GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1...

18
STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian persyaratan dalam rangka menyelesaikan Program Sarjana Strata Satu (S1) Jurusan Teknik Elektro Disusun oleh: ANAK AGUNG GEDE ARI PAWITRA PUTRA NIM. 1004405091 JURUSAN TEKNIK ELEKTRO FAKULTAS TEKNIK UNIVERSITAS UDAYANA JIMBARAN - BALI 2015

Transcript of GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1...

Page 1: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

STUDI TERHADAP UNJUK KERJA

GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM

DI KARANGASEM BALI

TUGAS AKHIR

Diajukan guna memenuhi sebagian persyaratan

dalam rangka menyelesaikan Program Sarjana Strata Satu (S1)

Jurusan Teknik Elektro

Disusun oleh:

ANAK AGUNG GEDE ARI PAWITRA PUTRA

NIM. 1004405091

JURUSAN TEKNIK ELEKTRO

FAKULTAS TEKNIK UNIVERSITAS UDAYANA

JIMBARAN - BALI

2015

Page 2: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

i

STUDI TERHADAP UNJUK KERJA

GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM

DI KARANGASEM BALI

TUGAS AKHIR

Diajukan guna memenuhi sebagian persyaratan

dalam rangka menyelesaikan Program Sarjana Strata Satu (S1)

Jurusan Teknik Elektro

Disusun oleh:

ANAK AGUNG GEDE ARI PAWITRA PUTRA

NIM. 1004405091

JURUSAN TEKNIK ELEKTRO

FAKULTAS TEKNIK UNIVERSITAS UDAYANA

JIMBARAN - BALI

2015

Page 3: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

ii

SURAT PERNYATAAN

Dengan ini saya menyatakan bahwa dalam penulisan Tugas Akhir ini

tidak terdapat karya yang pernah diajukan sebagai tugas penelitian di suatu

perguruan tinggi, dan sepanjang pengetahuan saya juga tidak terdapat karya atau

pendapat yang pernah ditulis atau diterbitkan oleh orang lain, kecuali yang secara

tertulis diacu dalam naskah ini dan disebutkan dalam daftar pustaka.

Denpasar, 11 November 2015

A.A. Gede Ari Pawitra Putra

NIM: 1004405091

Page 4: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian
Page 5: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

viii

DAFTAR ISI

JUDUL ....................................................................................................................... i

LEMBAR PERNYATAAN ....................................................................................... ii

LEMBAR PERSETUJUAN PEMBIMBING ............................................................ iii

KATA PENGANTAR ............................................................................................... iv

ABSTRAK ................................................................................................................. vi

ABSTRACT ............................................................................................................... vii

DAFTAR ISI .............................................................................................................. viii

DAFTAR GAMBAR ................................................................................................. xii

DAFTAR TABEL ...................................................................................................... xv

DAFTAR SINGKATAN ........................................................................................... xvi

BAB I PENDAHULUAN

1.1 Latar Belakang .................................................................................................... 1

1.2 Rumusan Masalah ............................................................................................... 3

1.3 Tujuan Penelitian ................................................................................................ 3

1.4 Manfaat Penelitian .............................................................................................. 3

1.5 Ruang Lingkup dan Batasan Masalah ................................................................. 3

BAB II TINJAUAN PUSTAKA

2.1 Tinjauan Muktahir .............................................................................................. 5

2.2 Tinjauan Pustaka ................................................................................................. 12

