B a c k u p d a t a KEGIATAN : PEMBANGUNAN PASAR LELANG MODEREN PEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN LOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG TAHUN ANGGARAN : 2015 DATA GAMBAR banyak kolom 40/60 26 bh banyak kolom praktis 32 bh panjang sloof 20/30 231 m panjang sloof 13/13 39.48 m panjang balok 25/50 210 m bayak pondasi plat 26 bh pajang pondasi batu k 231 m luasan lantai 401.68 m2 panjang saluran 406.19 m I 1 Pek. Pagar Pengaman p x L x T = stn Gambar V 60 H 72 Jml 132 = 132 m' 2 Pek. Pasangan Boplank V 54 H 66 Jml 120 = 120 m' 3 Gudang Direksi Cat V H Jml 6 x 6 = 36 m' II 1 Galian Tanah Pondasi p x L x T = M3 Gambar V H Jml 231 x 0.8 x 0.9 = 166.32 m3 2 Galian Tanah Pondasi Plat 1.2 x 1.2 x 1.5 = 2.16 m3 Jml 26 2.16 x 26 = 56.16 m3 3 Galian Tanah Pondasi Jalan V 192 H 227.7 Jml 419.7 0.4 x 0.7 = 117.516 m3 4 Galian Tanah Plat Decker 3 x 1.5 x 0.9 = 4.05 m3 4.05 x 3 = 12.15 m3 5 Galian Tanah Saluran V H Jml 406.19 x 0.5 x 0.7 = 142.17 m3 6 Urugan Tanah Bawah Lantai 401.68 x 0.3 = 120.504 m3 Total Urugan Tanah = 120.50 m3 7 Urugan Pasir Bawah Lantai 401.68 x 0.1 = 40.168 m3 Total Urugan Pasir = 40.17 m3 Bawah Lantai 8 Urugan Pasir Bawah Pondasi 1 Pondasi Bt Kali 231 0.8 x 0.05 = 9.24 m3 2 Pondasi Jalan 419.7 0.5 x 0.05 = 10.4925 m3 3 Pondasi Plat 1.2 x 1.2 x 0.05 = 1.56 m3 26 1.56 x 26 = 40.56 Total Urugan Pasir 60.29 m3 Bawah Pondasi III 1 Pasangan Batu Kosong 231 0.8 x 0.2 = 36.96 m3 2 Pasangan Pondasi Bt. Kali 0,3 + 0,6 231 x 0.45 x 0.7 = 72.765 m3 2 3 Pasangan Pondasi Bt. Kali (Jalan) 419.7 x 0.25 x 0.44 = 46.167 m3 4 Pasangan Pondasi Bt. Kali (Plat Decker) 0,4 +0,3 3 x 0.35 x 0.9 = 0.945 m3 2 0.945 x 6 = 5.67 m3 Lantai Decker 3 x 0.5 x 0.2 = 0.3 m3 0.3 x 6 = 1.8 m3 Jumlah = 7.47 m3 5 Pekerjaan Beton Tumbuk Bwh Lantai 401.68 x 0.15 = 60.252 m3 Total Beton Tumbuk = 60.25 m3 6 Pekerjaan Beton Tumbuk Bwh Saluran 406.19 0.5 x 0.07 = 14.22 m3 7 Lantai Kerja Pond. Plat 1:3:5 1.2 x 1.2 x 0.1 = 0.144 m3 26 0.144 x 26 = 3.74 m3

description

contoh build of quantity..

Transcript of BQ

Page 1: BQ

B a c k u p d a t a

KEGIATAN : PEMBANGUNAN PASAR LELANG MODEREN PEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN LOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG TAHUN ANGGARAN : 2015

DATA GAMBAR

banyak kolom 40/60 26bhbanyak kolom prakti 32bhpanjang sloof 20/30 231mpanjang sloof 13/13 39.48mpanjang balok 25/50 210mbayak pondasi plat 26bhpajang pondasi batu 231mluasan lantai 401.68m2panjang saluran 406.19m

I 1 Pek. Pagar Pengaman p x L x T = stn Gambar

V 60

H 72

Jml 132 = 132 m'

2 Pek. Pasangan Boplank V 54

H 66

Jml 120 = 120 m'

3 Gudang Direksi Cat

V

H

Jml 6 x 6 = 36 m'II 1 Galian Tanah Pondasi p x L x T = M3 Gambar

VHJml 231 x 0.8 x 0.9 = 166.32 m3

2 Galian Tanah Pondasi Plat 1.2 x 1.2 x 1.5 = 2.16 m3Jml 26 2.16 x 26 = 56.16 m3

3 Galian Tanah Pondasi JalanV 192H 227.7Jml 419.7 0.4 x 0.7 = 117.52 m3

4 Galian Tanah Plat Decker3 x 1.5 x 0.9 = 4.05 m3

4.05 x 3 = 12.15 m35 Galian Tanah Saluran V

HJml 406.19 x 0.5 x 0.7 = 142.17 m3

6 Urugan Tanah Bawah Lantai 401.68 x 0.3 = 120.504 m3Total Urugan Tanah = 120.50 m3

7 Urugan Pasir Bawah Lantai 401.68 x 0.1 = 40.168 m3Total Urugan Pasir = 40.17 m3

Bawah Lantai8 Urugan Pasir Bawah Pondasi

1Pondasi Bt Kali 231 0.8 x 0.05 = 9.24 m3

2Pondasi Jalan 419.7 0.5 x 0.05 = 10.4925 m3

3Pondasi Plat 1.2 x 1.2 x 0.05 = 1.56 m326 1.56 x 26 = 40.56

Total Urugan Pasir 60.29 m3Bawah Pondasi

III 1 Pasangan Batu Kosong231 0.8 x 0.2 = 36.96 m3

2 Pasangan Pondasi Bt. Kali

0,3 + 0,6 231 x 0.45 x 0.7 = 72.765 m32

3 Pasangan Pondasi Bt. Kali (Jalan)419.7 x 0.25 x 0.44 = 46.167 m3

4 Pasangan Pondasi Bt. Kali (Plat Decker) 0,4 +0,3 3 x 0.35 x 0.9 = 0.945 m3

2 0.945 x 6 = 5.67 m3

Lantai Decker 3 x 0.5 x 0.2 = 0.3 m30.3 x 6 = 1.8 m3

Jumlah = 7.47 m35 Pekerjaan Beton Tumbuk Bwh Lantai 401.68 x 0.15 = 60.252 m3

Total Beton Tumbuk = 60.25 m36 Pekerjaan Beton Tumbuk Bwh Saluran

406.19 0.5 x 0.07 = 14.22 m3

7 Lantai Kerja Pond. Plat 1:3:51.2 x 1.2 x 0.1 = 0.144 m3

26 0.144 x 26 = 3.74 m3

Page 2: BQ

8 Beton Pondasi Plat Setempat1.2 x 1.2 x 0.225 = 0.324 m3

26 0.324 x 26 = 8.42 m3

9 Beton Sloof 20/30231 0.2 x 0.3 = 13.86 m3

10 Beton Sloof 13/1339.48 0.13 x 0.13 = 0.67 m3

11 Beton Kolom Praktis1.3 x 0.13 x 0.13 = 0.02 m3

32 0.02 x 32 = 0.70 m3= 0.70 m3

12 Beton Kolom 40/605.775 x 0.2 x 0.2 = 0.23 m3

26 0.23 x 26 = 6.01 m3

Total = 6.01 m3Beton Kolom 20/20

13 Beton Balok 25/50210 x 0.25 x 0.5 = 26.25 m3

14 Beton Cor Jalan (Penulangan Tunggal)1 34.71 x 2 x 0.15 = 10.41 m32 12.95 x 2 x 0.15 = 3.89 m33 31.42 x 0.15 = 4.71 m34 24.08 x 0.15 = 3.61 m35 38.13 x 2 x 0.15 = 11.44 m36 12.95 x 3 x 0.15 = 5.83 m37 36.36 x 3 x 0.15 = 16.36 m38 22.61 x 3 x 0.15 = 10.17 m39 8.25 x 2 x 0.15 = 2.48 m3

10 12.87 x 3 x 0.15 = 5.79 m3= 74.69 m3

15 Beton Cor Rabat (Penulangan Tunggal)1 0 x 0 x 0.15 = 0.00 m32 22.23 x 2.62 x 0.15 = 8.74 m33 2.32 x 6.48 x 0.15 = 2.26 m34 8.5 x 17.07 x 0.15 = 21.76 m35 1.15 x 11.75 x 0.15 = 2.03 m36 23.38 x 0.9 x 0.15 = 3.16 m37 15.6 x 0.85 x 0.15 = 1.99 m39 0.9 x 8.43 x 0.15 = 1.14 m3

10 0.9 x 8.43 x 0.15 = 1.14 m311 0.85 x 10.6 x 0.15 = 1.35 m312 0.85 x 10.6 x 0.15 = 1.35 m3

= 44.91 m316 Beton Meja Los Ikan/Daging 3.1 x 1 x 0.12 = 0.372 m2

1.5 x 1 x 0.12 = 0.18 m2= 0.552 m2

0.552 x 4 = 2.208 m217 Beton Plat Decker 3 x 1 x 0.15 = 0.45 m3

0.45 x 3 = 1.35 m3

18 Pas. Dinding BataLos basah

13.3 x 1 = 13.30 m213.30 x 2 = 26.60 m2

Total Dinding Bata = 26.60 m2

19 Pas. Lantai Keramik 40 x 40 cm 1 21.4 x 15.6 = 333.84 m22 74 x 0.2 = 14.8 m2

kurang kolom 0.24 x 19 = 4.56 m2Total Keramik 344.08 m2

20 Pas. Lantai Keramik 40 x 40 cm (Tekstur) 1 10.6 x 6.4 = 67.84 m22 34 x 0.1 = 3.4 m2

kurang kolom 0.24 x 7 = 1.68 m2Total Keramik = 69.56 m2

21 Pas. Keramik 25 x 25 cm (Meja Beton)Meja

3.1 x 1 = 3.1 m21.5 x 1 = 1.5 m2

= 4.6 m24.6 x 4 = 18.4 m2

22 Pas. Keramik 25 x 40 cm (Meja Beton)Dinding

3.1 x 1.5 x 8 = 37.20 m21 x 1.5 x 8 = 12 m2

= 49.20 m223 Pas. Gril Besi Saluran = 406.19 m2

= 406.19 m2IV 1 Pas. Kuda-kuda Baja Ringan

1 26.07 x 11.59 = 302.15 m2

### x 2.00 = 604.30 m2

2 6.03 x 8.32 = 50.17 m2 50.17 x 1.00 = 50.17 m2

3 6.85 x 8.32 x 1 = 56.99 m2Total

Pas. Kuda-kuda = 711.46 m22 Pas. Atap Genteng Metal

= 711.46 m23 Pas. Lisplng GRC Doble H + V =

64.22 + 54.68 = 118.9 m'

