of mining with Various conditions in Indonesia, PAMA has gained muchexperience covers all the steps the which have been operating a fare study ofwealth, preproduction, development and production of regular mining construction. PAMA has built a good relationship with his client. With the success ofoperations in the construction and mining projects have been rewarded / rewardwith an extension of negotiations on the repetition of the original mining contract isa commitment to quality reporting PAMA perfect operational flexibility andreliability. PAMA attention to the importance of safety, health and the environment tointroduce the draft PAMA / good design and management system (PSMS) a, thewhich is based on three design Accreditation international recognition, theinternational ONV SEQ Rating System; National Occupatil Safety Association (NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System(MSMS). 16. PAMA also apply seperty management system ISO 9001, ISO 14001, Gren Astracompany (AGC), siystems Management of safety and health (SMK3) PAMAMnagemen Human Resources (PHRM) PAMA production management system(PPMs), Total Productive Mantenance (TPM), With a trainer / instructor with a goodand professional workers and full support from the parent company, PAMA Willcontinue to expand on the overall planning to become a leading contractor in SoutheastAsia.B. Vision and Mission The vision and mission of the PT. Pama Persada Nusantara are as follows:1. Company Vision Being a mining contractor grade world with productivity, enggenering, safety and environmental best.2. Company Mission a. Providing services with the operation of heavy equipment in the field of open andmining overburden That enables subscriber to get the best return on the world stage b. Provide opportunities for employees to develop their competence to measure inobjective c. Providing the best MVA and EVA to shareholders. d. Continually seeks to master the technology and engineering capabilities andenvironmentally sound as well as human safety for the progress of the nation and theState 17. IV. Take note of the manufacturing process (production) and or service1. Unit at the Promontory Priuk pic: GL. Mekanik Activity: mobilisai: Helper mechanical Pic: ExpeditionWelder2. To in yards Cileungsi Activity: part-Genune Activity: Check documents spb.c / ws / n-Local Part Pic : MechanicsSecurity3. The unit Entered the parking lot 8. Running Activity: Lower unit Pic : Mechanical Helper mechanical4. Parking in accordance Activity status model Activity: Set the distance units of the between unit + 15 m Pic : Mechanical5. Completeness and check the condition of the unit Pic-GL. Mechanical Activity: Q.A.L Unit condition Report Recommended part 18. Pic: Fore -GL. mekanik UNIT READY -Logistic -ppc USE / SALEActivity promotion repair cost analysis-DEMO ASIS$ Activity : PromotionDemo 20. V. Take note of the marketing process and marketing areaVI. Take note of the selection process or the hiring of employees1. Identified there (identify Them)2. Develop a position description (explanation of the development of positions)3. Identify the key selection criteria (to identify the key criteria)4. Create the advertis-ment (making the advertisement)5. Paper selection listiny short (forum / paper checks initial selection) 21. 6.Initial screening interview (interview) 7. Psicometric testing (pisicotes) 8. Assessment centers / simulation (removal and simulation) 9. Second / tehnical interview (interview techniques) 10. Reference checking (checking of certificate) 11. Offer (offer) 12. New employees (new hires)4. Note safty equipment for the industry and carry out the work Sefty shoes Sefty helmet Welding gloves Masks Ear plug Ear Muff 22. 