ITEM PEMBAYARAN NO. JENIS PEKERJAAN: 1.2 : MOBILISASINo.URAIANSATUANVOL.HARGA SATUAN (Rp.)Lembar 1.2-1 JUMLAH HARGA (Rp.)A.Sewa TanahB.PERALATAN Periksa lembar 1.2-27,450,000C. 1 2 3 4 5 6FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................M2 M2 M2 M2 M2 ....1 1 1 1 1 050,000 75,000 45,000 25,000 25,000 050,000 75,000 45,000 25,000 25,000 0D. 1 2 3 4 5 6 7PEMERIKSAAN LABORATORIUM Pembuatan Job Mix Pemeriksaan Lab

Transcript of DIV. 1 MOBILISASI

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI

No.

URAIAN

SATUAN

VOL.

HARGA SATUAN (Rp.)

Lembar 1.2-1 JUMLAH HARGA (Rp.)

A.

Sewa Tanah

B.

PERALATAN Periksa lembar 1.2-2

7,450,000

C. 1 2 3 4 5 6

FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

M2 M2 M2 M2 M2 ....

1 1 1 1 1 0

50,000 75,000 45,000 25,000 25,000 0

50,000 75,000 45,000 25,000 25,000 0

D. 1 2 3 4 5 6 7

PEMERIKSAAN LABORATORIUM Pembuatan Job Mix Pemeriksaan Laboratorium ...................... ...................... ...................... ......................

set set .... .... .... ....

6 6

500,000 500,000

3,000,000 3,000,000 0 0 0 0

E. E.I. 1 2 3 4 5 6 E.II. 1 2 3 4 5 6

MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping ...................... ...................... ...................... ...................... LAIN-LAIN Komunikasi Lapangan Lengkap Papan Nama Proyek ...................... ...................... ...................... ......................

LS LS .... .... .... ....

1

10,000,000

10,000,000

Set .... .... .... .... ....

1 2 0 0 0 0

5,000,000 350,000 0 0 0 0

5,000,000 700,000 0 0 0 0

F.

DEMOBILISASI Total Biaya Mobilisasi

LS

1

3,240,000

3,240,000 32,610,000

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

File : 89627200.xls.ms_office

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI KODE ALAT HARGA SATUAN (Rp.) Lembar 1.2-2 JUMLAH HARGA (Rp.)

No.

JENIS ALAT

SATUAN

VOL.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 DUMP TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER SCALE BRIDGE, 35 T. PICK UP TRUCK, 1 T. SURVEY EQUIPMENT E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit SET Unit SET 0 200,000,000 1 500,000 1 100,000 1 500,000 1 150,000 0 100,000 0 150,000 5 150,000 5 150,000 1 500,000 2 150,000 1 300,000 1 500,000 0 500,000 1 500,000 1 500,000 1 500,000 1 500,000 1 500,000 0 50,000 0 40,000,000 0 50,000 1 150,000 0 50,000 1 50,000 0 50,000 0 500,000 0 500,000 0 1,000,000 0 1,000,000 0 1,000,000 0 200,000 0 500,000 0 300,000 0 1,500,000 2 100,000 2 100,000 0 500,000 100,000 500,000 150,000 0 0 750,000 750,000 500,000 300,000 300,000 500,000 0 500,000 500,000 500,000 500,000 500,000 0 0 0 150,000 0 50,000 0 0 0 0 0 0 0 0 0 0 200,000 200,000