4 Pas. Spandek 1 1/2 x A x T = m20.5x 8.71x 7.31 = 31.8351 m2

Page 3: BQ

31.835 x 4 = 127.34 m2= 127.34 m2

5 Pek. Cat Kolom dan Balok Kolom 0.4 x 4.50 x 17 = 30.6 m20.6 x 4.5 x 17 = 45.9 m2

= 76.5 m2

Balok 0.2 x 210 = 42 m21 x 210 = 210 m2

= 252 m2= 328.5 m2

6 Pek. Cat Dinding 1 6.95 x 0.90 x 8 = 50.04 m2= 50.04 m2

Page 4: BQ

LOKASI

KABUPATEN LEBONG

DATA GAMBAR

banyak kolom 40/60 33 bhpanjang sloof 20/30 99 mpanjang balok 25/50 99 mbayak pondasi plat 33 bhpajang pondasi batu kali 99 mluasan lantai 480 m2panjang saluran 126.57 m

a PEKERJAAN LAPANGAN

panjang lebar

II PEKERJAAN TANAH DAN PASIR

1. Galian Tanah Pondasi 99.00 x 0.80

2 Galian tanah pondasi plat setempat 1.20 x 1.20

Galian tanah saluran

3 Urugan Tanah Kembali :

5 Urugan Pasir Bawah Pondasi 99.00 x 0.80

6 Urugan Tanah Bawah Lantai 480.00 0.30

6 Urugan pasir bawah plat setempat 1.20 x 1.20

7 Urugan Pasir Bawah Lantai

480.00

PEK. PASANGAN BATU / BETON 1 Pas Pondasi Batu Kosong / amstramping

99.00 x 0.80

2 Pas. Pondasi Batu Kali 1 : 499.00 x 0.45

Page 5: BQ

Panjang Pondasi - Lebar Kolom 501 - 26

1 Lantai Kerja Plat Setempat 1:3:5

1 1.00 0.07

2 Pas. Pondasi Plat Setempat1 1.00

0.20

3 Pas. Sloof 15/20

99.00 0.15

4 Pas. Balok Latei

H 87.5 0.15

V 124 0.15 211.5

Jumlah H+V

5 Kolom 20/20

129 0.20

5.16

6 Ring Balok 15/20

99.00 0.15

7 Pek. Meja Beton Los Ikan

30.00 1.15

8 Pek. Pondasi Batu Kali 1:4 (Jalan)

284 0.40

8 Pek. Jalan Beton T=15 cm

142 2.00

7.5 6.50

9 Pas. Grill Besi

7 Pas. Batu Bata 1 : 4

2.35 x 1.00

1.85 1.00

Page 6: BQ

1 1.00

Total

8 Pas. Kuda-kuda

1 6.30 45.99

2 6.30 45.99

3 7.20 142.56

4 7.20 34.56

5 3.72

6 3.72 27.90

Total

9 Pas. Atap Genteng Metal

10 Pas. Listplank Double 3/30+3/10

11 Pek. Plesteran Dinding 1 : 4 202.85 x 2 27.00 0.15

Jumlah

12 Pek. Acian Dinding 1 : 4

5 Pek. Lantai Keramik 40 X 40 cm

1. Keramik 40 x 40 2.35

4.82

2. Keramik Tekstur 40 x 40 2.35

4.82

3. Keramik Meja Beton a. Meja 1.15

10.00

Page 7: BQ

b. Dinding 2.35 2.35

8 Pek. Lantai Kerja 1 : 3 : 5 plat setempat1.20 x 1.20

0.07

9 Pek. Rabat Lantai selasarGedung lama

15.00 x 8.00 8.00 x 8.00

3.20 3.02

8.00 x 3.00 1.20

3.00 x 3.00 8.00 x 8.00 8.00 x 3.00

1.20 8.00 x 4.00

1.60 5.00 x 9.00 7.00 x 3.00

1.05 8.00 x 9.00 Gedung Baru 6.00 x 3.00 4.00 x 3.00

0.60

PEK. BETON BERTULANG1 Pek. Pondasi Plat Setempat

1.00 x 1.00 0.25

2 Pek. Sloof 20/25 cm72.00 x 0.20

3 Pek. Kolom pondasi 40/40 cm0.40 x 0.40

0.18

4 Pek. Kolom Struktur 40/40 cm L 10.40 x 0.40

0.56

5 Pek.Kolom struktur 40 / 40 cm L 20.40 x 0.40

0.64 6 Pek. Kolom Praktis 13/13 cm

0.13 x 0.13

Page 8: BQ

0.07

7 Pek. Pelat Dak L 1 6.00 x 3.004.00 x 3.00

1.44

8 Pek.Pelat Dak L 2 Atap

9 Pek.Plat Dak Teras

PEK. KAYU / KACAPEK. Kosen Pintu Aluminium

a 2.70 x 1 1.44 x 6 0.53 x 4 2.26 x 6 0.55 x 6

30.32

b 1.52 x 1 2.26 x 2 2.20 x 4 0.67 x 6 2.00 x 2

22.86

c 0.82 x 1 0.70 x 3 2.26 x 2 2.20 x 2

11.84 Total seluruh kusen pintu aluminium / m'

Pek. Kosen Jendela Aluminium a 2.84 x 2

1.56 x 5 0.6 x 4

1.44 x 4

21.64 b 2.50 x 2

0.76 x 14 0.73 x 4 3.54 x 4

32.72 c 1.70 x 2

Page 9: BQ

1.56 x 2

6.52 d 2.84 x 2

1.63 x 2

8.94 e 1.7 x 2

0.76 x 4 1.56 x 3 1.44 x 4

16.88 f 2.86 x 2

1.56 x 2

8.84

Total seluruh kusen jendela aluminium / m'

Pek. Kosen Jalusi/ventilasi Aluminium a 2.70 x 2

0.50 x 5 0.53 x 4 0.44 x 4

11.78 b 1.52 x 2

0.62 x 3 0.67 x 4 0.50 x 4

9.58 c 2.84 x 2

0.6 x 4 0.5 x 4

0.62 x 5

13.18 d 1.70 x 2

0.62 x 4 0.50 x 4 0.42 x 4

9.56 e 2.84 x 2

0.60 x 4 0.62 x 5 0.50 x 4

13.18 f 1.70 x 2

0.76 x 4

Page 10: BQ

0.50 x 4 0.62 x 3

10.30 g 2.84 x 2

0.60 x 4 0.62 x 6 0.50 x 4

13.80

Total seluruh kusen jalusi/ventilasi aluminium / m'

Pek. Jendela Kaca Rayben 3 mm/hidupPek. Jendela Kaca Rayben 5 mm/matiPek. Plafon gypsum

10.18 10.18 8.36 28.72

Page 11: BQ
Page 12: BQ
Page 13: BQ
Page 14: BQ
Page 15: BQ
Page 16: BQ
Page 17: BQ
Page 18: BQ

PENGGUNA JASADINAS PEKERJAAN UMUM

KABUPATEN LEBONG

tinggi jumlah sat.

x 0.75 = 59.40 m3

x 1.50 = 2.16 m3

61.56

= 15.39 m3

x 0.10 = 7.92 m3

144.00 m3

x 0.10 = 0.14 m3

x 0.10 = 48.00 m3

m3

x 0.20 = 15.84

0.70 = 31.18

Page 19: BQ

475.00 14,812.87

0.07 0.07 48.00 3.36

0.20 0.20 48.00 9.60 m3

0.20 2.97

0.15 1.97

0.15 2.79

4.76

0.20 5.16

5.00 25.80

0.20 2.97

0.12 4.14

0.70 79.52

0.15 42.60 m3

0.15 7.31 m3

49.91 m3

328.50

37.00 = 86.95 m2

54.00 99.90

Page 20: BQ

16.00 16.00

202.85 m2

7.30 45.99 2.00 91.98

7.30 45.99 4.00 183.96

19.80 142.56 2.00 285.12

4.80 34.56 2.00 69.12

3.32 12.35

7.50 27.90 2.00 55.80

698.33

698.33

165.00

= 405.70 m2

4.05 m2

409.75 m2

409.75 m2

x 2.05 = 4.82 m2

62.00 298.69 m2

x 2.05 4.82 m2

12.00 57.81 m2

8.70 10.00

4.00 40.02

Page 21: BQ

1.00 2.35 12 28.20

x 0.05 = 0.07 m3

x 20 = 1.44 m3

x 0.05 = 6.00 m3

x 0.05 = 3.20 m3

- 0.18 = 3.02 m3

x 4 = 12.08 m3

x 0.05 = 1.20 m3

x 4 = 4.80 m3

x 0.05 = 0.45 m3

x 0.05 = 3.20 m3

x 0.05 = 1.20 m3

- 0.12 = 1.08 m3 x 0.05 = 1.60 m3

- 0.60 = 1.00 m3

x 0.05 = 2.25 m3

x 0.05 = 1.05 m3

x 2 = 2.10 m3

x 0.05 = 3.60 m3

x 0.05 = 0.90 m3

x 0.05 = 0.60 m3

x 8 = 4.80 m3

Total = 42.26 m3

x 0.25 = 0.25 x 20 = 5.00

x 0.25 = 3.60

x 1.10 = 0.18 x 20 = 3.52

x 3.50 = 0.56 x 18 = 10.08

x 4.00 = 0.64

x 18 = 11.52

x 4.00 = 0.07

Page 22: BQ

x

x 0.12 = 2.16 x 0.12 = 1.44 x 8 = 11.52

= 2.70 m'

= 8.64 m'

= 2.12 m'

= 13.56 m'

= 3.30 m' Total = 30.32 m'

x 6 = 181.92 m'

= 1.52 m'

= 4.52 m'

= 8.80 m'

= 4.02 m'

= 4.00 m' Total = 22.86 m'

x 8 = 182.88 m'

= 0.82 m'

= 2.10 m'

= 4.52 m'

= 4.40 m' Total = 11.84 m'

x 6 = 71.04 m'

Total seluruh kusen pintu aluminium / m' = 435.84 m'

= 5.68 m'

= 7.80 m'

= 2.40 m'

= 5.76 m' Total = 21.64 m'

x 13 = 281.32 m'

= 5.00 m'

= 10.64 m'

= 2.92 m'

= 14.16 m' Total = 32.72 m'

x 2 = 65.44 m'

= 3.40 m'

Page 23: BQ

= 3.12 m' Total = 6.52 m'

x 1 = 6.52 m'

= 5.68 m'

= 3.26 m' Total = 8.94 m'

1 8.94 m'

= 3.40 m'

= 3.04 m'

= 4.68 m'

= 5.76 m' Total = 16.88 m'

x 3 = 50.64 m'

= 5.72 m'

= 3.12 m' Total = 8.84 m'

x 2 = 17.68 m'

Total seluruh kusen jendela aluminium / m' = 430.54 m'

= 5.40 m'