5. Take note of the steps in operation any or all of the machines used when prakerin Washing machine P2h (checks, equipment, daily) Prepaire hose to spray water Hose that contain the flow of water put into washing machine hose into the electrical panel legran Turn on the washing machine are marked with green or start To turn off the washing machine or simply press the red button off6. Note raw materials and auxiliary materials used in industry Auxiliary materials WD 40 to remove the rust Sandpaper Thiner Cat Clean and remove rust on electric einer 23. A. Student Activities ReportVII. DAILY ACTIVITY REPORTS STUDENTS competency/topic : Install Bottom Guard DZ 273 type of work : Track/ 12 October 2010 Description of activities Install guard Botom d 375 A. Tools in use: Handle 1 Socket 36 Short Pipe Jack hidroulik Cain blocks Combination Lock 36 Belt How it works: Tie Belt Bottom Guard below, then associate cain blocks mounted on both sides trackshue Lift SLOWLY by turning the crank cain bloks second, after cainblok since hydraulic lift used to help hold the Bottom Guard. After the Bottom Guard lifted use the key combination for installing bolts 36. To Bottom Guard held tight to use a socket 36 and the handle 1 "is already connected to the pipe. 24. competency/topic : Water Refill 1100 pc & installtype of work : radiator hose frames Track/ 12 track/13October 2010Description of ActivityRefill water radiator hose install pc 1100 & framesA. Refill the radiator waterThat tools are used Gallon emptyHow it works: Check the radiator to be objec tanks filled with water Use a gallon to fill the tank of the radiator After Completing the water, cover with a rapid re-radiators the make surethe radiator cap tightly closedB. Install hose framesTools used: The key to pass 36 Container / bucket 25. How it works: Remove the hose by using key frames pass36 Pour the used oil is in the frame That hose into the bucket Attach the new hose using key frames pass 36 competency/topic :Repair batrai cover 273 DZ type of work :track/14October 2010Description of activitiesRepair cover batrai DZ 273Tools used: Sandpaper Sanpolac Isamu (priming) ScrapsWork Airways: Putty using sanpolac dank Will cover the repair ape Flatten the surface using sandpaper cover After the flat surface of the cover, the cover painting by Isamu (priming)and then, paint the cover by using a compressor. 26. competency/topic : Install 273 DZ Bottom Guardtype of work : Track / October 18, 2010Description of ActivityInstall 273 DZ Bottom GuardTools used: Combination Lock 32 Socket 32 Handle 1 TokrainHow it works: Raise the Bottom Guard by using forklift Then attach the bolts and tightened with a socket 32 and the handle to use your 1 "and the combination lock 32 In order to use the bolts are securely attached tokrain and socket 32 27. competency/topic :Cleaning trackling type of work :Track / October 19, 2010Description of ActivityCleaning tracklingTools used: Scraps KatcherHow it works: Clean trackling with using a scrap of land That Sticks Spray trackling using katcher until clean. 28. competency/topic : Repair cover 263 DZtype of work : Track / October 20, 2010Description of ActivityDZ 263 Repair CoverTools used: Sandpaper Sanpolac Isamu (priming) ScrapsHow it works: Putty Will cover the repair by using sanpolac and skarp Flatten the surface using sandpaper After the flat surface of the cover, the cover painting by Isamu(priming) Then paint the cover by using a compressor 29. competency/topic : Cleaning tracklingtype of work : Track / 21-22 October 2010Description of ActivityCleaning tracklingTools used: Scraps KatcherHow it works: Clean trackling with using a scrap of land That Sticks Spray trackling using katcher until clean. 30. competency/topic : Final checks DZ unitstype of work : Track / 25 October to 1 November 2010Description of activitiesFinal checks DZ unitsA. Refill oil dozer unitsTools used: Pumps Jerry cansHow it works: Open the lid dozer oil tank and pour the oil from the pump using the supplied jerrycans Clean the work area of oil spills by using SawdustB. Painting Dozer unitTools used: CompressorsHow it works: Close the glass cabin units by using paper That Is not exposed to paint Spray the unit to average Dozer and tidy. 31. competency/topic : Remove install sprocket D-375 Atype of work : Track / 03-04 November 2010Description of ActivityRemove sprocket install D-375 ATools used: Socket 46 Handle 1 Rechet