    NO MATERIAL DAN UPAH KERJA SATUAN HARGA

    1 Bak Cuci Stainless Steel buah 250,000Rp

    2 Balok kayu kelas I m 3,500,000Rp

    3 Bata merah buah 550Rp4 Bathtub buah 4,000,000Rp

    5 Batu Belah 15 cm m 237,000Rp

    6 Besi beton polos kg 12,600Rp

    7 Cat Kayu kg 56,000Rp

    8 Cat Meni kg 16,500Rp

    9 Cat Tembok kg 19,000Rp

    10 Dempul kayu kg 11,000Rp

    11 Dolken kayu galam, panjang 4 m batang 20,000Rp

    12 Engsel Jendela 3" buah 26,000Rp

    13 Engsel Pintu 4" buah 35,500Rp

    14 Floor Drain buah 20,000Rp

    15 Genteng Metal lembar 50,000Rp

    16 Grendel jendela buah 14,400Rp

    17 Gypsum board lembar 66,500Rp

    18 Hak Angin buah 14,000Rp

    19 Kaca m 82,800Rp

    20 Kawat beton kg 21,000Rp

    21 Kayu kelas II balok m 3,162,500Rp

    22 Kayu kelas III m 1,983,000Rp

    23 Kerikil m 277,000Rp

    24 Kloset Duduk/Monoblok buah 453,000Rp25 Kran Air buah 26,000Rp

    26 Kran Air tipe bebek buah 32,000Rp

    27 Kunci Tanam Kamar Mandi Bulat set 30,000Rp

    28 Kunci Tanam pintu alumunium set 1,000,000Rp

    29 Kunci Tanam Slaag set 109,000Rp

    30 Kusen + daun pintu PVC set 400,000Rp

    31 Lem kayu kg 30,000Rp

    32 Lis kayu profil m' 7,000Rp

    33 Minyak bekisting liter 2,900Rp

    34 Paku 10 cm kg 17,500Rp

    35 Paku 5-12 cm kg 17,500Rp

    36 Paku 5-7 cm kg 17,500Rp

    37 Paku sekrup kg 29,000Rp

    38 Papan kayu kelas I m 3,205,000Rp

    39 Pasir Beton m 148,000Rp

    40 Pasir Pasangan m 134,000Rp

    41 Pasir Urug m 128,000Rp

    42 Pekerjaan septictank unit 3,500,000Rp

    HARGA SATUAN BAHAN & UPAH KERJA

  • 8/10/2019 Format RAB Bangunan Gedung

    2/44

    43 Pintu alumunium m' 145,000Rp

    44 Plamur kg 7,500Rp

    45 Plywood 9 mm lembar 125,000Rp

    46 Portland cement kg 1,250Rp

    47 Profil alumunium m' 145,000Rp

    48 Profil kaca m' 90,000Rp

    49 Rangka atap baja ringan m 95,000Rp50 Rangka plafon alumunium m 32,000Rp

    51 Seal Tape buah 2,000Rp

    52 Sealant tube 35,000Rp

    53 Semen warna kg 13,500Rp

    54 Skrup fixer buah 600Rp

    55 Tanah Urug m 152,000Rp

    56 Tarikan jendela buah 5,000Rp

    57 Ubin keramik m 45,500Rp

    58 Wastafel buah 195,500Rp

    1 Pekerja OH 50,000Rp

    2 Tukang batu / kayu / cat / besi OH 75,000Rp

    3 Kepala Tukang OH 100,000Rp

    4 Mandor OH 100,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    3/44

    DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN

    HIMPUNAN MAHASISWA SIPIL FT-UH

    PEKERJAAN

    LOKASI

    TAHUN ANGGARAN

    NO URAIAN PEKERJAAN SATUAN VOLUME

    A. PEKERJAAN PERSIAPAN DAN TANAH

    1. Pembersihan lahan dan bowplank Ls 1.000

    2. Pekerjaan galian tanah m 0.000 panjang

    lebar

    tinggi

    3. Pekerjaan urugan tanah kembali sisi pondasi m 0.000 panjang

    luas penampangsisi kanan kiri

    4. Pekerjaan urugan tanah peninggian lantai m 0.000 luasan

    tebal

    5. Pekerjaan urugan pasir di bawah pondasi m 0.000 panjang

    lebar

    tebal

    6. Pekerjaan urugan pasir di bawah lantai m 0.000 luasan

    tebal

    B. PEKERJAAN PONDASI1. Pekerjaan batu kosong (aanstamping) m 0.000 panjang

    lebar

    tinggi

    2. Pekerjaan pondasi batu kali 1:4 m 0.000 panjang

    sisi atas

    sisi bawah

    tinggi

    C. PEKERJAAN BETON

    1. Pekerjaan sloof beton 15/20 m 0.000 panjang

    lebar

    tinggi

    2. Pekerjaan kolom beton 15/20 m 0.000 panjang

    lebar

    tinggi

    jumlah

    3. Pekerjaan kolom beton 15/15 m 0.000 panjang

    lebar

    tinggi

    jumlah

    4. Pekerjaan balok beton 20/40 m 0.000 panjang

    lebar

    tinggi

    PERHITUNGAN VOLUME

    VOLUME PEKERJAAN

    : PEMBANGUNAN RUMAH TYPE 110/200

    : PERUMAHAN DOSEN TAMALANREA

    : 2014

  • 8/10/2019 Format RAB Bangunan Gedung

    4/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    lebar

    tinggi

    8. Pekerjaan meja dapur beton tebal 12 cm m 0.000 panjang

    lebar

    tebal

    D. PEKERJAAN PASANGAN DINDING

    1. Pasangan dinding 1/2 bata 1:5 m panjang

    tinggi

    4. Pasangan dinding 1/2 bata 1:3 m panjang

    tinggi

    7. Plesteran dan aci 1:5 m 0.000 luasan dinding

    luar dalam

    8. Plesteran dan aci 1:3 m 0.000 luasan dinding

    luar dalam

    E. PEKERJAAN PENUTUP LANTAI DAN DINDING

    1. Pasangan lantai keramik 40/40 m 0.000 luasan

    3. Pasangan lantai keramik 20/20 untuk KM/WC m 0.000 luasan

    4. Pasangan dinding keramik 20/20 m 0.000 panjang dinding

    tinggi

    5. Pasangan tegel plin 10/30 m 0.000 panjang dinding

    tinggi

    F. PEKERJAAN ATAP1. Pasang rangka atap baja ringan m 0.000 luasan atap

    2. Pasang atap genteng metal m 0.000 luasan atap

    3. Pasang lisplank woodplank 3/30 m' 0.000 panjang

    G. PEKERJAAN PLAFON

    1. Pasang rangka plafon hollow m 0.000 luasan

    2. Pasang penutup plafon gypsum m 0.000 luasan

    3. Pasang lis plafon kayu profil 5 cm m' 0.000 panjang dinding

    luar dalam

    H. PEKERJAAN KUSEN, PINTU, DAN JENDELA

    4. Pasang kusen pintu jendela Type PJ kayu kelas I m 0.000 panjang

    lebar

    tebal

    jumlah

    2. Pasang kusen pintu Type P2 kayu kelas I m 0.000 panjang

    lebar

    tebaljumlah

  • 8/10/2019 Format RAB Bangunan Gedung

    5/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    5. Pasang kusen jendela Type J1 kayu kelas I m 0.000 panjang

