(- ) H A RGA TO T A L N O U R A I A N P E K E R J A A N S A T U A N V O L U M E S A T U A N H A R G A ( R p ) ( R p ) 1 2 3 4 6 7 I. PEKERJ AAN P ERSIAPAN 1 Pembersihan la p a n g an Ls 1,00 1 0 0 . 0 00,00 100.00 0 , 0 0 2 Pemas a n g a n p atok / B o w p lank Ls 1, 0 0 2 5 0 . 0 0 0,00 250.000, 0 0 350.000,00 II. PEKERJ AAN TANAH 1 G a l i an t an a h p o n d as i M 3 1 1 2 ,55 1 7. 6 0 0 , 0 0 1 . 9 8 0 . 7 9 2 , 0 0 2 T imbunan k e mbali M 3 37,52 8.448,00 3 1 6 .926,72 3 Uru g an t a n a h bawah lan t a i M 3 27,00 105.600,00 2 . 8 5 1.200,00 4 U rugan p a s i r b a w a h l an t a i d a n pon d as i M 3 2 1 , 5 1 1 3 8 . 6 0 0 , 0 0 2 . 9 8 0 . 5 9 3 , 0 0 8.129.511,72 III. PEKERJ AAN BETON / PASANGAN 1 Peker j a a n A ans t am p in g M3 12,51 2 2 7 .865,00 2.8 4 9. 4 5 1,83 2 P asan g a n P on d as i B a t u b e l a h 1 : 5 M 3 5 5 , 0 2 4 8 4 . 4 1 8 , 0 0 2 6 . 6 5 3 . 6 4 7 , 2 0 3 P as. B a t u B ata 1 : 4 M 2 4 55,7 0 1 0 2 . 9 8 4 , 0 0 4 6 . 9 2 9 . 8 0 8 , 8 0 4 Plester a n Batu Ba t a 1 : 5 M 2 911, 4 0 27.54 4 ,0 0 2 5 .1 0 3.601,60 5 A ci a n m2 9 11,40 10.177,00 9. 2 7 5 . 3 1 7 ,80 6 B e t on C or R i ng B a l k 1 : 2 : 3 M 3 2 , 8 1 2 . 0 5 8 . 1 8 2 , 0 0 5 . 7 9 0 . 9 5 2 , 3 3 7 Beton C or Kol o m 1 : 2 : 3 M3 2, 6 1 2.058.1 8 2 , 0 0 5.371.855,0 2 8 Beton Cor Sl o o f 1 : 2 : 3 M3 3,7 5 2.058.1 8 2 , 0 0 7.721.269,7 7 9 Beton Cor Bal o k Latai 1 : 2 : 3 M3 0, 2 8 2.058.1 8 2 , 0 0 583.49 4 ,6 0 1 0 D a a g d an L eu f e l M 3 1 , 7 8 2 . 0 5 8 . 1 8 2 , 0 0 3 . 6 5 7 . 3 8 9 , 4 1 1 1 L a n t a i B e t on T u m b u k 1 : 3 : 5 M 3 9 , 0 0 6 7 7 . 0 3 9 , 0 0 6 . 0 9 3 . 3 5 1 , 0 0 11 Pasan g t e g el k e ramik 4 0 / 4 0 M 2 90,00 109.511,00 9. 8 5 5 . 9 90,00 12 Pasan g t e g el k e ramik 2 0 / 2 5 ber g lasir M 2 18,20 98.511,00 1.7 9 2 . 9 0 0,20 1 3 P asan g t e g e l k e ram i k 2 0 / 2 0 b er g l as i r M 2 4 , 8 0 9 8 . 5 1 1 , 0 0 4 7 2 . 8 5 2 , 8 0 14 Memasan g kl o s et duduk/monobl o ck Unit 2,00 1.370.908,00 2.7 4 1. 8 16,00 154.893.698,35 IV . PEKERJ AAN KAY U 1 Kusen Pintu uk. 60 x 2 0 0 cm K a y u J a t i Bh 2,00 450.000,00 9 0 0 . 0 0 0,00 2 K usen P i n t u u k . 8 0 x 2 0 0 cm K a y u J a t i B h 4 , 0 0 5 0 0 . 0 0 0 , 0 0 2 . 0 0 0 . 0 0 0 , 0 0 3 Kusen Pintu Jendel a u k. 80 x 200 cm Ka y u J ati Bh 1,00 750.000,00 7 5 0 . 0 0 0,00 4 Kusen Pintu Jendel a G anda uk. 80 x 2 0 0 cm K a y u J a t i Bh 1,00 950.000,00 9 5 0 . 0 0 0,00 5 D a un Pin t u u k. 60 x 200 cm, t= 3 c m K a y u J a t i Bh 2,00 450.00 0 , 0 0 900.000,00 6 D a un P i n t u u k . 8 0 x 2 0 0 cm, t = 3 c m K a y u J a t i B h 6 , 0 0 5 0 0 . 0 0 0 , 0 0 3 . 0 0 0 . 0 0 0 , 0 0 7 K usen J en d e l a G an d a 2 x 6 0 cm x 1 5 0 cm K ay u J at i B h 3 , 0 0 7 5 0 . 0 0 0 , 0 0 2 . 2 5 0 . 0 0 0 , 0 0 8 D a un Jendela Kac a 62cm x 152cm, t= 3 cm K a y u J a t i Bh 9,00 450.000,0 0 4 . 0 5 0.000,00 9 Boven g a n d a 2x 60 c m x 4 0 c m K a y u J a t i Bh 4 ,00 4 5 0.000,00 1.80 0 . 0 0 0 ,00 10 Boven 6 0 c m x 4 0cm K a y u J a t i Bh 2 ,00 3 5 0.000,00 700. 0 0 0 ,00 17.300.000,00 JUMLAH JUMLAH RENCANA ANGGARAN BIAYA JUMLAH JUMLAH