Power raint Short PipeHow it works:A. Remove sprocket Loosen the bolts are tight by using the power raint already connected witha short pipe with a socket 46 After the bolt is loose for easy to use handles and sockets 46 32. competency/topic : Cleaning trackling type of work : Track / November 5, 2010Description of ActivityCleaning TracklingTools used: Scraps KatcherHow it works: Clean trackling with using a scrap of land That Sticks Spray trackling using katcher to clean 33. competency/topic :Install the cover undercarige type of work :Track / November 6, 2010Description of ActivityInstall cover undercarigeTools used: Combination Lock 30 Socket 30 Handle 1 How it works: Attach the cover to undercarige already repaired Replace the which the bolts 30 are provided using a combination lock 30 In order to use the bolts are securely attached socket 30 and handle 1 Painting undercarige up neatly 34. competency/topic : Drain the transmission oiltype of work : Track / November 10,2010Description of activitiesDrain transmission oilTools used: Key L 5 Containers Pumps Sawdust StocksHow it works: Remove the transmission oil cap and provided input into the bucket Fill the tank using a transmission with new oil pump to taste Clean the area of the former oil spills by using Sawdust and cleancotton waste 35. competency/topic :Removeinstall hose assy frame type of work :Track / November 11,2010Description of ActivityRemove install hose assy frameTools used: Combination Lock 36How it works: Remove the hose frame to be removed using the pass key 36 Then attach the new hose That frames have been made available usingpass key 36 competency/topic : Dasboard INNERCABIN type of work : Track / 12-13 November 2010Description of activitiesDasboard InnercabinTools used: Stocks Sekrap and Thinner 36. How it works: Wipe the glass cabin with clean cotton waste if Necessary use paint thinner to moisten the dust cloth and then clean the glass cabin If there is old paint / rust scrap use and clean with dust cloth moistened with paint thinner competency/topic : Repair cover undercarige type of work : Track /November 15 , 2010Description of ActivityReapir cover undercarigeTools used: Sandpaper Sanpolac Isamu priming Spatula Combination Lock 30 & 24 Socket 30 & 36How it works:Putty That Will undercarige repaired using sanpolac and putty knife Flatten the surface using sandpaper cover After the flat surface of the cover, the cover painting by Isamu 37. Then painting the cover with compressed After the cover undercarige pairs nicely painted cover with a combinationlock to use your 30 & 36 and rechet competency/topic :Completed bolt cover enggine type of work :Track / November 16,2010Description of ActivityCompleted bolt cover undercarigeTools used: Combination Lock 19 Socket 19 RechetHow it works: Replace the bolt That Had been cleaned using a wire brush and container. Tighten the lock bolt by using a combination of 19 In order to use the bolt is securely attached to the socket 19 and rechet. 38. competency/topic :Install 273 DZ hidllertype of work :Track / November 17,2010Description of activityInstall 273 DZ hidllerTools used: Handle 1 Socket 30 Rechet Tokraint extencaint How it works: Attach hidller ready, to undecarige by using forklift After hidller installed correctly, enter the bolts That have been cleaned first, then Tighten using the socket handle and advance to more easily use rechet to tighten the bolts After the bolts tight, use the function tokrain tighten bolts in accordance with the size 39. competency/topic : Painting Standtype of work : Track / 20-22 November 2010Description of activityPainting boothTools used: Pilok Duct Tape Cater Cat SekrapHow it works: Clean the stand by using scrap until blended ago Paint booths with red paint After the paint is dry use the duct tape and cater for the load stand identityand then use paint to paint the identity of the load pilok stand 40. competency/topic :Install the sprocket 273 DZtype of work :Track / 23-24 september2010Description of activityInstall sprocket 273 DZThat tools are used: Tokraint Handle Socket 36How it works: Attach tith frameundercarige sprocket to 36 and insert the supplied bolt and tighten the bolt using a socket 36 and handle After the bolt tight to fit a standard bolt mounted using tokrait and socket 36. 