IFM-002/PND/IX/2014 - · PDF filePertamina’s overseas operations through Pertamina ......

8
Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected] IFM-002/PND/IX/2014 IFM-002/PND/IX/2014

Transcript of IFM-002/PND/IX/2014 - · PDF filePertamina’s overseas operations through Pertamina ......

Page 1: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

IFM-002/PND/IX/2014

Page 2: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

industry news update

INAMETA Platinum is GIS (Geographic information System) web portal

application, to examine oil & gas and other energy data availability in

Indonesia. INAMETA Platinum is also equipped with well log and Seismic Data

viewer.

INAMETA Platinum data consist of Working areas (oil, gas, and CBM) and the

most recent contracts, including 60 new Pertamina split areas, 60 basins, over

800 fields and 25.000 wells, more than 40.000 seismic lines, 45.000 technical

reports (geology, geophysics, geochemistry, bio-stratigraphy, reserves, and

prospects) and Oil and gas pipelines.

Government and Commission VII House of

Representatives Agreed on Macro Assumptions of

Draft State Budget 2015, which relates to Energy and

Mineral Resources, namely:

ICP US$ 105 per barrel

Total production/ oil and gas lifting 2,148,000 barrel of oil

equivalent per day, consists of oil lifting 900,000 barrel per day

and gas lifting 1,248,000 barrel per day.

Source:

Directorate General of Oil and Gas. (2014, September 15). Pemerintah dan Komisi VII Sepakati Asumsi Makro RAPBN 2015. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3731/Pemerintah-dan-Komisi-VII-Sepakati-Asumsi-Makro-RAPBN-2015

PT. Pertamina has successfully increased the total

production up to 11.9 percent compared to the realization in

the same period last year. Based on PT. Pertamina press release in

September 2014, in the first semester of 2014, PT. Pertamina

recorded a total production of 520,260 barrels of oil equivalent per

day (boepd). Pertamina’s overseas operations through Pertamina

International Exploration and Production and the consolidated

production of PT Pertamina Hulu Energi played the main role in this

increment of production.

Source:

PT. Pertamina. (2014, September 7). Pertamina Bukukan Produksi 520 ribu boepd. Retrieved 2014, from http://www.pertamina.com/news-room/siaran-

pers/pertamina-bukukan-produksi-520-ribu-boepd/

Draft State Budget 2015: Cost Recovery US$ 16

Billion, and Oil and Gas Revenue Target IDR

326.96 Trillion. These amounts are set by Budget Agency of

House of Representatives, wherein this cost recovery is smaller US$

16.5 billion than the Financial Memorandum Draft State Budget

2015, meanwhile oil and gas revenue target is higher IDR 23.25

trillion than the original plan which adjusted with the increment of

oil production target.

Source:

Directorate General of Oil and Gas. (2014, September 23). RAPBN 2015: Cost Recovery US$ 16 Miliar, Penerimaan Migas Rp 326,96 Triliun, Subsidi BBM Rp 276 Triliun. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3738/RAPBN-

2015:-Cost-Recovery-US$-16-Miliar,-Penerimaan-Migas-Rp-326,96-Triliun,-Subsidi-BBM-Rp-276-Triliun

President of Republic of Indonesia inaugurated

2 Oil and Gas Projects with the total investment

of Rp 13.6 trillion, namely Ruby Gas Field development

project (Sebuku Block) which managed by Mubadala Petroleum

and Sisi Nubi 2B (Mahakam Block) with the operator Total E&P

Indonesie.

Source:

Directorate General of Oil and Gas. (2014, September 15). Presiden Resmikan Proyek Migas Senilai Rp 13,6 Triliun. Retrieved 2014, from http://migas.esdm.go.id/berita-kemigasan/detail/3730/Presiden-Resmikan-Proyek-Migas-Senilai-Rp-13,6-Triliun

Page 3: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

new data available

Kampar block is located in the Central of Sumatra (onshore)

and stretches from north to south. Geologically, the northern

part of the block is included in Merbau Trend, southern part is

included in Lirik Trend, and the northern and eastern parts

bordered with Bengkalis Trough. This block has been explored

since 1959 and it covers area some of 4,545 sq km.

Data available:

351 2D seismic lines (2,657.04 km), 381 wells data, production

history and G&G data.

South and Central Sumatra Block (Kampar Block)

Page 4: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

Evaluation of

Data

Information

Revised

Data Relinquishment

Data

Evaluation Revised

Report Signing Data Storage

3 months (60 working days)

Notification of

obligation on PSC

Contractors to

relinquish Data

and/or PCS

Contractors took

the initiatives to

prepare

relinquishment of

Data

SKK Migas/PSC

Contractors (5

months before the

deadline)

Relinquish of Data

Information (Working

areas coordinates and

data list)

SKK Migas/PSC

Contractors

no

yes 2 weeks (10 working days)

Directorate General of Oil and Gas (DJM),

Center for Data and Information Technology on

EMR (Pusdatin ESDM)

Directorate General of Oil and Gas (DJM),

Center for Data and Information Technology on

EMR (Pusdatin ESDM)

no

yes

Center for Data and Information Technology on

EMR (Pusdatin ESDM)

PSC Contractors/SKK Migas, Directorate General of Oil and Gas (DJM),

Center for Data and Information Technology on EMR (Pusdatin ESDM)

Based on the rules and regulations, PSC

contractors are required to relinquish some

or total of their Working Areas along with

the data that obtained from the results of

the Exploration and Exploitation to the

Center of Data and Information Technology

on EMR through the Executing Agency. Data

that received from the elimination process of

some or all working areas (relinquishment/

termination) must be ensured its

completeness, so checking on data

completeness is performed.

The scope of examination of the quantity

and type of data that relinquished by the

PSC contractors are as follows:

Seismic Data

Well Data

G&G Reports and G&G Map

Study and other data

Data that received from the PSC contractors

are verified for the completeness and quality

of data, so the data verification reports can

be submitted to the Directorate of Oil and

Gas and data storage can be done.

Mechanism on Data Relinquishment of Exploration and Exploitation

Source: Pedoman Penyerahan Data Fisik Survey Umum, Eksplorasi, dan Eksploitasi Minyak dan Gas Bumi ESDM-2007

Page 5: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

Relinquishment and Termination activities of Indonesia oil and gas Working Areas in 2014 can be seen in the following:

SIAK 3,136.784 km 2D seismic

lines and 122 wells

Partial and Total Relinquishment

Partial and total relinquishment activities of Indonesia oil and gas

Working Areas in 2014 Status: May-August 2014

Page 6: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

SW BUKIT BARISAN 114.150 km 2D seismic lines

WEST TIMOR 124.251 km 2D

seismic lines

Page 7: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

EAST KANGEAN 476.708 km 2D seismic lines

NORTH MADURA 4,889.202 km 2D seismic lines

Page 8: IFM-002/PND/IX/2014 -  · PDF filePertamina’s overseas operations through Pertamina ... Proyek Migas Senilai Rp 13,6 Triliun Retrieved 2014, ... IFM-002/PND/IX/2014

Graha Elnusa Lt.5. Jl. TB. Simatupang Kav. 1B Jakarta 12560, Indonesia | Website: www.patranusa.com | Email: [email protected]

IFM-002/PND/IX/2014

WEST KAMPAR 2,142.142 km 2D

seismic lines and 6

wells

BONE 921.679 km 2D seismic lines