    lebar

    tebal

    jumlah

    6. Pasang kusen jendela Type J2 kayu kelas I m 0.000 panjangjumlah

    8. Pasang daun pintu panel kayu kelas I m 0.000 lebar

    tinggi

    jumlah

    10. Pasang daun jendela kaca rangka kayu kelas I Type PJ1 m 0.000 lebar

    tinggi

    jumlah daun per kusen

    jumlah kusen

    11. Pasang daun jendela kaca rangka kayu kelas I m 0.000 lebar

    tinggijumlah daun per kusen

    jumlah kusen

    I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA

    1. Pasang kunci pintu slaag bh 0.000 jumlah pintu

    4. Pasang kunci pintu tipe bulat bh 0.000 jumlah pintu

    5. Pasang engsel pintu 4" bh 0.000 jumlah per pintu

    jumlah pintu

    7. Pasang engsel jendela 3" bh 0.000 jumlah per jendela

    jumlah jendela

    8. Pasang grendel jendela bh 0.000 jumlah jendela

    9. Pasang hak angin jendela bh 0.000 jumlah per jendela

    jumlah jendela

    10. Pasangan tarikan jendela bh 0.000 jumlah jendela

    J. PEKERJAAN SANITASI

    1. Pasang kloset jongkok bh 0.000 jumlah

    2. Pasang kran air bh 0.000 jumlah

    3. Pasang kran air tipe bebek untuk meja dapur bh 0.000 jumlah

    5. Pasang kitchen sink set 0.000 jumlah

    6. Pasang floor drain KM/WC bh 0.000 jumlah

    7. Pasang wastafel bh 0.000 jumlah

    8. Pembuatan Septictank 2 x 1.5 x 1.5 m unit 1.000 jumlah

    9. Pasang pipa PVC diameter 3/4 inch untuk instalasi air bersih m' 0.000 panjang

    10. Pasang pipa PVC diameter 3 inch untuk instalasi air kotor m' 0.000 panjang

    11. Pasang pipa PVC diameter 4 inch untuk instalasi tinja m' 0.000 panjang

  • 8/10/2019 Format RAB Bangunan Gedung

    6/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    13. Pasang penyambung air bersih ke PDAM ls 1.000