2.2.1 Potensi Energi Matahari di Indonesia ....................................................... 12

2.2.2 Pembangkit Listrik Tenaga Surya ............................................................. 14

2.2.3 Sistem Pembangkit Listrik Tenga Surya ................................................... 15

2.2.3.1 PLTS Tidak Terhubung Jaringan (Off-Grid PV Plant) ................ 15

2.2.3.2 PLTS Terhubung Jaringan (On-Grid PV Plant) ........................... 16

2.2.3.3 PLTS Hybrid ................................................................................ 17

2.2.4 Komponen PLTS ...................................................................................... 18

2.2.4.1 Sel Surya (Photovoltaic) ............................................................... 18

Page 6: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

ix

2.2.4.1.1 Karakteristik Sel Surya ....................................................... 19

2.2.4.1.2 Teknologi Sel Surya ........................................................... 25

2.2.4.2 Modul Surya ................................................................................. 26

2.2.4.2.1 Rangkaian Sel Surya Secara Seri dan Paralel ..................... 29

2.2.4.3 Inverter ......................................................................................... 30

2.2.4.3.1 Inverter pada Sistem PLTS ................................................. 31

2.2.4.4 Solar Charge Controller ............................................................... 33

2.2.4.5 Baterai ........................................................................................... 34

2.2.5 Periode Jatuh Matahari dan Orientasi PV Array ....................................... 35

2.2.5.1 Sudut Kemiringan PV Module ...................................................... 36

2.2.6 Perancangan Teknis PLTS On-Grid Terpusat .......................................... 37

2.2.6.1 Kebijakan dan Pemerintah RI dalam Pembangunan PLTS

Terpusat ........................................................................................... 37

2.2.6.1.1 Pedoman Pembangunan PLTS Terpusat ............................ 38

2.2.7 Analisis Performa/Unjuk Kerja PLTS ....................................................... 44

2.2.7.1 Definisi Performa PLTS ............................................................... 44

2.2.7.1.1 Parameter Relevan untuk Performa PLTS ......................... 45

2.2.7.2 Analisis Sistem PLTS ................................................................... 47

2.2.7.2.1 Hasil Akhir/Final Yield (YF) .............................................. 47

2.2.7.2.2 Hasil Acuan/Reference Yield (YR)...................................... 47

2.2.7.2.3 Rasio Performa (PR)........................................................... 48

2.2.7.2.4 Hasil Array/Array Yield (YA) ............................................. 48

2.2.7.2.5 Rugi-Rugi Sistem/System Losses (LS) ................................ 48

2.2.7.2.6 Rugi-rugi Penangkapan Array/Array Capture Losses (LC) 49

2.2.7.2.7 Faktor Kapasitas (CF) ......................................................... 49

2.2.7.3 PVSyst............................................................................................. 49

2.2.7.4 Solmetric SunEye............................................................................ 51

Page 7: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

x

BAB III METODE PENELITIAN

3.1 Tempat dan Waktu Penelitian ............................................................................. 52

3.2 Data ..................................................................................................................... 52

3.2.1 Sumber Data ............................................................................................... 52

3.2.2 Jenis Data ................................................................................................... 52

3.2.3 Teknik Pengumpulan Data ......................................................................... 52

3.3 Tahapan Penelitian .............................................................................................. 53

3.4 Alur Penelitian .................................................................................................... 55

BAB IV PEMBAHASAN

4.1 Grid Connected 1 MWp Photovoltaic System Karangasem ............................... 56

4.2 Desain dan Instalasi PLTS Kubu ........................................................................ 57

4.2.1 Modul Surya PLTS Kubu ........................................................................ 59

4.2.2 PV Array ................................................................................................. 61

4.2.3 Inverter .................................................................................................... 62

4.2.4 Penyangga Modul .................................................................................... 63

4.2.5 Orientasi Modul PLTS Kubu .................................................................. 64

4.2.6 Array Protection Panel ........................................................................... 66

4.2.7 Panel Distribusi ....................................................................................... 68

4.2.8 Transformator Penaik Tegangan ............................................................. 69

4.2.9 Saklar Beban/Load Break Switch (LBS) 20 kV ...................................... 70

4.2.10 Penangkal Petir ........................................................................................ 70

4.2.11 Remote Monitoring System...................................................................... 71

4.3 Simulasi Produksi Energi PLTS Kubu Menggunakan PVSyst ........................... 72

4.3.1 Simulasi PLTS Kubu Skenario 1 ............................................................... 72

4.3.1.1 Tahapan pembuatan simulasi skenario 1 ..................................... 73

4.3.1.2 Hasil simulasi PVSyst PLTS Kubu skenario 1 ........................... 77

4.3.2 Simulasi PLTS Kubu Skenario 2 ............................................................... 81

4.3.2.1 Tahapan pembuatan simulasi skenario 2 ..................................... 81

4.3.2.2 Hasil simulasi PVSyst PLTS Kubu skenario 2 ........................... 86

4.3.3 Perbandingan Simulasi PVSyst PLTS Kubu Skenario 1 dan 2 ................. 89

Page 8: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xi

4.4 Produksi Energi Listrik Riil PLTS Kubu ............................................................ 90

4.4.1 Produksi Energi Listrik Riil Data Pengukuran Sisi PLTS ......................... 91

4.4.2 Produksi Energi Listrik Riil Data Pengukuran Sisi PLN .......................... 96

4.4.3 Perbandingan Produksi Energi Listrik Riil Data Pengukuran pada Sisi

PLTS dan PLN........................................................................................... 97

