Materi Maintenance Planner
No. Materi
Jumlah (1 sesi = 45
menit)Instruktur Pendamping
Keterangan
Modul Sesi Int Ekt Nama / Nopek Nama / Nopek1 Opening Ceremony 2 2 Pre Test 1 3 HSE, CSMS 1 2 v 1. Johanes Pri Hartanto (734876 / RU VI) 1. Sancoyo Budi Utomo (708178 / KP)
4 Maintenance Strategy 1 2 v 1. Togar M.P.Manurung (709458 / KP) 1. Djoko Priyono (708964 / RU V)
5 Proses Bisnis Pemeliharaan 1 2 v 1. Yosua I. M. Nababan (708129 / RU IV) 1. Nandang Kurnaedi (708429 / RU VI)
6 SK 51 1 4 v 1. Harry Purnomo (708072 / KP) 1. A. Zulfi (714082 / QM)
7 SAP Modul PM 1 5 v 1. Said Efendi (748015 / CSS - KP) 1. Yuliusman (720027 / KP)
8 MySAP Modul MMNH 1 3 v 1. Muh. Amar (….. / CSS) 1. Yuliusman (720027 / KP)
9 Technical DWG (PFD, Lay-out, Isometric, P&ID, Detail Dwg)
1 4 v 1. Kasim Mohani (708412 / KP)2. Nanang Agus Harianto ( 714293 / RU IV)
1. Abdullah (718027 / MR)
10 WSA (Work Scope Analysis) 1 2 v 1. Hery Yudhianto (714569/ RU V) 1. Agus Sujono (71……./ RU VI)
10 Job Plan Pekerjaan (Mech Stat, RE, Elect, Instr, Civil)
1 8 v 1. Yanus Supantoro (713791 / RU II)2. Usman Hasan (714252 / RU IV)3. Agus Wurlijanto (713872 / RU VI)
1. I Gusti Agung Nyoman Bismayudha (708104 / KP)
11 KAK / SOW (termasuk Regulasi Pemerintah) Mech Stat, RE, Elect, Instr, Civil
1 8 v 1. Djoni Suharno Sumangkut (719494 / RU II)2. M. Daud (713726 / RU VI)
1. Yuliwis (714674 / RU V)
12 Cost Estimasi Pekerjaan (Mech Stat, RE, Elect, Instr, Civil)
1 10 v 1. Agustinus Supartomo (714058 / RU III)2. 1. Agus Sujono (71……./ RU VI)3. Dian Adi Setyoko ( 746930 / RU VI)
1. Ahmad Zulfi ( 714082 / KP)2. Hery Yudhianto (714569 / RU V)
Quality Plan & Quality Assurance 1 2 v 1. Rahendrafedi (71……./ RU V) 1. Tur Istanto Widodo (7….. / RU II)
Standard & Code 1 2 v 1. Rahendrafedi (71……./ RU V) 1. Tur Istanto Widodo (7….. / RU II)
13 Metode Konstruksi (Mech Stat, RE, Elect, Instr, Civil)
1 4 v 1. Syaifuddin Azhar (717777 / RU V)2. Slamet Heriyadi (719648 / RU III)
1. I Gusti Agung Nyoman Bismayudha (708104 / KP)
14 Project Management, Schedulling & Primavera
2 8 v 1. Iskandar (717744 / RU IV)2. J. T. Parluhutan Purba ( 653738 / RU IV)
1. Iwan Kurniawan (7 …… / RU V)2. Warpin (727901 / RU II) --> Primavera
15 Strategi Kontrak (Unit Price, Lumpsum, LTSA, TSA, Leasing, Cost & Fee, at cost, dll)
1 8 v v 1. M. Solihin (719559 / RU VI)2. Djoni Suharno Sumangkut (719494 / RU II)
1. Slamet Heriyadi (719648 / RU III)
16 Legal Contract 1 4 v 1. Sulistiawan (730906 / Legal - KP) 1. Agus Aprianto (714836 / RU VI)
17 Proses Kontrak 1 2 v 1. Agus Aprianto (714836 / RU VI) 1. Muchamad Lutfi (739111 / KP)Penawaran
18 Supply Chain (Agent, Fabricator, Manufacturer, Vendor, Stockist, dll)
1 4 v 1. Muchamad Lutfi (739111 / KP) 1. Meiman Arifin (7…. / RU II)
19 Proses Bisnis Procurement (Warehousing, Inventory, Purchasing, Contract) termasuk Custom Clearance, incoterm (LC, TT, FOB, FOT, Franco Gudang).
1 4 v 1. Dadang Hardjanto (718562 / RU VI)2. Mahendra Udayana (718627 / RU III)
1. Samsul Munir H (718838 / KP)
20 GCG 1 4 v v 1. Compliance - Corporate Secretary
21 Manajemen Pengawasan (Audit, Fraud)
1 4 v 1. Refinery Internal Audit
22 Post Test 1 v 1. I Gusti Agung Nyoman Bismayudha (708104 / KP)2. N.E.M Sidabutar (704832 / KP)
23 Closing Ceremony 1 v 24 Site Visit v PT Badak - Bontang 25 Studi Kasus 4 + 4 26 Job Assignment
TOTAL SESI 23 101
Catatan : Cadangan Instruktur : 3. Yoyok Poerwedi (717063 / KP)
1. Choiron (714577 / KP) Kelompok study sisitim pemeliharaan 2. Arnold Edward (713572 / RU III)
2. Leodan Haadin (734843 / RU IV)Kelompok study compliance 2. Gatot Megantoro (704776 / KP)
2. Edy Suprijadi (708283 / KP)Kelompok study Procurement 1. Machfoed S. Hadi (706047 / KP)
1. Shofie Patria Indones (713775 / RU II)Kelompok study Perencanaan
Kelompok study Safety & Standard 2. Winasis (718019 / KP)M. Daud (713726/ RU VI)