    K. PEKERJAAN INSTALASI LISTRIK

    Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm titik jumlah

    Pasangan instalasi daya stop kontak kabel NYM 3 x 2,5 mm titik jumlah

    Pasangan lampu pijar 15 watt buah jumlah

    Pasangan lampu pijar 20 watt buah jumlah

    Pasangan lampu TL 1 x 20 watt buah jumlah

    Pasangan panel listrik buah jumlah

    Pasangan penyambung daya ke PLN Ls 1.000

    L PEKERJAAN PENGECATAN

    1. Pengecatan dinding dengan cat tembok m 0.000 luas dinding

    luar dalam

    2. Pengecatan plafon dengan cat tembok m 0.000 luas plafon

    3. Pengecatan kusen dengan cat kayu m 0.000 lebar permukaan

    panjang

    4. Pengecatan daun pintu dengan cat kayu m 0.000 luasan pintu

    luar dalam

    5. Pengecatan daun jendela dengan cat kayu m 0.000 luasan jendelaluar dalam

    M PEKERJAAN PEMBERSIHAN

    1. Pembersihan lahan setelah pekerjaan Ls 1.000

    -

  • 8/10/2019 Format RAB Bangunan Gedung

    7/44

    DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN

    HIMPUNAN MAHASISWA SIPIL FT-UH

    PEKERJAAN

    LOKASI

    TAHUN ANGGARAN

    NO URAIAN PEKERJAAN SATUAN VOLUME

    A. PEKERJAAN PERSIAPAN DAN TANAH

    1. Pembersihan lahan dan bowplank Ls 1.000

    2. Pekerjaan galian tanah m 0.000 panjang

    lebar

    tinggi

    3. Pekerjaan urugan tanah kembali sisi pondasi m 0.000 panjang

    luas penampangsisi kanan kiri

    4. Pekerjaan urugan tanah peninggian lantai m 0.000 luasan

    tebal

    5. Pekerjaan urugan pasir di bawah pondasi m 0.000 panjang

    lebar

    tebal

    6. Pekerjaan urugan pasir di bawah lantai m 0.000 luasan

    tebal

    B. PEKERJAAN PONDASI1. Pekerjaan batu kosong (aanstamping) m 0.000 panjang

    lebar

    tinggi

    2. Pekerjaan pondasi batu kali 1:4 m 0.000 panjang

    sisi atas

    sisi bawah

    tinggi

    C. PEKERJAAN BETON

    1. Pekerjaan sloof beton 15/20 m 0.000 panjang

    lebar

    tinggi

    2. Pekerjaan kolom beton 15/20 m 0.000 panjang

    lebar

    tinggi

    jumlah

    3. Pekerjaan kolom beton 15/15 m 0.000 panjang

    lebar

    tinggi

    jumlah

    4. Pekerjaan balok beton 20/40 m 0.000 panjang

    lebar

    tinggi

    PERHITUNGAN VOLUME

    VOLUME PEKERJAAN

    : PEMBANGUNAN RUMAH TYPE 110/200

    : PERUMAHAN DOSEN TAMALANREA

    : 2014

  • 8/10/2019 Format RAB Bangunan Gedung

    8/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    lebar m

    tinggi m

    8. Pekerjaan meja dapur beton tebal 12 cm m 0.000 panjang m

    lebar m

    tebal m

    D. PEKERJAAN PASANGAN DINDING

    1. Pasangan dinding 1/2 bata 1:5 m panjang m

    tinggi m

    4. Pasangan dinding 1/2 bata 1:3 m panjang m

    tinggi m

    7. Plesteran dan aci 1:5 m 0.000 luasan dinding m

    luar dalam x

    8. Plesteran dan aci 1:3 m 0.000 luasan dinding m

    luar dalam x

    E. PEKERJAAN PENUTUP LANTAI DAN DINDING

    1. Pasangan lantai keramik 40/40 m 0.000 luasan m

    3. Pasangan lantai keramik 20/20 untuk KM/WC m 0.000 luasan m

    4. Pasangan dinding keramik 20/20 m 0.000 panjang dinding m

    tinggi m

    5. Pasangan tegel plin 10/30 m 0.000 panjang dinding m

    tinggi m

    F. PEKERJAAN ATAP1. Pasang rangka atap baja ringan m 0.000 luasan atap m

    2. Pasang atap genteng metal m 0.000 luasan atap m

    3. Pasang lisplank woodplank 3/30 m' 0.000 panjang m

    G. PEKERJAAN PLAFON

    1. Pasang rangka plafon hollow m 0.000 luasan m

    2. Pasang penutup plafon gypsum m 0.000 luasan m

    3. Pasang lis plafon kayu profil 5 cm m' 0.000 panjang dinding m

    luar dalam x

    H. PEKERJAAN KUSEN, PINTU, DAN JENDELA

    4. Pasang kusen pintu jendela Type PJ kayu kelas I m 0.000 panjang m

    lebar m

    tebal m

    jumlah b

    2. Pasang kusen pintu Type P2 kayu kelas I m 0.000 panjang m

    lebar m

    tebal mjumlah b

  • 8/10/2019 Format RAB Bangunan Gedung

    9/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    5. Pasang kusen jendela Type J1 kayu kelas I m 0.000 panjang m

    lebar m

    tebal m

    jumlah b

    6. Pasang kusen jendela Type J2 kayu kelas I m 0.000 panjang mjumlah b

    8. Pasang daun pintu panel kayu kelas I m 0.000 lebar m

    tinggi m

    jumlah b

    10. Pasang daun jendela kaca rangka kayu kelas I Type PJ1 m 0.000 lebar m

    tinggi m

    jumlah daun per kusen b

    jumlah kusen b

    11. Pasang daun jendela kaca rangka kayu kelas I m 0.000 lebar m

    tinggi mjumlah daun per kusen b

    jumlah kusen b

    I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA

    1. Pasang kunci pintu slaag bh 0.000 jumlah pintu b

    4. Pasang kunci pintu tipe bulat bh 0.000 jumlah pintu b

    5. Pasang engsel pintu 4" bh 0.000 jumlah per pintu b

    jumlah pintu b

    7. Pasang engsel jendela 3" bh 0.000 jumlah per jendela b

    jumlah jendela b

    8. Pasang grendel jendela bh 0.000 jumlah jendela b

    9. Pasang hak angin jendela bh 0.000 jumlah per jendela b

    jumlah jendela b

    10. Pasangan tarikan jendela bh 0.000 jumlah jendela b

    J. PEKERJAAN SANITASI

    1. Pasang kloset jongkok bh 0.000 jumlah b

    2. Pasang kran air bh 0.000 jumlah b

    3. Pasang kran air tipe bebek untuk meja dapur bh 0.000 jumlah b

    5. Pasang kitchen sink set 0.000 jumlah b

    6. Pasang floor drain KM/WC bh 0.000 jumlah b

    7. Pasang wastafel bh 0.000 jumlah b

    8. Pembuatan Septictank 2 x 1.5 x 1.5 m unit 1.000 jumlah u

    9. Pasang pipa PVC diameter 3/4 inch untuk instalasi air bersih m' 0.000 panjang m

    10. Pasang pipa PVC diameter 3 inch untuk instalasi air kotor m' 0.000 panjang m

    11. Pasang pipa PVC diameter 4 inch untuk instalasi tinja m' 0.000 panjang m

  • 8/10/2019 Format RAB Bangunan Gedung

    10/44

    NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME

    13. Pasang penyambung air bersih ke PDAM ls 1.000

    K. PEKERJAAN INSTALASI LISTRIK

    Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm titik jumlah

    Pasangan instalasi daya stop kontak kabel NYM 3 x 2,5 mm titik jumlah

    Pasangan lampu pijar 15 watt buah jumlah

    Pasangan lampu pijar 20 watt buah jumlah

    Pasangan lampu TL 1 x 20 watt buah jumlah

    Pasangan panel listrik buah jumlah

    Pasangan penyambung daya ke PLN Ls 1.000

    L PEKERJAAN PENGECATAN

    1. Pengecatan dinding dengan cat tembok m 0.000 luas dinding

    luar dalam

    2. Pengecatan plafon dengan cat tembok m 0.000 luas plafon

    3. Pengecatan kusen dengan cat kayu m 0.000 lebar permukaan

    panjang

    4. Pengecatan daun pintu dengan cat kayu m 0.000 luasan pintu

    luar dalam

    5. Pengecatan daun jendela dengan cat kayu m 0.000 luasan jendelaluar dalam

    M PEKERJAAN PEMBERSIHAN

    1. Pembersihan lahan setelah pekerjaan Ls 1.000

    -

  • 8/10/2019 Format RAB Bangunan Gedung

    11/44

    DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN

    HIMPUNAN MAHASISWA SIPIL FT-UH

    PEKERJAAN : PEMBANGUNAN RUMAH TYPE 110/200

    LOKASI : PERUMAHAN DOSEN TAMALANREA

    TAHUN ANGGARAN : 2014

    NO SATUAN KOEF.