description

Contoh RAB rumah sedehana

Transcript of CONTOH RAB TIPE 40

  • (-)

    HARGA TOTALNO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA

    (Rp) (Rp)1 2 3 4 6 7

    I. PEKERJAAN PERSIAPAN1 Pembersihan lapangan Ls 1,00 100.000,00 100.000,002 Pemasangan patok/Bowplank Ls 1,00 250.000,00 250.000,00

    350.000,00II. PEKERJAAN TANAH1 Galian tanah pondasi M3 112,55 17.600,00 1.980.792,002 Timbunan kembali M3 37,52 8.448,00 316.926,723 Urugan tanah bawah lantai M3 27,00 105.600,00 2.851.200,004 Urugan pasir bawah lantai dan pondasi M3 21,51 138.600,00 2.980.593,00

    8.129.511,72

    III. PEKERJAAN BETON/PASANGAN1 Pekerjaan Aanstamping M3 12,51 227.865,00 2.849.451,832 Pasangan Pondasi Batu belah 1 : 5 M3 55,02 484.418,00 26.653.647,203 Pas. Batu Bata 1 : 4 M2 455,70 102.984,00 46.929.808,804 Plesteran Batu Bata 1 : 5 M2 911,40 27.544,00 25.103.601,605 Acian m2 911,40 10.177,00 9.275.317,80

    6 Beton Cor Ring Balk 1 : 2 : 3 M3 2,81 2.058.182,00 5.790.952,337 Beton Cor Kolom 1 : 2 : 3 M3 2,61 2.058.182,00 5.371.855,028 Beton Cor Sloof 1 : 2 : 3 M3 3,75 2.058.182,00 7.721.269,779 Beton Cor Balok Latai 1 : 2 : 3 M3 0,28 2.058.182,00 583.494,60

    10 Daag dan Leufel M3 1,78 2.058.182,00 3.657.389,4111 Lantai Beton Tumbuk 1 : 3 : 5 M3 9,00 677.039,00 6.093.351,00

    11 Pasang tegel keramik 40/40 M2 90,00 109.511,00 9.855.990,0012 Pasang tegel keramik 20/25 berglasir M2 18,20 98.511,00 1.792.900,2013 Pasang tegel keramik 20/20 berglasir M2 4,80 98.511,00 472.852,80

    14 Memasang kloset duduk/monoblock Unit 2,00 1.370.908,00 2.741.816,00

    154.893.698,35IV. PEKERJAAN KAYU1 Kusen Pintu uk. 60 x 200 cm Kayu Jati Bh 2,00 450.000,00 900.000,002 Kusen Pintu uk. 80 x 200 cm Kayu Jati Bh 4,00 500.000,00 2.000.000,003 Kusen Pintu Jendela uk. 80 x 200 cm Kayu Jati Bh 1,00 750.000,00 750.000,004 Kusen Pintu Jendela Ganda uk. 80 x 200 cm Kayu Jati Bh 1,00 950.000,00 950.000,005 Daun Pintu uk. 60 x 200 cm, t= 3 cm Kayu Jati Bh 2,00 450.000,00 900.000,006 Daun Pintu uk. 80 x 200 cm, t= 3 cm Kayu Jati Bh 6,00 500.000,00 3.000.000,007 Kusen Jendela Ganda 2 x 60cm x 150cm Kayu Jati Bh 3,00 750.000,00 2.250.000,008 Daun Jendela Kaca 62cm x 152cm, t= 3 cm Kayu Jati Bh 9,00 450.000,00 4.050.000,009 Boven ganda 2x 60cm x 40cm Kayu Jati Bh 4,00 450.000,00 1.800.000,00

