2. RINGKASAN KEMAJUAN PEKERJAAN 2.1 PAKET C1A PRIODE BULAN JANUARI 2015 DATA KEGIATAN RINGKASAN PROGRESS PERMASALAHAN UTAMA NAMA PAKET : C1A PENGASPALAN JALAN KAWASAN BY PASS WAKTU TERPAKAI : 64 HK - JMF LPA KELAS A BELUM SIAP (PASAR BARU - SWISSBEL HOTEL) SISI KIRI - SHOP DRAWING BELUM SIAP NAMA RUAS JALAN : PASAR BARU - BY PASS SISI KIRI % WAKTU TERPAKAI : 7.11 % : SOLUSI/SARAN-SARAN NOMOR KONTRAK : 620/775/KONTRAK/PU-BM/XI/2014 : 900 HK - SECEPATNYA MENYIAPKAN JMF LPA KEL TANGGAL KONTRAK : 20 NOVEMBER 2014 - SHOP DRAWING SECEPATNYA DISELESAI PANJANG PENANGANAN : 6.2 KM : 180 HK PPK : TIGOR ROMA UTTUNG SIHITE SE., ST. SITE ENGINEER : BAMBANG ASBUDI, ST. : 2.50 % KONTRAKTOR : PT ANEKA BANGUNAN CIPTA RENCANA KAEGIATAN BULAN DEPAN KONSULTAN SUPERVISI : CV. JASA MARIO AKTUAL PROGRESS : 3.37 % - PEKERJAAN GALIAN UNTUK SALURAN DR TANGGAL MULAI PELAKSANAAN : 21 NOVEMBER 2014 - PEKERJAAN GALIAN BIASA TANGGAL PHO : 7 MEI 2017 DEVIASI : 0.87 % - PEKERJAAN TIMBUNAN PILIHAN WAKTU PELAKSANAAN : 900 (SEMBILAN RATUS) HARI KALENDER - PEKERJAAN PENYIAPAN BADAN JALAN NOMOR SPMK : : 3.37 % - PEKERJAAN LAPIS PONDASI AGREGAT K TANGGAL SPMK : - PEKERJAAN LAPIS PONDASI AGREGAT K NILAI KONTRAK : Rp. 31.005.567.000,- ADDENDUM NO. : RINGKASAN PEMBAYARAN MC BULAN PEMBAYARAN (Rp) MC BULAN PEMBAYARAN (Rp) MC BULAN MC KEMAJUAN PEKERJAAN (PROGRESS) DIV. URAIAN BOBOT (%) 2014 NOV 1 - 2015 NOV 13 2016 NOV 25 KONTRAK BULAN LALU BULAN INI DES 2 - DES 14 DES 26 2015 JAN 3 896,432,800.00 2016 JAN 15 2017 JAN 27 I UMUM 0.29 0 0.15 0.15 FEB 4 FEB 16 FEB 28 II DRAINASE 1.50 0 0.11 0.11 MAR 5 MAR 17 MAR 29 III PEKERJAAN TANAH 3.75 0 0.88 0.88 APR 6 APR 18 APR 30 IV PELEBARAN PERKERASAN DAN BAHU JALAN 0.81 0 0.00 0.00 MEI 7 MEI 19 MEI 31 V PERKERASAN BERBUTIR 23.10 0 2.24 2.24 JUN 8 JUN 20 VI PERKERASAN ASPAL 61.95 0 0.00 0.00 JUL 9 JUL 21 VII STRUKTUR 1.44 0 0.00 0.00 AGU 10 AGU 22 VIII PENGEMBALIAN KONDISI & PEKERJAAN MINOR 7.16 0 0.00 0.00 SEPT 11 SEPT 23 TOTAL 100.00 0.00 3.37 3.37 OKT 12 OKT 24 KURVA MONITORING PROGRESS 100 100 90 90 80 80 70 70 60 60 50 50 40 40 30 30 20 20 10 10 0 0 TAHUN ANGGARAN 2014 2015 2016 2017 BULAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SCHEDULE PROGRESS 0 0.15 0.48 2.50 3.91 6.37 8.40 10.40 12.99 15.89 18.80 28.39 37.99 44.50 51.02 51.51 51.99 53.56 55.13 56.70 59.60 62.51 65.41 75.01 84.60 91.12 98 98.215 98.796 99.377 99.689 100 ACTUAL PROGRESS 0 0.00 0.00 3.37 DEVIASI -0.15 -0.48 0.87 W A K T U WAKTU PELAKSANAAN WAKTU PEMELIHARAAN K E M A J U A N SCHEDULE PROGGRESS PRGORESS S/D BULAN INI MC NO. MC NO. S/D BULAN INI REALISAI RENCANA