    A. PEKERJAAN PERSIAPAN DAN TANAH

    1 Pembersihan Lahan dan pemasangan bouwplank Ls 1.000

    2 Menggali 1 m tanah biasa sedalam 2 meterPekerja OH 0.900

    Mandor OH 0.045

    3 Mengurug kembali 1 m tanah

    Pekerja OH 0.300

    Mandor OH 0.015

    4 Mengurug 1 m tanah urug

    Tanah Urug m 1.200

    Pekerja OH 0.300

    Mandor OH 0.010

    5 Mengurug 1 m pasir urug

    Pasir Urug m 1.200

    Pekerja OH 0.300

    Mandor OH 0.010

    B. PEKERJAAN PONDASI

    1 Memasang 1 m batu kosong (aanstamping)

    Batu Belah 15 cm m 1.200

    Pasir Urug m 0.432

    Pekerja OH 0.780

    ANALISA HARGA SATUAN PEKERJAAN

    URAIAN

  • 8/10/2019 Format RAB Bangunan Gedung

    12/44

    Tukang Batu OH 0.390

    Kepala Tukang OH 0.390

    Mandor OH 0.390

    2 Memasang 1 m pondasi batu belah, 1 PC : 4 PP

    Batu Belah 15 cm m 1.200Portland Cement kg 163.000

    Pasir Pasangan m 0.520

    Pekerja OH 1.500

    Tukang Batu OH 0.750

    Kepala Tukang OH 0.075

    Mandor OH 0.075

    3 Membuat 1 m pondasi beton bertulang

    Kayu kelas III m 0.200

    Paku 5-12 cm kg 1.500

    Minyak bekisting liter 0.400

    Besi beton polos kg 157.500

    Kawat beton kg 2.250

    Portland Cement kg 336.000

    Pasir beton m 0.540

    Kerikil m 0.810

    Pekerja OH 5.300

    Tukang batu OH 0.275Tukang kayu OH 1.300

    Tukang besi OH 1.050

    Kepala Tukang OH 0.262

    Mandor OH 0.265

    C. PEKERJAAN BETON

    1 Membuat 1 m sloof beton bertulang

    Kayu kelas III m 0.270

    Paku 5-12 cm kg 2.000

    Minyak bekisting liter 0.600

    Besi beton polos kg 210.000

    Kawat beton kg 3.000

    Portland Cement kg 336.000

    Pasir beton m 0.540

    Kerikil m 0.810

    Pekerja OH 5.650

    Tukang batu OH 0.275

  • 8/10/2019 Format RAB Bangunan Gedung

    13/44

    Tukang kayu OH 1.560

    Tukang besi OH 1.400

    Kepala Tukang OH 0.323

    Mandor OH 0.283

    2 Membuat 1 m kolom beton bertulangKayu kelas III m 0.400

    Paku 5-12 cm kg 4.000

    Minyak bekisting liter 2.000

    Besi beton polos kg 315.000

    Kawat beton kg 4.500

    Portland Cement kg 336.000

    Pasir beton m 0.540

    Kerikil m 0.810

    Kayu kelas II balok m 0.150

    Plywood 9 mm lembar 3.500

    Dolken kayu galam, panjang 4 m batang 20.000

    Pekerja OH 7.050

    Tukang batu OH 0.275

    Tukang kayu OH 1.650

    Tukang besi OH 2.100

    Kepala Tukang OH 0.403

    Mandor OH 0.353

    3 Membuat 1 m balok beton bertulangKayu kelas III m 0.320

    Paku 5-12 cm kg 3.200

    Minyak bekisting liter 1.600

    Besi beton polos kg 210.000

    Kawat beton kg 3.000

    Portland Cement kg 336.000

    Pasir beton m 0.540

    Kerikil m 0.810

    Kayu kelas II balok m 0.140

    Plywood 9 mm lembar 2.800

    Dolken kayu galam, panjang 4 m batang 16.000

    Pekerja OH 6.350

    Tukang batu OH 0.275

    Tukang kayu OH 1.650

    Tukang besi OH 1.400

    Kepala Tukang OH 0.333

    Mandor OH 0.318

  • 8/10/2019 Format RAB Bangunan Gedung

    14/44

  • 8/10/2019 Format RAB Bangunan Gedung

    15/44

    Besi beton polos kg 210.000

    Kawat beton kg 3.000

    Portland cement kg 336.000

    Pasir beton m 0.540

    Kerikil m 0.810

    Kayu kelas II balok m 0.140

    Plywood 9 mm lembar 2.800Dolken kayu galam, panjang 4 m batang 16.000

    Pekerja OH 6.350

    Tukang batu OH 0.275

    Tukang kayu OH 1.650

    Tukang besi OH 1.400

    Kepala Tukang OH 0.333

    Mandor OH 0.318

    D. PEKERJAAN PASANGAN DINDING

    1 Memasang 1 m dinding 1/2 bata 1:5

    Bata merah buah 70.000

    Portland cement kg 9.680

    Pasir pasangan m 0.045

    Pekerja OH 0.300

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.015

    2 Memasang 1 m dinding 1/2 bata 1:3

    Bata merah buah 70.000

    Portland cement kg 14.300

    Pasir pasangan m 0.040

    Pekerja OH 0.300

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.015

    3 Memasang 1 m plesteran 1:5

    Portland cement kg 5.184

    Pasir pasangan m 0.026

    Pekerja OH 0.200

    Tukang Batu OH 0.150

    Kepala Tukang OH 0.015

  • 8/10/2019 Format RAB Bangunan Gedung

    16/44

    Mandor OH 0.010

    4 Memasang 1 m plesteran 1:3

    Portland cement kg 7.776

    Pasir pasangan m 0.023

    Pekerja OH 0.200

    Tukang Batu OH 0.150

    Kepala Tukang OH 0.015

    Mandor OH 0.010

    5 Memasang 1 m acian

    Portland cement kg 3.250

    Pekerja OH 0.150

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.008

    E. PEKERJAAN PENUTUP LANTAI DAN DINDING

    1 Memasang 1 m lantai keramik ukuran 30 x 30 cm

    Ubin keramik m 1.000

    Portland cement kg 10.000

    Pasir Pasangan m 0.045

    Semen warna kg 1.500

    Pekerja OH 0.620

    Tukang Batu OH 0.350

    Kepala Tukang OH 0.035

    Mandor OH 0.030

    2 Memasang 1 m lantai keramik ukuran 40 x 40 cm

    Ubin keramik m 1.000

    Portland cement kg 9.800

    Pasir Pasangan m 0.045

    Semen warna kg 1.300

    Pekerja OH 0.620

    Tukang Batu OH 0.350