41. competency/topic : Cleaning tracklingtype of work : Track / 25-26 November 2010Description of ActivityCleaning TracklingTools used: Skap KatcherHow it works: Clean trackling by using a scrap of land That Sticks Spray trackling by using katcher until clean. 42. competency/topic :PSMS (painting workshop)type of work :Track /Novemeber 29 - December 1, 2010Description of activitiesPSMS (painting workshop)Tools used: BrushHow it works: Mix the paint with a thiner then stirred with a flat Painting workshop clean and tidy. 43. competency/topic : Refill diesel units Dozertype of work : Track / 2-4 December 2010Description of activitiesRefill diesel units DozerTools used: PumpsHow it works: Open the tank lid and fill with diesel fuel That has been providedusing the pump Fill the tank if there is enough diesel fuel is spilled IMMEDIATELYclean by using Sawdust That has been provided. 44. competency/topic : Install the cover undercarigetype of work : Track / 5-9 December 2010Description of ActivityInstall cover undercarigeTools used: Combination Lock 30 Socket 30 Handle 1 How it works: Attach the cover to undercarige already repaired Replace the which the bolts 30 are provided using a combination lock 30 In order to use the bolts are securely attached socket 30 and handle 1 Painting undercarige up neatly 45. competency/topic : Washing unit Dozertype of work : Track / 10-11 December 2010Description of ActivityWashing unit DozerTools used: Scraps KatcherHow it works: Clean trackling with using a scrap of land That Sticks Spray trackling using katcher until clean. 46. Format prakerin student assessment (PSG)(Assessment by supervisor)Name of companyAddressNo aspect of the assessmentvaluea. Aspects of personality 1. Attitudes and behavior 80 2. Presence attendance / discipline 88 3. Initiative and creative ability74 4. Motivation and responsibili95 5. Mental readiness in working85 47. b. Aspects of competence 1. Timeliness of work completed85 2. Quality of work 80 3. Knowledge of75 4. The timing of the prakerin78 5. Knowledge of machining85 6. Knowledge of production process 87 7. Read engineering drawings 85 8. The use of machining80 9. Number of values1007 The average value82,85 Pass both the 48. I. IDENTITY Name : Anggra Rivaldi Place / Date of birth: Bekasi Augustus 22, 1994 Gender : Male Blood Type :- NIS / Class / progli : 10097662/XI TP 2 Name of parent / guardian: Arief sutandi Address: Rt 02/05 kp. babakan, ds. DayeuhKec. Cileungsi Kab. Bogor No HP / Tel: 02126724528 Cileungsi, December 11, 2011Signature of student 49. COMPANY IDENTITY (DU / IN)Name of DU / IN : PT. PAMA PERSADA NUSANTARABid. / Type of Business : IndustrialAddress : Jln. Kingdom Narogong km.23, 8 towerscenic area of industryTel / fax :Name of leader: Personal Mr. SantosoName of supervisor: Mr. SamsudinPkl start date: 11 October 2010Pkl completion date : December 11, 2010 50. STUDENT COUNTER 51. CHAPTER IICOMPANY OVERVIEWA. History of company PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMAderived from heavy equipment rental division to its parent company PT UnitedTractor Tbk is specialized heavy equipment sales and distributors. Formany, many famous brands Such as Komatsu and Nisan. Major shareholder ofPT. Astra International Tbk, one of the companies in Indonesia. PAMA is one herald mining contractor in Indonesia, where Indonesia hasa wealth not inferior to other nations. Against the backdrop of a solid andconstant desire to Improve Their professional and generate customersatisfaction, PAMA has grown in Indonesias mining industry, and provides allthe capabilities and services to clients and partners. PAMA is the largestmining contractor in Indonesia, has done 40% of coal mining spread in parts ofIndonesia in 2003. PAMA today operate with many mining regions inKalimantan and Sumatra, the scope of the projects handled include coalmining. Gold mining, construction and removal of soil. Coal mining intobusiness with the majority of 140.68 million cubic meters of bada areas in themine and Transported in 2003. 