Total untuk Item B pada Lembar 1

7,450,000

File : 89627200.xls.ms_office

Perhitungan Kebutuhan Alat untuk MobilisasiNo Nama Alat No Item Pekerjaan 2 E01 9 9 9 9 2 E02 9 9 9 9 2 E03 9 9 E04 7 E06 4 4 4 4 7 100 100 100 100 175 7 7 7 7 7 700 700 700 700 1225 150 200 150 79 49 m3 m3 m3 m3 jam 0.214 0.286 0.214 0.113 0.040 0.442 0.442 0.442 0.683 1.000 0.095 0.126 0.095 0.077 0.040 0.43259897 1 1 175 7 1225 70 jam 0.057 1.000 0.057 0.05714286 1 1 225 225 7 7 1575 1575 4,800 2,400 liter liter 3.048 1.524 0.003 0.003 0.009 0.005 0.01376936 1 1 225 225 225 225 50 7 7 7 7 7 1575 1575 1575 1575 350 74,900 3,745 3,745 3,745 200 m2 m3 m3 m3 m3 47.556 2.378 2.378 2.378 0.571 0.003 0.075 0.069 0.069 0.000 0.129 0.178 0.165 0.165 0.000 0.63670013 1 1 225 225 225 225 50 7 7 7 7 7 1575 1575 1575 1575 350 74,900 3,745 3,745 3,745 200 m2 m3 m3 m3 m3 47.556 2.378 2.378 2.378 0.571 0.002 0.054 0.055 0.055 0.002 0.103 0.129 0.132 0.132 0.001 0.49701101 1 1 Kode Alat bulan 3 Jadwal Pekerjaan Hari Kerja Jam Kerja per hari total 4 5 6=4x5 Kuantitas Pekerjaan 7 Sat Target Produksi Tiap Jam 8=7:6 koefisien alat per item 9 Peralatan Yang Diperlukan jumlah alat jumlah minimal kebut. di per item alat lapangan 10=8x9 11 12 13

1

1 Asphalt Mixing Plant 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5) 2 Asphalt Finisher 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5) 3 Asphalt Sprayer 6.1(1) 6.1(2) 4 Bulldozer 9.7 5 Concrete Mixer 7.1(5) 7.1(6) 7.1(8) 7.9 9.18 6 Concrete Vibrator 7.1(5) 7.1(6) 7.1(8)

4 4 4

100 100 100

7 7 7

700 700 700

150 200 150

m3 m3 m3

0.214 0.286 0.214

0.442 0.442 0.442

0.095 0.126 0.095

0.31554791

1

1

No

Nama Alat No Item Pekerjaan

Kode Alat

bulan 3

Jadwal Pekerjaan Hari Kerja Jam Kerja per hari total 4 225 175 5 7 7 6=4x5 1575 1225

Kuantitas Pekerjaan 7 4,800 49

Sat

Target Produksi Tiap Jam 8=7:6

koefisien alat per item 9 0.003 1.000

Peralatan Yang Diperlukan jumlah alat jumlah minimal kebut. di per item alat lapangan 10=8x9 0.010 0.040 11 0.04952381 12 1 13 1

1 2 7 Compressor 6.1(1) 9.17 8 Crane 9.12 9 Dump Truck 2.1 3.1(1) 3.2(2) 4.2(1) 5.1(1) 5.1(2) 6.1(1) 6.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(1) 8.1(5) 8.4(4) 8.4(6) 9.4 10 Excavator 2.1 3.1(1) 9.11 11 Flat Bed Truck 9.5 12 Generator Set 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5)

E05 9 7 E07 7 E08 7 6 6 7 5 5 9 9 9 9 9 9 2 2 2 2 7 E10 7 6 7 E11 7 E12 9 9 9 9 2 225 225 225 225 50 7 7 7 7 7 1575 1575 1575 1575 350 74,900 3,745 3,745 3,745 200 m2 m3 m3 m3 m3 47.556 2.378 2.378 2.378 0.571 0.002 0.054 0.055 0.055 0.002 0.103 0.129 0.132 0.132 0.001 0.49701101 1 1 175 7 1225 140 jam 0.114 1.000 0.114 0.11428571 1 1 175 150 175 7 7 7 1225 1050 1225 10,000 31,890 70 m3 m3 jam 8.163 30.371 0.057 0.054 0.054 1.000 0.437 1.626 0.057 2.12058028 3 3 175 150 150 175 125 125 225 225 225 225 225 225 50 50 50 50 175 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 1225 1050 1050 1225 875 875 1575 1575 1575 1575 1575 1575 350 350 350 350 1225 10,000 31,890 4,657 5,936 891 26,750 4,800 2,400 74,900 3,745 3,745 3,745 500 200 84 10 140 m3 m3 m3 m3 m3 m3 liter liter m2 m3 m3 m3 m3 m3 bh bh jam 8.163 30.371 4.435 4.846 1.018 30.571 3.048 1.524 47.556 2.378 2.378 2.378 1.429 0.571 0.240 0.029 0.114 0.095 0.154 0.581 0.145 0.068 0.145 0.003 0.003 0.012 0.308 0.315 0.315 0.254 1.211 0.155 0.092 1.000 0.780 4.669 2.578 0.705 0.070 4.446 0.009 0.005 0.586 0.733 0.749 0.749 0.363 0.692 0.037 0.003 0.114 17.2855044 18 18 175 7 1225 70 jam 0.057 1.000 0.057 0.05714286 1 1 liter jam 3.048 0.040

