PEMERINTAH ACEH DINAS BINA MARGA DAN DIPTA KARYA SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEH NAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGIN NOMOR PAKET : BANG/SMUL/2011/01 NOMOR KONTRAK : 37/KTR/BANG/SMLU/OTSUS/V/2011 KONTRAKTOR : PT. SELAMAT JAYA ABADI KONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANT LOKASI : KABUPATEN SIMUELUE NO. URAIAN SAT. KONTRAK AWAL Keter VOLUME DIVISI 1. UMUM 1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689 DIVISI 2. DRAINASE 50,100,000.00 0.689 2.1 Galian Untuk Selokan Drainase dan Saluran Air 37,888.00 2,000.00 75,776,000.00 1.042 2.3.5 Gorong-gorong Pipa Baja Bergelombang Ton 37,703,990.35 1.50 56,555,985.53 0.778 DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820 3.1.1 Galian Biasa 24,003.00 1,250.94 30,026,312.82 0.413 3.2.1 Timbunan Biasa 71,022.00 2,000.00 142,044,000.00 1.953 3.2.2 Timbunan Pilihan 106,227.00 1,221.83 129,791,335.41 1.785 3.3.1 Penyiapan Badan Jalan 2,922.00 27,900.00 81,523,800.00 1.121 DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272 4.2.2 Lapis Pondasi Agregat Klas B 455,605.00 1,860.00 847,425,300.00 11.652 DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652 5.1.1 Lapis Pondasi Agregat Klas A 526,671.00 2,790.00 1,469,412,090.00 20.204 5.1.2 Lapis Pondasi Agregat Klas B 449,249.00 3,720.00 1,671,206,280.00 22.979 DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184 6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158 6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541 6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757 6.3.10 Bahan Pengisi (Filler) Tambahan Kg 1,206.85 41,371.98 49,929,774.06 0.687 DIVISI 7. STRUKTUR 2,628,526,398.70 36.142 7.9 Pasangan Batu 613,517.00 80.00 49,081,360.00 0.675 7.10 (3) Bronjong 589,406.00 70.00 41,258,420.00 0.567 90,339,780.00 1.242 Jumlah Nilai Pekerjaan 7,272,727,282.46 100.00 PPN 10 % 727,272,728.25 TOTAL BIAYA PEKERJAAN 8,000,000,010.70 DIBULATKAN 8,000,000,000.00 PENYEDIA Ir. MUDJI HALIM JOHNNICO APRIANO DIREKTUR UTAMA HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) BOBOT (%)

description

Contoh MC 01

Transcript of Contoh MC 01

Page 1: Contoh MC 01

PEMERINTAH ACEHDINAS BINA MARGA DAN DIPTA KARYA

SUMBER DANA : KEGIATAN DANA OTONOMI KHUSUS KAB. SIMEULUE DINAS BINA MARGA DAN CIPTA KARYA ACEHNAMA PAKET : PENINGKATAN JALAN PSR INPRES - AIR DINGINNOMOR PAKET : BANG/SMUL/2011/01NOMOR KONTRAK : 37/KTR/BANG/SMLU/OTSUS/V/2011KONTRAKTOR : PT. SELAMAT JAYA ABADIKONSULTAN : PT. NUSVEY Ass. CV. ALPHA ENGINEERING CONSULTANTLOKASI : KABUPATEN SIMUELUE

NO. URAIAN SAT.KONTRAK AWAL

Keterangan

VOLUME

DIVISI 1. UMUM

1.2 Mobilisasi Ls 50,100,000.00 1.00 50,100,000.00 0.689

DIVISI 2. DRAINASE 50,100,000.00 0.689

2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 37,888.00 2,000.00 75,776,000.00 1.042