52. In 2003, PAMA earn income above U.S. $ 320 million. PAMA assetsincludes 1028 units of heavy equipment and the number of employees 4316people, in the conduct of mining with Various conditions in Indonesia, PAMAhas gained much experience covers all the steps the which have been operatinga fare study of wealth, preproduction, development and production of regularmining construction. PAMA has built a good relationship with his client. Withthe success of operations in the construction and mining projects have beenrewarded / reward with an extension of negotiations on the repetition of theoriginal mining contract is a commitment to quality reporting PAMA perfectoperational flexibility and reliability. PAMA attention to the importance of safety, health and the environment tointroduce the draft PAMA / good design and management system (PSMS) a,the which is based on three design Accreditation international recognition, theinternational ONV SEQ Rating System; National Occupatil Safety Association( NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System(MSMS). PAMA also apply seperty management system ISO 9001, ISO14001, Gren Astra company (AGC), siystems Management of safety andhealth (SMK3) PAMA Mnagemen Human Resources (PHRM) PAMAproduction management system (PPMs), Total Productive Mantenance (TPM),With a trainer / instructor with a good and professional workers and fullsupport from the parent company, 53. PAMA Will continue to expand on the overall planning to become a leading contractor in Southeast Asia.B. Vision and Mission The vision and mission of the PT. Pama Persada Nusantara are as follows:1. Company Vision Being a mining contractor grade world with productivity, enggenering, safety and environmental best.2. Company Missiona. Providing services with the operation of heavy equipment in the field of open and mining overburden That enables subscriber to get the best return on the world stageb. Provide opportunities for employees to develop their competence to measure in objectivec. Providing the best MVA and EVA to shareholders.d. Continually seeks to master the technology and engineering capabilities and environmentally sound as well as human safety for the progress of the nation and the State 54. III. Noted the companys organizational structure (owners & responsible person) 55. IV. Take note of the manufacturing process (production) and or service 1.Unit at the Promontory Priuk pic: GL. Mekanik Activity: Mobilisai: - Helper mechanical Pic : Expedition welder2. To in yards Cileungsi Activity: part-Genune Activity: Check documents spb.c / ws / n-Local Part Pic : Mechanics security3. The unit Entered the parking lot 8. Running Activity: Lower unit Pic : Mechanical Helper mechanical4. Parking in accordance Activity status model: Activity: Set the distance units of the between unit + 15 m Pic : Mechanical 56. 5. Completeness and check the condition of the unit Pic-GL. Mechanical Activity: Q.A.L Unit condition report Recommended part Pic : Fore - GL.mekanik UNIT READY -Logistic - ppc USE / SALE Activity promotion repair cost analysis DEMOASIS$Activity: PromotionDemo 59. V. Take note of the marketing process and marketing area 60. VI. Take note of the selection process or the hiring of employees 1.Identified there (identify Them) 2. Develop a position description (explanation of the development of positions) 3. Offer (offer) 4. Identify the key selection criteria (to identify the key criteria) 5. Create the advertis-ment (making the advertisement) 6. Paper selection listiny short (forum / paper checks initial selection) 7. Initial screening interview (interview) 8. Psicometric testing (pisicotes) 9. Assessment centers / simulation (removal and simulation) 10. Second / tehnical interview (interview techniques) 11. Reference checking (checking of certificate) 12. New employees (new hires)4.Note safty equipment for the industry