description

kerja praktek

Transcript of I. 4. RKP

Page 1: I. 4. RKP

2. RINGKASAN KEMAJUAN PEKERJAAN

2.1 PAKET C1A

PRIODE BULAN JANUARI 2015

DATA KEGIATAN RINGKASAN PROGRESS PERMASALAHAN UTAMANAMA PAKET : C1A PENGASPALAN JALAN KAWASAN BY PAS

WAKTU TERPAKAI : 64 HK- JMF LPA KELAS A BELUM SIAP

(PASAR BARU - SWISSBEL HOTEL) SISI K - SHOP DRAWING BELUM SIAPNAMA RUAS JALAN : PASAR BARU - BY PASS SISI KIRI

: 7.11 %: SOLUSI/SARAN-SARAN

NOMOR KONTRAK : 620/775/KONTRAK/PU-BM/XI/2014: 900 HK

- SECEPATNYA MENYIAPKAN JMF LPA KELAS ATANGGAL KONTRAK : 20 NOVEMBER 2014 - SHOP DRAWING SECEPATNYA DISELESAIKANPANJANG PENANGANAN : 6.2 KM

: 180 HKPPK : TIGOR ROMA UTTUNG SIHITE SE., ST.SITE ENGINEER : BAMBANG ASBUDI, ST.

: 2.50 %KONTRAKTOR : PT ANEKA BANGUNAN CIPTA RENCANA KAEGIATAN BULAN DEPANKONSULTAN SUPERVISI : CV. JASA MARIO

: 3.37 %- PEKERJAAN GALIAN UNTUK SALURAN DRAINASE

TANGGAL MULAI PELAKSANAAN : 21 NOVEMBER 2014 - PEKERJAAN GALIAN BIASATANGGAL PHO : 7 MEI 2017

DEVIASI : 0.87 %- PEKERJAAN TIMBUNAN PILIHAN

WAKTU PELAKSANAAN : 900 (SEMBILAN RATUS) HARI KALENDER - PEKERJAAN PENYIAPAN BADAN JALANNOMOR SPMK :

: 3.37 %- PEKERJAAN LAPIS PONDASI AGREGAT KELAS B

TANGGAL SPMK : - PEKERJAAN LAPIS PONDASI AGREGAT KELAS ANILAI KONTRAK : Rp. 31.005.567.000,-ADDENDUM NO. : RINGKASAN PEMBAYARAN

MC BULANPEMBAYARAN (Rp) MC BULAN PEMBAYARAN (Rp) MC BULAN MC NO. PEMBAYARAN (Rp)

KEMAJUAN PEKERJAAN (PROGRESS)

DIV. URAIANBOBOT (%)

2014

NOV 1 -

2015

NOV 13

2016

NOV 25

KONTRAK BULAN INIDES 2 - DES 14 DES 26

2015

JAN 3 896,432,800.00

2016

JAN 15

2017

JAN 27I UMUM 0.29 0 0.15 0.15 FEB 4 FEB 16 FEB 28II DRAINASE 1.50 0 0.11 0.11 MAR 5 MAR 17 MAR 29III PEKERJAAN TANAH 3.75 0 0.88 0.88 APR 6 APR 18 APR 30IV PELEBARAN PERKERASAN DAN BAHU JALAN 0.81 0 0.00 0.00 MEI 7 MEI 19 MEI 31V PERKERASAN BERBUTIR 23.10 0 2.24 2.24 JUN 8 JUN 20VI PERKERASAN ASPAL 61.95 0 0.00 0.00 JUL 9 JUL 21VII STRUKTUR 1.44 0 0.00 0.00 AGU 10 AGU 22VIII PENGEMBALIAN KONDISI & PEKERJAAN MINOR 7.16 0 0.00 0.00 SEPT 11 SEPT 23

TOTAL 100.00 0.00 3.37 3.37 OKT 12 OKT 24

KURVA MONITORING PROGRESS100 100

90 9080 80

70 7060 60

50 5040 40

30 3020 20

10 100 0

TAHUN ANGGARAN 2014 2015 2016 2017BULAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31SCHEDULE PROGRESS 0 0.15 0.48 2.50 3.91 6.37 8.40 10.40 12.99 15.89 18.80 28.39 37.99 44.50 51.02 51.51 51.99 53.56 55.13 56.70 59.60 62.51 65.41 75.01 84.60 91.12 98 98.2153 98.7962 99.3771 99.6886 100

ACTUAL PROGRESS 0 0.00 0.00 3.37

DEVIASI -0.15 -0.48 0.87

WAKTU

% WAKTU TERPAKAIWAKTU PELAKSANAAN WAKTU PEMELIHARAAN

KEMAJUAN

SCHEDULE PROGGRESSAKTUAL PROGRESS

PRGORESS S/D BULAN INI

MC NO.

MC NO.