2.3.5 Gorong-gorong Pipa Baja Bergelombang Ton 37,703,990.35 1.50 56,555,985.53 0.778

DIVISI 3. PEKERJAAN TANAH 132,331,985.53 1.820

3.1.1 Galian Biasa M³ 24,003.00 1,250.94 30,026,312.82 0.413

3.2.1 Timbunan Biasa M³ 71,022.00 2,000.00 142,044,000.00 1.953

3.2.2 Timbunan Pilihan M³ 106,227.00 1,221.83 129,791,335.41 1.785

3.3.1 Penyiapan Badan Jalan M² 2,922.00 27,900.00 81,523,800.00 1.121

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN 383,385,448.23 5.272

4.2.2 Lapis Pondasi Agregat Klas B M³ 455,605.00 1,860.00 847,425,300.00 11.652

DIVISI 5. PERKERASAN BERBUTIR 847,425,300.00 11.652

5.1.1 Lapis Pondasi Agregat Klas A M³ 526,671.00 2,790.00 1,469,412,090.00 20.204

5.1.2 Lapis Pondasi Agregat Klas B M³ 449,249.00 3,720.00 1,671,206,280.00 22.979

DIVISI 6. PERKERASAN ASPAL 3,140,618,370.00 43.184

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 11,249.00 13,950.00 156,923,550.00 2.158

6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 521,662.00 2,027.22 1,057,523,639.64 14.541

6.3.8.a Aspal Ton 10,809,425.00 126.20 1,364,149,435.00 18.757

6.3.10 Bahan Pengisi (Filler) Tambahan Kg 1,206.85 41,371.98 49,929,774.06 0.687

DIVISI 7. STRUKTUR 2,628,526,398.70 36.142

7.9 Pasangan Batu M³ 613,517.00 80.00 49,081,360.00 0.675

7.10 (3) Bronjong M³ 589,406.00 70.00 41,258,420.00 0.567

90,339,780.00 1.242 Jumlah Nilai Pekerjaan 7,272,727,282.46 100.00 PPN 10 % 727,272,728.25 TOTAL BIAYA PEKERJAAN 8,000,000,010.70 DIBULATKAN 8,000,000,000.00

PENYEDIAIr. MUDJI HALIM

JOHNNICO APRIANODIREKTUR UTAMA

HARGA SATUAN (Rp.) JUMLAH HARGA

(Rp.)BOBOT

(%)

Page 2: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANANMONTHLY CERTIFICATE (MC)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 1 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

URAIAN PEKERJAAN

NILAI KONTRAK JUMLAH PEMBAYARAN

KONTRAK AWAL (Rp.)S/D

BULAN INIS/D BOBOT (%) BOBOT (%)

BULAN LALU BULAN INI S/D BULAN INI ITEM PEKERJAAN

1 2 3 4 5 6 7 8

1 UMUM 50,100,000.00 - 35,070,000.00 35,070,000.00 0.48% 0.48%

2 DRAINASE 132,331,985.53 - 70,067,415.04 70,067,415.04 0.96% 0.96%

3 PEKERJAAN TANAH 383,385,448.23 - 205,296,253.71 205,296,253.71 2.82% 2.82%

4 PELEBARAN DAN PERKERASAN BAHU JALAN 847,425,300.00 - - - 0.00% 0.00%

5 PERKERASAN BERBUTIR 3,140,618,370.00 - 526,376,068.32 526,376,068.32 7.24% 7.24%

6 PERKERASAN ASPAL 2,628,526,398.70 - - - 0.00% 0.00%

7 STRUKTUR 90,339,780.00 - - - 0.00% 0.00%

A SUB TOTAL 7,272,727,282.46 - 836,809,737.07 836,809,737.07

11.51%S/D BULAN INI

B PPN (10%) X A 727,272,728.25 - 83,680,973.71 83,680,973.71 11.51%

C JUMLAH TOTAL A + B 8,000,000,010.70 - 920,490,710.78 920,490,710.78

D DIBULATKAN C 8,000,000,000.00 - 920,490,000.00 920,490,000.00 BULAN INI

E MATERIAL ON SITE (MOS)11.51%

F JUMLAH KOTOR SERTIFIKAT BULAN INI

G POTONGAN - POTONGAN S/D BULAN LALU

1 SERTIFIKAT S/D BULAN LALU (KOMULATIF) - 0.00%

2 5 % JAMINAN PEMELIHARAAN ( 5% X D ) 46,024,500.00

3 20 % PENGEMBALIAN UANG MUKA 184,098,000.00

H JUMLAH POTONGAN ( 1 + 2 + 3 ) 230,122,500.00

I JUMLAH BERSIH SERTIFIKAT BULAN INI TERMASUK PPN 10% (F-H) 690,367,500.00

J DIBULATKAN 690,367,500.00

Terbilang : #VALUE!