    Kepala Tukang OH 0.035

    Mandor OH 0.030

  • 8/10/2019 Format RAB Bangunan Gedung

    17/44

    2 Memasang 1 m lantai keramik ukuran 20 x 20 cm

    Ubin keramik m 1.000

    Portland cement kg 10.400

    Pasir Pasangan m 0.045

    Semen warna kg 1.620

    Pekerja OH 0.620Tukang Batu OH 0.350

    Kepala Tukang OH 0.035

    Mandor OH 0.030

    3 Memasang 1 m dinding keramik ukuran 20 x 20 cm

    Ubin keramik m 1.000

    Portland cement kg 9.300

    Pasir Pasangan m 0.018

    Semen warna kg 1.940

    Pekerja OH 0.600

    Tukang Batu OH 0.450

    Kepala Tukang OH 0.045

    Mandor OH 0.030

    4 Memasang 1 m plint keramik ukuran 10 x 30 cm

    Ubin keramik m 1.000

    Portland cement kg 10.000

    Pasir Pasangan m 0.045Semen warna kg 1.940

    Pekerja OH 0.620

    Tukang Batu OH 0.350

    Kepala Tukang OH 0.035

    Mandor OH 0.030

    F. PEKERJAAN ATAP

    1 Memasang 1 m rangka atap baja ringan

    Rangka atap baja ringan m 1.000

    2 Memasang 1 m atap genteng multiroof

    Genteng Metal Lbr 1.020

    Paku Biasa 5-12 cm Kg 0.200

    Pekerja Oh 0.200

    Tukang Besi Oh 0.100

  • 8/10/2019 Format RAB Bangunan Gedung

    18/44

    Kepala Tukang Oh 0.010

    Mandor Oh 0.001

    3 Memasang 1 m' lisplank kayu 3/30

    Papan kayu m 0.011

    Paku 5-7 cm kg 0.050

    Pekerja OH 0.100

    Tukang Kayu OH 0.200

    Kepala Tukang OH 0.020

    Mandor OH 0.005

    G. PEKERJAAN PLAFON

    1 Memasang 1 m rangka plafon alumunium

    Rangka plafon alumunium m 1.050

    2 Memasang 1 m plafon gypsum

    Gypsum board lembar 0.364

    Paku sekrup kg 0.110

    Pekerja OH 0.100

    Tukang kayu OH 0.050

    Kepala Tukang OH 0.005

    Mandor OH 0.005

    3 Memasang 1 m' lis profil kayu 5 cm

    Lis kayu profil m' 1.050

    Paku kg 0.010

    Pekerja OH 0.050

    Tukang kayu OH 0.050

    Kepala tukang OH 0.005

    Mandor OH 0.003

    H. PEKERJAAN KUSEN, PINTU, DAN JENDELA

    1 Memasang 1 m kusen pintu & jendela kayu kelas I

    Balok kayu kelas I m 1.100

    Paku 10 cm kg 1.250

    Lem kayu kg 1.000

    Pekerja OH 6.000

    Tukang kayu OH 20.000

  • 8/10/2019 Format RAB Bangunan Gedung

    19/44

    Kepala tukang OH 2.000

    Mandor OH 0.300

    2 Memasang 1 set kusen pintu daun pintu PVC

    Kusen + daun pintu PVC set 1.000

    3 Memasang 1 m' kusen pintu alumunium

    Profil alumunium m 1.100

    Skrup fixer buah 2.000

    Sealant tube 0.060

    Pekerja OH 0.043

    Tukang besi OH 0.043

    Kepala Tukang OH 0.004

    Mandor OH 0.002

    4 Memasang 1 m kusen jendela kaca kayu kelas I

    Balok kayu m 0.040

    Kaca m 1.100

    Lem kayu kg 0.300

    Pekerja OH 0.800

    Tukang kayu OH 2.000

    Kepala tukang OH 0.200

    Mandor OH 0.040

    5 Memasang 1 m daun pintu panel kayu

    Papan kayu kelas I m 0.040

    Lem kayu kg 0.500

    Pekerja OH 1.000

    Tukang kayu OH 2.500

    Kepala tukang OH 0.250

    Mandor OH 0.050

    6 Memasang 1 m pintu kaca rangka alumunium

    Pintu alumunium m 4.400

    Profil kaca m 4.500

    Sealant tube 0.270

    Pekerja OH 0.085

    Tukang besi OH 0.085

  • 8/10/2019 Format RAB Bangunan Gedung

    20/44

    Kepala tukang OH 0.008

    Mandor OH 0.004

    7 Memasang 1 m daun jendela kaca kayu kelas I

    Papan kayu m 0.024

    Kaca m 1.100Lem kayu kg 0.300

    Pekerja OH 0.800

    Tukang kayu OH 2.000

    Kepala tukang OH 0.200

    Mandor OH 0.040

    8 Memasang 1 m dinding kaca rangka alumunium

    Profil alumunium m 8.500

    Profil kaca m 4.500

    Sealant tube 0.540

    Pekerja OH 0.100

    Tukang besi OH 0.100

    Kepala tukang OH 0.010

    Mandor OH 0.008

    I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA

    1 Memasang 1 buah kunci pintu slaagKunci Tanam Slaag set 1.000

    Pekerja OH 0.010

    Tukang Kayu OH 0.500

    Kepala Tukang OH 0.010

    Mandor OH 0.005

    2 Memasang 1 buah kunci pintu alumunium

    Kunci tanam pintu alumunium set 1.000

    Pekerja OH 0.060

    Tukang Kayu OH 0.600

    Kepala Tukang OH 0.060

    Mandor OH 0.003

    3 Memasang 1 buah kunci pintu tipe bulat

    Kunci Tanam Kamar Mandi Bulat set 1.000

  • 8/10/2019 Format RAB Bangunan Gedung

    21/44

  • 8/10/2019 Format RAB Bangunan Gedung

    22/44

    Pekerja OH 0.015

    Tukang Kayu OH 0.150

    Kepala Tukang OH 0.015

    Mandor OH 0.001

    J. PEKERJAAN SANITASI1 Memasang 1 buah kloset duduk

    Kloset Duduk/Monoblok Bh 1.000

    Pekerja Oh 3.300

    Tukang Batu Oh 1.100

    Kepala Tukang Oh 0.001

    Mandor Oh 0.160

    2 Memasang 1 buah kran air 3/4

    Kran Air buah 1.000

    Seal Tape buah 0.025

    Pekerja OH 0.010

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.005

    3 Memasang 1 buah kran air tipe bebek

    Kran Air tipe bebek buah 1.000Seal Tape buah 0.025

    Pekerja OH 0.010

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.005

    4 Memasang 1 buah bathtub

    Bathtub bh 1.000

    Portland Cement kg 6.000

    Pasir Pasang m3 0.010

    Pekerja OH 2.100