and carry out the work Sefty shoes Sefty helmet 61. Welding gloves Masks Ear plug Ear Muff5. Take note of the steps in operation any or all of the machines used when prakerin Washing machine P2h (checks, equipment, daily) Prepaire hose to spray water Hose that contain the flow of water put into washing machine Put hose into the electrical panel legran Turn on the washing machine are marked with green or start To turn off the washing machine or simply press the red button off6. Mencatat raw materials and auxiliary materials used in industry Auxiliary materials WD 40 to remove the rust Sandpaper Thiner Cat Clean and remove rust on electric einer 62. VII. DAILY ACTIVITY REPORTS STUDENTSStudent Activities ReportNo. DAY / DATE TYPE OF ACTIVITY1. 11-14 October 2010 : > p5m (talk five minutes)> Cleaning grader2. 15 October 2010: > Cleaning blade> Cleaning propeller of a pile of oil> Open the hose auto lube3. 16 October 2010: > Break> Cleaning system on the grader over 233 units> Cleaning Minning plate> Cleaning sap4. 18 October 2010: > 233 unit graders cabin cleaning> Sand the cover unit 233 Grader5. 19 October 2010: > Clean the filter> Sand the cover unit 233 Grader 63. 6. 20 Octobe, 2010 : > Cleaning the tandem > Attach nipple grase7. 21 October 2010 : > Cleaning and wrap it over breakesystem demean plastic wrap8. 22 October 2010 : > Sand the front as 233 units graders9. 25 October 2010 : > Pump oil pump chain tandem with Install the nuts10. 26 October 2010: > Replacing the wheel and tire unit 233 Grader > Cleaning the glass cabin 233 unit graders11. 27 October 2010: > Cleaning the glass cabin unit 233 Grader : > Suck the oil in 233 unit graders because of leakages in sap / breaking system12. 28 October 2010: > Painting cabin units graders > Sucking oil > Grader unit 23313. 01 November 2010 : > Cleaning air from red silicon tandem > Cleaning the red rings on silicon > Sand the tandem unit 233 Grader > Sand tendem chain 64. 14. 2-4 November 2010 : > Placing and open tire unit 233 Grader > Installing over breaking the system15. 5 November 2010: > Cleaning the glass cabin16. 6 November 2010: > Transmission oil change on a 233 unit graders17. 8 November 2010: > Put nuts guard fh 16 > Remove the site operator fh 1618. 9 November 2010: > Scrap skotlet fh 16 : > Fill the oil tendem 233 unit graders19. 10 November 2010 : > Filling oil tendem > Install the plate on the sap : > Install tire Grader 233 : > Painting graders hose 23320. 11 November 2010 : > Sand the chassis / cab fh 16 : > Support painting cabin fh 1621. 12 November 2010 : > Cleaning covers fh 16 65. 22. 13 November 2010 : > Support graders painting cabin 266 > Clean the work area / bays23. 14 November 2010 : > Sand the door Grader 266 > Cleaning the area24. 15 November 2010 : > Rreleasing water separator / filter fh 16 > Painting the cover fh 1625. 18 November 2010 : > Cleaning water separator FH 16 > Painting water separator fh 16 > Filling diesel water separator fh 16 > Cleaning the chain graders tendem 27726. 19 November 2010 : > 266 painting door graders27. 22 November 2010 : > 266 washing graders28. 23 November 2010 : > 266 painting door graders29. 24 November 2010 : > 266 washing graders > Fix the cylinder riper30. 25 November 2010 : > Rreplacing the valve WL > Riper GR-fixing cylinder 266. 66. 31. 26 November 2010 : > Fixing cylinder 266 riper GR32. 29 November 2010 : > Attach hose cylinder > Clining area33. 30 November - 3 December : > After finish the workshop area > Support unit parking34. 4 December 2010: > Cannibal mud guard fh 1635. 6 December 2010: > Release the piping > Releasing electrically ct system (crane truck) 01836. 8 December 2010: > Moving cabin ct (truck crane) 01837. 9 December 2010: > Release unit of a crane truck covers 018 > Cleaning cabins ct (truck crane) 01838. 10 December 2010 : > washing cabin ct (truck crane) 018 > washing cover (truck crane) 01839. 