JAM OPERASI PLTU PANGKALAN SUSU.docx

5
JAM OPERASI PLTU PANGKALAN SUSU 1st SINKRON s/d COD 1st SINKRON COD JAM OPERASI UNIT 1 10/4/2014 8/20/2015 3, 136.28 UNIT 2 7/21/2014 7/14/2015 3, 408.08 COD s/d 31 Des 2015 COD 31 Des 2015 JAM OPERASI UNIT 1 8/20/2015 12/31/2015 2, 412.53 UNIT 2 7/14/2015 12/31/2015 3, 085.57 1-januari-2016 s/d Rencana FYI (UPK KITSUM 2) JAM OPERASI UNIT 1 1/1/2016 5/20/2016 3, 185.50 UNIT 2 1/1/2016 3/15/2016 1, 399.73 1-januari-2016 s/d Rencana FYI (P3BS) JAM OPERASI UNIT 1 1/1/2016 9/22/2016 6, 185.50 UNIT 2 1/1/2016 7/20/2016 4, 447.73 TOTAL JAM OPERASI 1st SINKRON s/d FYI UPK KITSUM 2 P3BS UNIT 1 8,734.32 11,734.32

Transcript of JAM OPERASI PLTU PANGKALAN SUSU.docx

Page 1: JAM OPERASI PLTU PANGKALAN SUSU.docx

JAM OPERASI PLTU PANGKALAN SUSU

1st SINKRON s/d COD1st SINKRON COD JAM OPERASI

UNIT 1 10/4/2014 8/20/2015 3,136.28UNIT 2 7/21/2014 7/14/2015 3,408.08

COD s/d 31 Des 2015COD 31 Des 2015 JAM OPERASI

UNIT 1 8/20/2015 12/31/2015 2,412.53UNIT 2 7/14/2015 12/31/2015 3,085.57

1-januari-2016 s/d Rencana FYI (UPK KITSUM 2)JAM OPERASI

UNIT 1 1/1/2016 5/20/2016 3,185.50UNIT 2 1/1/2016 3/15/2016 1,399.73

1-januari-2016 s/d Rencana FYI (P3BS)JAM OPERASI

UNIT 1 1/1/2016 9/22/2016 6,185.50UNIT 2 1/1/2016 7/20/2016 4,447.73

TOTAL JAM OPERASI 1st SINKRON s/d FYIUPK KITSUM 2 P3BS

UNIT 1 8,734.32 11,734.32UNIT 2 7,893.38 10,941.38

Page 2: JAM OPERASI PLTU PANGKALAN SUSU.docx

UNIT1

MULAI SINKRON JAM GANGGUAN KETERANGAN GANGGUAN (FO OMC)

1Sabtu, 14-02-2015 jam 15:33

Sabtu, 14-02-2015 jam 17:43 TRIP (FO OMC) pada beban 132 MW (MFT - all FDF TRIP, diawali oleh TRIP APH)

2/14/2015 15:13 2/14/2015 17:43 2.50

2Selasa, 17-02-2015 jam 21:13

Rabu, 01-04-2015 jam 21:41 TRIP (FO OMC) pada beban 151 MW, MFT TRIP (OVER SPEED)

2/17/2015 21:13 4/1/2015 21:41 1,032.47 semua Mill dan PA fan trip, unit sempat house load 15 MW kemudian generator TRIP, SST TRIP, Info UPB : ada 3 Tower SUTET 275 kv PSU-Binjai roboh

3Sabtu, 04-04-2015 jam 11:38

Minggu, 05-04-2015 jam 04:11 TRIP (FO OMC) pada beban 180 MW, MFT TRIP (OVER SPEED)

4/4/2015 11:38 4/5/2015 4:11 16.55 Transmisi 275 kv BINJAI-PKLSU TRIP (Gangguan Hubung Singkat 2 phasa RS SUTT 150 kv Binjai-Brandan)

4Senin,28-09-2015 jam 19:16

Rabu, 30-09-2015 jam 14:40 TRIP (FO OMC)

9/28/2015 19:16 9/30/2015 14:40 43.40 Gangguan luar, GI Binjai gangguan CT (black out SBU)

5Minggu, 17-01-2016 jam 18:34

Rabu, 20-01-2016 jam 07:15 TRIP (FO OMC) , Black out sistem

1/17/2016 19:16 1/20/2016 7:15 59.98 Gangguan Transmisi 150 kv Belawan-Binjai, rupture disk unit 1 pecah1154.90

Page 3: JAM OPERASI PLTU PANGKALAN SUSU.docx

UNIT 2

MULAI SINKRONJAM GANGGUAN KETERANGAN GANGGUAN (FO OMC)

1Kamis, 2-10-2014, jam 17:59

Sabtu, 04-10-2014, jam 19:40 TRIP (FO OMC) (gangguan dari luar) relay Restrictive Eart Fault (REF) di GT bekerja (arus tak seimbang)

10/2/2014 17:59 10/4/2014 19:40 49.68

(relay REF bekerja, gangguan Penghantar 150 KV P.Brandan-Langsa 1,2 trip, sistem Aceh-Sumut terpisah). Proteksi UFR tahap 5 kerja, PLTU Nagan Raya 2 TRIP, Aceh blackout, menyebabkan GTU aktif dan Generator trip, kemudian Turbin dan Boiler trip, Seharusnya relay ini tidak bekerja pada saat kondisi tersebut. Penyebabnya adalah kesalahan pengkabelan di terminal panel proteksi

2Kamis, 11-12-2014, jam 4:50

Kamis, 11-12-2014 jam 21:45 (FO OMC) TRIP pada beban 170 MW ( ETS Over speed,SST lepas) gangguan luar, PMT 275 KV Binjai-PSU trip

12/11/2014 4:50 12/11/2014 21:45 16.92 Distance fasa R kerja, CB 6B2&6AB2 lepas sehingga unit tidak bisa transfer beban ke sistem, PMT 275 KV Binjai-PSU trip kedua sisi, indikasi DR Z1 phasa R AR lock out, fault locator 35,06 km

3Selasa, 17-02-2015 jam 21:13

Kamis, 26-03-2015 jam 23:29 Tower SUTET 275 kv PSU-Binjai roboh

2/17/2015 21:13 3/26/2015 23:29 890.27 Menuunggu perbaikan tower SUTET 275 kv P.Susu -Binjai selesai di perbaiki

4Minggu, 17-01-2016 jam 18:34

Senin, 01-02-2016 jam 23:17 (FO OMC) , Black out sistem

1/17/2016 18:34 2/1/2016 23:17 364.72 Gangguan Transmisi 150 kv Belawan-Binjai, rupture disk unit 2 pecah 1,321.58