4.5 Perbandingan Simulasi PVSyst dengan Produksi Energi Listrik Riil Sisi

PLTS dan Sisi PLN................................................................................... .......... . 100

4.5.1 Perbandingan Simulasi PVSyst dengan Produksi Energi Listrik Riil

Data Pengukuran Sisi PLTS Kubu ............................................................ 101

4.5.2 Perbandingan Simulasi PVSyst dengan Produksi Energi Listrik Riil

Data Pengukuran Sisi PLN ........................................................................ 102

4.6 Analisa Unjuk Kerja PLTS Kubu ....................................................................... 104

BAB V PENUTUP

5.1 Kesimpulan ......................................................................................................... 109

5.2 Saran ................................................................................................................... 110

DAFTAR PUSTAKA

LAMPIRAN

Page 9: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xii

DAFTAR GAMBAR

Gambar 2.1 Pembangkit Listrik Tenaga Surya ...................................................... 14

Gambar 2.2 Diagram Prinsip PLTS Off-Grid/Stand Alone System ........................ 16

Gambar 2.3 Diagram Prinsip PLTS On-Grid ......................................................... 17

Gambar 2.4 Prinsip Kerja Sel Surya dengan P-N Junction .................................... 19

Gambar 2.5 Grafik Fill Factor ............................................................................... 21

Gambar 2.6 Grafik Daya Maksimum ..................................................................... 22

Gambar 2.7 Karakteristik Kurva I-V Sel Surya Terhadap Perubahan Irradiance . 24

Gambar 2.8 Grafik Pengaruh Suhu Terhadap Kurva I-V Sel Surya ...................... 25

Gambar 2.9 Susunan Sel Surya .............................................................................. 27

Gambar 2.10 Lapisan Modul Sel Surya ................................................................... 28

Gambar 2.11 Konfigurasi Rangkaian Seri-Paralel Modul Surya ............................. 30

Gambar 2.12 Konfigurasi Central Inverter .............................................................. 32

Gambar 2.13 Konfigurasi String Inverter ................................................................ 33

Gambar 2.14 Orbit Bumi dan Sudut Penyimpangan ................................................ 35

Gambar 2.15 Sudut Kemiringan Modul Surya ......................................................... 37

Gambar 2.16 Tampilan Program PVSyst ................................................................. 54

Gambar 2.17 Solmetric SunEye ............................................................................... 54

Gambar 3.1 Diagram Alur Penelitian ..................................................................... 55

Gambar 4.1a Foto Satelit Lokasi PLTS Kubu Karangasem .................................... 56

Gambar 4.1b Foto Satelit Lokasi PLTS Kubu Karangasem .................................... 57

Gambar 4.2 Blok Diagram PLTS Kubu ................................................................. 58

Gambar 4.3 Konstruksi Panel Array ...................................................................... 59

Gambar 4.4 LEN 200Wp-24V Monocrystalline PV Module ................................. 60

Gambar 4.5 Karakteristik I-V LEN 200 Wp-24V .................................................. 61

Gambar 4.6 PV array PLTS Kubu Karangasem ..................................................... 62

Gambar 4.7 Inverter SUNGROW tipe SG20KTL ................................................. 63

Gambar 4.8 Penyangga Modul Tipe Tetap dengan Kemiringan 13-15o ................ 64

Gambar 4.9 Perencanaan arah modul surya ........................................................... 65

Page 10: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xiii

Gambar 4.10 Konstruksi perencanaan sudut kemiringan modul PLTS Kubu ......... 66

Gambar 4.11 Pengukuran langsung sudut kemiringan modul di PLTS Kubu ......... 66

Gambar 4.12 Array Protection Panel ....................................................................... 67

Gambar 4.13 Single Line Diagram Array Protection Panel ..................................... 67

Gambar 4.14 Panel Distribusi .................................................................................. 68