= 2.50 m'

= 2.12 m'

= 1.76 m' Total = 11.78 m'

x 6 = 70.68 m'

= 3.04 m'

= 1.86 m'

= 2.68 m'

= 2.00 m'

Total = 9.58 m'

x 8 = 76.64 m'

= 5.68 m'

= 2.40 m'

= 2.00 m'

= 3.10 m' Total = 13.18 m'

x 13 = 171.34 m'

= 3.40 m'

= 2.48 m'

= 2.00 m'

= 1.68 m' Total = 9.56 m'

x 1 = 9.56 m'

= 5.68 m'

= 2.40 m'

= 3.10 m'

= 2.00 m' Total = 13.18 m'

x 1 = 13.18 m'

= 3.40 m'

= 3.04 m'

Page 24: BQ

= 2.00 m'

= 1.86 m' Total = 10.30 m'

x 3 = 30.90 m'

= 5.68 m'

= 2.40 m'

= 3.72 m'

= 2.00 m' Total = 13.80 m'

x 2 = 27.60 m'

Total seluruh kusen jalusi/ventilasi aluminium / m' = 399.90 m'

Page 25: BQ
Page 26: BQ
Page 27: BQ
Page 28: BQ
Page 29: BQ
Page 30: BQ
Page 31: BQ
Page 32: BQ

PEMERINTAH DAERAH KABUPATEN LEBONGDINAS KOPERASI UKM DAN PERINDAG

JALAN KOMPLEK PERKANTORAN JALUR DUA - TUBEI

BILL OF QUANTITY (bq)

KEGIATAN

PENGEMBANGAN PASAR LELANG

PEKERJAAN

PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN

LOKASI

PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG

TAHUN ANGGARAN 2015

CV.CITRA MALINDO DESAIN KONSULTAN PERENCANA,PENGAWAS,MANAGEMENT TEKNIS PEMBANGUNAN Jl. Kemas Jamaluddin No. 27 Manna Bengkulu Selatan Telp. (0739) 21292 - (0739) 347028___________________________________________________________________________________________________________________________________________________________________________________________________

Page 33: BQ
Page 34: BQ

T I M E S C H E D U L L E

KEGIATAN : PEMBANGUNAN PASAR LELANG

PEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN

LOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG

TAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN

JANGKA WAKTU PELAKSANAANBOBOTM I N G G U KET

(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

I PEKERJAAN PERSIAPAN 4.124 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 100%

II PEKERJAAN BONGKARAN BANGUNAN LAMA 0.927 0.31 0.31 0.31

III PEKERJAAN TANAH DAN PASIR 3.615 0.60 0.60 0.60 0.60 0.60 0.60

IV PEKERJAAN PASANGAN, BATU DAN BETON 74.365 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20 6.20

V PEKERJAAN ATAP 14.479 7.24 7.24 50%

VI PEKERJAAN INSTALASI LISTRIK DAN TITIK API 0.254 0.13 0.13

VII PEKERJAAN INSTALASI AIR BERSIH 1.191 0.40 0.40 0.40

VIII PEKERJAAN PENGECATAN 0.861 0.43 0.43

IX PEKERJAAN LAIN-LAIN 0.185 0.09 0.09 0%

JUMLAH % 100.000

RENCANA BOBOT PER MINGGU % 0.55 0.55 7.35 7.04 7.04 7.04 6.44 6.44 6.84 6.84 7.57 7.17 6.44 6.87 7.91 7.57 0.34

KOMULATIF BOBOT PER MINGGU % 0 0.55 1.10 8.45 15.50 22.54 29.58 36.02 42.46 49.30 56.13 63.70 70.87 77.31 84.18 92.09 99.66 100.00

Lebong, 16 Juli 2015

Dibuat Oleh :Konsultan Perancana :

CV. CITRA MALINDO DESAIN

JEFRI ANTHONIWakil Direktur

Page 35: BQ

DAFTAR ANALISAKEGIATAN : PEMBANGUNAN PASAR LELANG

PEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN

LOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG

TAHUN ANGGARAN : 2015

NO. KODE U R A I A N INDEX SATUANHARGA (Rp )

BAHAN UPAH ( Rp )

1 2 3 4 5 6 7 9

I PEKERJAAN PERSIAPAN

ABK-Pper 6.4 I M' PASANGAN BOWPLANK

Kayu 5/7 ( kayu Kls IV ) 0.004 m3 2,000,000.00 8,400.00

Paku campur 0.020 kg 19,000.00 380.00

Papan Kls IV 0.005 m3 2,000,000.00 9,600.00

Tukang kayu 0.100 Oh 80,000.00 8,000.00

Pekerja 0.100 Oh 70,000.00 7,000.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 33,880.00

2 ABK-Pper 6.5 I M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M

Bahan

Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 750.00 937.50

Semen Portland 2.500 Kg 1,500.00 3,750.00

Pasir Beton 0.400 m3 150,000.00 60,000.00

Koral Beton 0.009 m3 160,000.00 1,440.00

Kayu Kasau Kelas III 0.072 m3 2,000,000.00 144,000.00

Besi 0.060 Kg 19,000.00 1,140.00

Meni Besi 0.450 Lt 17,500.00 7,875.00

Tenaga

Tukang Kayu 0.200 Oh 80,000.00 16,000.00

Perkerja 0.400 Oh 70,000.00 28,000.00

Kepala Tukang 0.020 Oh 90,000.00 1,800.00

Mandor 0.020 Oh 100,000.00 2,000.00

J U M L A H 266,942.50

3 P.Per 6.6 1 M2 PEMBUATAN GUDANG SEMENTARA DAN ALAT-ALAT

Dolken kayu f 8-10/400 cm 1.700 Btg 13,000.00 22,100.00

Kayu Kelas III 0.010 M3 2,000,000.00 20,000.00

Kayu Papan Kelas III 0.030 m3 2,000,000.00 60,000.00

Paku campur 0.300 Kg 19,000.00 5,700.00

Seng gelombang bjls 20 1.100 Lbr 35,000.00 38,500.00

Pekerja 1.000 Oh 70,000.00 70,000.00

Tukang 2.000 Oh 80,000.00 160,000.00

Kepala Tukang 0.200 Oh 90,000.00 18,000.00

Mandor 0.050 Oh 100,000.00 5,000.00

J U M L A H 399,300.00

II PEKERJAAN TANAH

1 P.Tnh 6.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER

Pekerja 0.600 Oh 70,000.00 42,000.00

Mandor 0.050 Oh 100,000.00 5,000.00

J U M L A H 47,000.00

2 P.Tnh 6.9 1 M3 URUGAN KEMBALI

Pekerja 0.192 Oh 70,000.00 13,440.00

Mandor 0.019 Oh 100,000.00 1,900.00

J U M L A H 15,340.00

3 Sup Tnh 6.9 1 M3 URUGAN TANAH

Tanah Urug 1.200 M3 90,000.00 108,000.00

Pekerja 0.192 Oh 70,000.00 13,440.00

Mandor 0.019 Oh 100,000.00 1,900.00

J U M L A H 123,340.00

4 P.Tnh 6.11 1 M3 URUGAN PASIR

Pasir urug 1.200 M3 125,000.00 150,000.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Mandor 0.010 Oh 100,000.00 1,000.00

J U M L A H 172,000.00

5 P.Tnh 6.12 1 M3 HAMPARAN KORAL T= 12 cm

M3 Koral 1.0000 M3 160,000.00 160,000.00

Pekerja 1.2000 Oh 70,000.00 84,000.00

Mandor 0.6000 Oh 100,000.00 60,000.00

J U M L A H 304,000.00

III PEKERJAAN PONDASI

1 P.Pon 6.5 1 M3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps

Batu kali 1.100 M3 160,000.00 176,000.00

Semen 163.000 Kg 1,500.00 244,500.00

Pasir pasang 0.520 M3 130,000.00 67,600.00

Pekerja 1.500 Oh 70,000.00 105,000.00

Tukang 0.600 Oh 80,000.00 48,000.00

Kepala Tukang 0.060 Oh 90,000.00 5,400.00

Mandor 0.075 Oh 100,000.00 7,500.00

J U M L A H 654,000.00

JUMLAH

Page 36: BQ

2 P.Pon 6.14 1 M3 PASANGAN PONDASI BATU KOSONG

Batu kali 1.200 M3 160,000.00 192,000.00

Pasir urug 0.300 M3 125,000.00 37,500.00

Pekerja 0.780 Oh 70,000.00 54,600.00

Tukang 0.390 Oh 80,000.00 31,200.00

Kepala Tukang 0.039 Oh 90,000.00 3,510.00

Mandor 0.039 Oh 100,000.00 3,900.00

J U M L A H 322,710.00

IV PEKERJAAN DINDING

1 P.Ddg 6.2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 2 Ps

Bata merah 140.000 Bh 750.00 105,000.00

Semen 43.500 Kg 1,500.00 65,250.00

Pasir pasang 0.080 M3 130,000.00 5,600.00

Pekerja 0.650 Oh 70,000.00 45,500.00

Tukang 0.200 Oh 80,000.00 16,000.00

Kepala Tukang 0.020 Oh 90,000.00 1,800.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 242,150.00

2 P.Ddg 6.2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 4 Ps

Bata merah 5 x 11 x 22 cm 140.000 Bh 750.00 105,000.00

Semen 26.550 Kg 1,500.00 39,825.00

Pasir pasang 0.093 M3 130,000.00 12,090.00

Pekerja 0.650 Oh 70,000.00 45,500.00

Tukang 0.200 Oh 80,000.00 16,000.00

Kepala Tukang 0.020 Oh 90,000.00 1,800.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 223,215.00

3 P.Ddg 6.9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps

Bata merah 5 x 11 x 22 cm 70.000 Bh 750.00 52,500.00

Semen 18.950 Kg 1,500.00 28,425.00

Pasir pasang 0.038 M3 130,000.00 4,940.00

Pekerja 0.320 Oh 70,000.00 22,400.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.015 Oh 100,000.00 1,500.00

J U M L A H 118,665.00

4 P.Ddg 6.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps ( untuk 1 m3 = 10 x nya )

Bata merah 5 x 11 x 22 cm 70.000 Bh 750.00 52,500.00

Semen 11.500 Kg 1,500.00 17,250.00

Pasir pasang 0.043 M3 130,000.00 5,590.00

Pekerja 0.320 Oh 70,000.00 22,400.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.015 Oh 100,000.00 1,500.00

J U M L A H 108,140.00

V. PEKERJAAN PLESTERAN

1 P.Pls 6.2 1 M2 PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM

Semen 8.520 Kg 1,500.00 12,780.00

Pasir pasang 0.017 M3 130,000.00 2,210.00

Pekerja 0.200 Oh 70,000.00 14,000.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.0100 Oh 100,000.00 1,000.00

