Pekerjaan : Perencanaan Teknis Penurapan S.Tenggarong Lokasi : Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur Konsultan Perencana : PT. Retracindo Tahun Perencanaan : 2013 Harga Dasar (Rupiah) 1 3 4 I Upah I.1 Pekerja oh 65,000.00 I.2 Mandor oh 85,000.00 I.3 Tukang (batu,kayu,besi,cat) oh 80,000.00 I.6 Tukang Pipa oh 80,000.00 I.8 Kepala Tukang oh 85,000.00 I.13 Sopir Truck oh 75,000.00 I.14 Pembantu Sopir oh 70,000.00 I.15 Operator Alat Berat oh 82,000.00 I.16 Operator Genset, Pompa, Concrete Mixer, Concrete Vibrator oh 82,000.00 I.17 Asisten Operator Genset, Pompa, Concrete Mixer, Concrete Vibrator oh 75,000.00 I.18 Juru Ukur oh 75,000.00 I.19 Pembantu Juru Ukur oh 70,000.00 I.20 Teknisi (Mekanik & Elektrik) oh 83,000.00 *) oh = orang per hari Yogyakarta, November 2013 PT. Retracindo Ir. Indra Suharyanto,M.T Ketua Tim 2 Pemerintah Kabupaten Kutai Kartanegara Dinas Bina Marga dan Sumber Daya Air Harga Dasar Upah, Bahan dan Sewa Peralatan No. Uraian Satuan

Transcript of Harga Dasar.pdf

Page 1: Harga Dasar.pdf

Pekerjaan : Perencanaan Teknis Penurapan S.Tenggarong

Lokasi : Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur

Konsultan Perencana : PT. Retracindo

Tahun Perencanaan : 2013

Harga Dasar

(Rupiah)

1 3 4

I Upah

I.1 Pekerja oh 65,000.00

I.2 Mandor oh 85,000.00

I.3 Tukang (batu,kayu,besi,cat) oh 80,000.00

I.6 Tukang Pipa oh 80,000.00

I.8 Kepala Tukang oh 85,000.00

I.13 Sopir Truck oh 75,000.00

I.14 Pembantu Sopir oh 70,000.00

I.15 Operator Alat Berat oh 82,000.00

I.16 Operator Genset, Pompa, Concrete Mixer, Concrete Vibrator oh 82,000.00

I.17 Asisten Operator Genset, Pompa, Concrete Mixer, Concrete Vibrator oh 75,000.00

I.18 Juru Ukur oh 75,000.00

I.19 Pembantu Juru Ukur oh 70,000.00

I.20 Teknisi (Mekanik & Elektrik) oh 83,000.00

*) oh = orang per hari

Yogyakarta, November 2013

PT. Retracindo

Ir. Indra Suharyanto,M.T

Ketua Tim

2

Pemerintah Kabupaten Kutai Kartanegara

Dinas Bina Marga dan Sumber Daya Air

Harga Dasar Upah, Bahan dan Sewa Peralatan

No. Uraian Satuan

Page 2: Harga Dasar.pdf

Pekerjaan : Perencanaan Teknis Penurapan S.Tenggarong

Lokasi : Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur

Konsultan Perencana : PT. Retracindo

Tahun Perencanaan : 2013

Harga DasarBiaya

AngkutHarga di Lokasi

(Rupiah) (Rupiah) (Rupiah)