Gambar 4.15 Single Line Diagram Panel Distribusi ................................................ 69

Gambar 4.16 Transformator Penaik Tegangan 250 kVA ......................................... 69

Gambar 4.17 Load Break Switch (LBS) pole mounted ........................................... 70

Gambar 4.18 Tower Penangkal Petir PLTS Kubu ................................................... 70

Gambar 4.19 Meja Monitoring PLTS Kubu ............................................................ 71

Gambar 4.20 Display Monitor dan Logger PLTS Kubu .......................................... 71

Gambar 4.21 Environmental Monitoring Device ..................................................... 72

Gambar 4.22 Tampilan Menu Awal Program PVSyst ............................................. 73

Gambar 4.23 Tampilan Menu Project Designation .................................................. 74

Gambar 4.24 Menu Parameter Site & Meteo (Interactive Map) ............................. 74

Gambar 4.25 Tampilan Menu Parameter site & Meteo ........................................... 75

Gambar 4.26 Tampilan Menu Albedo Setting ......................................................... 76

Gambar 4.27 Tampilan Pengaturan Orientasi dan Kemiringan Panel ..................... 76

Gambar 4.28 Tampilan Pengaturan Definisi Sistem PLTS ...................................... 77

Gambar 4.29 Grafik Potensi Energi Listrik Optimum Skenario 1 ........................... 78

Gambar 4.30 Grafik Unjuk Kerja PLTS Kubu Skenario 1 ...................................... 79

Gambar 4.31 Diagram Alir Rugi-rugi Sistem Keseluruhan PLTS Kubu

Skenario 1 ........................................................................................... 79

Gambar 4.32 Tampilan awal program Solmetric SunEye Versi 4.8 ........................ 81

Gambar 4.33 Pengukuran Titik 1 (Sky 01) .............................................................. 82

Gambar 4.34 Pengukuran Titik 2 (Sky 02) .............................................................. 82

Gambar 4.35 Pengukuran Titik 3 (Sky 03) .............................................................. 82

Gambar 4.36 Peta Titik Pengukuran Shading PLTS Kubu ...................................... 83

Gambar 4.37 Sudut Horizon Rata-rata PLTS Kubu ................................................. 83

Gambar 4.38 Nilai Rata-rata Solar Access PLTS Kubu .......................................... 84

Gambar 4.39 Tampilan Menu System Variant ......................................................... 84

Page 11: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xiv

Gambar 4.40 Tampilan Menu Definisi Horizon ...................................................... 84

Gambar 4.41 Menu Profile Reading/Importation..................................................... 85

Gambar 4.42 Horizon PLTS Kubu pada PVSyst ..................................................... 85

Gambar 4.43 Grafik Potensi Energi Listrik Optimum Skenario 2 ........................... 86

Gambar 4.44 Grafik Unjuk Kerja PLTS Kubu Skenario 2 ...................................... 87

Gambar 4.45 Diagram Alir Rugi-rugi Sistem Keseluruhan PLTS Kubu

Skenario 2 ........................................................................................... 87

Gambar 4.46 Grafik Perbandingan Produksi Energi Skenario 1 dan 2 .................... 90

Gambar 4.47 Grafik Perbandingan Rasio Performa Skenario 1 dan 2 ..................... 90

Gambar 4.48 Grafik Produksi Energi Listrik Riil Pengukuran Sisi PLTS ............... 91

Gambar 4.49 Grafik Produksi Riil (MWh) Inverter 1-25 Selama Tahun 2014 ....... 93

Gambar 4.50 Grafik Produksi Riil (MWh) Inverter 26-50 Selama Tahun 2014 ..... 95

Gambar 4.51 Grafik Produksi Energi Listrik Riil Pengukuran Sisi PLN ................ 97

Gambar 4.52 Grafik Perbandingan Pengukuran Sisi PLTS dan Sisi PLN ............... 98

Gambar 4.53 Grafik Perbandingan Produksi Riil Sisi PLTS dengan Simulasi

PVSyst PLTS Kubu ............................................................................ 101

Gambar 4.54 Grafik Perbandingan Produksi Riil Sisi PLN dengan Simulasi

PVSyst PLTS Kubu ............................................................................ 103

Gambar 4.55 Perbandingan Grafik Curah Hujan (Merah) dan Produksi Energi

Listrik Riil PLTS (Biru) Selama Tahun 2014 .................................... 104