J U M L A H 43,340.00

2 P.Pls 6.3 1 M2 PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM

Semen 5.200 Kg 1,500.00 7,800.00

Pasir pasang 0.020 M3 130,000.00 2,600.00

Pekerja 0.200 Oh 70,000.00 14,000.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.010 Oh 100,000.00 1,000.00

J U M L A H 38,750.00

3 P.Pls 6.25 1 M2 ACIAN

Semen 5.200 Kg 1,500.00 7,800.00

Pekerja 0.025 Oh 70,000.00 1,750.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.0150 Oh 100,000.00 1,500.00

J U M L A H 23,950.00

4 P.Pls 6.4 1 M2 ROOSTER TERAWANG (12 X 11 X 24 )

Rooster/Terawang 36.000 bh 30,000.00 1,080,000.00

Semen 12.800 Kg 1,500.00 19,200.00

Pasir pasang 0.035 M3 130,000.00 4,550.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.150 Oh 90,000.00 13,500.00

J U M L A H 1,147,150.00

Page 37: BQ

5 P.Pls 6.5 1 M2 GLAAS BLOCK

Glaas block 25.000 bh 35,000.00 875,000.00

Semen 12.800 Kg 1,500.00 19,200.00

Pasir pasang 0.035 M3 130,000.00 4,550.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.150 Oh 90,000.00 13,500.00

J U M L A H 942,150.00

VI. PEKERJAAN KAYU

1 P.Ky 6.2 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KELAS II

Kayu kelas II 1.200 M3 3,500,000.00 4,200,000.00

Pekerja 6.000 Oh 70,000.00 420,000.00

Tukang 18.000 Oh 80,000.00 1,440,000.00

Kepala Tukang 2.000 Oh 90,000.00 180,000.00

Mandor 0.3000 Oh 100,000.00 30,000.00

J U M L A H 6,270,000.00

2 P.Ky 6.8 1 M2 PASANGAN PINTU PANEL KAYU KELAS II

Kayu, papan kelas II 0.040 M3 3,500,000.00 140,000.00

Pekerja 1.000 Oh 70,000.00 70,000.00

Tukang 2.500 Oh 80,000.00 200,000.00

Kepala Tukang 0.250 Oh 90,000.00 22,500.00

Mandor 0.050 Oh 100,000.00 5,000.00

J U M L A H 437,500.00

3 P.Ky 6.10 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KELAS II

Kayu, papan kelas II 0.035 M3 3,500,000.00 122,500.00

Kaca bening 5 mm 0.740 M2 80,000.00 59,200.00

Pekerja 0.800 Oh 70,000.00 56,000.00

Tukang 2.000 Oh 80,000.00 160,000.00

Kepala Tukang 0.200 Oh 90,000.00 18,000.00

Mandor 0.040 Oh 100,000.00 4,000.00

J U M L A H 419,700.00

4 P.Ky 6.13 1 M2 PASANGAN PINTU JENDELA JALUSI KAYU KELAS II

Kayu, papan kelas II 0.064 M3 3,500,000.00 224,000.00

Pekerja 1.000 Oh 70,000.00 70,000.00

Tukang 3.000 Oh 80,000.00 240,000.00

Kepala Tukang 0.300 Oh 90,000.00 27,000.00

Mandor 0.500 Oh 100,000.00 50,000.00

J U M L A H 611,000.00

5 P.Ky 6.17 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KELAS II

Kayu, papan kelas III 0.060 M3 3,500,000.00 210,000.00

Paku campur 0.150 Kg 19,000.00 2,850.00

Pekerja 0.500 Oh 70,000.00 35,000.00

Tukang 2.000 Oh 80,000.00 160,000.00

Kepala Tukang 0.200 Oh 90,000.00 18,000.00

Mandor 0.025 Oh 100,000.00 2,500.00

J U M L A H 428,350.00

6 P.Ky 6.17 1 M2 PASANGAN PINTU TEAKWOOD RANGKAP, RANGKA KAYU KELAS II

Kayu, papan kelas III 0.0196 M3 3,500,000.00 68,600.00

Paku campur 0.030 Kg 19,000.00 570.00

Lem kayu 0.300 Lt 15,000.00 4,500.00

Teakwood 4' x 8' x 4 mm 1.000 Lbr 60,000.00 60,000.00

Pekerja 0.600 Oh 70,000.00 42,000.00

Tukang 2.000 Oh 80,000.00 160,000.00

Kepala Tukang 0.200 Oh 90,000.00 18,000.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 356,670.00

7 P.Ky 6.30 1 M3 PASANGAN KONSTRUKSI KUDA-KUDA KAYU KELAS II + GORDING

Kayu kelas III 1.1000 M3 2,000,000.00 2,200,000.00

Besi strip 15.000 Kg 19,000.00 285,000.00

Paku campur 0.800 Kg 19,000.00 15,200.00

Pekerja 4.000 Oh 70,000.00 280,000.00

Tukang 12.000 Oh 80,000.00 960,000.00

Kepala Tukang 1.200 Oh 90,000.00 108,000.00

Mandor 0.200 Oh 100,000.00 20,000.00

J U M L A H 3,868,200.00

8 P.Ky 6.31 1 M2 PASANGAN KASO + RENG KAYU KELAS II ( RANGKA ATAP )

Kayu kelas II 0.012 M3 3,500,000.00 42,000.00

Paku biasa campur 0.150 Kg 19,000.00 2,850.00

Pekerja 0.100 Oh 70,000.00 7,000.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 61,250.00

Page 38: BQ

9 P.Ky 6.51 1 M1 LISPLANK 2 x ( 3 x 20 ) CM KAYU KELAS II

Kayu, Papan kelas II 0.0145 M3 3,500,000.00 50,750.00

Paku campur 0.060 Kg 19,000.00 1,140.00

Pekerja 0.150 Oh 70,000.00 10,500.00

Tukang 0.250 Oh 80,000.00 20,000.00

Kepala Tukang 0.025 Oh 90,000.00 2,250.00

Mandor 0.075 Oh 100,000.00 7,500.00

J U M L A H 92,140.00

10 P.Ky 6.56 1 M2 PAS. DINDING PEMISAH GYPSUM/GRC RANGKAP, RANGKA KAYU KELAS II

Kayu kelas II Balok 0.0195 M3 3,500,000.00 68,250.00

Kayu kelas IIPapan 0.007 M3 3,500,000.00 24,500.00

Paku campur 0.100 Kg 19,000.00 1,900.00

Lem kayu 0.560 Ltr 15,000.00 8,400.00

Gypsum/BRC 1.000 Lbr 65,000.00 65,000.00

Pekerja 0.150 Oh 70,000.00 10,500.00

Tukang 0.450 Oh 80,000.00 36,000.00

Kepala Tukang 0.045 Oh 90,000.00 4,050.00

Mandor 0.075 Oh 100,000.00 7,500.00

J U M L A H 226,100.00

VII. PEKERJAAN BETON

1 P.Btn 6.1 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

Semen 218.00 Kg 1,500.00 327,000.00

Pasir beton 0.5200 M3 130,000.00 67,600.00

Koral beton 0.870 M3 160,000.00 139,200.00

Pekerja 1.650 Oh 70,000.00 115,500.00

Tukang 0.250 Oh 80,000.00 20,000.00

Kepala Tukang 0.025 Oh 90,000.00 2,250.00

Mandor 0.080 Oh 100,000.00 8,000.00

J U M L A H 679,550.00

2 P.Btn 6.4 1 M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr, TEBAL 5 CM

Semen 10.000 Kg 1,500.00 15,000.00

Pasir beton 0.026 M3 130,000.00 3,380.00

Koral beton 0.044 M3 160,000.00 7,040.00

Pekerja 1.150 Oh 70,000.00 80,500.00

Tukang 0.020 Oh 80,000.00 1,600.00

Kepala Tukang 0.002 Oh 90,000.00 180.00

Mandor 0.006 Oh 100,000.00 600.00

J U M L A H 108,300.00

3 P.Btn 6.13 1 M3 MEMBUAT BETON BERTULANG, 1 Pc : 2 Ps : 3 Split 1/2

Semen 336.00 Kg 1,500.00 504,000.00

Pasir beton 0.540 M3 130,000.00 70,200.00

Koral beton 0.810 M3 160,000.00 129,600.00

Pekerja 2.000 Oh 70,000.00 140,000.00

Tukang 0.350 Oh 80,000.00 28,000.00

Kepala Tukang 0.035 Oh 90,000.00 3,150.00

Mandor 1.000 Oh 100,000.00 100,000.00

J U M L A H 974,950.00

4 P.Btn 6.25 1 KG PEMBESIAN DENGAN BESI POLOS ATAU ULIR

Besi beton (polos / ulir) 1.050 Kg 19,000.00 19,950.00

Kawat beton 0.015 Kg 18,000.00 270.00

Pekerja 0.007 Oh 70,000.00 490.00

Tukang 0.007 Oh 80,000.00 560.00

Kepala Tukang 0.0007 Oh 90,000.00 63.00

Mandor 0.0003 Oh 100,000.00 30.00

J U M L A H 21,363.00

5 P.Btn 6.28 1 M2 PASANGAN BEGISTING UNTUK PONDASI

Kayu, Papan kelas III 0.040 M3 2,000,000.00 80,000.00

Paku campur 0.300 Kg 19,000.00 5,700.00

Minyak Bekisting 0.100 Ltr 20,000.00 2,000.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Tukang 0.260 Oh 80,000.00 20,800.00

Kepala Tukang 0.026 Oh 90,000.00 2,340.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 132,340.00

6 P.Btn 6.29 1 M2 PASANGAN BEGISTING UNTUK SLOOF

Kayu, Papan kelas III 0.045 M3 2,000,000.00 90,000.00

Paku campur 0.300 Kg 19,000.00 5,700.00

Minyak Bekisting 0.100 Ltr 20,000.00 2,000.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Tukang 0.260 Oh 80,000.00 20,800.00

Kepala Tukang 0.026 Oh 90,000.00 2,340.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 142,340.00

