2. RINGKASAN KEMAJUAN PEKERJAAN
2.1 PAKET C1A
PRIODE BULAN JANUARI 2015
DATA KEGIATAN RINGKASAN PROGRESS PERMASALAHAN UTAMANAMA PAKET : C1A PENGASPALAN JALAN KAWASAN BY PAS
WAKTU TERPAKAI : 64 HK- JMF LPA KELAS A BELUM SIAP
(PASAR BARU - SWISSBEL HOTEL) SISI K - SHOP DRAWING BELUM SIAPNAMA RUAS JALAN : PASAR BARU - BY PASS SISI KIRI
: 7.11 %: SOLUSI/SARAN-SARAN
NOMOR KONTRAK : 620/775/KONTRAK/PU-BM/XI/2014: 900 HK
- SECEPATNYA MENYIAPKAN JMF LPA KELAS ATANGGAL KONTRAK : 20 NOVEMBER 2014 - SHOP DRAWING SECEPATNYA DISELESAIKANPANJANG PENANGANAN : 6.2 KM
: 180 HKPPK : TIGOR ROMA UTTUNG SIHITE SE., ST.SITE ENGINEER : BAMBANG ASBUDI, ST.
: 2.50 %KONTRAKTOR : PT ANEKA BANGUNAN CIPTA RENCANA KAEGIATAN BULAN DEPANKONSULTAN SUPERVISI : CV. JASA MARIO
: 3.37 %- PEKERJAAN GALIAN UNTUK SALURAN DRAINASE
TANGGAL MULAI PELAKSANAAN : 21 NOVEMBER 2014 - PEKERJAAN GALIAN BIASATANGGAL PHO : 7 MEI 2017
DEVIASI : 0.87 %- PEKERJAAN TIMBUNAN PILIHAN
WAKTU PELAKSANAAN : 900 (SEMBILAN RATUS) HARI KALENDER - PEKERJAAN PENYIAPAN BADAN JALANNOMOR SPMK :
: 3.37 %- PEKERJAAN LAPIS PONDASI AGREGAT KELAS B
TANGGAL SPMK : - PEKERJAAN LAPIS PONDASI AGREGAT KELAS ANILAI KONTRAK : Rp. 31.005.567.000,-ADDENDUM NO. : RINGKASAN PEMBAYARAN
MC BULANPEMBAYARAN (Rp) MC BULAN PEMBAYARAN (Rp) MC BULAN MC NO. PEMBAYARAN (Rp)
KEMAJUAN PEKERJAAN (PROGRESS)
DIV. URAIANBOBOT (%)
2014
NOV 1 -
2015
NOV 13
2016
NOV 25
KONTRAK BULAN INIDES 2 - DES 14 DES 26
2015
JAN 3 896,432,800.00
2016
JAN 15
2017
JAN 27I UMUM 0.29 0 0.15 0.15 FEB 4 FEB 16 FEB 28II DRAINASE 1.50 0 0.11 0.11 MAR 5 MAR 17 MAR 29III PEKERJAAN TANAH 3.75 0 0.88 0.88 APR 6 APR 18 APR 30IV PELEBARAN PERKERASAN DAN BAHU JALAN 0.81 0 0.00 0.00 MEI 7 MEI 19 MEI 31V PERKERASAN BERBUTIR 23.10 0 2.24 2.24 JUN 8 JUN 20VI PERKERASAN ASPAL 61.95 0 0.00 0.00 JUL 9 JUL 21VII STRUKTUR 1.44 0 0.00 0.00 AGU 10 AGU 22VIII PENGEMBALIAN KONDISI & PEKERJAAN MINOR 7.16 0 0.00 0.00 SEPT 11 SEPT 23
TOTAL 100.00 0.00 3.37 3.37 OKT 12 OKT 24
KURVA MONITORING PROGRESS100 100
90 9080 80
70 7060 60
50 5040 40
30 3020 20
10 100 0
TAHUN ANGGARAN 2014 2015 2016 2017BULAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31SCHEDULE PROGRESS 0 0.15 0.48 2.50 3.91 6.37 8.40 10.40 12.99 15.89 18.80 28.39 37.99 44.50 51.02 51.51 51.99 53.56 55.13 56.70 59.60 62.51 65.41 75.01 84.60 91.12 98 98.2153 98.7962 99.3771 99.6886 100
ACTUAL PROGRESS 0 0.00 0.00 3.37
DEVIASI -0.15 -0.48 0.87
WAKTU
% WAKTU TERPAKAIWAKTU PELAKSANAAN WAKTU PEMELIHARAAN
KEMAJUAN
SCHEDULE PROGGRESSAKTUAL PROGRESS
PRGORESS S/D BULAN INI
MC NO.
MC NO.