Gambar 4.56 Jarak Negara (a) Inggris, (b) Arizona, (c) Ghana, dan (d) PLTS

Kubu Terhadap Garis Khatulistiwa .................................................... 108

Page 12: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xv

DAFTAR TABEL

Tabel 2.1 Intensitas Radiasi Matahari di Indonesia ................................................ 13

Tabel 2.2 Perbandingan Karakteristik Teknologi Sel Surya ................................... 26

Tabel 2.3 Parameter Untuk Performa PLTS Grid-Connected ................................ 45

Tabel 4.1a Karakteristik Elektrikal LEN 200 Wp-24 V ........................................... 60

Tabel 4.1b Karakteristik Mekanikal dan Temperatur LEN 200 Wp-24 V ................ 60

Tabel 4.2 Data Meteorologi NASA sesuai Lokasi PLTS Kubu .............................. 75

Tabel 4.3 Potensi Optimum Energi Listrik PLTS Kubu Skenario 1 ....................... 78

Tabel 4.4 Koefisien Peforma Normal PLTS Kubu Skenario 1 ............................... 80

Tabel 4.5 Total Produksi Energi Listrik (MWh) Setiap Jam Dalam Sehari per

Bulan pada Skenario 1............................................................................. 80

Tabel 4.6 Potensi Optimum Energi Listrik PLTS Kubu Skenario 2 ....................... 86

Tabel 4.7 Koefisien Peforma Normal PLTS Kubu Skenario 2 ............................... 88

Tabel 4.8 Total Produksi Energi Listrik (MWh) Setiap Jam Dalam Sehari per

Bulan pada Skenario 2............................................................................. 88

Tabel 4.9 Perbandingan Performa Skenario 1 dan 2 ............................................... 89

Tabel 4.10 Produksi Energi Listrik Riil Pengukuran Sisi PLTS ............................... 91

Tabel 4.11 Produksi Riil (MWh) Inverter 1-25 Selama Tahun 2014 ........................ 92

Tabel 4.12 Produksi Riil (MWh) Inverter 26-50 Selama Tahun 2014 ...................... 94

Tabel 4.13 Produksi Energi Listrik Riil Pengukuran Sisi PLN ................................. 96

Tabel 4.14 Perbandingan Pengukuran Sisi PLTS dan Sisi PLN ............................... 98

Tabel 4.15 Pengukuran Sisi PLTS pada Bulan Januari-Maret .................................. 99

Tabel 4.16 Pengukuran Sisi PLTS Bulan Desember ................................................. 100

Tabel 4.17 Perbandingan Produksi Riil Sisi PLTS dengan Simulasi PVSyst

PLTS Kubu .............................................................................................. 101

Tabel 4.18 Perbandingan Produksi Riil Sisi PLN dengan Simulasi PVSyst

PLTS Kubu .............................................................................................. 102

Tabel 4.19 Curah Hujan Kabupaten Karangasem 2014 (mm) .................................. 103

Tabel 4.20 Final Yield / Hasil akhir PLTS Kubu ...................................................... 105

Tabel 4.21 Rata-rata Fin.al Yield / Hasil akhir dan Faktor Kapasitas PLTS Kubu .. 106

Page 13: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xvi

DAFTAR SINGKATAN

A : Ampere

AC : Alternating Current

Ah : Ampere hour

C : Celcius

Cb : Jumlah baterai yang digunakan

cm : Centimeter

CO2 : Karbondioksida

d : Hari otonomi

DC : Direct Current

DOD : Depth of Discharge

Emodul : Produksi energi harian PV module

I : Arus terminal sel surya

Imp : Arus pada titik kerja maksimum

Isc : Arus hubung singkat

kWh : Kilo Watt hour

Lx : Lux

ƞ : Efisiensi PV module

Nmodul : Jumlah PV module yang digunakan

Ph/day : Peak hour per day

Pin : Daya input

PLN : Perusahaan Listrik Negara

PLTS : Pembangkit Listrik Tenaga Surya

Pmpp : Daya keluaran maksimum PV module

PWM : Pulse Width Modulation

R : Tahanan

SESF : Sistem Energi Surya Fotovoltaik

STC : Standard Test Condition

T : Temperatur ambient

Page 14: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

xvii

V : Tegangan terminal sel surya

Vmp : Tegangan pada titik kerja maksimum

Vs : Tegangan dasar yang dipakai (12 atau 24 V DC)