    Tukang Batu OH 0.750

    Kepala Tukang OH 0.070

    Mandor OH 0.110

  • 8/10/2019 Format RAB Bangunan Gedung

    23/44

    5 Memasang 1 set kitchen sink

    Bak Cuci Stainless Steel buah 1.000

    Pekerja OH 0.030

    Tukang Batu OH 0.300

    Kepala Tukang OH 0.030

    Mandor OH 0.002

    6 Memasang 1 buah floor drain

    Floor Drain bh 1.000

    Pekerja OH 0.010

    Tukang Batu OH 0.100

    Kepala Tukang OH 0.010

    Mandor OH 0.005

    7 Memasang 1 buah wastafel

    Wastafel buah 1.000

    Semen warna Kg 6.000

    Pasir Pasang m3 0.010

    Pekerja Oh 1.200

    Tukang Batu Oh 1.450

    Kepala Tukang Oh 0.150

    Mandor Oh 0.100

    8 Pembuatan 1 unit septictank

    Pekerjaan septictank unit 1.000

    L PEKERJAAN PENGECATAN

    1 1 m Pengecatan dinding dengan cat tembok

    Plamur kg 0.120

    Cat Tembok kg 0.180

    Pekerja OH 0.028

    Tukang Cat OH 0.042

    Kepala Tukang OH 0.004

    Mandor OH 0.003

    2 1 m Pengecatan plafon dengan cat tembok

    Plamur kg 0.120

    Cat Tembok kg 0.180

  • 8/10/2019 Format RAB Bangunan Gedung

    24/44

    Pekerja OH 0.050

    Tukang Cat OH 0.070

    Kepala Tukang OH 0.004

    Mandor OH 0.003

    3 1 m Pengecatan dengan cat kayu

    Cat Meni kg 0.200

    Dempul kayu kg 0.150

    Cat kayu kg 0.260

    Pekerja OH 0.070

    Tukang Cat OH 0.009

    Kepala Tukang OH 0.006

    Mandor OH 0.003

    M PEKERJAAN PEMBERSIHAN

    1 Pembersihan Lahan Ls 1.000

  • 8/10/2019 Format RAB Bangunan Gedung

    25/44

    HARGA SATUAN JUMLAH

    1,000,000Rp 1,000,000Rp

    1,000,000Rp

    50,000Rp 45,000Rp

    100,000Rp 4,500Rp

    49,500Rp

    50,000Rp 15,000Rp

    100,000Rp 1,500Rp

    16,500Rp

    152,000Rp 182,400Rp

    50,000Rp 15,000Rp

    100,000Rp 1,000Rp

    198,400Rp

    128,000Rp 153,600Rp

    50,000Rp 15,000Rp

    100,000Rp 1,000Rp169,600Rp

    237,000Rp 284,400Rp

    128,000Rp 55,296Rp

    50,000Rp 39,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    26/44

    75,000Rp 29,250Rp

    100,000Rp 39,000Rp

    100,000Rp 39,000Rp

    485,946Rp

    237,000Rp 284,400Rp1,250Rp 203,750Rp

    134,000Rp 69,680Rp

    50,000Rp 75,000Rp

    75,000Rp 56,250Rp

    100,000Rp 7,500Rp

    100,000Rp 7,500Rp

    704,080Rp

    1,983,000Rp 396,600Rp

    17,500Rp 26,250Rp

    2,900Rp 1,160Rp

    12,600Rp 1,984,500Rp

    21,000Rp 47,250Rp

    1,250Rp 420,000Rp

    148,000Rp 79,920Rp

    277,000Rp 224,370Rp

    50,000Rp 265,000Rp

    75,000Rp 20,625Rp75,000Rp 97,500Rp

    75,000Rp 78,750Rp

    100,000Rp 26,200Rp

    100,000Rp 26,500Rp

    3,470,255Rp

    1,983,000Rp 535,410Rp

    17,500Rp 35,000Rp

    2,900Rp 1,740Rp

    12,600Rp 2,646,000Rp

    21,000Rp 63,000Rp

    1,250Rp 420,000Rp

    148,000Rp 79,920Rp

    277,000Rp 224,370Rp

    50,000Rp 282,500Rp

    75,000Rp 20,625Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    27/44

    75,000Rp 117,000Rp

    75,000Rp 105,000Rp

    100,000Rp 32,300Rp

    100,000Rp 28,300Rp

    4,591,165Rp

    1,983,000Rp 793,200Rp

    17,500Rp 70,000Rp

    2,900Rp 5,800Rp

    12,600Rp 3,969,000Rp

    21,000Rp 94,500Rp

    1,250Rp 420,000Rp

    148,000Rp 79,920Rp

    277,000Rp 224,370Rp

    3,162,500Rp 474,375Rp

    125,000Rp 437,500Rp

    20,000Rp 400,000Rp

    50,000Rp 352,500Rp

    75,000Rp 20,625Rp

    75,000Rp 123,750Rp

    75,000Rp 157,500Rp

    100,000Rp 40,300Rp

    100,000Rp 35,300Rp

    7,698,640Rp

    1,983,000Rp 634,560Rp

    17,500Rp 56,000Rp

    2,900Rp 4,640Rp

    12,600Rp 2,646,000Rp

    21,000Rp 63,000Rp

    1,250Rp 420,000Rp

    148,000Rp 79,920Rp

    277,000Rp 224,370Rp

    3,162,500Rp 442,750Rp

    125,000Rp 350,000Rp

    20,000Rp 320,000Rp

    50,000Rp 317,500Rp

    75,000Rp 20,625Rp

    75,000Rp 123,750Rp

    75,000Rp 105,000Rp

    100,000Rp 33,300Rp

    100,000Rp 31,800Rp

    5,873,215Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    28/44

    1,983,000Rp 495,750Rp

    17,500Rp 52,500Rp

    2,900Rp 3,480Rp

    12,600Rp 2,520,000Rp

    21,000Rp 63,000Rp1,250Rp 403,750Rp

    148,000Rp 76,960Rp

    277,000Rp 216,060Rp

    3,162,500Rp 332,063Rp

    125,000Rp 312,500Rp

    20,000Rp 280,000Rp

    50,000Rp 280,000Rp

    75,000Rp 26,250Rp

    75,000Rp 172,500Rp

    75,000Rp 105,000Rp

    100,000Rp 40,500Rp

    100,000Rp 20,200Rp

    5,400,513Rp

    1,983,000Rp 495,750Rp

    17,500Rp 52,500Rp

    2,900Rp 3,480Rp

    12,600Rp 2,520,000Rp

    21,000Rp 63,000Rp1,250Rp 403,750Rp

    148,000Rp 76,960Rp

    277,000Rp 216,060Rp

    3,162,500Rp 332,063Rp

    125,000Rp 312,500Rp

    20,000Rp 280,000Rp

    50,000Rp 280,000Rp

    75,000Rp 26,250Rp

    75,000Rp 172,500Rp

    75,000Rp 105,000Rp

    100,000Rp 40,500Rp

    100,000Rp 20,200Rp

    5,400,513Rp

    1,983,000Rp 634,560Rp

    17,500Rp 56,000Rp

    2,900Rp 4,640Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    29/44

    12,600Rp 2,646,000Rp

    21,000Rp 63,000Rp

    1,250Rp 420,000Rp

    148,000Rp 79,920Rp

