Eemcat

download Eemcat

of 6

Transcript of Eemcat

  • 7/23/2019 Eemcat

    1/6

    ENERGY EFFICIENCY MEASURES BY CATEGORY

    11-Mar-98

    Building ENVelope (roofing, cladding and window technologies)CATEGORY:

    Add outside shading device

    Change % glazing

    Change roof reflectivity

    Commissioning and re-commissioning

    Control air infiltration

    Improve window thermal performance

    Ongoing FDD

    Reduce air leakage

    Reduce wall and roof U-factors

    Controls (EMCS)CATEGORY:

    Add discriminator or reset control

    Add outside air reset control to hydronic radiation systems

    Change humidity control set point

    Change leaving coil temperature(s)

    Change thermostat temperatures (cooling, heating and setback)

    Control air infiltration

    Heat pumps

    HRV Heat Recovery ventilator

    Hybrid Dual duct dedicated Outside air)

    Implement thermal storage

    More timely equipment maintenance

    Occupancy sensors

    Ongoing FDD

    Peak demand reduction

    Personalized environment controls

    Predictive Control

    Recover exhaust air heat

    Time of use (energy source)

    Upgrade control system

    ELECtrical components and systemsCATEGORY:

    Add fan power boxes (VAV system)

    Add SD to VAV fan

    Commissioning and re-commissioning

    1

  • 7/23/2019 Eemcat

    2/6

    Improve cooling tower fan efficiencies

    Improve energy efficiency of appliances

    Improve heating plant pump control efficiency

    Install chiller system free cooling

    Modify cooling plant pumps

    Ongoing FDD

    Reduce office equipment loads

    Replace auxiliary heating plant motors with higher efficiency units

    Replace system fans

    ENERGY Supply and DistributionCATEGORY:

    Commissioning and re-commissioning

    Inform Users of Energy Use via Meter *

    Ongoing FDDPeak demand reduction

    Time of use (energy source)

    User pays

    HVAC systemsCATEGORY:

    Add ceiling return air plenum

    Add discriminator or reset control

    Add double bundle condenser

    Add fan power boxes (VAV system)

    Add outside air reset control to hydronic radiation systems

    Add SD to VAV fan

    Air Filtration - Electronic

    Change Constant Volume Reheat to VAV

    Change floor U-factor

    Change humidity control set point

    Change leaving coil temperature(s)

    Change roof reflectivity

    Change thermostat temperatures (cooling, heating and setback)

    Commissioning and re-commissioning

    Heat pumps

    HRV Heat Recovery ventilator

    Hybrid Dual duct dedicated Outside air)

    Implement thermal storage

    Improve cooling tower fan efficiencies

    Improve double bundle condenser efficiency

    Improve energy efficiency of appliances

    2

  • 7/23/2019 Eemcat

    3/6

    Improve heating plant pump control efficiency

    Install chiller system free cooling

    Insulate DHW storage tank

    Insulate pipes and duct work

    Low Energy Alternative Cooling

    Modify cooling plant pumps

    Modify lighting levels relative to occupant density

    More timely equipment maintenance

    Occupancy sensors

    Ongoing FDD

    Optimize preheat coil

    Personalized environment controls

    Predictive Control

    Recover exhaust air heatReduce air leakage

    Reduce office equipment loads

    Reduce system operating hours

    Reduce ventilation amounts(refer to current standard)

    Reduce wall and roof U-factors

    Replace auxiliary heating plant motors with higher efficiency units

    Replace boilers

    Replace cooling plant equipment

    Replace DHW boiler/heater

    Replace DHW storage tankReplace system fans

    Replace unitary equipment

    Time of use (energy source)

    Upgrade control system

    Upgrade to High Efficiency cooling *

    Upgrade to High Efficiency Heating *

    Utilize free cooling for air systems

    LIGHTingCATEGORY:

    Add inside shading device

    Change % glazing

    Change lighting ballast and decrease power reqd

    Commissioning and re-commissioning

    Daylighting

    Improve window thermal performance

    Modify lighting levels relative to occupant density

    3

  • 7/23/2019 Eemcat

    4/6

    Occupancy sensors

    Ongoing FDD

    Personalized environment controls

    Reduce system operating hours

    Upgrade control system

    MECHanical components and systemsCATEGORY:

    Add ceiling return air plenum

    Add discriminator or reset control

    Add double bundle condenser

    Add fan power boxes (VAV system)

    Add outside air reset control to hydronic radiation systems

    Add SD to VAV fan

    Change Constant Volume Reheat to VAVChange floor U-factor

    Change roof reflectivity

    Change temperature of DHW supply

    Commissioning and re-commissioning

    HRV Heat Recovery ventilator

    Improve cooling tower fan efficiencies

    Improve double bundle condenser efficiency

    Improve energy efficiency of appliances

    Improve heating plant pump control efficiency

    Install chiller system free cooling

    Install DHW pump control

    Insulate DHW storage tank

    Insulate pipes and duct work

    Low Energy Alternative Cooling

    Modify cooling plant pumps

    Modify lighting levels relative to occupant density

    More timely equipment maintenance

    Ongoing FDD

    Optimize preheat coil

    Recover exhaust air heat

    Reduce air leakage

    Reduce DHW requirements

    Reduce office equipment loads

    Reduce system operating hours

    Reduce wall and roof U-factors

    Replace auxiliary heating plant motors with higher efficiency units

    4

  • 7/23/2019 Eemcat

    5/6

    Replace boilers

    Replace cooling plant equipment

    Replace DHW boiler/heater

    Replace DHW storage tank

    Replace system fans

    Replace unitary equipment

    Upgrade to High Efficiency cooling *

    Upgrade to High Efficiency Heating *

    Utilize free cooling for air systems

    Office design/SPACE utilisationCATEGORY:

    Commissioning and re-commissioning

    Daylighting

    Modify lighting levels relative to occupant densityOngoing FDD

    Personalized environment controls

    Reduce system operating hours

    Reduce ventilation amounts(refer to current standard)

    Upgrade control system

    OVERALL Systems DesignCATEGORY:

    Commissioning and re-commissioning

    Integration of sub-systems

    Ongoing FDD

    PERFormance MONitoringCATEGORY:

    Commissioning and re-commissioning

    Inform Users of Energy Use via Meter *

    Monitoring of performance

    Ongoing FDD

    User pays

    Service WATER Supply and Distribution (hot, grey etc.)CATEGORY:

    Change temperature of DHW supply

    Commissioning and re-commissioningInstall DHW pump control

    Insulate DHW storage tank

    Modify lighting levels relative to occupant density

    Occupancy sensors

    Ongoing FDD

    5

  • 7/23/2019 Eemcat

    6/6

    Reduce DHW requirements

    Replace DHW boiler/heater

    Replace DHW storage tank

    SOLARCATEGORY:

    Add inside shading device

    Change % glazing

    Change lighting ballast and decrease power reqd

    Commissioning and re-commissioning

    Daylighting

    Improve window thermal performance

    Modify lighting levels relative to occupant density

    Ongoing FDD

    6