BULAN LALU

S/D BULAN INI

REALI-SAI

REN-CANA

Page 2: I. 4. RKP
Page 3: I. 4. RKP

2. RINGKASAN KEMAJUAN PEKERJAAN

2.2 PAKET C1B

PRIODE BULAN JANUARI 2015

DATA KEGIATAN RINGKASAN PROGRESS PERMASALAHAN UTAMANAMA PAKET : C1A PENGASPALAN JALAN KAWASAN BY PASS

WAKTU TERPAKAI : 64 HK- JMF LPA KELAS A BELUM SIAP

(PASAR BARU - SWISSBEL HOTEL) SISI KANAN - SHOP DRAWING BELUM SIAPNAMA RUAS JALAN : PASAR BARU - BY PASS SISI KANAN

: 7.11 %: SOLUSI/SARAN-SARAN

NOMOR KONTRAK : 620/776/KONTRAK/PU-BM/XI/2014: 900 HK

- SECEPATNYA MENYIAPKAN JMF LPA KELAS ATANGGAL KONTRAK : 20 NOVEMBER 2014 - SHOP DRAWING SECEPATNYA DISELESAIKANPANJANG PENANGANAN : 6.2 KM

: 180 HKPPK : TIGOR ROMA UTTUNG SIHITE SE., ST.SITE ENGINEER : BAMBANG ASBUDI, ST.

: 0.592 %KONTRAKTOR : PT GAYA BAKTI JAYA RENCANA KAEGIATAN BULAN DEPANKONSULTAN SUPERVISI : CV. JASA MARIO

: 0.197 %- PEKERJAAN GALIAN BIASA

TANGGAL MULAI PELAKSANAAN : 21 NOVEMBER 2014 - PEKERJAAN TIMBUNAN BIASATANGGAL PHO : 7 MEI 2017

DEVIASI : -0.394 %- PEKERJAAN TIMBUNAN PILIHAN

WAKTU PELAKSANAAN : 900 (SEMBILAN RATUS) HARI KALENDER - PEKERJAAN PENYIAPAN BADAN JALANNOMOR SPMK :

: 0.20 %- PEKERJAAN LAPIS PONDASI AGREGAT KELAS B

TANGGAL SPMK :NILAI KONTRAK : Rp. 33.052.572.000,-ADDENDUM NO. : RINGKASAN PEMBAYARAN

MC BULAN PEMBAYARAN (Rp) MC BULAN PEMBAYARAN (Rp) MC BULAN MC NO. PEMBAYARAN (Rp)KEMAJUAN PEKERJAAN (PROGRESS)

DIV. URAIANBOBOT (%)

2014

NOV 1 -

2015

NOV 13

2016

NOV 25

KONTRAK BULAN INIDES 2 - DES 14 DES 26

2015

JAN 3 52,090,400.00

2016

JAN 15

2017

JAN 27I UMUM 0.29 0 0.12 0.12 FEB 4 FEB 16 FEB 28II DRAINASE 1.50 0 0.00 0.00 MAR 5 MAR 17 MAR 29III PEKERJAAN TANAH 3.75 0 0.077 0.08 APR 6 APR 18 APR 30IV PELEBARAN PERKERASAN DAN BAHU JALAN 0.81 0 0.00 0.00 MEI 7 MEI 19 MEI 31V PERKERASAN BERBUTIR 23.10 0 0.00 0.00 JUN 8 JUN 20VI PERKERASAN ASPAL 61.95 0 0.00 0.00 JUL 9 JUL 21VII STRUKTUR 1.44 0 0.00 0.00 AGU 10 AGU 22VIII PENGEMBALIAN KONDISI & PEKERJAAN MINOR 7.16 0 0.00 0.00 SEPT 11 SEPT 23

TOTAL 100.00 0.00 0.197 0.197 OKT 12 OKT 24

KURVA MONITORING PROGRESS

100 10090 90

80 8070 70

60 6050 50

40 4030 30

20 2010 10

0 0

TAHUN ANGGARAN 2014 2015 2016 2017

BULAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

SCHEDULE PROGRESS 0 0.01 0.30 0.59 0.88 2.23 3.29 4.35 5.77 6.14 6.50 6.95 7.03 7.29 8.06 8.75 9.44 9.50 9.57 9.62 11.51 13.41 19.06 24.72 47.22 69.73 83 96.4781 97.6521 98.826 100 100

ACTUAL PROGRESS 0 0.00 0.00 0.197

WAKTU

% WAKTU TERPAKAIWAKTU PELAKSANAAN WAKTU PEMELIHARAAN

KEMAJUAN

SCHEDULE PROGGRESSAKTUAL PROGRESS

PRGORESS S/D BULAN INI

MC NO.

MC NO.

BULAN LALU

S/D BULAN INI

REALI-SAI

REN-CANA

Page 4: I. 4. RKP

DEVIASI -0.01 -0.30 -0.39