EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT PT. TB PBB WIJAYA KARYA BETON BOYOLALI Skripsi ini Disusun Guna Memenuhi Salah Satu Syarat untuk Memperoleh Ijazah S1 Disusun Oleh: WAHYU DIAN SEKAR RINI J410130046 PROGRAM STUDI KESEHATAN MASYARAKAT FAKULTAS ILMU KESEHATAN UNIVERSITAS MUHAMMADIYAH SURAKARTA 2017

Transcript of EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf ·...

Page 1: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI

BAGIAN PRODUKSI TIANG PANCANG BULAT PT. TB PBB

WIJAYA KARYA BETON BOYOLALI

Skripsi ini Disusun Guna Memenuhi Salah Satu Syarat

untuk Memperoleh Ijazah S1

Disusun Oleh:

WAHYU DIAN SEKAR RINI

J410130046

PROGRAM STUDI KESEHATAN MASYARAKAT

FAKULTAS ILMU KESEHATAN

UNIVERSITAS MUHAMMADIYAH SURAKARTA

2017

Page 2: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

ii

EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI

BAGIAN PRODUKSI TIANG PANCANG BULAT PT. TB PBB

WIJAYA KARYA BETON BOYOLALI

Skripsi ini Disusun Guna Memenuhi Salah Satu Syarat

untuk Memperoleh Ijazah S1

Disusun Oleh:

WAHYU DIAN SEKAR RINI

J410130046

PROGRAM STUDI KESEHATAN MASYARAKAT

FAKULTAS ILMU KESEHATAN

UNIVERSITAS MUHAMMADIYAH SURAKARTA

2017

Page 3: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT
Page 4: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

ABSTRACT

WAHYU DIAN SEKAR RINI J410 1300 046

EVALUATION OF THE IMPLEMENTATION OF RISK CONTROLLING

DEVICES AT PRODUCTION DEPARTMENT OF ROUND POLE PT. TB

PBB WIJAYA KARYA BETON BOYOLALI

Based on accident database, workplace accidents can be caused by environment

and unsafe behavior. Controlling devices applied always optimized on PPE

(Personal Protective Equipment). Uncertainty situation and conditionfactors can

lead to accidents.In a pile production, there are still potential hazards and

extreme values as well as some cases of accidents occurred and hence this study

conductedto know the application of HIRA and evaluate the availability and

suitability of the risk controlling devices that had been done. The purpose of this

study is to determine the availability and suitability of risk controllingdevices in

an attempt to prevent workplace accident in the production department of

PTWikaBoyolali. This study used Observational Descriptive method. The sample

of this study was all employees that work on the morning shift at 1, 2, and 4lane.

Analysis of respondents characteristic was done with univariate and the result

was analysed with observational method using HIRADC form and evaluation of

availability and conformity of controlling devices. The result indicated that the

controllingdevices are available and compatible with the hierarchy of controls

applied and can reduce the workplace accident, but still need some improvements

in its implementation. Suitable PPE need to be added to optimize the controlling

devices.

Keywords : HIRADC, High risk, Controlling devices.

Page 5: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

iii

HALAMAN PERSETUJUAN

Skripsi dengan judul :

EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI

BAGIAN PRODUKSI TIANG PANCANG BULAT PT. TB PBB WIJAYA

KARYA BETON BOYOLALI

Disusun Oleh : Wahyu Dian Sekar Rini

NIM : J410130046

Telah kami setujui untuk dipertahankan di hadapan Tim Penguji Sidang Skripsi

Program Studi Kesehatan Masyarakat Fakultas Ilmu Kesehatan Universitas

Muhammadiyah Surakarta.