7 P.Btn 6.30 1 M2 PASANGAN BEGISTING UNTUK KOLOM

Kayu, Papan kelas III 0.040 M3 2,000,000.00 80,000.00

Paku campur 0.400 Kg 19,000.00 7,600.00

Minyak Bekisting 0.200 Ltr 20,000.00 4,000.00

Balok kayu 0.015 M3 2,000,000.00 30,000.00

Plywood 9 mm 0.350 Lbr 135,000.00 47,250.00

Dolken kayu f 8-10/400 cm 2.000 Btg 13,000.00 26,000.00

Pekerja 0.300 Oh 70,000.00 21,000.00

Tukang 0.330 Oh 80,000.00 26,400.00

Kepala Tukang 0.033 Oh 90,000.00 2,970.00

Mandor 0.006 Oh 100,000.00 600.00

J U M L A H 245,820.00

Page 39: BQ

8 P.Btn 6.31 1 M2 PASANGAN BEGISTING UNTUK BALOK

Kayu, Papan kelas III 0.040 M3 2,000,000.00 80,000.00

Paku campur 0.400 Kg 19,000.00 7,600.00

Minyak Bekisting 0.200 Ltr 20,000.00 4,000.00

Balok kayu 0.018 M3 2,000,000.00 36,000.00

Plywood 9 mm 0.350 Lbr 135,000.00 47,250.00

Dolken kayu f 8-10/400 cm 2.000 Btg 13,000.00 26,000.00

Pekerja 0.320 Oh 70,000.00 22,400.00

Tukang 0.330 Oh 80,000.00 26,400.00

Kepala Tukang 0.033 Oh 90,000.00 2,970.00

Mandor 0.006 Oh 100,000.00 600.00

J U M L A H 253,220.00

9 P.Btn 6.32 1 M2 PASANGAN BEGISTING UNTUK LANTAI

Kayu, kelas III 0.040 M3 2,000,000.00 80,000.00

Paku campur 0.400 Kg 19,000.00 7,600.00

Minyak Bekisting 0.200 Ltr 20,000.00 4,000.00

Balok kayu 0.015 M3 2,000,000.00 30,000.00

Plywood 9 mm 0.350 Lbr 135,000.00 47,250.00

Dolken kayu f 8-10/400 cm 6.000 Btg 13,000.00 78,000.00

Pekerja 0.320 Oh 70,000.00 22,400.00

Tukang 0.330 Oh 80,000.00 26,400.00

Kepala Tukang 0.033 Oh 90,000.00 2,970.00

Mandor 0.006 Oh 100,000.00 600.00

J U M L A H 299,220.00

10 Supl.Btn.A1 1 M3 BETON PONDASI PLAT, KOLOM 40/40 ( 100 Cm x 100 Cm )

P.Btn 6.13 Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

P.Btn 6.25 Besi beton (polos / ulir) 103.308 Kg 21,363.00 2,206,968.80

P.Btn 6.30 Begisting 3.942 M2 245,820.00 969,022.44

J U M L A H 4,150,941.24

11 Supl.Btn.B 1 M3 BETON SLOOF,20/30

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 120.275 Kg 21,363.00 2,569,435.68

Begisting 10.000 M2 142,340.00 1,423,400.00

J U M L A H 4,967,785.68

12 Supl.Btn.B1 1 M3 BETON SLOOF,13/13

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 135.411 Kg 21,363.00 2,892,787.85

Begisting 15.385 M2 142,340.00 2,189,846.15

J U M L A H 6,057,584.00

13 Supl.Btn.C 1 M3 BETON KOLOM PRAKTIS

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 135.411 Kg 21,363.00 2,892,787.85

Begisting 15.385 M2 142,340.00 2,189,846.15

J U M L A H 6,057,584.00

14 Supl.Btn.D 1 M3 BETON KOLOM 25/25

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 117.530 Kg 21,363.00 2,510,793.39

Begisting 10.000 M2 142,340.00 1,423,400.00

J U M L A H 4,909,143.39

15 Supl.Btn.E 1 M3 BETON KOLOM 40/60

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 116.790 Kg 21,363.00 2,494,979.64

Begisting 8.750 M2 142,340.00 1,245,475.00

J U M L A H 4,715,404.64

16 Supl.Btn.F 1 M3 BETON BALOK ATAS KUSEN 15/15

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 155.624 Kg 21,363.00 3,324,595.51

Begisting 10.000 M2 142,340.00 1,423,400.00

J U M L A H 5,722,945.51

17 Supl.Btn.G 1 M3 BETON BALOK GANTUNG SELASAR 15/15

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 203.780 Kg 21,363.00 4,353,352.14

Begisting 10.000 M2 142,340.00 1,423,400.00

J U M L A H 6,751,702.14

18 Supl.Btn.H 1 M3 BETON RING BALOK 25/50

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 148.481 Kg 21,363.00 3,171,995.74

Begisting 12.800 M2 142,340.00 1,821,952.00

J U M L A H 5,968,897.74

19 Supl.Btn.J 1 M3 BETON KOLOM 15X15 Cm

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 203.780 Kg 21,363.00 4,353,352.14

Begisting 10.000 M2 245,820.00 2,458,200.00

J U M L A H 7,786,502.14

20 Supl.Btn.L 1 M3 BETON Bertulang T = 7 Cm

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 46.700 Kg 21,363.00 997,652.10

Begisting 12.727 M2 299,220.00 3,808,172.94

J U M L A H 5,780,775.04

21 Supl.Btn.M 1 M3 BETON LISPLANK T = 7 cm

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 79.460 Kg 21,363.00 1,697,503.98

Begisting 23.333 M2 299,220.00 6,981,700.26

J U M L A H 9,654,154.24

Page 40: BQ

22 Supl.Btn.N 1 M3 DAK BETON T = 10 Cm

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 98.640 Kg 21,363.00 2,107,246.32

Begisting 14.000 M2 299,220.00 4,189,080.00

J U M L A H 7,271,276.32

23 Supl.Btn.O 1 M3 BETON PENUTUP SEPTICK TANK T = 10 Cm

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 98.640 Kg 21,363.00 2,107,246.32

Begisting 14.000 M2 299,220.00 4,189,080.00

J U M L A H 7,271,276.32

24 Supl.Btn.P 1 M3 BETON RABAT TULANGAN

Beton Bertulang 1 : 2 : 3 1.000 M3 974,950.00 974,950.00

Besi beton (polos / ulir) 48.125 Kg 21,363.00 1,028,094.38

Begisting 6.667 M2 299,220.00 1,994,800.00

J U M L A H 3,997,844.38

VIII. PEKERJAAN PENUTUP ATAP

1 P.Atp 6.30 1 M2 RANGKA BAJA RINGAN

Lysaght Smart C.75.75 3.6000 m1 30,000.00 108,000.00

Reng U TS 40 6.2000 m1 5,833.33 36,166.67

Screw / Dynabolt 31.0000 Pcs 1,500.00 46,500.00

Valley Gutter Talang Jurai 0.0300 m1 65,000.00 1,950.00

Stap Bracing 0.7000 m1 7,000.00 4,900.00

Pekerja 0.1000 Oh 70,000.00 7,000.00

Tukang 0.1000 Oh 80,000.00 8,000.00

Kepala Tukang 0.0500 Oh 90,000.00 4,500.00

Mandor 0.0100 Oh 100,000.00 1,000.00

Alat bantu 1.0000 Ls 10,000.00 10,000.00

J U M L A H 228,016.67

2 P.Atp 6.31 1M² PASANGAN ATAP GENTENG METAL (T. 0,3mm)

Genteng Metal (T.0,3 mm) 1.1000 M2 38,000.00 41,800.00

Paku atap genteng 0.0508 Kg 50.00 2.54

Pekerja 0.2000 Org/h 70,000.00 14,000.00

Tukang 0.1000 Org/h 80,000.00 8,000.00

Kepala Tukang 0.0100 Org/h 90,000.00 900.00

Mandor 0.0010 Org/h 100,000.00 100.00

J U M L A H 64,802.54

3 P.Atp 6.36 1 M1 PASANGAN NOK GENTENG METAL

Nok genteng metal 1.100 Bh 40,000.00 44,000.00

Paku atap 0.050 Kg 50.00 2.50

Pekerja 0.250 Oh 70,000.00 17,500.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.013 Oh 100,000.00 1,300.00

