Irigasi Saluran Primer R1S1 Kp

4
Dimensi Saluran R1S1 Kp 0.264 m = 1 b/h = 1 b=h # V rencana 0,30-0,35 K = 35 V rencan 0.35 A = (b+ mh) h (b+ 1.h) h # A = 0.754 # P = # Q = V.A A = Q/V 0.264 0.35 # T = b+2.m.h 0.754 0,65+2.1.0, 0.38 1.95 h = 0.61 b = h b = 0,61 m h dihitung lagi utk yg trapesium simetris A = (b+m.h)h Q A.V 0,75 = (0,65+1.h)h 0,264 = A. 0,35 0,75 = A 0.754 h = 0.65 # Rumus STRIKLER V = R = A 0,35 = P 0,35 = 0.022 I = 0.0004 0.754 0.303 V D = A T Q = 264 l/det m 3 /det 2h 2 bh + h 2 2.(0,61) 2 h 2 + h 2 2h 2 b+2h √m 2 +1 h+2h √1 2 +1 h+2h√2 2h 2 = 2h 2 = h 2 = # direncanakan b saluran = 0,65 m. 0,65h+h 2 K R 2/3 I 1/2 35.(0,303) 2/3 I 1/2 15,789 I 1/2 2h 2 I 1/2 = h+2h √2 0,65+2.0,65 # FR = √g.D

Transcript of Irigasi Saluran Primer R1S1 Kp

Page 1: Irigasi Saluran Primer R1S1 Kp

Dimensi Saluran R1S1 Kp

0.264m = 1b/h = 1 b=h # V rencana 0,30-0,35K = 35 V rencana 0.35A = (b+ mh) h

(b+ 1.h) h # A =

0.754

# P = # Q = V.A

A = Q/V0.264

0.35 # T = b+2.m.h0.754 0,65+2.1.0,65

0.38 1.95h = 0.61b = hb = 0,61 m

h dihitung lagi utk yg trapesium simetrisA = (b+m.h)h Q = A.V0,75 = (0,65+1.h)h 0,264 = A. 0,350,75 = A = 0.754h = 0.65

# Rumus STRIKLERV = R = A0,35 = P0,35 =

0.022I = 0.0004

0.754

0.303

V D = AT

Q = 264 l/det = m3/det

2h2

bh + h2 2.(0,61)2

h2 + h2 m2

2h2

b+2h √m2+1h+2h √12+1h+2h√2

2h2 =

2h2 = h2 =

# direncanakan b saluran = 0,65 m.

0,65h+h2 m2

K R 2/3 I 1/2

35.(0,303)2/3 I1/2 15,789 I1/2 2h 2

I 1/2 = h+2h √2

0,65+2.0,65 √2

# FR = √g.D

Page 2: Irigasi Saluran Primer R1S1 Kp

0.35 0.754√9,8. 0,387 1.95

0.18 < 1 (ok) 0.387

T = 1,95 m

h = 0,65 m

b = 0,65 m

Page 3: Irigasi Saluran Primer R1S1 Kp

h = 0,65 m