    277,000Rp 224,370Rp

    3,162,500Rp 442,750Rp

    125,000Rp 350,000Rp20,000Rp 320,000Rp

    50,000Rp 317,500Rp

    75,000Rp 20,625Rp

    75,000Rp 123,750Rp

    75,000Rp 105,000Rp

    100,000Rp 33,300Rp

    100,000Rp 31,800Rp

    5,873,215Rp

    550Rp 38,500Rp

    1,250Rp 12,100Rp

    134,000Rp 6,030Rp

    50,000Rp 15,000Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 1,500Rp

    81,630Rp

    550Rp 38,500Rp

    1,250Rp 17,875Rp

    134,000Rp 5,360Rp

    50,000Rp 15,000Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 1,500Rp

    86,735Rp

    1,250Rp 6,480Rp

    134,000Rp 3,484Rp

    50,000Rp 10,000Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    30/44

    100,000Rp 1,000Rp

    33,714Rp

    1,250Rp 9,720Rp

    134,000Rp 3,082Rp

    50,000Rp 10,000Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 1,000Rp

    36,552Rp

    1,250Rp 4,063Rp

    50,000Rp 7,500Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 800Rp

    20,863Rp

    45,500Rp 45,500Rp

    1,250Rp 12,500Rp

    134,000Rp 6,030Rp

    13,500Rp 20,250Rp

    50,000Rp 31,000Rp

    75,000Rp 26,250Rp

    100,000Rp 3,500Rp

    100,000Rp 3,000Rp

    148,030Rp

    58,000Rp 58,000Rp

    1,250Rp 12,250Rp

    134,000Rp 6,030Rp

    13,500Rp 17,550Rp

    50,000Rp 31,000Rp

    75,000Rp 26,250Rp

    100,000Rp 3,500Rp

    100,000Rp 3,000Rp

    157,580Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    31/44

    45,500Rp 45,500Rp

    1,250Rp 13,000Rp

    134,000Rp 6,030Rp

    13,500Rp 21,870Rp

    50,000Rp 31,000Rp75,000Rp 26,250Rp

    100,000Rp 3,500Rp

    100,000Rp 3,000Rp

    150,150Rp

    45,500Rp 45,500Rp

    1,250Rp 11,625Rp

    134,000Rp 2,412Rp

    13,500Rp 26,190Rp

    50,000Rp 30,000Rp

    75,000Rp 33,750Rp

    100,000Rp 4,500Rp

    100,000Rp 3,000Rp

    156,977Rp

    45,500Rp 45,500Rp

    1,250Rp 12,500Rp

    134,000Rp 6,030Rp13,500Rp 26,190Rp

    50,000Rp 31,000Rp

    75,000Rp 26,250Rp

    100,000Rp 3,500Rp

    100,000Rp 3,000Rp

    153,970Rp

    95,000Rp 95,000Rp

    95,000Rp

    50,000Rp 51,000Rp

    17,500Rp 3,500Rp

    50,000Rp 10,000Rp

    75,000Rp 7,500Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    32/44

    100,000Rp 1,000Rp

    100,000Rp 100Rp

    73,100Rp

    3,205,000Rp 35,255Rp

    17,500Rp 875Rp

    50,000Rp 5,000Rp

    75,000Rp 15,000Rp

    100,000Rp 2,000Rp

    100,000Rp 500Rp

    58,630Rp

    32,000Rp 33,600Rp

    33,600Rp

    66,500Rp 24,206Rp

    29,000Rp 3,190Rp

    50,000Rp 5,000Rp

    75,000Rp 3,750Rp

    100,000Rp 500Rp

    100,000Rp 500Rp

    37,146Rp

    7,000Rp 7,350Rp

    17,500Rp 175Rp

    50,000Rp 2,500Rp

    75,000Rp 3,750Rp

    100,000Rp 500Rp

    100,000Rp 300Rp

    14,575Rp

    3,500,000Rp 3,850,000Rp

    17,500Rp 21,875Rp

    30,000Rp 30,000Rp

    50,000Rp 300,000Rp

    75,000Rp 1,500,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    33/44

    100,000Rp 200,000Rp

    100,000Rp 30,000Rp

    5,931,875Rp

    400,000Rp 400,000Rp

    400,000Rp

    145,000Rp 159,500Rp

    600Rp 1,200Rp

    35,000Rp 2,100Rp

    50,000Rp 2,150Rp

    75,000Rp 3,225Rp

    100,000Rp 430Rp

    100,000Rp 210Rp

    168,815Rp

    3,500,000Rp 140,000Rp

    82,800Rp 91,080Rp

    30,000Rp 9,000Rp

    50,000Rp 40,000Rp

    75,000Rp 150,000Rp

    100,000Rp 20,000Rp

    100,000Rp 4,000Rp454,080Rp

    3,205,000Rp 128,200Rp

    30,000Rp 15,000Rp

    50,000Rp 50,000Rp

    75,000Rp 187,500Rp

    100,000Rp 25,000Rp

    100,000Rp 5,000Rp

    410,700Rp

    145,000Rp 638,000Rp

    90,000Rp 405,000Rp

    35,000Rp 9,450Rp

    50,000Rp 4,250Rp

    75,000Rp 6,375Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    34/44

    100,000Rp 800Rp

    100,000Rp 400Rp

    1,064,275Rp

    3,205,000Rp 76,920Rp

    82,800Rp 91,080Rp30,000Rp 9,000Rp

    50,000Rp 40,000Rp

    75,000Rp 150,000Rp

    100,000Rp 20,000Rp

    100,000Rp 4,000Rp

    391,000Rp

    145,000Rp 1,232,500Rp

    90,000Rp 405,000Rp

    35,000Rp 18,900Rp

    50,000Rp 5,000Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 800Rp

    1,670,700Rp

    109,000Rp 109,000Rp

    50,000Rp 500Rp

    75,000Rp 37,500Rp

    100,000Rp 1,000Rp

    100,000Rp 500Rp

    148,500Rp

    1,000,000Rp 1,000,000Rp

    50,000Rp 3,000Rp

    75,000Rp 45,000Rp

    100,000Rp 6,000Rp

    100,000Rp 300Rp

    1,054,300Rp

    30,000Rp 30,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    35/44

    50,000Rp 250Rp

    75,000Rp 37,500Rp

    100,000Rp 500Rp

    100,000Rp 250Rp

    68,500Rp

    35,500Rp 35,500Rp

    50,000Rp 750Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 75Rp

    49,075Rp

    26,000Rp 26,000Rp

    50,000Rp 750Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 75Rp

    39,575Rp

    14,400Rp 14,400Rp

    50,000Rp 750Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 75Rp

    27,975Rp

    14,000Rp 14,000Rp

    50,000Rp 750Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 75Rp

    27,575Rp