11 December 2010 : > Washing engine ct (truck crane) 018 > Clening area ct (truck crane) 018 67. Format prakerin student assessment (PSG)(Assessment by supervisor)Name of companyAddressNo aspect of the assessmentValuea. Aspects of personality1. Attitudes and behavior802. Presence attendance / discipline803. Initiative and creative ability 754. Motivation and responsibility 755. Mental readiness in working 75 68. Valueb. Aspects of competence 1. Timeliness of work completed75 2. Quality of work 75 3. Knowledge of safety 70 4. The timing of the prakerin80 5. Knowledge of machining75 6. Knowledge of production process 78 7. Read engineering drawings 70 8. The use of machining70Number of values the average valuePass both the 69. IDENTITYName: WAHYUDINPlace / Date of birth : Bogor December 12, 1993Gender: MaleBlood Type:ANIS / Class / progli: 10097857/XI tp 3Name of parent / guardian : NasanAddress : Kp. Walahir Rt. 07/ 04 Ds. Nambo Kec. KlapanunggalNo HP / Tel : 085714211271Cileungsi, December 11, 2011 Signature of student 70. COMPANY IDENTITY (DU / IN)Name of DU / IN : CV. RIZKY JAYA PERSADABid. / Type of Business : -Address : Jln. Pesantren Ds. Pasir angin Rt 01/05 Pasir angin, Cileungsi, BogorTel / fak : (021) 82498741, 82498640Name of leader: Mr. Waliyadi I Adnan. STName of supervisor: Mr. TonyPkl start date: July 27, 2010Pkl completion date : October 26, 2010 71. Student Counter 72. III. Noted the companys organizational structure (owners & responsible person) 73. NOTE THE PREPARATION WORK AND K 31. Record the steps or preparatory work has not Following the directives of the leadership of the company Making planning what work will be done Preparing sefty2. Noting industrial machines that are used the following function M / c Tool =) make the goods according to customer perrmintaan (corresponding image) M / c scrap =) make / take over the plate thickness of 1 mm M / c milling =) Make goods according to customer demand (corresponding image) M / c grinding surface =) make the goods to be fine (go to precision measurements) Mic weld =) welding / connect between the plate3. Take note of the following hand tools in the industry functions Hand grinding machine (smooths rough objects) Stingy (smooths rough objects) Sandpaper (removing rust and dirt) 74. 4. Noting sefty equipment for the industry and carry out the work Gloves (to avoid minor cuts / scrapes hand) Masks (avoid dust) Helmet (avoiding impact in the head) Glass eyes (avoid dirt / dust) Shoes (to protect feet)5. Take note of the steps in operate any or all of the machines used when prakerin Lathes Reading working drawings Preparation tool and the workpiece Operation lathes Put the material into a machine with a fast dibble On the dial (should be straight) Prepare a chisel Turn the key on 75. 6. Record the raw materials and auxiliary materials used in industry Material 400 ss Material s 45 c Material SKD 11 Material VCN Material pvc Material crethane Material mc blue Material credits 304 (stainless)7. Take note of the manufacturing process (production) and or service Machining of materials The process of cutting Lathe process Milling process Cnc process 76. 8. Notes the marketing process and marketing area Costumer PT. Yamaha PT. VTE PT. Sanyo PT. Winteq PT. Toyota t huso9.Record the employee selection process or acceptance hiresJobs - (notably, the Internet) - (Directly in the test on the machine in their respective fields)Interview salary + placementmachine 3 - month trialContract 1 yearAGENDA NOTE TO MAKE WORK1. 27 Juli 2010: > Grinding components gaspan > Clean pvc news 77. 2. 28 July 2010 : > Attach the clamp bolts> Paint the gutters 5 assy line 7> Install cables3. 29 July 2010 : > Grinding plate t-2> Grinding pvc-news> Install clamp bolt4. 30 July 2010 : > Grinding plate> Install adjuster-plate> Install clamp bolt5. 02 August 2010 : > Clean test jigli> Painting the carrier> Grinding plate6. 03 August 2010 : > Cutting oil gaspan> Pressing oil gaspan7. 04 August 2010 : > Sand the bushing or ring> Sand the pin> Sand the shim ute> Grinding oil gaspan 78. 8. 05 August 2010 : > Grinding oil containment secodry collector> Clean the bushing / rings9. 06 August 2010 : > Grinding components gaspan> Welding components gaspan> Lathe gaspan round d = 40510. 