    10 Boven 60cm x 40cm Kayu Jati Bh 2,00 350.000,00 700.000,00

    17.300.000,00

    JUMLAH

    JUMLAH

    RENCANA ANGGARAN BIAYA

    JUMLAH

    JUMLAH

  • V. PEKERJAAN ATAP/PLAFOND1 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu lokal M2 106,80 365840,20 39.073.379,642 Pasang lisplank ukuran (3 x 20) cm, kayu kamper M1 27,15 93981,00 2.551.584,153 Pasang Nok, Gording, Jurai kayu kamper M3 0,78 12524600,00 9.827.302,144 Atap Genteng Beton M2 106,80 84.150,00 8.987.598,685 Genteng Kerpus M1 16,82 116.009,00 1.951.271,386 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing M2 90,00 146.630,00 13.196.700,007 Pasang talang miring, seng BJLS 28, papan kayu kamper M1 6,00 39.925,00 239.550,00

    75.827.385,99

    VI. PEKERJAAN PENGECATAN1 Pengecetan Dinding M2 911,40 12.336,00 11.243.030,402 Pengecatan Plafond M2 90,00 12.336,00 1.110.240,003 Pengecetan Kosen Ls 1,00 4.500.000,00 4.500.000,005 Pengecatan Listplank Ls 1,00 1.250.000,00 1.250.000,00

    18.103.270,40VII. PEKERJAAN INSTALASI LISTRK DAN AIR1 Instalasi titik lampu ttk 19,00 150.000,00 2.850.000,002 Instalasi stop kontak ttk 7,00 150.000,00 1.050.000,003 Saklar tunnggal bh 5,00 12.500,00 62.500,004 Saklar ganda bh 5,00 14.750,00 73.750,005 Stop kontak bh 7,00 14.750,00 103.250,006 Lampu SL 40 watt bh 8,00 65.000,00 520.000,007 Lampu SL 20 watt bh 10,00 30.000,00 300.000,008 Fitting lampu bh 19,00 11.000,00 209.000,009 Instalasi air bersih 3/4" M' 19,50 34.309,00 669.025,50

    10 Instalasi Air kotor 3" M' 17,00 142.659,00 2.425.203,0011 Instalasi air kotor 4" M' 15,00 186.301,00 2.794.515,0012 Floor Drain bh 2,00 22.990,00 45.980,0013 Kran 1/2" bh 5,00 24.227,00 121.135,0014 MCB unit 1,00 150.000,00 150.000,0015 Bak Mandi unit 2,00 100.000,00 200.000,00

    11.574.358,50

    VIII. PEKERJAAN LAIN-LAIN1 Selot Unit 8,00 150.000,00 1.200.000,002 Engsel Pintu ARCH 4 Inchi Psg 8,00 18.500,00 148.000,003 Engsel Jendela 3 Inchi Psg 4,00 16.500,00 66.000,004 Hak angin Bh 8,00 14.000,00 112.000,005 Grendel Jendela Bh 4,00 12.000,00 48.000,006 Tarikan Jendela Bh 4,00 14.000,00 56.000,007 Tangki Air kapasitas 500lt Unit 1,00 795.000,00 795.000,008 Pompa Air Unit 1,00 1.500.000,00 1.500.000,009 Septictank Unit 1,00 500.000,00 500.000,00

    1011

    4.425.000,00

    JUMLAH

    JUMLAH

    JUMLAH

    JUMLAH

  • REKAPITULASI :

    I. PEKERJAAN PERSIAPAN Rp. 350.000,00

    II. PEKERJAAN TANAH Rp. 8.129.511,72

    III. PEKERJAAN BETON/PASANGAN Rp. 154.893.698,35

    IV. PEKERJAAN KAYU Rp. 17.300.000,00

    V. PEKERJAAN ATAP/PLAFOND Rp. 75.827.385,99

    VI. PEKERJAAN PENGECATAN Rp. 18.103.270,40

    VII. PEKERJAAN INSTALASI LISTRK DAN AIR Rp. 11.574.358,50

    VIII. PEKERJAAN LAIN-LAIN Rp. 4.425.000,00

    Rp. 290.603.224,96

    Rp. 290.603.000,00DIBULATKAN

    JUMLAH