BULAN LALU
S/D BULAN INI
REALI-SAI
REN-CANA
2. RINGKASAN KEMAJUAN PEKERJAAN
2.2 PAKET C1B
PRIODE BULAN JANUARI 2015
DATA KEGIATAN RINGKASAN PROGRESS PERMASALAHAN UTAMANAMA PAKET : C1A PENGASPALAN JALAN KAWASAN BY PASS
WAKTU TERPAKAI : 64 HK- JMF LPA KELAS A BELUM SIAP
(PASAR BARU - SWISSBEL HOTEL) SISI KANAN - SHOP DRAWING BELUM SIAPNAMA RUAS JALAN : PASAR BARU - BY PASS SISI KANAN
: 7.11 %: SOLUSI/SARAN-SARAN
NOMOR KONTRAK : 620/776/KONTRAK/PU-BM/XI/2014: 900 HK
- SECEPATNYA MENYIAPKAN JMF LPA KELAS ATANGGAL KONTRAK : 20 NOVEMBER 2014 - SHOP DRAWING SECEPATNYA DISELESAIKANPANJANG PENANGANAN : 6.2 KM
: 180 HKPPK : TIGOR ROMA UTTUNG SIHITE SE., ST.SITE ENGINEER : BAMBANG ASBUDI, ST.
: 0.592 %KONTRAKTOR : PT GAYA BAKTI JAYA RENCANA KAEGIATAN BULAN DEPANKONSULTAN SUPERVISI : CV. JASA MARIO
: 0.197 %- PEKERJAAN GALIAN BIASA
TANGGAL MULAI PELAKSANAAN : 21 NOVEMBER 2014 - PEKERJAAN TIMBUNAN BIASATANGGAL PHO : 7 MEI 2017
DEVIASI : -0.394 %- PEKERJAAN TIMBUNAN PILIHAN
WAKTU PELAKSANAAN : 900 (SEMBILAN RATUS) HARI KALENDER - PEKERJAAN PENYIAPAN BADAN JALANNOMOR SPMK :
: 0.20 %- PEKERJAAN LAPIS PONDASI AGREGAT KELAS B
TANGGAL SPMK :NILAI KONTRAK : Rp. 33.052.572.000,-ADDENDUM NO. : RINGKASAN PEMBAYARAN
MC BULAN PEMBAYARAN (Rp) MC BULAN PEMBAYARAN (Rp) MC BULAN MC NO. PEMBAYARAN (Rp)KEMAJUAN PEKERJAAN (PROGRESS)
DIV. URAIANBOBOT (%)
2014
NOV 1 -
2015
NOV 13
2016
NOV 25
KONTRAK BULAN INIDES 2 - DES 14 DES 26
2015
JAN 3 52,090,400.00
2016
JAN 15
2017
JAN 27I UMUM 0.29 0 0.12 0.12 FEB 4 FEB 16 FEB 28II DRAINASE 1.50 0 0.00 0.00 MAR 5 MAR 17 MAR 29III PEKERJAAN TANAH 3.75 0 0.077 0.08 APR 6 APR 18 APR 30IV PELEBARAN PERKERASAN DAN BAHU JALAN 0.81 0 0.00 0.00 MEI 7 MEI 19 MEI 31V PERKERASAN BERBUTIR 23.10 0 0.00 0.00 JUN 8 JUN 20VI PERKERASAN ASPAL 61.95 0 0.00 0.00 JUL 9 JUL 21VII STRUKTUR 1.44 0 0.00 0.00 AGU 10 AGU 22VIII PENGEMBALIAN KONDISI & PEKERJAAN MINOR 7.16 0 0.00 0.00 SEPT 11 SEPT 23
TOTAL 100.00 0.00 0.197 0.197 OKT 12 OKT 24
KURVA MONITORING PROGRESS
100 10090 90
80 8070 70
60 6050 50
40 4030 30
20 2010 10
0 0
TAHUN ANGGARAN 2014 2015 2016 2017
BULAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
SCHEDULE PROGRESS 0 0.01 0.30 0.59 0.88 2.23 3.29 4.35 5.77 6.14 6.50 6.95 7.03 7.29 8.06 8.75 9.44 9.50 9.57 9.62 11.51 13.41 19.06 24.72 47.22 69.73 83 96.4781 97.6521 98.826 100 100
ACTUAL PROGRESS 0 0.00 0.00 0.197
WAKTU
% WAKTU TERPAKAIWAKTU PELAKSANAAN WAKTU PEMELIHARAAN
KEMAJUAN
SCHEDULE PROGGRESSAKTUAL PROGRESS
PRGORESS S/D BULAN INI
MC NO.
MC NO.
BULAN LALU
S/D BULAN INI
REALI-SAI
REN-CANA
DEVIASI -0.01 -0.30 -0.39