    5,000Rp 5,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    36/44

    50,000Rp 750Rp

    75,000Rp 11,250Rp

    100,000Rp 1,500Rp

    100,000Rp 75Rp

    18,575Rp

    453,000Rp 453,000Rp

    50,000Rp 165,000Rp

    75,000Rp 82,500Rp

    100,000Rp 100Rp

    100,000Rp 16,000Rp

    716,600Rp

    26,000Rp 26,000Rp

    2,000Rp 50Rp

    50,000Rp 500Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 500Rp

    35,550Rp

    32,000Rp 32,000Rp2,000Rp 50Rp

    50,000Rp 500Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 500Rp

    41,550Rp

    4,000,000Rp 4,000,000Rp

    1,250Rp 7,500Rp

    134,000Rp 1,340Rp

    50,000Rp 105,000Rp

    75,000Rp 56,250Rp

    100,000Rp 7,000Rp

    100,000Rp 11,000Rp

    4,188,090Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    37/44

    250,000Rp 250,000Rp

    50,000Rp 1,500Rp

    75,000Rp 22,500Rp

    100,000Rp 3,000Rp

    100,000Rp 150Rp277,150Rp

    20,000Rp 20,000Rp

    50,000Rp 500Rp

    75,000Rp 7,500Rp

    100,000Rp 1,000Rp

    100,000Rp 500Rp

    29,500Rp

    195,500Rp 195,500Rp

    13,500Rp 81,000Rp

    134,000Rp 1,340Rp

    50,000Rp 60,000Rp

    75,000Rp 108,750Rp

    100,000Rp 15,000Rp

    100,000Rp 10,000Rp

    471,590Rp

    3,500,000Rp 3,500,000Rp

    3,500,000Rp

    7,500Rp 900Rp

    19,000Rp 3,420Rp

    50,000Rp 1,400Rp

    75,000Rp 3,150Rp

    100,000Rp 420Rp

    100,000Rp 250Rp

    9,540Rp

    7,500Rp 900Rp

    19,000Rp 3,420Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    38/44

    50,000Rp 2,500Rp

    75,000Rp 5,250Rp

    100,000Rp 400Rp

    100,000Rp 250Rp

    12,720Rp

    16,500Rp 3,300Rp

    11,000Rp 1,650Rp

    56,000Rp 14,560Rp

    50,000Rp 3,500Rp

    75,000Rp 675Rp

    100,000Rp 600Rp

    100,000Rp 250Rp

    24,535Rp

    1,000,000Rp 1,000,000Rp

    1,000,000Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    39/44

    DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN

    HIMPUNAN MAHASISWA SIPIL FT-UH

    PEKERJAAN

    LOKASI

    TAHUN ANGGARAN

    NO SATUAN VOLUME

    A. PEKERJAAN PERSIAPAN DAN TANAH

    1. Pembersihan lahan dan bowplank Ls

    2. Pekerjaan galian tanah m

    3. Pekerjaan urugan tanah kembali sisi pondasi m

    4. Pekerjaan urugan tanah peninggian lantai m

    5. Pekerjaan urugan pasir di bawah pondasi m

    6. Pekerjaan urugan pasir di bawah lantai m

    B. PEKERJAAN PONDASI

    1. Pekerjaan batu kosong (aanstamping) m

    2. Pekerjaan pondasi batu kali 1:4 m

    C. PEKERJAAN BETON

    1. Pekerjaan sloof beton 20/30 m

    2. Pekerjaan kolom beton 30/30 m

    3. Pekerjaan kolom beton 15/15 m

    4. Pekerjaan balok beton 20/40 m

    5. Pekerjaaan plat beton tebal 12 cm m

    6. Pekerjaan tangga beton m

    7. Pekerjaan ringbalk beton 20/20 m

    8. Pekerjaan meja dapur beton tebal 12 cm m

    D. PEKERJAAN PASANGAN DINDING

    1. Pasangan dinding 1/2 bata 1:5 m

    4. Pasangan dinding 1/2 bata 1:3 m

    3. Plesteran dan aci 1:5 m

    4. Plesteran dan aci 1:3 m

    E. PEKERJAAN PENUTUP LANTAI DAN DINDING

    1. Pasangan lantai keramik 40/40 m

    3. Pasangan lantai keramik 20/20 untuk KM/WC m

    4. Pasangan dinding keramik 20/20 m

    5. Pasangan tegel plin 10/30 m

    F. PEKERJAAN ATAP

    RENCANA ANGGARAN BIAYA

    URAIAN PEKERJAAN

    : PEMBANGUNAN RUMAH TYPE 110/200

    : PERUMAHAN DOSEN TAMALANREA

    : 2014

  • 8/10/2019 Format RAB Bangunan Gedung

    40/44

  • 8/10/2019 Format RAB Bangunan Gedung

    41/44

    K. PEKERJAAN INSTALASI LISTRIK

    L PEKERJAAN PENGECATAN

    1. Pengecatan dinding dengan cat tembok m

    2. Pengecatan plafon dengan cat tembok m

    3. Pengecatan kusen dengan cat kayu m

    4. Pengecatan daun pintu dengan cat kayu m

    5. Pengecatan daun jendela dengan cat kayu m

    M PEKERJAAN PEMBERSIHAN

    1. Pembersihan lahan setelah pekerjaan Ls

    TERBILANG

  • 8/10/2019 Format RAB Bangunan Gedung

    42/44

    HARGA SATUAN JUMLAH HARGA

    1,000,000.00Rp -Rp

    49,500.00Rp -Rp

    16,500.00Rp -Rp

    16,500.00Rp -Rp

    169,600.00Rp -Rp

    169,600.00Rp -Rp

    Subtotal I -Rp

    485,946.00Rp -Rp

    704,080.00Rp -Rp

    Subtotal II -Rp

    4,591,165.00Rp -Rp

    7,698,640.00Rp -Rp

    7,698,640.00Rp -Rp

    5,873,215.00Rp -Rp

    5,400,512.50Rp -Rp

    5,400,512.50Rp -Rp

    5,873,215.00Rp -Rp

    5,400,512.50Rp -Rp

    Subtotal III -Rp

    81,630.00Rp -Rp

    86,735.00Rp -Rp

    54,576.50Rp -Rp

    57,414.50Rp -RpSubtotal IV -Rp

    148,863Rp -Rp

    150,150Rp -Rp

    156,977Rp -Rp

    153,970Rp -Rp

    Subtotal V -Rp

  • 8/10/2019 Format RAB Bangunan Gedung

    43/44

  • 8/10/2019 Format RAB Bangunan Gedung

    44/44

    Subtotal X -Rp

    -Rp

    -Rp

    -Rp

    -Rp

    -Rp-Rp

    -Rp

    -Rp

    -Rp

    Subtotal XI -Rp

    9,540.00Rp -Rp

    12,720.00Rp -Rp

    24,535.00Rp -Rp

    24,535.00Rp -Rp

    24,535.00Rp -Rp

    Subtotal XII -Rp

    1,000,000.00Rp -Rp

    Subtotal XIII -Rp

    Total I s.d. XIII -Rp