09 August 2010: > Sand the pin> Welding components gaspan> Sand the rounded gaspan d = 40510 August 201011. 10 August 2010: > Drilled components gaspan> Lathe gaspan round d = 40512. 11 August 2010: > Weld components gaspan> Grinding carier13. 12 August 2010: > Sand component gaspan> Grinding carier> Cut pindal 1314. 13 August 2010: > Weld carier> Grinding carier 79. 15. 16 August 2010 : > a lathe bushing or ring > Sand the pin16. 18 August 2010 : > Grinding carier > Cut the plate (m / c cutt whell) > Cut The Iron (M / C Cutt Whell) > Grinding iron17. 19 August 2010 : > a lathe bolts d = 9. 40 > Grinding plate > Drill the plate d = 618. 20 August 2010 : > Cut the pvc (m / c jig saw) > Drilled pvc (m / c drill)19. 23 August 2010 : > Lathe bolts d = 9. 40 > Grinding plate t = 2 > Sand the plate t = 220. 24 August 2010 : > Install adjuster plate > Lathe bolts d = 9. 4021. 25 August 2010 : > a lathe bolts d = 9.40 > Sand the bushing / rings22. 26 August 2010 : > Cut the plate t = 2 > Grinding plate t = 2 > Gluing acrylic saind bord 80. 23. 27 August 2010: > a lathe bolts d = 9.40> Pressing gaspan box24. 30 August 2010: > Gluing pvc news> Grinding pvc news> Clear pvc news25. 31 August 2010: > a lathe pin> Improving the welding transformer 22026. 01 September 2010 : > Repair welding transformer 220> Improving the ac outlet27. 02 september 2010 : > lathe bolts d = 9.40> Cut round gaspan28. 03 september 2010 : > Cut plate> Grinding plate> Drill the plate d = 1029. 16 September 2010 : > to cut iron> Grinding of iron> Sand box gaspan> Clean the box gaspan 81. 30. 17 september 2010 : > Sand the pin> Sand box gaspan31. 20 september 2010 : > Drilled pvc> Sand box gaspan32. 21 september 2010 : > Drilled pvc> Sand box gaspan33. 22 september 2010 : > Cut the iron> Grinding of iron> Cut the plate (m / c cutt whell)> Grinding plate34. 23 september 2010 : > Oil pressing gaspan35. 24 september 2010 : > Gluing pvc news> Grinding pvc news> Cut the clear rubber36. 27 September 2010 : > Gluing pvc news: > Clear pvc news37. 28 September 2010 : > Gluing pvc news> Clear pvc news> Cut the clear rubber 82. 38. 29 september 2010 : > Grinding oil gaspan> Gaspan oil sand> Filing pin39. 30 september 2010 : > Gaspan oil sand> Clean up oil gaspan40. 01 october 2010 : > Sand component gaspan> Pressing oil gaspan> Filing pin41. 04 october 2010 : > Install pvc> Clean the grinding machine42. 05 october 2010 : > Grinding oil gaspan> Gaspan oil sand> Drill carrier43. 06 october 2010 : > Clean carrier> Gaspan oil sand> Lathe vacuum tank assy44. 07 october 2010 : > Cleaning jig cover uder> Clean the jig side cover 3> Clean the jig sped meters45. 08 october 2010 : > Cutting plate> Grinding plate> Sand the pin 83. 46. 13 October 2010 : > Cut pvc (m / c mosque s)> Sand box gaspan> Cut the plate47. 14 october 2010 : > Cut pvc (m / c jig saw)> Sand box gaspan48. 15 October 2010 : > Gaspan sand box> Cut the pin (m / c jig saw)> Sand the pin (m / c lathe)49. 18 october 2010 : > Grinding carier> Help make the carrier50. 19 October 2010 : > Helped make the carrier>Grinding carier> Gaspan oil sand51. 20 October 2010 : > Helped improve the milling machine> Grinding oil gaspan> Gaspan oil sand 84. 52. 21 October 2010 : > Helped make the carrier> Lathe pin> Drilled pvc (m / c drill)53. 25 october 2010 : > Cutting pin (m / c jig saw)> Cut the pvc (m / c jig saw)54. 26 October 2010 : > Cut pvc (m / c jig saw)> Cut acrylic (m / c jig saw) 85. Format prakerin student assessment (PSG)(Assessment by supervisor)Name of companyAddressNo aspect of the assessmentvaluea. Aspects of personality1. Attitudes and behavior922. Presence attendance / discipline913. Initiative and creative ability 954. Motivation and responsibility 955. Mental readiness in working 95 86. b. Aspects of competence 1. Timeliness of work completed90 2. Quality of work 90 3. Knowledge of safety 89 4. The timing of the prakerin89 5. Knowledge of machining89 6. Knowledge of production process 89 7. Read engineering drawings 89 8. The use of machining82 9. Number of values1.175The average valuePass both the