NOMOR MATA PEMBAYARAN

DIPERIKSA/DISETUJUI OLEH :KONSULTAN SUPERVISI

__________________SITE ENGINEER

MENYETUJUI OLEH :PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

Ir. ZULKARNEN, MT.Nip. 19640516 199703 1 001

DIAJUKAN OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

ALWIN ABDULLAHDIREKTUR UTAMA

MENGETAHUI OLEH :KUASA PENGGUNA ANGGARAN / KUASA PENGGUNA BARANG

KEGIATAN PEMBANGUNAN JALAN DAN JEMBATANDINAS BINA MARGA DAN CIPTA KARYA ACEH

Ir. FAJRI, MTPEMBINA

NIP. 19640831 199203 1 005

Page 3: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 2 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 1. UMUM JUMLAH KONTRAK AWAL Rp 50,100,000.00

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

1.2 Mobilisasi Ls 1.00 50,100,000.00 50,100,000.00 - - 0.70 35,070,000.00 0.70 35,070,000.00

DIVISI 1. UMUM

TOTAL HARGA 50,100,000.00 - - -

TOTAL PEMBAYARAN - - 35,070,000.00 35,070,000.00

PERSENTASE 100.00% 0.00% 70.00% 70.00%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 4: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 3 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 2. DRAINASE JUMLAH KONTRAK AWAL Rp 132,331,985.53

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

2.1 Galian Untuk Selokan Drainase dan Saluran Air M³ 2,000.00 37,888.00 75,776,000.00 - - 1,849.33 70,067,415.04 1,849.33 70,067,415.04

2.3.5 Gorong-Gorong Pipa Baja Bergelombang Ton 1.50 37,703,990.35 56,555,985.53 - - - - - -

DIVISI 2. DRAINASE

TOTAL HARGA 132,331,985.53 - - -

TOTAL PEMBAYARAN - - 70,067,415.04 70,067,415.04

PERSENTASE 100.00% 0.00% 52.95% 52.95%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 5: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 4 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 3. PEKERJAAN TANAH JUMLAH KONTRAK AWAL Rp 383,385,448.23

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

3.1.1 Galian Biasa M³ 1,250.94 24,003.00 30,026,312.82 - - - - - -

3.2.1 Timbunan Biasa M³ 2,000.00 71,022.00 142,044,000.00 - - - - - -

3.2.2 Timbunan Pilihan M³ 1,221.83 106,227.00 129,791,335.41 - - 1,221.83 129,791,335.41 1,221.83 129,791,335.41

3.3 Penyiapan Badan jalan M² 27,900.00 2,922.00 81,523,800.00 - - 25,840.15 75,504,918.30 25,840.15 75,504,918.30

DIVISI 3. PEKERJAAN TANAH

TOTAL HARGA 383,385,448.23 - - -

TOTAL PEMBAYARAN - - 205,296,253.71 205,296,253.71

PERSENTASE 100.00% 0.00% 53.55% 53.55%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 6: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 5 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN JUMLAH KONTRAK AWAL Rp 847,425,300.00

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

4.2.2 Lapis Pondasi Aggregat Klas B M³ 1,860.00 455,605.00 847,425,300.00 - - - - - -

DIVISI 4. PELEBARAN DAN PERKERASAN BAHU JALAN

TOTAL HARGA 847,425,300.00 - - -

TOTAL PEMBAYARAN - - - -

PERSENTASE 100.00% 0.00% 0.00% 0.00%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 7: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 6 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 5. PERKERASAN BERBUTIR JUMLAH KONTRAK AWAL Rp 3,140,618,370.00