J U M L A H 76,152.50

4 P.Atp 7.1 1M² PASANGAN ATAP SPANDEK

Atap Spandek 0.700 Lbr 110,000.00 77,000.00

Baut 0.020 Kg 500.00 10.00

Pekerja 0.120 Oh 70,000.00 8,400.00

Tukang 0.060 Oh 80,000.00 4,800.00

Kepala Tukang 0.006 Oh 90,000.00 540.00

Mandor 0.006 Oh 100,000.00 600.00

J U M L A H 91,350.00

IX. PEKERJAAN LANGIT-LANGIT

1 P.LL 6.19 1 M1 LIST LANGIT-LANGIT KAYU PROFIL

List kayu profil 1.100 M 12,500.00 13,750.00

Paku biasa campur 0.010 Kg 19,000.00 190.00

Pekerja 0.050 Oh 70,000.00 3,500.00

Tukang 0.050 Oh 80,000.00 4,000.00

Kepala Tukang 0.005 Oh 90,000.00 450.00

Mandor 0.003 Oh 100,000.00 300.00

J U M L A H 22,190.00

2 P.LL 6.21 1 M2 PASANGAN LANGIT-LANGIT PLYWOOD 3 MM + RANGKA KAYU KELAS III

Kayu kelas III 0.012 M3 2,000,000.00 24,000.00

Paku campur 0.150 Kg 19,000.00 2,850.00

Plywood 3' mm 0.375 Lbr 60,000.00 22,500.00

Pekerja 0.270 Oh 70,000.00 18,900.00

Tukang 0.400 Oh 80,000.00 32,000.00

Kepala Tukang 0.040 Oh 90,000.00 3,600.00

Mandor 0.0140 Oh 100,000.00 1,400.00

J U M L A H 105,250.00

X PEKERJAAN SANITASI

1 P.San 6.2 1 Bh PASANGAN KLOSED JONGKOK PORSELIN

Klosed jongkok 1.000 Bh 250,000.00 250,000.00

Semen 6.000 Kg 1,500.00 9,000.00

Pasir pasang 0.010 M3 130,000.00 1,300.00

Pekerja 1.000 Oh 70,000.00 70,000.00

Tukang 1.500 Oh 80,000.00 120,000.00

Kepala Tukang 1.500 Oh 90,000.00 135,000.00

Mandor 0.160 Oh 100,000.00 16,000.00

J U M L A H 601,300.00

Page 41: BQ

2 P.San 6.5 1 Bh PASANGAN WASTAFEL

Wastafel 1.000 Bh 300,000.00 300,000.00

Perlengkapan (12% Wastafel) 1.000 Ls 36,000.00 36,000.00

Semen 6.000 Kg 1,500.00 9,000.00

Pasir pasang 0.010 M3 130,000.00 1,300.00

Pekerja 1.200 Oh 70,000.00 84,000.00

Tukang 1.450 Oh 80,000.00 116,000.00

Kepala Tukang 0.150 Oh 90,000.00 13,500.00

Mandor 0.100 Oh 100,000.00 10,000.00

J U M L A H 569,800.00

3 P.San 6.7 1 Bh BAK MANDI FIBREGLASS VOLUME 0,30 M3

Bak fibreglass 1.000 Bh 450,000.00 450,000.00

Perlengkapan (18% Wastafel) 1.000 Ls 54,000.00 54,000.00

Pekerja 1.800 Oh 70,000.00 126,000.00

Tukang 2.700 Oh 80,000.00 216,000.00

Kepala Tukang 0.540 Oh 90,000.00 48,600.00

Mandor 0.110 Oh 100,000.00 11,000.00

J U M L A H 905,600.00

4 P.San 6.25 1 M1 PEMASANGAN PIPA PVC TIPE AW DIAMETER 1/2"

Pipa PVC 1.200 M' 8,500.00 10,200.00

Perlengkapan (35% Wastafel) 1.000 Ls 1,020.00 1,020.00

Pekerja 0.036 Oh 70,000.00 2,520.00

Tukang 0.060 Oh 80,000.00 4,800.00

Kepala Tukang 0.0060 Oh 90,000.00 540.00

Mandor 0.0018 Oh 100,000.00 180.00

J U M L A H 19,260.00

5 P.San 6.32 1 M1 PEMASANGAN PIPA PVC TIPE AW DIAMETER 4"

Pipa PVC 1.200 M' 65,000.00 78,000.00

Perlengkapan (35% Wastafel) 1.000 Ls 22,750.00 22,750.00

Pekerja 0.081 Oh 70,000.00 5,670.00

Tukang 0.135 Oh 80,000.00 10,800.00

Kepala Tukang 0.0135 Oh 90,000.00 1,215.00

Mandor 0.0041 Oh 100,000.00 410.00

J U M L A H 118,845.00

6 P.San 6.32 1 M1 PEMASANGAN PIPA PVC TIPE AW DIAMETER 5"

Pipa PVC 1.200 M' 75,000.00 90,000.00

Perlengkapan (35% Wastafel) 1.000 Ls 26,250.00 26,250.00

Pekerja 0.081 Oh 70,000.00 5,670.00

Tukang 0.135 Oh 80,000.00 10,800.00

Kepala Tukang 0.0135 Oh 90,000.00 1,215.00

Mandor 0.0041 Oh 100,000.00 410.00

J U M L A H 134,345.00

7 P.San 6.35 1 BH KRAN AIR DIAMETER 3/4" ATAU 1/2 "

Kran air 1.000 Bh 27,500.00 27,500.00

Seel tape 0.025 Bh 10,000.00 250.00

Pekerja 0.010 Oh 70,000.00 700.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 37,850.00

8 P.San 6. A 1 BH SEPTICTANK 1,5 x 2,0 M dan RESAPAN

Galian tanah 10.500 M3 47,000.00 493,500.00

Urugan kembali 2.625 M3 15,340.00 40,267.50

Pasangan Batu Bata 1 : 2 8.400 M2 118,665.00 996,786.00

Beton tumbuk 1 : 3 : 5 0.300 M3 679,550.00 203,865.00

Plesteran 1 : 2 13.500 M2 43,340.00 585,090.00

Plat beton 1 : 2 ; 3 0.200 M3 974,950.00 194,990.00

Pipa hawa 2 " 1.000 Bh 65,000.00 65,000.00

Koral beton 0.750 M3 160,000.00 120,000.00

Pasir pasang 1.000 M3 130,000.00 130,000.00

Pipa Dia 4 " 4.000 M' 65,000.00 260,000.00

Pekerja 0.010 Oh 70,000.00 700.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 3,090,198.50

XI PEKERJAAN BESI DAN ALUMUNIUM

1 P.B&A 6.18 1 M1 TALANG DATAR, SENG BJLS 20

Seng plat 3' x 6 ' bjls 20 0.500 Lbr 35,000.00 17,500.00

Paku biasa 0.015 Kg 19,000.00 285.00

Kayu, papan klas III 0.0096 M3 2,000,000.00 19,200.00

Flincote/ Meni besi 0.250 Kg 17,500.00 4,375.00

Pekerja 0.150 Oh 70,000.00 10,500.00

Tukang 0.400 Oh 80,000.00 32,000.00

Kepala Tukang 0.025 Oh 90,000.00 2,250.00

Mandor 0.00125 Oh 100,000.00 125.00

JUMLAH 86,235.00

2 P.B&A 6.19 1 M1 TALANG MIRING, SENG BJLS 20

Seng plat 3' x 6 ' bjls 20 0.500 Lbr 35,000.00 17,500.00

Paku campur 0.015 Kg 19,000.00 285.00

Kayu, papan klas III 0.019 M3 2,000,000.00 38,000.00

Flincote/ Meni besi 0.300 Kg 17,500.00 5,250.00

Pekerja 0.040 Oh 70,000.00 2,800.00

Tukang 0.400 Oh 80,000.00 32,000.00

Kepala Tukang 0.025 Oh 90,000.00 2,250.00

Mandor 0.00125 Oh 100,000.00 125.00

J U M L A H 98,210.00

Page 42: BQ

3 P.B&A 7.1 1 M1 PASANGAN GRILL PENUTUP SALURAN

Besi Siku 10.368 Kg 10,000.00 103,675.00

Besi 6.320 Kg 19,000.00 120,080.00

Las 15.000 ttk 1,350.00 20,250.00

Pekerja 0.400 Oh 70,000.00 28,000.00

Tukang 0.200 Oh 80,000.00 16,000.00

Kepala Tukang 0.020 Oh 90,000.00 1,800.00

Mandor 0.020 Oh 100,000.00 2,000.00

J U M L A H 291,805.00

XII PEKERJAAN KUNCI DAN KACA

1 P.K&K 6.1 1 BH PASANG KUNCI TANAM ANTIK / KUNCI GAGANG

Kunci tanam antik 1.000 Bh 200,000.00 200,000.00

Pekerja 0.060 Oh 70,000.00 4,200.00

Tukang 0.600 Oh 80,000.00 48,000.00

Kepala Tukang 0.060 Oh 90,000.00 5,400.00

Mandor 0.003 Oh 100,000.00 300.00

J U M L A H 257,900.00

2 P.K&K 6.2 1 BH PASANG KUNCI TANAM BIASA

Kunci tanam biasa 1.000 Bh 102,000.00 102,000.00

Pekerja 0.010 Oh 70,000.00 700.00

Tukang 0.500 Oh 80,000.00 40,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.005 Oh 100,000.00 500.00

J U M L A H 144,100.00

3 P.K&K 6.3 1 BH PASANG KUNCI TANAM KAMAR MANDI

Kunci tanam kamar mandi 1.000 Bh 175,000.00 175,000.00

Pekerja 0.005 Oh 70,000.00 350.00

Tukang 0.500 Oh 80,000.00 40,000.00

Kepala Tukang 0.005 Oh 90,000.00 450.00

Mandor 0.0025 Oh 100,000.00 250.00

J U M L A H 216,050.00

4 P.K&K 6.5 1 BH PASANG ENGSEL PINTU

Engsel pintu 1.000 Bh 17,500.00 17,500.00

Pekerja 0.015 Oh 70,000.00 1,050.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.00075 Oh 100,000.00 75.00

J U M L A H 31,975.00

5 P.K&K 6.6 1 BH PASANG ENGSEL JENDELA KUPU-KUPU

Engsel jendela 1.000 Bh 12,500.00 12,500.00

Pekerja 0.010 Oh 70,000.00 700.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.010 Oh 90,000.00 900.00

Mandor 0.00050 Oh 100,000.00 50.00

J U M L A H 22,150.00

6 P.K&K 6.9 1 BH PASANG KAIT ANGIN

Kait angin 1.000 Bh 12,500.00 12,500.00

Pekerja 0.015 Oh 70,000.00 1,050.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.00075 Oh 100,000.00 75.00

J U M L A H 26,975.00

7 P.K&K 6.11 1 BH PASANG KUNCI SELOT

Kunci gerendel 1.000 Bh 7,500.00 7,500.00

Pekerja 0.020 Oh 70,000.00 1,400.00

Tukang 0.200 Oh 80,000.00 16,000.00

Kepala Tukang 0.020 Oh 90,000.00 1,800.00

Mandor 0.001 Oh 100,000.00 100.00

J U M L A H 26,800.00

8 P.K&K 6.16 1 M2 PASANGAN KACA TEBAL 5 MM

Kaca bening 1.100 M2 80,000.00 88,000.00

Pekerja 0.015 Oh 70,000.00 1,050.00

Tukang 0.150 Oh 80,000.00 12,000.00

Kepala Tukang 0.015 Oh 90,000.00 1,350.00

Mandor 0.00075 Oh 100,000.00 75.00

J U M L A H 102,475.00

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 P.Pld 6.44 1 M2 PASANGAN LANTAI KERAMIK 20 X 20 CM

Keramik 20 x 20 cm 25.000 Bh 5,000.00 125,000.00

Semen 11.380 Kg 1,500.00 17,070.00

Pasir pasang 0.042 M3 130,000.00 5,460.00

Semen warna 1.5000 Kg 2,000.00 3,000.00

Pekerja 0.620 Oh 70,000.00 43,400.00

Tukang 0.350 Oh 80,000.00 28,000.00

Kepala Tukang 0.035 Oh 90,000.00 3,150.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 228,080.00

2 P.Pld 6.47 1 M2 PASANGAN LANTAI KERAMIK 40 X 40 CM

Keramik 40 x 40 cm 9.000 Bh 7,777.78 70,000.00

Semen 10.000 Kg 1,500.00 15,000.00

Pasir pasang 0.042 M3 130,000.00 5,460.00

Semen warna 1.500 Kg 2,000.00 3,000.00

Pekerja 0.620 Oh 70,000.00 43,400.00

Tukang 0.350 Oh 80,000.00 28,000.00

Kepala Tukang 0.035 Oh 90,000.00 3,150.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 171,010.00

Page 43: BQ

3 P.Pld 6.47.a 1 M2 PASANGAN LANTAI KERAMIK 40 X 40 CM (TEKSTUR)

Keramik 40 x 40 cm (Tekstur) 11.000 Bh 8,333.33 91,666.67

Semen 10.000 Kg 1,500.00 15,000.00

Pasir pasang 0.042 M3 130,000.00 5,460.00

Semen warna 1.500 Kg 2,000.00 3,000.00

Pekerja 0.620 Oh 70,000.00 43,400.00

Tukang 0.350 Oh 80,000.00 28,000.00

Kepala Tukang 0.035 Oh 90,000.00 3,150.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 192,676.67

4 P.Pld 6.68 1 M2 PASANGAN DINDING KERAMIK 20 X 25 CM

Keramik 20 x 25 cm 20.000 Bh 6,000.00 120,000.00

Semen 9.300 Kg 1,500.00 13,950.00

Pasir pasang 0.018 M3 130,000.00 2,340.00

Semen warna 1.500 Kg 2,000.00 3,000.00

Pekerja 0.600 Oh 70,000.00 42,000.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.045 Oh 90,000.00 4,050.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 196,340.00