Surakarta, 10 Juli 2017

Pembimbing

Tarwaka, PGDip.Sc.,M.Erg

NIP. 19640929 198803 1 019

Page 6: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

iv

Page 7: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

v

PERNYATAAN KEASLIAN PENELITIAN

Dengan ini saya menyatakan bahwa skripsi ini adalah hasil pekerjaan saya

sendiri dan di dalamnya tidak terdapat hasil karya yang pernah diajukan untuk

memperoleh gelar kesarjanaan di suatu perguruan tinggi dan lembaga pendidikan

lainnya. Pengetahuan yang diperoleh dari hasil penerbitan maupun yang

belum/tidak diterbitkan sumbernya dijelaskan di dalam tulisan dan daftar pustaka.

Surakarta, 10 Juli 2017

Wahyu Dian Sekar Rini

Page 8: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

vi

BIODATA

Nama : Wahyu Dian Sekar Rini

Tempat/ Tanggal Lahir : Jakarta, 15 Agustus 1995

Jenis Kelamin : Perempuan

Agama : Islam

E-mail : [email protected]

Alamat : Jalan Sunter Muara RT 0 8 RW 05 No.22 Sunter

Agung Kecamatan Tj Priuk, Jakarta - Utara

Riwayat Pendidikan : 1. Lulus TK. Taman Nyiur Sunter Agung 2001

2. Lulus SDN 7 Sunter Agung tahun 2007

3. Lulus SMPN 221 Sunter Agung tahun 2010

4. Lulus SMAN 80 Sunter Agung tahun 2013

5.Menempuh pendidikan di program studi

kesehatan masyarakat FIK UMS sejak tahun

2013.

Page 9: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

vii

KATA PENGANTAR

Assalammualaikum Wr. Wb

Puji dan syukur penulis panjatkan kehadirat Allah SWT yang telah

melimpahkan segala karunia, nikmat, dan hidayah-Nya sehingga penulis dapat

menyelesaikan skripsi dengan judul “ Evaluasi Penerapan Sarana

Pengendalian Risiko Di Bagian Produksi Tiang Pancang Bulat PT.TB PBB

Wijaya Karya Beton Boyolali”, Skripsi disusun sebagai salah satu syarat untuk

mencapai gelar strata satu di Fakultas Ilmu Kesehatan Universitas

Muhammadiyah Surakarta bidang Kesehatan Masyarakat.

Penulis menyadari tanpa bantuan dari berbagai pihak, tidak banyak yang

bisa penulis lakukan dalam menyelesaikan proposal skripsi ini, oleh karena itu

penulis ingin menyampaikan ucapan terima kasih kepada:

1. Dr. Mutalazimah, SKM., M.Kes selaku Dekan Fakultas Ilmu Kesehatan

Universitas Muhammadiyah Surakarta

2. Sri Darnoto, SKM., M.Kes selaku Ketua Program Studi Kesehatan

Masyarakat Fakultas Ilmu Kesehatan Universitas Muhammadiyah

Surakarta

3. Tarwaka, PGDip.Sc.,M.Erg selaku Pembimbing yang telah memberikan

bimbingan, masukan, dan meluangkan waktu untuk memberikan arahan

kepada penulis dengan kesabaran selama penyusunan proposal skripsi ini.

4. Dosen- dosen Program Studi Kesehatan Masyarakat yang telah

memberikan ilmu dan pengalaman kepada penulis selama ini.

5. HSE Officer (Bapak Harsoyo, Bapak Ari, Bapak Eko yang telah

membantu dalam pengambilan data, pembimbing lapangan.

6. Ibu, Bapak, Kakak-kakak yang telah memberikan dukungan, doa,

semangat, kasih sayang, dan membantu finansial.

7. Sahabat tersayang ( Yulia, Isnaini, Ulfa, Ayu, Adilia) yang selalu

memberikan semangat walaupun kita long distance relationship.

Page 10: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

viii

8. Sahabat seperti keluarga ( Ayu Prima, Rizqiyani, Syamsul, Ayu Luvita,

Daranita, Liana, Deny Ari, Nurimeta, Bertalita, Sekar, kunden 2) yang

selalu mengingatkan penulis dan memberikan semangat.