Voc : Tegangan rangkaian terbuka

W : Watt

Wh : Watthour

Page 15: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

iv

KATA PENGANTAR

Puji syukur penulis panjatkan kehadapan Ida Sang Hyang Widhi Wasa,

Tuhan Yang Maha Esa karena atas berkat rahmat-Nya penulis dapat

menyelesaikan Tugas Akhir yang berjudul “Studi Terhadap Unjuk Kerja Grid

Connected 1 MWp Photovoltaic System di Karangasem Bali”. Tugas Akhir ini

disusun untuk memenuhi sebagian persyaratan dalam rangka menyelesaikan

pendidikan sarjana strata satu (S1) pada Jurusan Teknik Elektro Fakultas Teknik

Universitas Udayana.

Dalam penyusunan Tugas Akhir ini, penulis mendapatkan petunjuk,

bantuan, dan bimbingan dari berbagai pihak. Sehubungan dengan hal tersebut

pada kesempatan ini penulis menyampaikan ucapan terima kasih kepada:

1. Bapak Prof. Ir. I Wayan Redana, MA.Sc., Ph.D. selaku Dekan Fakultas

Teknik Universitas Udayana.

2. Bapak Ir. I Nyoman Setiawan, MT. selaku ketua jurusan Teknik Elektro

Fakultas Teknik Universitas Udayana.

3. Bapak I Putu Ardana, ST., MT. selaku pembimbing akademik yang telah

memberikan bimbingan selama menempuh perkuliahan.

4. Bapak I Nyoman Satya Kumara, ST., M.Sc., Ph.D. selaku dosen pembimbing

I yang telah memberikan bimbingan, perhatian, serta dorongan yang

sangat maksimal selama penyusunan tugas akhir ini.

5. Bapak Ir. I Wayan Sukerayasa, MT. selaku dosen pembimbing II yang

telah memberikan bimbingan, perhatian, serta dorongan yang sangat

maksimal selama penyusunan tugas akhir ini.

6. Orang tua dan keluarga besar penulis yang selalu memberikan dukungan

moril, motivasi, dan materil serta membimbing sehingga penyusunan tugas

akhir ini dapat selesai.

7. Teman hidup penulis Anak Agung Ayu Ari, Amd. Keb. yang selalu

memberi semangat dan dukungan kepada penulis sehingga penyusunan

tugas akhir ini dapat selesai.

Page 16: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

v

8. Para sahabat seperjuangan Aryanata Meiyana, ST., Arya Suryadarma.,

Tjok Visnu, Satrya Sonatha, ST., dan seluruh rekan-rekan angkatan 2010,

serta Agus Setiawan, ST. dan Bli Wayan Bracuk yang sudah membantu

dan memberikan dukungan penuh dalam suka maupun duka hingga tugas

akhir ini dapat terselesaikan.

9. Serta semua pihak yang tidak bisa penulis sebutkan satu-persatu atas

bantuan dan saran yang telah diberikan sehingga tugas akhir ini dapat

terselesaikan.

Penulis menyadari sepenuhnya bahwa tugas akhir ini masih jauh dari

sempurna. Oleh karena itu, segala bentuk ide pengembangan, kritik, dan saran

yang bersifat membangun dari pihak dosen penguji dan berbagai pihak lainnya

sangat penulis hargai dan harapkan demi kesempurnaan tugas akhir ini. Akhir

kata, semoga tugas akhir ini dapat bermanfaat dalam pengembangan ilmu sains

dan teknologi, serta menambah pengetahuan luas semua pihak.

Denpasar, 11 November 2015

Penulis

Page 17: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

vi

ABSTRAK

STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP

PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI

Indonesia yang memiliki insolasi energi cahaya matahari mencapai rata-

rata 4,8 kWh/m2 per hari, seharusnya dapat memaksimalkan potensi tersebut

untuk mengembangkan Pembangkit Listrik Tenaga Surya (PLTS). Permasalahan

energi di masa depan dan potensi Energi Baru Terbarukan (EBT) yang dimiliki

oleh Indonesia mendorong pemerintah mengeluarkan Perpres No. 5 tahun 2006

tentang Kebijakan Energi Nasional (KEN). PLTS 1 MWp terinterkoneksi jaringan

di Kubu Karangasem ini merupakan PLTS berkapasitas besar yang baru dibangun

di Indonesia, yang nantinya akan dijadikan contoh bagi pembangunan PLTS

selanjutnya. Maka dari itu perlunya dilakukan studi terhadap unjuk kerja dari

PLTS tersebut.