5 P.Pld 6.69 1 M2 PASANGAN DINDING KERAMIK 25 x 40 CM

Keramik 25 x 40 cm 10.000 Bh 25,000.00 250,000.00

Semen 9.300 Kg 1,500.00 13,950.00

Pasir pasang 0.018 M3 130,000.00 2,340.00

Semen warna 1.500 Kg 2,000.00 3,000.00

Pekerja 0.600 Oh 70,000.00 42,000.00

Tukang 0.100 Oh 80,000.00 8,000.00

Kepala Tukang 0.045 Oh 90,000.00 4,050.00

Mandor 0.030 Oh 100,000.00 3,000.00

J U M L A H 326,340.00

XIV PEKERJAAN PENGECATAN

1 P.Cat 6.8 1 M2 PENGECATAN BIDG.KAYU BARU (1 lps Plamir), 1 Lps Cat dasar, 2 Lps Cat Penutup.

Cat meni 0.200 Kg 17,500.00 3,500.00

Plamir 0.150 Kg 17,500.00 2,625.00

Cat dasar kayu 0.170 Kg 40,000.00 6,800.00

Cat penutup 2 kali 0.260 Kg 27,500.00 7,150.00

Pekerja 0.070 Oh 70,000.00 4,900.00

Tukang 0.009 Oh 80,000.00 720.00

Kepala Tukang 0.006 Oh 90,000.00 540.00

Mandor 0.0025 Oh 100,000.00 250.00

J U M L A H 26,485.00

2 P.Cat 6.11 1 M2 PENGECATAN BESI (Lapis Meni )

Meni Besi 0.150 Ltr 17,500.00 2,625.00

Cat Warna Besi 0.372 Ltr 45,000.00 16,740.00

Ampelas 2.000 Lbr 4,500.00 9,000.00

Pekerja 0.070 Oh 70,000.00 4,900.00

Tukang 0.060 Oh 80,000.00 4,800.00

Kepala Tukang 0.016 Oh 90,000.00 1,440.00

Mandor 0.0025 Oh 100,000.00 250.00

J U M L A H 39,755.00

3 P.Cat 6.14 1 M2 PENGECATAN TEMBOK BARU (1 lps Plamir, 1 Lps Cat dasar, 2 Lps Cat Penutup.)

Plamir 0.100 Kg 17,500.00 1,750.00

Cat dasar 0.100 Kg 25,000.00 2,500.00

Cat penutup 2 kali 0.260 Kg 25,000.00 6,500.00

Pekerja 0.020 Oh 70,000.00 1,400.00

Tukang 0.063 Oh 80,000.00 5,040.00

Kepala tukang 0.0063 Oh 90,000.00 567.00

Mandor 0.0025 Oh 100,000.00 250.00

J U M L A H 18,007.00

Lebong, 16 Juli 2015

Dibuat Oleh :

Konsultan Perancana :

CV. CITRA MALINDO DESAIN

JEFRI ANTHONI

Wakil Direktur

Page 44: BQ

DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA

KEGIATAN : PEMBANGUNAN PASAR LELANGPEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMANLOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONGTAHUN ANGGARAN : 2015

A. HARGA BAHAN BATU DAN PASIR1 Koral Rp. 160,000.00 /m3

2 Semen Portland Rp. 1,500.00 /kg

3 Semen Putih / Semen Warna Rp. 2,000.00 /kg

4 Tanah Timbunan Rp. 90,000.00 /m3

5 Pasir Urug Rp. 125,000.00 /m3

6 Pasir Beton Rp. 150,000.00 /m3

7 Pasir Pasang Rp. 130,000.00 /m3

8 Batu Kali Rp. 160,000.00 /m3

9 Batu Bata Rp. 750.00 /bh

B. HARGA BAHAN KAYU1 Tripleks 3 mm Rp. 60,000.00 /lbr

2 GRC Board/gipsum Rp. 65,000.00 /lbr

3 Multypleks 9 mm Rp. 135,000.00 /lbr

4 List Kayu Profil Rp. 12,500.00 /m'

5 List Gypsum Rp. 25,000.00 /m'

6 Kayu Kelas III Rp. 2,000,000.00 /m3

7 Kayu Kelas II Rp. 3,500,000.00 /m3

8 Kayu Dolken Rp. 13,000.00 /btg

C. HARGA BAHAN KACA DAN BESI1 Kaca Bening 5 mm Rp. 80,000.00 /m2

2 Kaca Panasap 5 mm (Kaca Rayban) Rp. 85,000.00 /m2

3 Besi Beton Rp. 19,000.00 /kg

4 Kawat Bendrat Rp. 18,000.00 /kg

5 Paku Halus Rp. 25,000.00 /kg

6 Paku Genteng Rp. 45,000.00 /kg

7 Paku Macam-macam Ukuran Rp. 19,000.00 /kg

8 Paku Skrup Rp. 500.00 /bh

9 Baut Behel/Plat Strip Rp. 17,500.00 /kg

D. HARGA BAHAN PENUTUP LANTAI1 Keramik 40 x 40 cm Rp. 7,000.00 /bh

2 Kearamik Lantai 20 x 20 cm (Anti Slip) Rp. 5,000.00 /bh

3 Keramik Dinding 20 x 25 cm Rp. 6,000.00 /bh

4 Keramik Dinding 25 x40 cm Rp. 25,000.00 /bh

E. HARGA BAHAN PENUTUP ATAP1 Genteng Metal Rp. 38,000.00 /lbr

2 Bubungan Genteng Metal Rp. 40,000.00 /lbr

3 Seng Plat BJLS 20 Rp. 35,000.00 /lbr

4 Lysaght Swmart C.75.75 Rp. 78,000.00 Btg

5 Reng U Ts 40.4.48 Rp. 35,000.00 Btg

6 Screw Dynabolt Rp. 1,500.00 /bh

7 Valley Gutter Talang Jurai Rp. 65,000.00 /bh

8 Strap Bracing Rp. 7,000.00 /bh

F. HARGA BAHAN KUNCI DAN PENGGANTUNG1 Kunci Pintu 2 Slaag Rp. 175,000.00 /bh

2 Engsel Pintu Nylon Rp. 17,500.00 /bh

3 Engsel Jendela Nylon Rp. 12,500.00 /bh

4 Handle Pegangan Pintu Rp. 250,000.00 /bh

5 Handle Pegangan Jendela Rp. 7,500.00 /bh

6 Grendel Jendela Rp. 7,500.00 /bh

7 Grendel Pintu Rp. 12,500.00 /bh

9 Atap Spandek Rp. 110,000.00 /Lbr

8 Hak Angin Jendela Rp. 12,500.00 /bh

Page 45: BQ

G. HARGA BAHAN LISTRIK1 Lampu TL 2 x 18 Watt Grill RM Rp. 125,000.00 /bh

2 Lampu SL 18 Watt + Fitting Rp. 45,000.00 /bh

3 Lampu SL 11 Watt + Fitting Rp. 45,000.00 /bh

4 Lampu Almeteur (Baret) Rp. 125,000.00 /bh

5 Saklar Tunggal Setara Broco Rp. 49,000.00 /bh

6 Saklar Ganda Setara Broco Rp. 52,000.00 /bh

7 Stop Kontak Setara Broco Rp. 15,000.00 /bh

8 Box MCB Rp. 500,000.00 /Unit

9 Instalasi Titik Api Penerangan Rp. 100,000.00 /Titik

10 Instalasi Titik Api Stop Kontak Rp. 100,000.00 /Titik

H. HARGA BAHAN SANITASI / SANITAIR1 Kloset Jongkok Rp. 250,000.00 /bh

2 Kran Air Stainlees Steel Rp. 27,500.00 /bh

3 Kran Air Plastick Rp. 20,000.00 /bh

4 Floor Drain Rp. 75,000.00 /bh

5 Afour Drain Rp. 40,000.00 /bh

6 Shower Rp. 85,000.00 /bh

7 Bak Cuci Stainlees Steel (Ganda) Rp. 1,000,000.00 /bh

8 Bak Cuci Stainlees Steel (engkel) Rp. 750,000.00 /bh

9 Water Drain + Fiber glass Rp. 750,000.00 set

10 Bak Mandi Fibreglass Rp. 450,000.00 /bh

11 Bak Resevoar Fiberglass Kap. 1000 ltr Rp. 700,000.00 /bh

12 Seal Tape Rp. 10,000.00 /bh

13 Pipa AW 1/2" Rp. 8,500.00 m'

14 Pipa Aw 4 " Rp. 65,000.00 m'

15 Pipan AW 5 " Rp. 75,000.00 m'

16 Wastafel Rp. 300,000.00 /bh

I. HARGA BAHAN CAT1 Cat Kayu/besi setara Bee Brand Rp. 45,000.00 /kg

2 Cat Kayu Dasar Rp. 40,000.00 /kg

3 Cat Tembok Setara Metrolite Rp. 27,500.00 /kg

4 Cat Tembok Dasar Rp. 25,000.00 /kg

5 Dempul Rp. 20,000.00 /kg

6 Plamir Rp. 17,500.00 /kg

7 Amplas Rp. 4,500.00 /lbr

8 Cat Menie Rp. 17,500.00 /kg

9 Minyak Cat Rp. 12,500.00 /kg

10 Lem Kayu Rp. 15,000.00 /kg

11 Compound Rp. 5,000.00 /kg

12 Minyak Bekisting Rp. 20,000.00 /ltr

J. UPAH KERJA1 Pekerja Rp. 70,000.00 /hari

2 Tukang Batu, Tukang Kayu, Tukang Besi da Rp. 80,000.00 /hari

3 Kepala Tukang Rp. 90,000.00 /hari

4 Mandor Rp. 100,000.00 /hari

Lebong, 16 Juli 2015

Dibuat Oleh :Konsultan Perancana :

CV. CITRA MALINDO DESAIN

JEFRI ANTHONIWakil Direktur

Page 46: BQ

BILL OF QUANTITY (BQ)

KEGIATAN : PEMBANGUNAN PASAR LELANGPEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMAN

LOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONG

TAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN VOLUME KODE SAT HARGA JUMLAH

PEK. ANALISA SATUAN (Rp)