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

5.1.1 Lapis Pondasi Agregat Klas A M³ 2,790.00 526,671.00 1,469,412,090.00 - - - - - -

5.1.2 Lapis Pondasi Agregat Klas B M³ 3,720.00 449,249.00 1,671,206,280.00 - - 1,171.68 526,376,068.32 1,171.68 526,376,068.32

DIVISI 5. PERKERASAN BERBUTIR

TOTAL HARGA 3,140,618,370.00 - - -

TOTAL PEMBAYARAN - - 526,376,068.32 526,376,068.32

PERSENTASE 100.00% 0.00% 16.76% 16.76%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 8: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 7 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 6. PERKERASAN ASPAL JUMLAH KONTRAK AWAL Rp 2,628,526,398.70

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

6.1.(1)(a) Lapis Resap Pengikat - Aspal Cair Liter 13,950.00 11,249.00 156,923,550.00 - - - - - -

6.3.(6a) Laston Lapis Antara (AC-BC) (gradasi halus/kasar) Ton 2,027.22 521,662.00 1,057,523,639.64 - - - - - -

6.3.8.a Aspal Ton 126.20 10,809,425.00 1,364,149,435.00 - - - - - -

6.3.10 Bahan Pengisi (Filler) Tambahan Kg 41,371.98 1,206.85 49,929,774.06 - - - - - -

DIVISI 6. PERKERASAN ASPAL

TOTAL HARGA 2,628,526,398.70 - - -

TOTAL PEMBAYARAN - - - -

PERSENTASE 100.00% 0.00% 0.00% 0.00%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT

Page 9: Contoh MC 01

PEMERINTAH ACEH

DINAS BINA MARGA DAN CIPTA KARYAPEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XV SIMEULUE

SERTIFIKAT BULANAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS BINA MARGA DAN CIPTA KARYA ACEH SERTIFIKAT : 01 (SATU)

NAMA PAKET : PENINGKATAN JALAN SINABANG-SIBIGO BULAN : APRIL

NOMOR KONTRAK : 13/SPPK/PBJ/DBC/APBA/III/2012 TANGGAL : 25 APRIL 2012

TANGGAL KONTRAK : 21 MARET 2012 HALAMAN : 8 dari 8

NILAI KONTRAK : Rp. 8,000,000,000.00,-

SUMBER DANA : APBA TAHUN ANGGARAN 2012

PENYEDIA JASA : PT. FLAMBOYANT HUMA ARTA

DIVISI 7. STRUKTUR JUMLAH KONTRAK AWAL Rp 90,339,780.00

URAIAN PEKERJAAN SAT.

KUANTITAS S/D BULAN LALU BULAN INI S/D BULAN INI

KUANTITAS KUANTITAS KUANTITAS

1 2 3 4 5 6 = 4 x 5 7 8 = 5 x 7 9 10 = 5 x 9 11 = 7 + 9 12 = 8 + 10

7.9 Pasangan Batu M³ 80.00 613,517.00 49,081,360.00 - - - - - -

7.10 (3) Bronjong M³ 70.00 589,406.00 41,258,420.00 - - - - - -

DIVISI 7. STRUKTUR

TOTAL HARGA 90,339,780.00 - - -

TOTAL PEMBAYARAN - - - -

PERSENTASE 100.00% 0.00% 0.00% 0.00%

NOMOR MATA PEMB.

HARGA SATUAN

(Rp.)

JUMLAH HARGA AWAL

(Rp.)KONTRAK

AWAL

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

JUMLAH HARGA

(Rp.)

DISETUJUI OLEH :PEMBANTU PPTK

PEMBANGUNAN JALAN DAN JEMBATAN WILAYAH XI (SIMEULUE)

RUSVAN VERIZAL, STNip. 19830706 201001 1029

DIPERIKSA OLEH :KONSULTAN SUPERVISI

________________CHIEF INSPECTOR

DIBUAT OLEH :PENYEDIA BARANG/JASA

PT. FLAMBOYANT HUMA ARTA

SYAHRIZAL, ST.GENERAL SUPERINTENDENT