Dalam penelitian ini performa/unjuk kerja PLTS Kubu dianalisis dengan

menggunakan data monitoring operasi PLTS selama setahun, yaitu selama kurun

waktu Januari-Desember 2014. Selanjutnya dilakukan dua simulasi untuk

memperoleh estimasi produksi energi ideal tanpa shading dan dengan faktor

shading. Simulasi dilakukan menggunakan software PVSyst, sedangkan untuk

memperoleh data shading dilakukan pengukuran langsung shading factor meng-

gunakan Solmetric SunEye Meter, dan unjuk kerja/rasio performa PLTS dila-

kukan analisis dengan perhitungan sesuai dengan standar IEC 61724.

Hasil dari analisis menunjukkan desain dari sistem PLTS Kubu sudah

sesuai dengan standar. Modul surya memiliki kemiringan antara 13-15o, meng-

hadap 0o ke arah utara. Sedangkan hasil simulasi energi listrik ideal yang dapat

dicapai oleh PLTS Kubu per tahun tanpa adanya faktor shading adalah sebesar

1.802 MWh, dengan Performa Ratio (PR) sebesar 90,7 %. Simulasi kedua dengan

adanya faktor shading sesuai dengan index shading di lokasi meng-hasilkan 1.696

MWh per tahun, dengan PR sebesar 85,3 %. Angka tersebut lebih tinggi dari

produksi riil PLTS Kubu sesuai lingkungan terpasang yang sebesar 1.196 MWh

dan memiliki faktor kapasitas sebesar 18,11 % dengan lama penyinaran rata-rata

selama 4,35 jam per hari selama tahun 2014.

Kata kunci: Pembangkit listrik, PLTS, modul surya, unjuk kerja

Page 18: GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM Awal.pdf · STUDI TERHADAP UNJUK KERJA GRID CONNECTED 1 MWP PHOTOVOLTAIC SYSTEM DI KARANGASEM BALI TUGAS AKHIR Diajukan guna memenuhi sebagian

vii

ABSTRACT

STUDIES ON THE PERFORMANCE OF GRID CONNECTED 1 MWP

PHOTOVOLTAIC SYSTEM IN KARANGASEM BALI

Indonesia which has the solar insolation energy on the average 4,8

kWh/m2 per day should can maximize the potential to develop the photovoltaic

power plant system. The problem of energy in the future and potential of

renewable energy in Indonesia have encouraged the government to release

Perpres No. 5 tahun 2006 about National Energy Policy (KEN). The Grid

connected 1 MWp PV System in Kubu Karangasem is a new-large capacity PV

system built in Indonesia, which will be an example for further development of

PV system building in Indonesia. Hence, the need of study is neccesary to analyse

the performance of the Kubu PV system.

This research of Kubu PV system performance is analysed by using PV

system operation monitoring data during a year, during the period of January-

December 2014. Furtermore, two simulations conducted to obtain the estimation

of ideal production energy without and with shading factor. Simulations made by

using PVSyst software, whereas shading index data obtained by direct

measurement using Solmetric SunEye Meter, and the performance ratio of PV

system is analysed by calculation in accordance with IEC 61724 standar.

Result of analysis showed design of Kubu PV system in compliance with

standard. The PV modules have declivity between 13-15o, facing towards 0

o to

north. Meanwhile the simulation result of ideal electrical energy production that

can be reached by Kubu PV system per year without shading factor is 1,802

MWh, with Performance Ratio (PR) of 90.7%. The Second simulation with

shading factor according to shading index in location produce 1,696 MWh per

year, with PR 85.3%. That number is higher than Kubu PV system real production

in accordanceof the location installed about 1,196 MWh and has the Capacity

Factor (CF) 18.11 % with radiation is on the average of 4.35 hours per day

during year 2014.

Keywords: Power plant, PV system, PV module, Performance ratio