1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN

1 Pek.Pengukuran dan Pembersihan 1.00 ls m' 5,000,000.00 5,000,000.00

2 Pek. Pagar Pengaman 132.00 ABK-Pper 6.5 m' 266,942.50 35,236,410.00

3 Pekerjaan Pas. Bowplank 120.00 ABK-Pper 6.4 m' 33,880.00 4,065,600.00

4 Gudang, Barak Kerja dan Direksikeet 36.00 P.Per 6.6 m2 399,300.00 14,374,800.00

5 P3K 1.00 ls unit 550,000.00 550,000.00

6 Scurity/ Keamanan Proyek 2.00 ls 4 bln 3,000,000.00 6,000,000.00

7 Pengadaan Listrik Kerja/ Air Kerja 1.00 ls unit 1,000,000.00 1,000,000.00

8 Papan Nama Proyek 1.00 ls bh 500,000.00 500,000.00

Sub Jumlah Pekerjaan Persiapan 66,726,810.00

II PEKERJAAN BONGKARAN BANGUNAN LAMA

1 Pekerjaan Bongkaran Bangunan Lama 1.00 ls unit 15,000,000.00 15,000,000.00

Sub Jumlah Pekerjaan Bongkaran 15,000,000.00

III PEKERJAAN TANAH DAN PASIR

1 Galian Tanah Pondasi 166.32 P.Tnh 6.1 m3 47,000.00 7,817,040.00

2 Galian Tanah Pondasi Plat 56.16 P.Tnh 6.1 m3 47,000.00 2,639,520.00

3 Galian Tanah Pondasi Jalan 117.52 P.Tnh 6.1 m3 47,000.00 5,523,252.00

4 Galian Tanah Pondasi Plat Decker 12.15 P.Tnh 6.1 m3 47,000.00 571,050.00

5 Galian Tanah Saluran 142.17 P.Tnh 6.1 m3 47,000.00 6,681,825.50

6 Galian Tanah Gound Tank 12.50 P.Tnh 6.1 m3 47,000.00 587,500.00

7 Urugan Tanah Kembali 164.77 P.Tnh 6.9 m3 15,340.00 2,527,584.58

8 Urugan Tanah Bawah Lantai 120.50 Sup Tnh 6.9 m3 123,340.00 14,862,963.36

9 Urugan Pasir Bawah Pondasi 60.29 P.Tnh 6.11 m3 172,000.00 10,370,310.00

10 Urugan Pasir Bawah Lantai 40.17 P.Tnh 6.11 m3 172,000.00 6,908,896.00

Sub Jumlah Pekerjaan Tanah dan Pasir 58,489,941.44

IV PEKERJAAN PASANGAN, BATU DAN BETON

1 Pasangan Batu Kosong ( Aanstamping ) 36.96 P.Pon 6.14 m3 322,710.00 11,927,361.60

2 Pasangan Pondasi Batu Kali 1 : 4 72.76 P.Pon 6.5 m3 654,000.00 47,588,310.00

3 Pasangan Pondasi Batu Kali 1:4 Jalan 46.17 P.Pon 6.5 m3 654,000.00 30,193,218.00

4 Pasangan Pondasi Batu Kali 1:4 Plat Decker 7.47 P.Pon 6.5 m3 654,000.00 4,885,380.00

5 Pek. Cor Beton Bertulang di Bawah Lantai t=15 cm 60.25 Supl.Btn.P m3 3,997,844.38 240,878,119.28

6 Pek. Cor Beton Rabat t=15cm 44.91 Supl.Btn.P m3 679,550.00 30,516,521.27

7 Pek. Beton Tumbuk Bawah Saluran 1:3:5 14.22 P.Btn 6.1 m3 679,550.00 9,660,924.51

8 Lantai Kerja Pond. Plat Setempat 1:3:5 3.74 P.Btn 6.1 m3 679,550.00 2,544,235.20

9 Pek. Beton 1 : 2 : 3 Untuk :

- Pondasi Plat Setempat 1 : 2 : 3 8.42 Supl.Btn.A1 m3 4,150,941.24 34,967,529.04

- Beton Sloof 20/30 cm 0.30 Supl.Btn.B m3 4,967,785.68 1,490,335.70

- Beton Sloof 13/13 cm 0.67 Supl.Btn.B1 m3 6,057,584.00 4,041,692.74

- Beton Kolom 40/60 cm 6.01 Supl.Btn.E m3 4,715,404.64 28,320,720.29

- Beton Kolom 13/13 0.70 Supl.Btn.C m3 6,057,584.00 4,258,723.86

- Ring Balok 25/50 26.25 Supl.Btn.H m3 5,968,897.74 156,683,565.69

- Cor Beton bertulang Jalan t=15cm 74.69 Supl.Btn.P m3 3,997,844.38 298,608,990.98

- Beton Cor Meja Beton Los Ikan/Daging 2.21 Supl.Btn.L m3 5,780,775.04 12,763,951.29

- Beton Cor Plat Decker T = 15 cm 1.35 Supl.Btn.N m3 7,271,276.32 9,816,223.03

- Beton Cor T = 12 cm (Penutup Ground Tank) 0.63 Supl.Btn.O m3 7,271,276.32 4,615,806.21

10 Pas. Dinding Batu Bata 1 : 4 26.60 P.Ddg 6.11 m2 108,140.00 2,876,524.00

11 Pas. Dinding Batu Bata 1 : 2 (Ground Tank) 9.00 P.Ddg 6.2 m2 242,150.00 2,179,350.00

12 Pek. Pasangan Saluran Air 406.19 ls m' 100,000.00 40,619,000.00

13 Plesteran Dinding Bata 1:2 (Ground Tank) 18.00 P.Pls 6.2 m2 43,340.00 780,120.00

14 Plesteran Dinding Bata 1:4 53.20 P.Pls 6.3 m2 38,750.00 2,061,500.00

15 Acian Dinding, Kolom dan Ground Tank 423.70 P.Pls 6.25 m2 23,950.00 10,147,615.00

16 Pasangan Keramik Lantai 40 x 40 cm 344.08 P.Pld 6.47 m2 171,010.00 58,841,120.80

17 Pasangan Keramik Lantai 40 x 40 cm (Tekstur) 69.56 P.Pld 6.47.a m2 192,676.67 13,402,588.93

18 Pasangan Keramik Meja Beton 25 x 25 cm 18.40 P.Pld 6.68 m2 196,340.00 3,612,656.00

19 Pasangan Keramik Meja Beton 25 x 40 cm 49.20 P.Pld 6.69 m2 326,340.00 16,055,928.00

20 Pasangan Pintu Besi Man Hole dan kunci 1.00 ls bh 500,000.00 500,000.00

21 Pasangan Grill Besi Saluran Air 406.19 P.B&A 7.1 m2 291,805.00 118,528,272.95

Page 47: BQ

1,203,366,284.36

Page 48: BQ

NO URAIAN PEKERJAAN VOLUME KODE

SAT HARGA JUMLAH

PEK. ANALISA SATUAN (Rp)

1 2 3 4 5 6 7

V PEKERJAAN ATAP

1 Pas. Kuda-kuda Baja Ringan 711.46 P.Atp 6.30 m2 228,016.67 162,225,695.34

2 Pas. Atap Genteng Metal 711.46 P.Atp 6.31 m2 64,802.54 46,104,687.28

3 Pas. Nok/Bubungan Genteng Metal 32.11 P.Atp 6.36 m' 76,152.50 2,445,256.78

4 Pas. Penutup Sandek 127.34 P.Atp 7.1 m2 91,350.00 11,632,527.27

5 Pas. Listplank GRC Double 118.90 ls m' 100,000.00 11,890,000.00

Sub Jumlah Pekerjaan Atap dan Plafond 234,298,166.66

VI PEKERJAAN INSTALASI LISTRIK DAN TITIK API

1 Pas. Lampu SL + Fitting Cup 15.00 ls bh 110,000.00 1,650,000.00

2 Pas. Saklar Tunggal 1.00 ls bh 49,000.00 49,000.00

3 Pas. Saklar Ganda 2.00 ls bh 52,000.00 104,000.00

4 Pas. Box MCB 1.00 ls bh 500,000.00 500,000.00

5 Instalasi Titik Lampu 15.00 Ls Bh 100,000.00 1,500,000.00

6 Instalasi Titik Api 3.00 ls titik 100,000.00 300,000.00

Sub Jumlah Pekerjaan Instalasi Listrik dan Titik Api 4,103,000.00

VII PEKERJAAN INSTALASI AIR BERSIH

1 Pembuatan Tower Air 1.00 ls unit 7,500,000.00 7,500,000.00

2 Tedmond Kapasitas 1,5 m3 (Stainless Steel) 1.00 ls bh 4,000,000.00 4,000,000.00

3 Pemasukan PDAM + Pas. Instalasi Pipa Air Bersih 1.00 ls unit 3,000,000.00 3,000,000.00

4 Pas. Stop Kran 3/4" 1.00 P.San 6.35 bh 37,850.00 37,850.00

5 Pas. Stop Kran 1/2" 2.00 P.San 6.35 bh 37,850.00 75,700.00

6 Pas. Kran Air Dia 1/2" 4.00 P.San 6.35 bh 37,850.00 151,400.00

7 Pas. Pompa Air (Jet Pump) 1.00 unit bh 4,500,000.00 4,500,000.00

Sub Jumlah Pekerjaan Instalasi Air Bersih 19,264,950.00

VIII PEKERJAAN PENGECATAN

1 Pekerjaan Cat Kolom dan Cat Balok 328.50 P.Cat 6.14 m2 18,007.00 5,915,299.50

2 Pekerjaan Cat Dinding Tembok 50.04 P.Cat 6.14 m2 18,007.00 901,070.28

3 Pekerjaan Cat Plint 378.54 ls m' 18,800.00 7,116,552.00

Sub Jumlah Pekerjaan Pengecatan 13,932,921.78

IX PEKERJAAN LAIN-LAIN

1 Pek.Pembersihan Akhir 1.00 ls unit 500,000.00 500,000.00

2 Administrasi dan Pelaporan 1.00 ls unit 2,500,000.00 2,500,000.00

Sub Jumlah Pekerjaan Lain-Lain 3,000,000.00

Lebong, 16 Juli 2015

Dibuat Oleh :

Konsultan Perancana :

CV. CITRA MALINDO DESAIN

JEFRI ANTHONI

Wakil Direktur

Page 49: BQ

REKAPITULASI

KEGIATAN : PEMBANGUNAN PASAR LELANGPEKERJAAN : PEMBANGUNAN PASAR TRADISIONAL MODEREN MUARA AMANLOKASI : PASAR TERMINAL MUARA AMAN KEC. AMEN KABUPATEN LEBONGTAHUN ANGGARAN : 2015

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN Rp 66,726,810.00

II PEKERJAAN BONGKARAN BANGUNAN LAMA Rp 15,000,000.00

III PEKERJAAN TANAH DAN PASIR Rp 58,489,941.44

IV PEKERJAAN PASANGAN, BATU DAN BETON Rp 1,203,366,284.36

V PEKERJAAN ATAP Rp 234,298,166.66

VI PEKERJAAN INSTALASI LISTRIK DAN TITIK API Rp 4,103,000.00

VII PEKERJAAN INSTALASI AIR BERSIH Rp 19,264,950.00

VIII PEKERJAAN PENGECATAN Rp 13,932,921.78

IX PEKERJAAN LAIN-LAIN Rp 3,000,000.00

A JUMLAH Rp 1,618,182,074.25 B PPN 10% Rp 161,818,207.42 C TOTAL Rp 1,780,000,281.67 D DIBULATKAN Rp 1,780,000,000.00

Terbilang : Satu Milyard Tujuh Ratus Delapan Puluh Juta Ribu Rupiah

Lebong, 16 Juli 2015

Dibuat Oleh :

Konsultan Perancana :

CV. CITRA MALINDO DESAIN

JEFRI ANTHONI

Wakil Direktur