9. Sahabat seperjuangan pembimbing (Yesi, Vista, Mba Yesi, Mba Nurul,

Gina, Diandra, Sylvia, Mba Yasmin, Fernanda) yang tidak lelah untuk

berjuang.

10. Teman- teman Mahasiswa Kesehatan Masyarakat Angkatan 2013, atas

dukungan dan kebersamaanya selama ini, kalian luar biasa.

11. Teman- teman Demisioner HMP, BEM FIK (Abdullah Bin Amir),

Komunitas K3LH UMS yang telah memberikan masukan untuk penulis.

12. Semua pihak yang telah membantu dalam menyelesaikan proposal skripsi

ini, baik secara langsung maupun tidak langsung yang tidak dapat penulis

sebutkan satu persatu.

Penulis menyadari bahwa dalam penyusunan skripsi ini masih terdapat

kekurangan. Semoga skripsi ini dapat bermanfaat bagi semua pihak.

Wassalammualaikum Wr Wb

Surakarta, 10 Juli 2017

Wahyu Dian Sekar Rini

Page 11: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

ix

DAFTAR ISI

HALAMAN JUDUL ........................................................................................................ i

HALAMAN SAMPUL ..................................................................................................... ii

ABSTRAK

ABSTRACT

PERNYATAAN PERSETUJUAN .................................................................................. iii

PENGESAHAN ............................................................................................................... iv

PERNYATAAN KEASLIAN PENELITIAN .................................................................. v

BIODATA ......................................................................................................................... vi

KATA PENGANTAR ..................................................................................................... vii

DAFTAR ISI .................................................................................................................... ix

DAFTAR TABEL............................................................................................................. xi

DAFTAR GAMBAR ....................................................................................................... xii

DAFTAR LAMPIRAN .................................................................................................... xiii

DAFTAR SINGKATAN ................................................................................................. xiv

BAB I PENDAHULUAN

A. Latar Belakang ............................................................................................... 1

B. Rumusan Masalah ......................................................................................... 4

C. Tujuan Penelitian ........................................................................................... 4

D. Manfaat Penelitian ......................................................................................... 5

BAB II TINJAUAN PUSTAKA

A. Teori pendukung ........................................................................................... 7

1. Tempat Kerja ........................................................................................... 7

2. Tempat Kerja Konstruksi ........................................................................ 7

3. Proses Kerja ............................................................................................ 7

4. SMK3 ...................................................................................................... 9

5. Manajement Risiko ................................................................................. 12

6. Evaluasi Sarana Pengendalian Risiko ..................................................... 21

7. Dampak Sarana Pengendalian yang tidak terkendali............................... 22

B. Kerangka berfikir ........................................................................................... 26

BAB III METODE PENELITIAN

A. Jenis dan Rancangan Penelitian ..................................................................... 27

B. Waktu danTempat .......................................................................................... 27

C. Populasi dan Sampel ...................................................................................... 28

D. Definisi Konsep .............................................................................................. 28

E. Pengumpulan Data dan Pengolahan Data ...................................................... 31

F. Langkah-langkah Penelitian ........................................................................... 33

G. Analisis Data ................................................................................................. 35

H. Alur penelitian ............................................................................................... 37

Page 12: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

x

BAB IV HASIL

A. Gambaran Umum ........................................................................................... 38

B. Karakteristik Responden ................................................................................ 40

C. Hasil Observasi dan Wawancara .................................................................... 43

D. Karakteristik Tempat ...................................................................................... 49

E. Hazard Identification Risk Asessment and Determining Control .................. 49

BAB V PEMBAHASAN

A. Evaluasi Sistem Manajement ......................................................................... 55

1.Identifikasi Potensi Bahaya ......................................................................... 58