1 3 4 5 6 = 4 + 5

II Bahan

II.1 Pasir Pasang (Sedang) m³ 180,200.00 51500 231,700.00

II.2 Pasir Beton (Kasar) m³ 400,500.00 51500 452,000.00

II.3 Pasir Halus (untuk HRS) m³ 318,653.18 51500 370,153.18

II.4 Pasir Urug (ada unsur lempung) m³ 400,500.00 51500 452,000.00

II.5 Batu Kali m³ 221,400.00 51500 272,900.00

II.6 Agregat Kasar m³ 318,653.18 51500 370,153.18

II.7 Agregat Halus m³ 318,653.18 51500 370,153.18

II.8 F i l l e r kg 945.00 945.00

II.9 Batu Belah / Kerakal m³ 293,600.00 51500 345,100.00

II.10 G r a v e l m³ 233,000.00 51500 284,500.00

II.11 Bahan Tanah Timbunan m³ 28,400.00 51500 79,900.00

II.12 Bahan Pilihan m³ 38,400.00 51500 89,900.00

II.13 Semen / PC (kg) kg 1,700.00 600 2,300.00

II.14 Besi Beton kg 14,000.00 300 14,300.00

II.15 Kawat Beton kg 25,000.00 25,000.00

II.16 Kawat Bronjong kg 27,400.00 27,400.00

II.17 S i r t u m³ 251,900.00 251,900.00

II.18 P a k u kg 25,500.00 25,500.00

II.19 Kayu Perancah m³ 2,750,000.00 2,750,000.00

II.20 B e n s i n ltr 8,500.00 8,500.00

II.21 S o l a r ltr 12,000.00 12,000.00

II.22 Minyak Pelumas / Olie ltr 65,000.00 65,000.00

II.23 Baja Tulangan (Polos) U24 kg 19,000.00 300 19,300.00

II.24 Baja Tulangan (Ulir) D32 kg 21,000.00 300 21,300.00

II.25 Kapur m³ 40,000.00 51500 91,500.00

II.26 Chipping (kg) kg 169.06 169.06

II.27 Cat kg 53,500.00 53,500.00

II.28 Pasir Urug m³ 177,400.00 51500 228,900.00

II.29 Agregat Pecah Mesin 0-5 mm m³ 318,653.18 51500 370,153.18

II.30 Agregat Pecah Mesin 5-10 & 10-20 mm m³ 318,653.18 51500 370,153.18

II.31 Agregat Pecah Mesin 20-30 mm m³ 318,653.18 51500 370,153.18

II.32 Baja Tulangan (Polos) U32 kg 19,000.00 300 19,300.00

II.33 Baja Tulangan (Ulir) D39 kg 21,000.00 300 21,300.00

II.34 Multipleks 12 mm lbr 181,500.00 3500 185,000.00

II.35 Curing Compound ltr 38,500.00 38,500.00

II.36 Kayu Acuan m3

2,750,000.00 2,750,000.00

II.37 Casing m2

9,000.00 9,000.00

II.38 Plat beton SUPW bh 12,000,000.00 12,000,000.00

II.39 Plat sambung kg 45,000.00 45,000.00

Pemerintah Kabupaten Kutai Kartanegara

Dinas Bina Marga dan Sumber Daya Air

Harga Dasar Upah, Bahan dan Sewa Peralatan

No. Uraian Satuan

2

Page 3: Harga Dasar.pdf

II.40 Batang tarik U24 kg 40,000.00 40,000.00

II.41 Material Grout zak 350,000.00 350,000.00

II.42 Pengadaan tiang pancang beton diameter 40 cm m 1,250,000.00 1,250,000.00

II.43 Blue Sheet m 150,000.00 150,000.00

*) m = meter

kg = kilogram

lbr = lembar

bh = buah

ltr = liter

biaya angkut adalah biaya dari tempat asal ke lokasi penumpukan material/bahan kecuali untuk tanah urugan,

biaya angkut adalah biaya dari tempat asal ke lokasi penghamparan dan pemadatan

Yogyakarta, November 2013

PT. Retracindo

Ir. Indra Suharyanto,M.T

Ketua Tim

Page 4: Harga Dasar.pdf

Pekerjaan : Perencanaan Teknis Penurapan S.Tenggarong

Lokasi : Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur

Konsultan Perencana : PT. Retracindo

Tahun Perencanaan : 2013

Harga Sewa

(Rupiah)

1 3 4

III Sewa Peralatan

III.1 Dump Truck (3 - 4 m3) Jam 395,426.50

III.3 Tandem Roller (6 - 9 ton) Jam 381,407.46

III.4 Theodolite/Waterpass hari 75,000.00

III.5 Generator Set Jam 239,610.72

III.6 Concrete Mixer Jam 241,061.26

III.7 Concrete Vibrator Jam 179,680.88

III.8 Excavator Jam 392,767.71

III.9 Compresor Jam 221,268.43

III.10 Grouting Pump Jam 150,000.00

III.11 Crane Jam 429,437.74

III.12 Trailer Jam 311,349.39

III.13 Pile drive Jam 436,818.26

III.14 Welding set Jam 183,666.37

Yogyakarta, November 2013

PT. Retracindo

Ir. Indra Suharyanto,M.T

Ketua Tim

2

Pemerintah Kabupaten Kutai Kartanegara

Dinas Bina Marga dan Sumber Daya Air

No. Uraian Satuan

Harga Dasar Upah, Bahan dan Sewa Peralatan