No Uraian Satuan Harga (Rp.) 1 2 3 4 I. SATUAN UPAH KERJA 1 Pekerja Perhari - 2 Mandor Perhari - 3 Tukang Perhari - 4 Kepala Tukang Perhari - II. SATUAN HARGA BAHAN MATERIAL 1 Semen Portland (Andalas Type I) Zak - 2 Semen Portland (Andalas Type I) Kg - 3 Semen Warna Kg - 4 Batu Gunung Belah M3 - 5 Batu Kali M3 - 6 Kerikil/ Koral Beton Lokal M3 - 7 Kerikil/ Koral Beton Lokal Kg - 8 Pasir Beton Lokal M3 - 9 Pasir Beton Lokal Kg - 10 Pasir Pasangan Lokal M3 - 11 Pasir Urug M3 - 12 Tanah Timbun M3 - 13 Air Bersih Ltr - 14 Balok Kayu Kls II M3 - 15 Balok Kayu Kelas III M3 - 16 Lem Kayu Kg - 17 Kayu Terentang/ Bekisting M3 - 18 Kayu untuk Perancah M3 - 19 Dolken Kayu Galam dia. 8-10 cm, pjg = 4 mtr Btg - 20 Paku Kayu Kg - 21 Besi Beton Ulir Kg - 22 Besi Beton Polos Kg - 23 Kawat Beton Kg - 24 Cat Tembok (setara Dulux Weathershield) Kg - 25 Cat Tembok Dasar (setara Dulux Weathershield) Kg - 26 Dempul Cat/ Plamir/ Sealer setara Dulux Kg - 27 Cat Kayu (setara Avian) Kg - 28 Cat Kayu Dasar Kg - 29 Cat Menie Kg - 30 Minyak Bekisting Ltr - 31 Paku Triplek Kg - 32 Amplas Lbr - 33 Paku seng Kg - 34 Paku Onduline Bh - 35 Triplek/ Plywood 6 mm Lbr - 36 Triplek/ Plywood 9 mm Lbr - 37 Atap Emerald 0.35 M2 - 38 Atap Onduline M2 - DAFTAR HARGA DASAR SATUAN UPAH KERJA DAN SATUAN HARGA BAHAN MATERIAL

description

HARGA BAHAN

Transcript of DUB.pdf

No Uraian Satuan Harga (Rp.)

1 2 3 4

I. SATUAN UPAH KERJA

1 Pekerja Perhari -

2 Mandor Perhari -

3 Tukang Perhari -

4 Kepala Tukang Perhari -

II. SATUAN HARGA BAHAN MATERIAL

1 Semen Portland (Andalas Type I) Zak -

2 Semen Portland (Andalas Type I) Kg -

3 Semen Warna Kg -

4 Batu Gunung Belah M3 -

5 Batu Kali M3 -

6 Kerikil/ Koral Beton Lokal M3 -

7 Kerikil/ Koral Beton Lokal Kg -

8 Pasir Beton Lokal M3 -

9 Pasir Beton Lokal Kg -

10 Pasir Pasangan Lokal M3 -

11 Pasir Urug M3 -

12 Tanah Timbun M3 -

13 Air Bersih Ltr -

14 Balok Kayu Kls II M3 -

15 Balok Kayu Kelas III M3 -

16 Lem Kayu Kg -

17 Kayu Terentang/ Bekisting M3 -

18 Kayu untuk Perancah M3 -

19 Dolken Kayu Galam dia. 8-10 cm, pjg = 4 mtr Btg -

20 Paku Kayu Kg -

21 Besi Beton Ulir Kg -

22 Besi Beton Polos Kg -

23 Kawat Beton Kg -

24 Cat Tembok (setara Dulux Weathershield) Kg -

25 Cat Tembok Dasar (setara Dulux Weathershield) Kg -

26 Dempul Cat/ Plamir/ Sealer setara Dulux Kg -

27 Cat Kayu (setara Avian) Kg -

28 Cat Kayu Dasar Kg -

29 Cat Menie Kg -

30 Minyak Bekisting Ltr -

31 Paku Triplek Kg -

32 Amplas Lbr -

33 Paku seng Kg -

34 Paku Onduline Bh -

35 Triplek/ Plywood 6 mm Lbr -

36 Triplek/ Plywood 9 mm Lbr -

37 Atap Emerald 0.35 M2 -

38 Atap Onduline M2 -

DAFTAR HARGA DASAR SATUAN UPAH KERJA DAN SATUAN

HARGA BAHAN MATERIAL

No Uraian Satuan Harga (Rp.)

1 2 3 4

39 Rabung Metal (Emerald) M' -

40 Rabung Onduline M' -

41 Plat Seng 3 x 6 Kaki Lbr -

42 Wall Stud 64 mm M' -

43 Wall Track Meead 64 mm M' -

44 Wall Track Botton M' -

45 Skrup Fisher Bh -

46 Keramik 20 x 20 cm Bh -

47 Keramik 20 x 25 cm Bh -

48 Keramik 25 x 50 cm Bh -

49 Keramik 30 x 30 cm Bh -

50 Keramik 40 x 40 cm Bh -

51 Granit 60 60 cm Bh -

52 Batu Bata Bh -

53 Paving Block M2 -

54 Papan Lisplank M' -

55 GRC Board Lisplank 20 cm T= 9 mm M' -

56 GRC tebal = 4 mm Lbr -

Sabang, ....... ......................................2015

Penawar,

PT./CV. .............................................

Nama Lengkap

Jabatan