No

Nama Alat No Item Pekerjaan

Kode Alat

bulan 3

Jadwal Pekerjaan Hari Kerja Jam Kerja per hari total 4 150 150 175 125 125 175 5 7 7 7 7 7 7 6=4x5 1050 1050 1225 875 875 1225

Kuantitas Pekerjaan 7 4,657 53,500 5,936 891 26,750 70

Sat

Target Produksi Tiap Jam 8=7:6

koefisien alat per item 9 0.006 0.003 0.012 0.012 0.012 1.000

Peralatan Yang Diperlukan jumlah alat jumlah minimal kebut. di per item alat lapangan 10=8x9 0.027 0.128 0.057 0.012 0.358 0.057 11 0.63903322 12 1 13 1

1 2 13 Motor Grader 3.2(2) 3.3(1) 4.2(1) 5.1(1) 5.1(2) 9.8 14 Pneumatic Tyred Roller 5.1(1) 5.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 15 Tandem Roller 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(5) 16 Vibrator Roller 3.2(2) 5.1(1) 5.1(2) 9.14 17 Water Tank 3.3(1) 4.2(1) 5.1(1) 7.1(5) 7.1(6) 7.1(8) 7.9 8.1(1) 9.6

E13 6 6 7 5 5 7 m3 m2 m3 m3 m3 jam 4.435 50.952 4.846 1.018 30.571 0.057

7 5 5 9 9 9 E17 9 9 9 9 2 E19 6 5 5 7 E23 6 7 5 4 4 4 4 2 7

175 125 125 225 225 225

7 7 7 7 7 7

1225 875 875 1575 1575 1575

891 26,750 74,900 3,745 3,745 3,745

m3 m3 m2 m3 m3 m3

0.727 30.571 85.600 2.378 2.378 2.378

0.004 0.004 0.002 0.026 0.026 0.021

0.003 0.131 0.196 0.061 0.061 0.051

0.50368146

1

1

225 225 225 225 50

7 7 7 7 7

1575 1575 1575 1575 350

74,900 3,745 3,745 3,745 200

m2 m3 m3 m3 m3

47.556 2.378 2.378 2.378 0.571

0.003 0.034 0.046 0.038 0.111

0.153 0.082 0.109 0.091 0.063

0.49821296

1

1

150 125 125 175

7 7 7 7

1050 875 875 1225

4,657 891 26,750 70

m3 m3 m3 jam

4.435 1.018 30.571 0.057

0.010 0.018 0.018 1.000

0.045 0.018 0.546 0.057

0.66551976

1

1

150 175 125 100 100 100 100 50 175

7 7 7 7 7 7 7 7 7

1050 1225 875 700 700 700 700 350 1225

53,500 5,936 891 150 200 150 79 500 70

m2 m3 m3 m3 m3 m3 m3 m3 jam

50.952 4.846 1.018 0.214 0.286 0.214 0.113 1.429 0.057

0.003 0.021 0.021 0.053 0.055 0.046 0.424 0.021 1.000

0.153 0.102 0.021 0.011 0.016 0.010 0.048 0.030 0.057

0.44921323

1

1

No

Nama Alat No Item Pekerjaan

Kode Alat

bulan 3

Jadwal Pekerjaan Hari Kerja Jam Kerja per hari total 4 150 175 125 125 225 225 225 225 50 50 175 5 7 7 7 7 7 7 7 7 7 7 7 6=4x5 1050 1225 875 875 1575 1575 1575 1575 350 350 1225

Kuantitas Pekerjaan 7 4,657 5,936 891 26,750 74,900 3,745 3,745 3,745 500 200 70

Sat

Target Produksi Tiap Jam 8=7:6

koefisien alat per item 9 0.018 0.018 0.036 0.036 0.001 0.037 0.038 0.038 0.036 0.002 1.000

