KEGIATAN : PEMBANGUNAN GEDUNG KANCA (KANTOR CABANG) PERKERJAAN : PEMBANGUNAN GEDUNG KANTOR CABANG PT. BRI (PERSERO) Tbk. LHOKSEUMAWE LOKASI : KOTA LHOKSEUMAWE TAHUN : 2015 1 3 4 5 6 PEKERJAAN STRUKTUR 1 Balok Praktis Lantai I - Beton K-300 M3 0.962 1,540,000.00 Rp 1,482,180.70 Rp - Besi Beton KG 257.700 15,435.00 Rp 3,977,599.43 Rp - Bekisting M2 14.807 169,522.50 Rp 2,510,119.66 Rp 2 Tangga Utama Lantai 2 - Beton K-300 M3 3.159 1,540,000.00 Rp 4,864,860.00 Rp - Besi Beton KG 392.917 15,435.00 Rp 6,064,677.77 Rp - Bekisting M2 20.397 169,522.50 Rp 3,457,750.43 Rp 3 Beton Topi-topi Lantai I - Beton K-300 M3 2.056 1,540,000.00 Rp 3,165,624.00 Rp - Besi Beton KG 56.333 15,435.00 Rp 869,493.31 Rp - Bekisting M2 25.124 169,522.50 Rp 4,259,083.29 Rp 4 Beton Topi-topi Lantai II - Beton K-300 M3 2.502 1,540,000.00 Rp 3,853,080.00 Rp - Besi Beton KG 68.566 15,435.00 Rp 1,058,314.98 Rp - Bekisting M2 30.580 169,522.50 Rp 5,183,998.05 Rp 5 Beton Janggutan (Balok Teras Depan) - Beton K-300 M3 1.320 1,540,000.00 Rp 2,032,800.00 Rp - Besi Beton KG 144.432 15,435.00 Rp 2,229,313.85 Rp - Bekisting M2 18.800 169,522.50 Rp 3,187,023.00 Rp TOTAL 48,195,918.46 Rp Dibuat Oleh PT. ELEKTRINDO ARTHA PRATAMA ACHMAD NOFEL Project Manager BILL OF QUANTITY Uraian Pekerjaan 2 No. Sat. Volume HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

description

ewr3r232r

Transcript of Item Tambahan

  • KEGIATAN : PEMBANGUNAN GEDUNG KANCA (KANTOR CABANG)

    PERKERJAAN : PEMBANGUNAN GEDUNG KANTOR CABANG PT. BRI (PERSERO) Tbk. LHOKSEUMAWE

    LOKASI : KOTA LHOKSEUMAWE

    TAHUN : 2015

    1 3 4 5 6

    PEKERJAAN STRUKTUR

    1 Balok Praktis Lantai I

    - Beton K-300 M3 0.962 1,540,000.00Rp 1,482,180.70Rp

    - Besi Beton KG 257.700 15,435.00Rp 3,977,599.43Rp

    - Bekisting M2 14.807 169,522.50Rp 2,510,119.66Rp

    2 Tangga Utama Lantai 2

    - Beton K-300 M3 3.159 1,540,000.00Rp 4,864,860.00Rp

    - Besi Beton KG 392.917 15,435.00Rp 6,064,677.77Rp

    - Bekisting M2 20.397 169,522.50Rp 3,457,750.43Rp

    3 Beton Topi-topi Lantai I

    - Beton K-300 M3 2.056 1,540,000.00Rp 3,165,624.00Rp

    - Besi Beton KG 56.333 15,435.00Rp 869,493.31Rp

    - Bekisting M2 25.124 169,522.50Rp 4,259,083.29Rp

    4 Beton Topi-topi Lantai II

    - Beton K-300 M3 2.502 1,540,000.00Rp 3,853,080.00Rp

    - Besi Beton KG 68.566 15,435.00Rp 1,058,314.98Rp

    - Bekisting M2 30.580 169,522.50Rp 5,183,998.05Rp

    5 Beton Janggutan (Balok Teras Depan)

    - Beton K-300 M3 1.320 1,540,000.00Rp 2,032,800.00Rp

    - Besi Beton KG 144.432 15,435.00Rp 2,229,313.85Rp

    - Bekisting M2 18.800 169,522.50Rp 3,187,023.00Rp

    TOTAL 48,195,918.46Rp

    Dibuat Oleh

    PT. ELEKTRINDO ARTHA PRATAMA

    ACHMAD NOFEL

    Project Manager

    BILL OF QUANTITY

    Uraian Pekerjaan

    2

    No. Sat. VolumeHARGA SATUAN

    (Rp)JUMLAH HARGA (Rp)

  • PEKERJAAN STRUKTUR

    P1 P2 L1 L2 T

    1 2 3 4 5 6 7 8 9 10 11 13

    1 Balok Praktis Lantai I 56.95 0.13 0.13 0.962 M3

    - Beton K-300 0.962 M3

    - Besi Beton 257.700 Kg

    - Bekisting 14.807 M2

    2 Tangga Utama Lantai 2

    - Plat Tangga 7.28 1.50 0.15 1.638 M3

    - Plat Bordes 3.10 1.50 0.15 0.698 M3

    - anak Tangga 20 0.30 1.50 0.18 0.824 M3

    3.159 M3

    - Beton K-300 3.159 M3

    - Besi Beton 392.917 Kg

    - Bekisting 20.397 M2

    3 Beton Topi-topi Lantai I 45.68 0.45 0.10 2.056 M3

    - Beton K-300 2.056 M3

    - Besi Beton 56.333 Kg

    - Bekisting 25.124 M2

    4 Beton Topi-topi Lantai II 55.60 0.45 0.10 2.502 M3

    - Beton K-300 2.502 M3

    - Besi Beton 68.566 Kg

    - Bekisting 30.580 M2

    5 Beton Janggutan (Balok Teras Depan) 8.00 1.10 0.15 1.320 M3

    - Beton K-300 1.320 M3

    - Besi Beton 144.432 Kg

    - Bekisting 18.800 M2

    Volume Rumus

    12

    CALCULATION SHEET

    No Uraian Pekerjaan Type Jumlah

    (Bh)Panjang (m) Lebar (m)

    Tinggi

    (m)Diameter

    (m)Luas (m2)