2. Penilaian Risiko.......................................................................................... 59

B. Evaluasi sarana pengendalian risiko .............................................................. 61

C. Evaluasi sarana pengendalian terhadap penurunan kecelakaan kerja ........... 66

BAB VI SIMPULAN DAN SARAN

A. Simpulan......................................................................................................... 69

B. Saran ............................................................................................................... 69

DAFTAR PUSTAKA

LAMPIRAN

Page 13: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

xi

DAFTAR TABEL

Tabel Halaman

1 Matrix Penilaian Risiko .......................................................................... 18

2 Klasifikasi Tingkat Risiko....................................................................... 18

3 Distribusi frekuensi dan persentase tenaga kerja berdasarkan umur…... 40

4 Distribusi frekuensi dan persentase tenaga kerja berdasarkan

pendidikan…………………………………………………………….

41

5 Distribusi frekuensi dan persentase tenaga kerja berdasarkan lama

kerja……………………………………………………………………

41

6 Distribusi frekuensi dan persentase tenaga kerja berdasarkan cara kerja 42

7 Distribusi frekuensi dan persentase tenaga kerja berdasarkan Peralatan

kerja............................................................................................................

43

8 Distribusi frekuensi dan persentase tenaga kerja berdasarkan Peralatan

kerja............................................................................................................

44

9 Distribusi frekuensi dan persentase tenaga kerja berdasarkan kecelakaan

kerja………………………………………………………………………

45

10 Distribusi frekuensi dan persentase tenaga kerja berdasarkan APD……. 46

11 Identikasi bahaya pada tempat kerja 49

12 Identifikasi bahaya dan Penilaian Risiko pada Proses Pembuatan rakitan 50

13 Identifikasi bahaya dan Penilaian Risiko pada Proses Pengecoran ……. 51

14 Identifikasi bahaya dan Penilaian Risiko pada Proses Pemadatan Beton.. 52

15 Identifikasi bahaya dan Penilaian Risiko pada Proses Finishing………... 53

16 Prioritas Risiko berdasarkan Tempat kerja……………………………… 54

Page 14: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

xii

DAFTAR GAMBAR

Gambar Halaman

1. Domino Rentetan Kejadian Kecelakaan Kerja ................................ 24

2. Fenomena Gunung Es……................................................................ 25

3. Kerangka Berfikir……………………… ..........................................26

4. Alur Penelitian………………. ......................................................... 37

Page 15: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

xiii

DAFTAR LAMPIRAN

Lampiran

1. Formulir persetujuan menjadi responden

2. Formulir data diri responden

3. Kuesioner Penelitian

4. Wawancara

5. Tabel Alternatif sarana pengendalian

6. Tabel Evaluasi Sarana Pengendalian

7. Dokumentasi

8. Surat keterangan menyelesaikan praktek

Page 16: EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI …eprints.ums.ac.id/53817/2/HALAMAN DEPAN.pdf · EVALUASI PENERAPAN SARANA PENGENDALIAN RISIKO DI BAGIAN PRODUKSI TIANG PANCANG BULAT

xiv

DAFTAR SINGKATAN

APD : Alat Pelindung Diri

HIRA : Hazard Identification Risk Assesment

HIRADC :Hazard Identification Risk Assesment and

Determining Control

HSE : Health Safety Environment

ILO : International Labor Organization

JAMSOSTEK : Jaminan Sosial Tenaga Kerja

JSA : Job Safety Analisis

K3 : Kesehatan Keselamatan Kerja

MEA : Masyarakat Ekonomi Asia

NAB : Nilai Ambang Batas

P3K : Pertolongan Pertama Pada Kecelakaan

PAK : Penyakit Akibat Kerja

PBB : Pabrik Produk Beton

PP : Peraturan Pemerintah

PT : Perseroan Terbatas

REVIEW : Peninjauan Kembali

SMK3 : Sistem Manajemen Kesehatan Keselamatan Kerja

WIKA : Wijaya Karya