Peralatan Yang Diperlukan jumlah alat jumlah minimal kebut. di per item alat lapangan 10=8x9 0.079 0.086 0.036 1.091 0.071 0.088 0.090 0.090 0.051 0.001 0.057 11 1.74237698 12 3 13 3

1 2 18 Wheel Loader 3.2(2) 4.2(1) 5.1(1) 5.1(2) 6.3(5) 6.3(6) 6.3(6)a 6.3(7) 8.1(1) 8.1(5) 9.9 19 Pedestrian Roller 8.1(1)

E15 6 7 5 5 9 9 9 9 2 2 7 E24 2 50 7 350 500 m3 1.429 0.059 0.085 0.08473454 1 1 m3 m3 m3 m3 m2 m3 m3 m3 m3 m3 jam 4.435 4.846 1.018 30.571 47.556 2.378 2.378 2.378 1.429 0.571 0.057

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.8 (1) : Pemeliharaan & Perlindungan Lalu Lintas

% TERHADAP TOTAL BIAYA PROYEK = 0.0788 % HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

No.

URAIAN

SATUAN

VOL.

I. 1 2 3 4 5 II. 1 2 3 III. 1 2 3 4 5 6 7 8

Data & Asumsi Jumlah lokasi pekerjaan Total Masa Pelaksanaan Proyek Masa Pemeliharaan & Perlindungan Lalin Sudah termasuk persiapan/pemasangan Pembongkaran termasuk Demobilisasi Pekerja Pengatur Lalu Lintas Jumlah lokasi pekerjaan Petugas Rambu "Stop-Jalan" Pengendali kecepatan kendaraan Pemimpin Regu (Mandor) Bahan & Perlengkapan Jumlah lokasi pekerjaan Rambu "Stop-Jalan" Rambu lain (Batas kec., hati2, dll) Bendera Kuning/Hijau/Merah Barikade Kayu 1/2 lebar jalan Traffic Cone, jumlah per lokasi = 5 Bahan Cat Pantul + Pengencer + Kuas Perlengkapan Keamanan Pekerja Perlengkapan lainnya Lokasi Hari Hari 5 360 270

2 2 1

Lokasi Org/hari Org/hari Org/hari

5 2,700 2,700 270

3,143 3,143 3,536

8,485,706 8,485,706 954,644

Lokasi Buah Buah Buah Buah Buah Set Set LS

5 10 15 30 10 25 5 21 1

25,000 25,000 15,000 100,000 35,000 40,000 50,000 500,000

250,000 375,000 450,000 1,000,000 875,000 200,000 1,050,000 500,000

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas

22,626,056

Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

File : 89627200.xls.ms_office

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.8 (2) : Pemasangan & Pemeliharaan Jembatan Sementara

% TERHADAP TOTAL BIAYA PROYEK = 0.4260 % HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)

No.

URAIAN

SATUAN

VOL.

I. 1 2 3 4 5 6

Data & Asumsi Jembatan sementara jenis Bailley Jembatan sementara konstruksi kayu Sewa jembatan Bailley sudah termasuk angkut, pasang dan bongkar Detour diperlukan length (m) = 300 Total Masa Pelaksanaan Proyek Masa Pemeliharaan Jembatan Efektif M2 M2 250 150

M2 Hari Hari

1,200 360 180

II. 1 2 3 4 5 6

Bahan & Perlengkapan Biaya jembatan Bailley Biaya jembatan kayu Agg.Kls.B Detour tebal (cm) = 10 Agg.Kls.A Detour tebal (cm) = 10 Prime Coat Detour Sewa tanah M2 M2 M3 M3 Liter M2 250 150 120 120 1,200 1,300 115,000 100,000 280,043 273,072 2,917 500 28,750,000 15,000,000 33,605,156 32,768,626 3,500,280 650,000

III. 1 2 3

Pekerja Untuk Pemeliharaan Pekerja Tukang ( Batu/Cat/Las) Pemimpin Regu (Mandor) 9 3 1 Org/hari Org/hari Org/hari 1,620 540 180 2,857 5,357 3,214 4,628,567 2,892,857 578,572

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas

122,374,058

Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.